CN110241700A - Repair technology after pit slot detection - Google Patents

Repair technology after pit slot detection Download PDF

Info

Publication number
CN110241700A
CN110241700A CN201910447720.5A CN201910447720A CN110241700A CN 110241700 A CN110241700 A CN 110241700A CN 201910447720 A CN201910447720 A CN 201910447720A CN 110241700 A CN110241700 A CN 110241700A
Authority
CN
China
Prior art keywords
pit slot
groove
cutting
depth
pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910447720.5A
Other languages
Chinese (zh)
Other versions
CN110241700B (en
Inventor
闫旭亮
李军
李永翔
于敏
彭俊
沈力
徐晓莹
石会龙
王志婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia Luqiao Engineering Technology Inspection Co Ltd
Original Assignee
Inner Mongolia Luqiao Engineering Technology Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia Luqiao Engineering Technology Inspection Co Ltd filed Critical Inner Mongolia Luqiao Engineering Technology Inspection Co Ltd
Priority to CN201910447720.5A priority Critical patent/CN110241700B/en
Publication of CN110241700A publication Critical patent/CN110241700A/en
Application granted granted Critical
Publication of CN110241700B publication Critical patent/CN110241700B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/065Recycling in place or on the road, i.e. hot or cold reprocessing of paving in situ or on the traffic surface, with or without adding virgin material or lifting of salvaged material; Repairs or resurfacing involving at least partial reprocessing of the existing paving
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C23/00Auxiliary devices or arrangements for constructing, repairing, reconditioning, or taking-up road or like surfaces
    • E01C23/06Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road
    • E01C23/09Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges
    • E01C23/0966Devices or arrangements for working the finished surface; Devices for repairing or reconditioning the surface of damaged paving; Recycling in place or on the road for forming cuts, grooves, or recesses, e.g. for making joints or channels for markings, for cutting-out sections to be removed; for cleaning, treating, or filling cuts, grooves, recesses, or fissures; for trimming paving edges for filling or priming, with or without working the surface of the filling or applying particulate material thereto, e.g. for filling the joints of stone-sett paving

Abstract

The invention discloses repair technologies after a kind of detection of pit slot, comprising the following steps: S1, the spacing a for measuring initial pit slot bottom bosom and road surface;S2, cut coverage is determined;S3, cutting;S4, the road surface in cut coverage is crushed;Particle in S5, recycling pit slot;S6, leveling pit slot bottom surface;S7, filler is added into pit slot, filler includes reclaimed materials and virgin material;S8, compacting leveling filler.Technique proposed by the present invention, position to be cut is few, of less demanding to the technical level of equipment and staff, and the integral construction period is short;Simultaneously while having used reclaimed materials, the quality at repairing position ensure that.

Description

Repair technology after pit slot detection
Technical field
The invention belongs to technical field of roadway maintenance, further to energy-efficient bituminous pavement recovery technique, specifically It is related to repair technology after pit slot detects.
Background technique
Road surface pit slot (pot holes) refers in the case where driving acts on, road surface aggregate local shedding and the hollow that generates, is The Common Diseases that bituminous pavement is easily sent out multiple influence travel safety, comfort and appearance of a street road looks.If maintenance is too late When, great threat can be constituted to traffic safety, while the increase of maintenance cost can be aggravated.Existing pit repairing, generally follows Be that circular hole side is mended, the principle that oblique hole is just being mended makes maintenance surface be rectangle, and surrounding is parallel or vertical with pavement strip, if range It can be expanded around according to surface disease actual range.
But such traditional cutting mode, because cut coverage is that staff judges to combine working experience by naked eyes Come what is carried out, the shape and size of cutting are lack of standardization, cause the quality filled up that can not unify, if the range of cutting compares Greatly, the construction time is on the one hand not only increased, on the other hand, needs a large amount of virgin material to fill up pit slot, to the specification and skill of equipment Art requirement is also relatively high, even if the prior art can carry out part processing to the pitch cut down and recycle, but salvage material Properties be to be markedly less than virgin material, probability that this results in the position repaired with reclaimed materials to occur disease after it again is remote Greater than the position repaired with virgin material.
Summary of the invention
In order to solve above-mentioned disadvantage existing in the prior art, the present invention provide a kind of construction time it is short, to equipment and skill Art is of less demanding, repair technology after the low pit slot detection of disease probability occurs again in repairing position, comprising the following steps:
S1, the spacing a for measuring initial pit slot bottom bosom and road surface;
S2, cut coverage is determined;
S3, cutting;
S4, the road surface in cut coverage is crushed;
Particle in S5, recycling pit slot;
S6, leveling pit slot bottom surface;
S7, filler is added into pit slot, the filler includes reclaimed materials and virgin material;
S8, compacting leveling filler.
Further, the S1 the following steps are included:
S11, one light barrier is set in the surface of pit slot;
S12, next light source is put vertically in the certain point at pit slot edge, utilize the machine vision being arranged in below light barrier Equipment is then shut off light source from shade under vertical angle recordings;
S13, another point at pit slot edge put next light source vertically, using the same machine vision equipment same Shade is recorded from vertical angle in position, is then shut off light source;
S14, the shade recorded twice is compared, marks the position essentially coincided in shade at two;
S15, the position for measuring above-mentioned label from sustained height using Laser Distance Measuring Equipment;
S16, to measure the maximum position of depth be initial pit slot bottom bosom, which is a.
Further, the S2 the following steps are included:
S21, several grooves are determined according to the shape of pit slot;
S22, the cutting track being located at outside pit slot is determined according to groove.
Further, the S21 the following steps are included:
S211, several pit slot side walls are chosen to the part of convex, selected food portion its to convex length l > pit slot Side wall is all to the inside convex average length of inner male part
S212, the endpoint of selected part is subjected to line, outputs several slots along these lines in the bottom surface of pit slot;
S213, every two adjacent part endpoint between slot be a groove, the depth of groove is b.
Further, the S22 the following steps are included:
S221, a cutting line is determined outside each groove, the corresponding groove of each cutting line is parallel, cutting The length at pit slot edge the distance between the corresponding groove of line d corresponding not less than groove;
S222, the both ends of each cutting line are extended outwardly until intersecting, these cutting lines and intersection point are constituted and cut Cut track.
Further, the S3 the following steps are included:
S31, it is cut using cutting equipment along cutting track, the depth h of cutting1Equal to initial pit slot bosom with The sum of the spacing a and the depth b of groove on road surface;
S32, dashpot is offered far from the side of selected part in each cutting line, the section of the dashpot is straight Angle triangle is not less than 30 degree with the angle α of two sides of dashpot, the depth h of the dashpot2No more than initial pit slot The spacing a in bottom bosom and road surface.
Further, the S4 the following steps are included:
S41, the part between groove and cutting track is crushed using crushing plant, broken sequence is from selection portion The end divided starts then mobile to cutting line direction, grinding depth h3Greater than the spacing a on initial pit slot bosom and road surface and Less than the sum of the depth b of spacing a and groove on pit slot bosom and road surface.
Further, after leveling pit slot depth h4Equal to the depth of the spacing a and groove on initial pit slot bosom and road surface Spend the sum of b.
Further, the S7 the following steps are included:
S71, reclaimed materials is first laid in pit slot, the height c of reclaimed materials is less than the spacing a in initial pit slot bosom and road surface The sum of with the depth b of groove;
Reclaimed materials hardening is waited after S72, compacting leveling reclaimed materials;
S73, appropriate virgin material is supplemented into pit slot.
Repair technology after pit slot detection proposed by the present invention, cutting more standardizes, to the technical level of equipment and staff Of less demanding, the integral construction period is short;Simultaneously while having used reclaimed materials, the quality at repairing position ensure that.
Detailed description of the invention
Fig. 1 is the position view of groove of the present invention and cutting line,
Fig. 2 is the structural schematic diagram of dashpot of the present invention.
Figure number and title: 1, pit slot, 2, groove, 3, cutting line, 4, dashpot.
Specific embodiment
By the technology contents that the present invention will be described in detail, construction feature, reached purpose and efficacy, hereby enumerates embodiment below And it is explained in detail in conjunction with Figure of description.
Repair technology after a kind of detection of pit slot, comprising the following steps:
1, the spacing a for measuring pit slot 1 bottom bosom and road surface is arranged a light barrier in the surface of pit slot, guarantees A darker state is in pit slot, then pit slot edge put vertically next light source (cannot be excessively high or too low, should Guarantee that light source can be subject to the direction of relative level and shine most of pit slot bottom), it at this time only can there are two types of positions yin occurs Shadow: protrusion or recess, raised shade appear in the side of its backlight, and the shade of recess then appears in recess, utilizes work Industry camera records these shadow positions;Light source is put down vertically in another place position in pit slot edge, also utilizes industrial phase Machine records these shadow positions in the same angle of same position;The shade recorded twice is compared, because of light source Position changed, so necessarily biggish change can also occur for the shade of protrusion, but the shade of groove changes very little, Therefore the part for recording overlapping twice is the position of pit slot sunken inside, the depth being finally recessed using laser range finder to everywhere Degree measures, and taking maximum value therein is the spacing a on pit slot bottom bosom and road surface, without to entire pit slot bottom Portion carries out blanket type measurement;
2, the length of each part in part of pit slot 1 side wall to convex is measured, and calculates its average length
It 3, will be to the length of convexPart select, the endpoint of selected part is subjected to line, in pit slot 1 The groove 2 that depth is b is outputed along these lines in bottom surface;(as shown in Figure 1, pit slot one shares A, B, C, D, E five to convex Part, but because D is less than average length to the length of convex, only with connection A, B, C, E)
4, determine that the position of d (length at the corresponding pit slot edge of > groove) determines one outside each groove 2 Cutting line in parallel extends outwardly at the both ends of each cutting line until intersecting, these cutting lines and intersection point, that is, structure At cutting track;
5, carrying out depth along cutting track using cutting equipment is h1(h1=a+b) cutting, it is remote in each cutting line It is h that side from selected part, which offers depth,2(h2=dashpot a), the section of dashpot is that apex angle is (α=30 °) α Right angled triangle;(as shown in Fig. 2, being equipped with dashpot, a side in its side far from pit slot after the processing for completing cutting line Face guarantees the inner wall that pit slot will not be damaged in subsequent shattering process, on the other hand during last filler pit slot edge it is oblique Face can make filler cooling more evenly, guarantee the effect of pit slot filling.)
6, the part between groove and cutting track is crushed, broken sequence is right since the end of selected part Backward cutting line direction is mobile, grinding depth a≤h3≤a+b;
7, broken ground surface material is subjected to recycling and is reprocessed into reclaimed materials, while the bottom surface of pit slot flattened, leveling The depth h of pit slot afterwards4=a+b;
8, the reclaimed materials that height is c (c < a+b) will be first laid in pit slot, waiting reclaimed materials hardening after compacting leveling, to The appropriate virgin material of supplement in pit slot, the height of virgin material are a+b-c;
9, can be open to traffic after it being waited to harden after virgin material compacting leveling.
To sum up, only the preferred embodiments of the invention, is not limited the scope of protection of the present invention with this, all according to the invention patent Equivalent changes and modifications made by range and description are all within the scope of the invention patent covers.

Claims (9)

1. repair technology after pit slot detection, which comprises the following steps:
S1, the spacing a for measuring initial pit slot bottom bosom and road surface;
S2, cut coverage is determined;
S3, cutting;
S4, the road surface in cut coverage is crushed;
Particle in S5, recycling pit slot;
S6, leveling pit slot bottom surface;
S7, filler is added into pit slot, the filler includes reclaimed materials and virgin material;
S8, compacting leveling filler.
2. repair technology after pit slot according to claim 1 detection, which is characterized in that the S1 the following steps are included:
S11, one light barrier is set in the surface of pit slot;
S12, next light source is put vertically in the certain point at pit slot edge, utilize the machine vision equipment being arranged in below light barrier From shade under vertical angle recordings, it is then shut off light source;
S13, another point at pit slot edge put next light source vertically, using the same machine vision equipment in the same position Shade is recorded from vertical angle, is then shut off light source;
S14, the shade recorded twice is compared, marks the position essentially coincided in shade at two;
S15, the position for measuring above-mentioned label from sustained height using Laser Distance Measuring Equipment;
S16, to measure the maximum position of depth be initial pit slot bottom bosom, which is a.
3. repair technology after pit slot according to claim 2 detection, which is characterized in that the S2 the following steps are included:
S21, several grooves are determined according to the shape of pit slot;
S22, the cutting track being located at outside pit slot is determined according to groove.
4. repair technology after pit slot according to claim 3 detection, which is characterized in that the S21 the following steps are included:
S211, several pit slot side walls are chosen to the part of convex, selected part its to convex length l > pit slot side wall institute Average length of the oriented inner male part to convex
S212, the endpoint of selected part is subjected to line, outputs several slots along these lines in the bottom surface of pit slot;
S213, every two adjacent part endpoint between slot be a groove, the depth of groove is b.
5. repair technology after pit slot according to claim 4 detection, which is characterized in that the S22 the following steps are included:
S221, outside each groove determine a cutting line, the corresponding groove of each cutting line is parallel, cutting line with The length at pit slot edge the distance between its corresponding groove d corresponding not less than groove;
S222, the both ends of each cutting line are extended outwardly until intersecting, these cutting lines and intersection point constitute cutting rail Mark.
6. repair technology after pit slot according to claim 5 detection, which is characterized in that the S3 the following steps are included:
S31, it is cut using cutting equipment along cutting track, the depth h of cutting1Equal to initial pit slot bosom and road surface Spacing a and the sum of the depth b of groove;
S32, dashpot is offered far from the side of selected part in each cutting line, the section of the dashpot is right angle three It is angular, it is not less than 30 degree with the angle α of two sides of dashpot, the depth h of the dashpot2No more than initial pit slot bottom The spacing a in bosom and road surface.
7. repair technology after pit slot according to claim 6 detection, which is characterized in that the S4 the following steps are included:
S41, the part between groove and cutting track is crushed using crushing plant, broken sequence is from selected part End starts then mobile to cutting line direction, grinding depth h3Greater than the spacing a on initial pit slot bosom and road surface and it is less than Initial the sum of pit slot bosom and the spacing a and the depth b of groove on road surface.
8. repair technology after pit slot detection according to claim 4, it is characterised in that: the depth h of pit slot after leveling4It is equal to Initial the sum of pit slot bosom and the spacing a and the depth b of groove on road surface.
9. repair technology after pit slot according to claim 8 detection, which is characterized in that the S7 the following steps are included:
S71, reclaimed materials is first laid in pit slot, the height c of reclaimed materials is less than the spacing a and ditch in initial pit slot bosom and road surface The sum of depth b of slot;
Reclaimed materials hardening is waited after S72, compacting leveling reclaimed materials;
S73, appropriate virgin material is supplemented into pit slot.
CN201910447720.5A 2019-05-27 2019-05-27 Pit slot detection post-repair process Active CN110241700B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910447720.5A CN110241700B (en) 2019-05-27 2019-05-27 Pit slot detection post-repair process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910447720.5A CN110241700B (en) 2019-05-27 2019-05-27 Pit slot detection post-repair process

Publications (2)

Publication Number Publication Date
CN110241700A true CN110241700A (en) 2019-09-17
CN110241700B CN110241700B (en) 2020-12-04

Family

ID=67885209

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910447720.5A Active CN110241700B (en) 2019-05-27 2019-05-27 Pit slot detection post-repair process

Country Status (1)

Country Link
CN (1) CN110241700B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS577544A (en) * 1980-06-17 1982-01-14 Mitsubishi Electric Corp Road surface condition detector
KR101461198B1 (en) * 2013-11-28 2014-11-14 씨엘엠테크(주) L-shaped ditch of the road for the repair of concrete repair materials and construction methods
CN104988928A (en) * 2015-05-25 2015-10-21 浙江省围海建设集团股份有限公司 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images
CN205134163U (en) * 2015-11-30 2016-04-06 长安大学 Car is repaired in bituminous paving hole groove
CN107254830A (en) * 2017-06-28 2017-10-17 中国路桥工程有限责任公司 Concrete road surface rapid-maintenance device and method
CN108914753A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of airport asphalt concrete pavement preventive maintenance method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS577544A (en) * 1980-06-17 1982-01-14 Mitsubishi Electric Corp Road surface condition detector
KR101461198B1 (en) * 2013-11-28 2014-11-14 씨엘엠테크(주) L-shaped ditch of the road for the repair of concrete repair materials and construction methods
CN104988928A (en) * 2015-05-25 2015-10-21 浙江省围海建设集团股份有限公司 Method for monitoring foundation pit excavation horizontal displacement in real-time manner based on digital images
CN205134163U (en) * 2015-11-30 2016-04-06 长安大学 Car is repaired in bituminous paving hole groove
CN107254830A (en) * 2017-06-28 2017-10-17 中国路桥工程有限责任公司 Concrete road surface rapid-maintenance device and method
CN108914753A (en) * 2018-07-26 2018-11-30 江苏增光复合材料科技有限公司 A kind of airport asphalt concrete pavement preventive maintenance method

Also Published As

Publication number Publication date
CN110241700B (en) 2020-12-04

Similar Documents

Publication Publication Date Title
CN110241700A (en) Repair technology after pit slot detection
CN103437267A (en) Method for regenerating flexible structure of milling material for asphalt pavement
CN208415128U (en) A kind of roadmarking
CN111719400B (en) Method for repairing damaged road surface
KR101451252B1 (en) Machine for crushing pavement having wheel and crushing method of pavement using it
CN110184876A (en) A kind of asphalt roads road surface cracking method for repairing and mending
CN108677780A (en) A kind of roadmarking and production method
KR100586876B1 (en) Road indicator installed between border blocks
CN109468930A (en) A kind of crack repairing method of bituminous pavement after snow
CN104612016A (en) Quick municipal road first-aid repair method
CN209854551U (en) Sidewalk rail with water dripping function
CN211113161U (en) Connecting mechanism of telescopic device
CN209114275U (en) A kind of wear-resisting garage non-slip ramp small stone is consulted
CN207003165U (en) A kind of wear-resisting type color anti-skid road surface of reflecting at night
KR101406295B1 (en) Boundary stone
KR100939536B1 (en) Land indication device
CN110241817A (en) A kind of impaired after-construction method of the friction pile stake holes of emergency repair engineering
CN110725198A (en) Connecting mechanism of telescopic device
CN110725197A (en) Beam end or bridge head concrete structure with embedded part embedded specially for expansion joint and its application
CN215164277U (en) Luminous floor tile with separated base
CN211689744U (en) Bend antiskid road surface
CN214401347U (en) Effectual bituminous paving of heat dissipation cooling mills plane device
CN107905130A (en) A kind of anti-Rolling Stone percussion mechanism of bridge pier based on waste and old Container Reconstruction
CN114775386B (en) Pit identification and segmentation method based on machine vision
CN216445748U (en) Intelligent road construction roughness detector

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant