CN110245768A CN201810189169.4A CN201810189169A CN110245768A CN 110245768 A CN110245768 A CN 110245768A CN 201810189169 A CN201810189169 A CN 201810189169A CN 110245768 A CN110245768 A CN 110245768A
Authority
CN
China
Prior art keywords
load
load prediction
prediction
distribution network
planning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810189169.4A
Other languages
Chinese (zh)
Inventor
武文毳
赵培军
柳创
任广东
陶宇鑫
李�杰
杨红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Xinjiang Electric Power Co Ltd Bortala Power Supply Co
Original Assignee
State Grid Xinjiang Electric Power Co Ltd Bortala Power Supply Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Xinjiang Electric Power Co Ltd Bortala Power Supply Co filed Critical State Grid Xinjiang Electric Power Co Ltd Bortala Power Supply Co
Priority to CN201810189169.4A priority Critical patent/CN110245768A/en
Publication of CN110245768A publication Critical patent/CN110245768A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention provides a kind of distribution network planning method, include the following steps: to carry out future load forecast and recent load prediction to planning region, obtain load prediction results: future load forecast includes township load prediction, rural resident's life and electric heating load prediction and agriculture load prediction, and recent load prediction includes natural increase load prediction, large user's load prediction and electric heating load prediction;Carry out power distribution network As-Is Assessment to planning region, obtain assessment result: power distribution network As-Is Assessment includes substation's analysis and medium-voltage line analysis;According to load prediction results and assessment result, determines substation location, grid structure, calculates substation capacity demand and capacity-load ratio check.The beneficial effects of the invention are as follows the construction that can optimize power grid;Distribution network construction and the project amount of transformation, scale of investment arrangement more rationalize.

Description

A kind of power distribution network unit style division methods
Technical field
The present invention relates to electric power electric technical fields, more particularly, to a kind of distribution network planning method.
Background technique
Power distribution network is the important component of power grid, is the important infrastructure in area.How to guarantee power distribution network for area Socio-economic development and living standards of the people, which improve, provides good power supply, is mainly asking of being faced of distribution network planning Topic.
Rural area power grid construction paces are relatively slow, build dynamics relative deficiency, the operation time limit is more than 20 years old Equipment, operational safety hidden danger, the problems such as equipment level is insufficient still long-term existence.With the promotion of the level of agricultural productive forces, people The continuous improvement of people's living standard, Development of China's Urbanization deepen continuously, necessarily to all kinds of cities including power infrastructures City's infrastructure construction is put forward higher requirements.How the power supply capacity in rural area and Urban Areas power grid existing abundance is guaranteed, again High-quality reliable power supply can be provided for economic development and the raising of living standards of the people, be main problem to be solved.
Summary of the invention
The purpose of the present invention is to overcome the shortcomings of the existing technology, provides a kind of distribution network planning method, can optimize electricity The construction of net;Distribution network construction and the project amount of transformation, scale of investment arrangement more rationalize.
In order to solve the above technical problems, the technical solution adopted by the present invention is that: a kind of distribution network planning method, including it is as follows Step: future load forecast and recent load prediction are carried out to planning region, obtain load prediction results: the distant view load is pre- Survey includes that township load prediction, rural resident's life and electric heating load prediction and agriculture load prediction, the recent load are pre- Survey includes natural increase load prediction, large user's load prediction and electric heating load prediction;Distribution is carried out to the planning region Net As-Is Assessment, obtains assessment result: the power distribution network As-Is Assessment includes substation's analysis and medium-voltage line analysis;According to institute Load prediction results and the assessment result are stated, substation location, grid structure is determined, calculate substation capacity demand and holds load Than checking.
Further, the township load prediction specific steps include:
According to the difference and its area accounting situation analysis load structure for planning all kinds of land character electricity consumptions of regional status At;
Load prediction is carried out using district load density index method, obtains township load prediction results.
Further, the prediction result of rural resident's life and electric heating load prediction is determined using following formula,
P1=amount × each household power load
Further, the prediction result of the agriculture load prediction is determined using following formula,
P2=agricultural acreage/500 × 100/1000
Further, the specific steps of the natural increase load prediction include: to be gone through according to the load of the planning region History data, select polynomial method, etc. growth rate methods, order curve method, the method for moving average and envelope model-Lower Bound Limit prediction side Method;It is balanced by the multipath of a variety of different mathematics methods, obtains the pre- of the planning region natural increase load prediction Survey result.
Further, the prediction technique of large user's load prediction are as follows: according to status large user's electricity consumption level, in conjunction with rule Large user's situation during drawing, predicts the planning region large user load.
Further, the prediction technique of the electric heating load prediction are as follows: in conjunction with planning period heating system situation, to institute Planning region electric heating load is stated to be predicted.
Further, substation's analysis includes analyzing capacity matching reasonability, reactive compensation configuring condition, 10kV to go out Line interval utilization power, substation's load factor and transforming plant main transformer N-1 verification.
Further, the prediction technique of medium pressure circuit analysis are as follows: horizontal, negative from network structure level, grid equipment Lotus deliverability carries out analyzing and diagnosing to the planning region status 10kV public line situation.
Compared with prior art, the advantages and positive effects of the present invention are: the construction of power grid can be optimized, make power grid Construction and upgrading it is more scientific, it is reasonable, specification, promote power distribution network appropriately exceeding development;Distribution network construction and the project amount of transformation, Scale of investment arrangement more rationalizes, and optimizes project management.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, With reference to embodiment to this hair It is bright to be described in further detail.Obviously, described embodiment is only a part of the embodiments of the present invention, rather than all Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art obtain without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.It should be noted that for purposes of clarity, being omitted in explanation The expression and description of component unrelated to the invention, known to persons of ordinary skill in the art and processing.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is merely for convenience of description of the present invention and simplification of the description, without referring to Show or imply that signified device or element must have a particular orientation, be constructed and operated in a specific orientation, therefore cannot manage Solution is limitation of the present invention.
The present embodiment provides a kind of distribution network planning methods, include the following steps:
Step 1: future load forecast and recent load prediction being carried out to planning region, obtain load prediction results: distant view Load prediction includes township load prediction, rural resident's life and electric heating load prediction and agriculture load prediction, recent load Prediction includes natural increase load prediction, large user's load prediction and electric heating load prediction;
Township load prediction specific steps include:
According to the difference and its area accounting situation analysis load structure for planning all kinds of land character electricity consumptions of regional status;
Load prediction is carried out using district load density index method, obtains township load prediction results.
The prediction result of rural resident's life and electric heating load prediction is determined using following formula,
P1=amount × each household power load
The prediction result of agriculture load prediction is determined using following formula,
P2=agricultural acreage/500 × 100/1000
The specific steps of natural increase load prediction include: the demand history data according to planning region, select multinomial Method, etc. growth rate methods, order curve method, the method for moving average and envelope model-Lower Bound Limit prediction technique;Pass through a variety of different numbers The multipath balance for learning model method, obtains the prediction result of planning region natural increase load prediction.
The prediction technique of large user's load prediction are as follows: according to status large user's electricity consumption level, in conjunction with planning period large user Situation predicts planning region large user's load.
The prediction technique of electric heating load prediction are as follows: in conjunction with planning period heating system situation, to planning region electric heating Load is predicted.
Step 2: carry out power distribution network As-Is Assessment to planning region, obtain assessment result: power distribution network As-Is Assessment includes becoming Power station analysis and medium-voltage line analysis;
Substation's analysis includes analyzing capacity matching reasonability, reactive compensation configuring condition, 10kV outgoing line interval to utilize feelings Condition, substation's load factor and transforming plant main transformer N-1 verification.
The prediction technique of medium-voltage line analysis are as follows:, grid equipment level horizontal from network structure, load service capability are to rule Partition domain status 10kV public line situation carries out analyzing and diagnosing.
Step 3: according to load prediction results and assessment result, determining substation location, grid structure, calculate substation's appearance Amount demand and capacity-load ratio are checked.
The beneficial effects of the present invention are: the construction of power grid can be optimized, make the construction and upgrading of power grid it is more scientific, it is reasonable, Specification promotes power distribution network appropriately exceeding development;Distribution network construction and the project amount of transformation, scale of investment arrangement more rationalize, Optimize project management.
One or more embodiments of the invention is described in detail above, but the content be only it is of the invention compared with Good embodiment, should not be considered as limiting the scope of the invention.It is all according to equivalent change made by the present patent application range With improve etc., should still be within the scope of the patent of the present invention.

Claims (9)

1. a kind of distribution network planning method, which comprises the steps of:
Future load forecast and recent load prediction are carried out to planning region, obtain load prediction results: the distant view load is pre- Survey includes that township load prediction, rural resident's life and electric heating load prediction and agriculture load prediction, the recent load are pre- Survey includes natural increase load prediction, large user's load prediction and electric heating load prediction;
Power distribution network As-Is Assessment is carried out to the planning region, obtain assessment result: the power distribution network As-Is Assessment includes power transformation It stands and analyzes and medium-voltage line analysis;
According to the load prediction results and the assessment result, determines substation location, grid structure, calculates substation capacity Demand and capacity-load ratio are checked.
2. distribution network planning method according to claim 1, it is characterised in that: the township load prediction specific steps packet It includes:
According to the difference and its area accounting situation analysis load structure for planning all kinds of land character electricity consumptions of regional status;
Load prediction is carried out using district load density index method, obtains township load prediction results.
3. distribution network planning method according to claim 2, it is characterised in that: determine that the rural resident is raw using following formula Living and electric heating load prediction prediction result,
P1=amount × each household power load.
4. distribution network planning method according to claim 2, it is characterised in that: determine that the agriculture load is pre- using following formula The prediction result of survey,
P2=agricultural acreage/500 × 100/1000.
5. distribution network planning method according to claim 1, it is characterised in that: the natural increase load prediction it is specific Step includes: the demand history data according to the planning region, select polynomial method, etc. growth rate methods, order curve method, shifting The dynamic method of average and envelope model-Lower Bound Limit prediction technique;It is balanced, is obtained by the multipath of a variety of different mathematics methods The prediction result of the planning region natural increase load prediction.
6. distribution network planning method according to claim 1, it is characterised in that: the prediction side of large user's load prediction Method are as follows: according to status large user's electricity consumption level, in conjunction with planning period large user's situation, to the planning region large user load into Row prediction.
7. distribution network planning method according to claim 1, it is characterised in that: the prediction side of the electric heating load prediction Method are as follows: in conjunction with planning period heating system situation, the planning region electric heating load is predicted.
8. distribution network planning method according to claim 1, it is characterised in that: substation's analysis includes analysis capacity Match reasonability, reactive compensation configuring condition, 10kV outgoing line interval utilization power, substation's load factor and transforming plant main transformer N-1 Verification.
9. distribution network planning method according to claim 1, it is characterised in that: the prediction technique of medium pressure circuit analysis Are as follows:, grid equipment level horizontal from network structure, load service capability are to the planning region status 10kV public line situation Carry out analyzing and diagnosing.
CN201810189169.4A 2018-03-08 2018-03-08 A kind of power distribution network unit style division methods Pending CN110245768A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810189169.4A CN110245768A (en) 2018-03-08 2018-03-08 A kind of power distribution network unit style division methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810189169.4A CN110245768A (en) 2018-03-08 2018-03-08 A kind of power distribution network unit style division methods

Publications (1)

Publication Number Publication Date
CN110245768A true CN110245768A (en) 2019-09-17

Family

ID=67882003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810189169.4A Pending CN110245768A (en) 2018-03-08 2018-03-08 A kind of power distribution network unit style division methods

Country Status (1)

Country Link
CN (1) CN110245768A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001525A (en) * 2020-07-22 2020-11-27 温州电力设计有限公司 Regional perspective and near-intermediate-period comprehensive load prediction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112001525A (en) * 2020-07-22 2020-11-27 温州电力设计有限公司 Regional perspective and near-intermediate-period comprehensive load prediction method

Similar Documents

Publication Publication Date Title
CN110245811A (en) A kind of distribution network planning method
CN107038530A (en) A kind of power distribution network overall planning method and system
CN106682810B (en) Long-term operation method of cross-basin cascade hydropower station group under dynamic production of giant hydropower station
CN104573853B (en) The systematization of low-voltage platform area distribution network voltage quality evaluation and optimization solves method
CN104766140A (en) Layered and segmented modularized power grid scheduling method
CN103577901A (en) Method of intertidal zone wind power for accessing power grid
CN110443402A (en) A kind of urban distribution network gridding planing method adapting to high reliability power demands
CN107067104A (en) A kind of power supply grid load forecasting method based on GIS-Geographic Information System
CN107832919A (en) A kind of source net lotus coordinated control system for intermittent renewable energy access power network
CN107748968A (en) A kind of construction method of distribution network engineering cost Data Analysis Model
CN110119888A (en) A kind of active gridding planing method based on distributed generation resource access
Jiang et al. Study of future power interconnection scheme in ASEAN
CN105956693B (en) A kind of virtual plant economic load dispatching method based on distributed gradient algorithm
CN108898239A (en) A kind of site selection method for distribution transformer based on data analysis
CN110245768A (en) A kind of power distribution network unit style division methods
CN108366073A (en) A kind of safety utilization of electric power system for supporting ammeter online and user interaction
CN115879652B (en) Hierarchical collaborative planning method and device for energy network, electronic equipment and storage medium
CN104217281A (en) Power grid planning method oriented towards cluster planning of city
CN105224993A (en) A kind of substation planning method optimized power distribution network and run
CN114548609B (en) Water resource collaborative allocation method for ecological power generation and water supply
Ma et al. Evaluation model for economic operation of active distribution network orienting to energy internet
CN106447061A (en) Distributed power supply constant volume addressing method
CN202705984U (en) Combined flood-preventing optimized scheduling system for cascade reservoir group
CN104361453A (en) Decision-making method of intelligentization building projects of intelligent power distribution network
CN109871983B (en) Electric power energy management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190917