CN110222985A - Economic factor analysis and evaluation system and operating method based on electricity consumption big data - Google Patents

Economic factor analysis and evaluation system and operating method based on electricity consumption big data Download PDF

Info

Publication number
CN110222985A
CN110222985A CN201910496767.0A CN201910496767A CN110222985A CN 110222985 A CN110222985 A CN 110222985A CN 201910496767 A CN201910496767 A CN 201910496767A CN 110222985 A CN110222985 A CN 110222985A
Authority
CN
China
Prior art keywords
analysis
data
subsystem
economic
index
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910496767.0A
Other languages
Chinese (zh)
Inventor
张秋雁
宋强
张俊玮
丁超
邵峥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201910496767.0A priority Critical patent/CN110222985A/en
Publication of CN110222985A publication Critical patent/CN110222985A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of economic factor analysis and evaluation system based on electricity consumption big data, it includes: that data prediction subsystem is connect with index system management subsystem and configuration management subsystem;Index system management subsystem is connect with interaction prediction subsystem and configuration management subsystem;Interaction prediction subsystem is connect with early warning analysis subsystem and configuration management subsystem;Early warning analysis subsystem is connect with configuration management subsystem;Configuration management subsystem: configuration management subsystem is uniformly controlled and is adjusted to data prediction subsystem, index system management subsystem, interaction prediction subsystem and early warning analysis subsystem;Solve method and not simple and clear etc. enough technical problems of result that the prior art is associated analysis by electric power big data and economy class data.

Description

Economic factor analysis and evaluation system and operating method based on electricity consumption big data
Technical field
The present invention relates to economic evaluation and electric system more particularly to a kind of economic factor analysis based on electricity consumption big data With evaluation system and operating method.
Background technique
In the development process of electricity economics, being introduced into for electricity consumption big data is to be seen in power economy subject by electric power The important supplement of this economic subdiscipline and perfect, has started newer research form.Electric power data and economy class data Quantity be it is huge, electric power big data is that multi-angle carries out from many aspects when being associated analysis with economy class data, therefore It is multiplicity for probing into for mutual incidence relation, is currently associated by electric power big data and economy class data The method of analysis and result are not simple and clear enough.To can make full use of the value contained in electricity consumption big data, need to it More fully analysis is carried out to probe into.Its potential value is lacked to dig, extracts high reliability information, and can be by these useful letters The reasonable arrangement of breath, is presented to user with straightaway form.
Summary of the invention
When the technical problem to be solved in the present invention: a kind of economic factor analysis based on electricity consumption big data being provided and evaluation is System and operating method, the method and result of analysis are associated to solve the prior art by electric power big data and economy class data Not simple and clear etc. enough technical problems.
The technical scheme is that:
A kind of economic factor analysis and evaluation system based on electricity consumption big data, it includes:
Data prediction subsystem: it is made of data type selected section, data character selected section;Data type selection The data type of input is analyzed in part, and the data that judgement belongs to electric power level still fall within the data of economic level;Number According to property selected section classified to the format of the data of input system: being that structural data are then put into corresponding index frame It is spare in frame;If the data of input do not meet structural data format, call web crawler to picture or PDF property Data extract processing, further obtain structural data, place into spare in corresponding index system;At data After reason is complete, then enter the electricity consumption big data that electricity consumption big data building part is directed to analysis target according to index building;With index System management subsystem is connected with configuration management subsystem;
Index system management subsystem: coupling index system part, industry level coupling index body including enterprise level Pastern door, industrial level coupling index body portion, the coupling index system part GDP and index display portion;Index system management Subsystem stores the index classification being related to during each analysis object analysis, the energy when carrying out data processing and data are analyzed It enough recalls and compares use;Each index is made of economic level and electric power level two parts, and each analysis object is corresponding Index also respectively includes electric power level and economic level two large divisions;Index display portion is responsible for choosing target analysis pair in user Corresponding index is shown by forms such as charts as after;It is connect with interaction prediction subsystem and configuration management subsystem;
Interaction prediction subsystem includes industrial structure judgment part, analysis of Economic Development and predicted portions;The industrial structure is sentenced Analysis evolution of objective status and development model are analyzed using per capita household electricity consumption benchmark line model as theoretical foundation disconnected part Judgement;Economic analysis and predicted portions are then to construct panel to analysis target first in stationary test method as theoretical foundation Data carry out unit root test to panel data, and test and judge whether there is the economic incidence relation of electric power-, and further progress is returned Return analysis to carry out forecast analysis;It is connect with early warning analysis subsystem and configuration management subsystem;
Early warning analysis subsystem: including conclusion processing part and conclusion display portion;Early warning analysis subsystem to analysis at It manages resulting result to carry out last processing and show arrangement, part is handled by conclusion and is handled resulting result is analyzed Be presented as picture or table shows format;Resulting result presentation will be handled to user by conclusion display portion, and be used Family can be by adjusting the format and emphasis that show content to the selection of conclusion display portion;Connect with configuration management subsystem It connects;
Configuration management subsystem: configuration management subsystem is to data prediction subsystem, index system management subsystem, pass Connection predicting subsystem and early warning analysis subsystem are uniformly controlled and are adjusted.
A kind of operating method of economic factor analysis and evaluation system based on electricity consumption big data, it includes:
(1) corresponding data are inputted economic factor analysis and Economic appraisal by input port;
(2) data prediction subsystem analyzes and determines data type with regard to data format, and wants to type mismatch conjunction The data asked are excluded, and are carried out structuring processing to the undesirable data of format, are further constructed different analysis targets Under multidimensional electricity consumption big data;
(3) index system management subsystem sets corresponding index under different analysis targets, and storage is in the database, with It calls at any time;
(4) interaction prediction subsystem is theoretical using benchmark line model per capita and Causality Analysis, the production to analysis target Industry structure and economic development form are analyzed, and are carried out in advance in the case where panel data meets the requirements to economic development situation Survey analysis;
(5) early warning analysis subsystem handles resulting result to analysis and carries out pictorialization processing, while according to user demand Analysis result is shown.
Beneficial effects of the present invention:
The present invention be using electricity consumption big data as data analysis foundation, using power economy theory as analysis means it is economical because Element analysis and Economic appraisal.By excavating the high price value information contained in electricity consumption big data, to macroeconomy and production The economic situation of the levels such as Ji, industrial economy is analyzed already, economic scene is evaluated, further to economic forecasting and rule It draws and angularly proposes constructive suggestions.And by it with the intuitive expression-form such as picture, table and text by high price value information and Data exhibiting is on interface, to provide convenience for user, the person of being convenient to use carry out economic situation understanding and carry out through The prediction of situation that helps refers to;Solve method and knot that the prior art is associated analysis by electric power big data and economy class data Not simple and clear etc. enough technical problems of fruit.
Detailed description of the invention:
Fig. 1 is present system composition schematic diagram.
Specific embodiment
By excavating the high price value information contained in electricity consumption big data when the object of the invention, to macroeconomy and industry The economic situation of the levels such as economy, industrial economy is analyzed, economic scene is evaluated, further to economic forecasting and planning Angularly propose constructive suggestions.And it is used the intuitive expression-form such as picture, table and text by high price value information and number According to being presented on interface, to provide convenience for user, the person of being convenient to use carries out economic situation understanding and carries out economical Prediction of situation reference.
The present invention is specific: data prediction subsystem, index system management subsystem, interaction prediction subsystem, early warning point Analyse subsystem and configuration management subsystem.
The data prediction subsystem is made of data type selected section, data character selected section.Data type Selected section mainly analyzes the data type of input, judges that it belongs to the data of electric power level and still falls within economic level Data;Data character selected section, major function are to carry out preliminary classification to the format of the data of input system: if it is Structural data are then put into spare in corresponding index system;If the data of input do not meet structural data format, adjust Extract processing with data of the web crawler to properties such as picture, PDF, further obtain structural data, then by its It is put into spare in corresponding index system;After data processing is complete, then needs to enter electricity consumption big data and construct part, according to Electricity consumption big data of the index building for analysis target.
Coupling index system part of the index system management subsystem by enterprise level, industry level coupling index body Pastern door, industrial level coupling index body portion, State-level (GDP) coupling index system part, index display portion composition. From first and last, this system is exactly an achievement data library, the index classification being related to during major analysis object analysis Storage shown can recall when carrying out data processing and data are analyzed and compare use.The corresponding index of each level by Economic level and electric power level two parts are constituted, therefore the corresponding index of each analysis object also respectively includes electric power level and warp Ji level two large divisions.Wherein index display portion, which is mainly responsible for, leads to corresponding index after user chooses target analyte The forms such as chart are crossed to show.
The interaction prediction subsystem is made of industrial structure judgment part, analysis of Economic Development and predicted portions.Industry Mould to analysis evolution of objective status and is developed mainly using per capita household electricity consumption benchmark line model as theoretical foundation in structure decision part Formula (i.e. industrial structure composition) is analyzed and determined;Economic analysis and prediction module are then in stationary test method for theory Foundation, constructs panel data to analysis target first, carries out unit root test to panel data.Whether co integration test etc. judges it There are the economic incidence relation of electric power-, further progress regression analysis is to carry out forecast analysis.
The early warning analysis subsystem handles part by conclusion, conclusion display portion forms.This system handles institute to analysis The result obtained carries out last processing and shows arrangement, handles part by conclusion and handles the resulting result of analysis, will It is presented as the intuitives such as picture, table it is strong show format;By conclusion display portion, will handle resulting result presentation to User, and user can be by adjusting the format and emphasis that show content to the selection of conclusion display portion.
The configuration management subsystem is to above data preprocessing subsystem, index system management subsystem, interaction prediction Subsystem, early warning analysis subsystem four systems are uniformly controlled and are adjusted.
Steps are as follows for concrete operation method:
(1) corresponding data are inputted economic factor analysis and Economic appraisal by input port;
(2) system analyzes and determines data type with regard to data format, and closes desired data to type mismatch and carry out It excludes, structuring processing is carried out to the undesirable data of format, further index constructs under different analysis targets Multidimensional electricity consumption big data;
(3) in index system administrative section, corresponding index under different analysis targets is set, and is stored in the database, It is called at any time with facilitating;
(4) interaction prediction part is theoretical using benchmark line model per capita and Causality Analysis, to the industry of analysis target Structure and economic development form explication de texte, and economic development situation is predicted in the case where panel data meets the requirements Analysis;
(5) early warning analysis part handles resulting result to analysis and carries out pictorialization processing, while according to user preferences, will Analysis result is shown.

Claims (2)

1. a kind of economic factor analysis and evaluation system based on electricity consumption big data, it includes:
Data prediction subsystem: it is made of data type selected section, data character selected section;Data type selected section The data type of input is analyzed, the data that judgement belongs to electric power level still fall within the data of economic level;It is Statistical Matter selected section is classified to the format of the data of input system: being that structural data are then put into corresponding index system It is spare;If the data of input do not meet structural data format, call web crawler to the number of picture or PDF property According to processing is extracted, structural data is further obtained, is placed into spare in corresponding index system;When data processing is complete Quan Hou then enters electricity consumption big data of the electricity consumption big data building part according to index building for analysis target;With index system Management subsystem is connected with configuration management subsystem;
Index system management subsystem: coupling index system part, industry level coupling index system portion including enterprise level Door, industrial level coupling index body portion, the coupling index system part GDP and index display portion;Index system manages subsystem System stores the index classification being related to during each analysis object analysis, can adjust when carrying out data processing and data are analyzed Use is compared out;Each index is made of economic level and electric power level two parts, the corresponding index of each analysis object Also electric power level and economic level two large divisions are respectively included;Index display portion is responsible for after user chooses target analyte Corresponding index is shown by forms such as charts;It is connect with interaction prediction subsystem and configuration management subsystem;
Interaction prediction subsystem includes industrial structure judgment part, analysis of Economic Development and predicted portions;Industrial structure judging part Divide using per capita household electricity consumption benchmark line model as theoretical foundation, analysis is carried out to analysis evolution of objective status and development model and is sentenced It is disconnected;Economic analysis and predicted portions are then to construct panel number to analysis target first in stationary test method as theoretical foundation According to panel data progress unit root test, test and judge whether there is the economic incidence relation of electric power-, and further progress returns Analysis is to carry out forecast analysis;It is connect with early warning analysis subsystem and configuration management subsystem;
Early warning analysis subsystem: including conclusion processing part and conclusion display portion;Early warning analysis subsystem handles institute to analysis The result obtained carries out last processing and shows arrangement, carries out processing to the resulting result of analysis by conclusion processing part and shows Show format for picture or table;Resulting result presentation will be handled to user by conclusion display portion, and user can By adjusting the format and emphasis that show content to the selection of conclusion display portion;It is connect with configuration management subsystem;
Configuration management subsystem: configuration management subsystem is pre- to data prediction subsystem, index system management subsystem, association It surveys subsystem and early warning analysis subsystem is uniformly controlled and is adjusted.
2. a kind of operating method of economic factor analysis and evaluation system based on electricity consumption big data as described in claim 1, It includes:
(1) corresponding data are inputted economic factor analysis and Economic appraisal by input port;
(2) data prediction subsystem analyzes and determines data type with regard to data format, and closes requirement to type mismatch Data are excluded, and are carried out structuring processing to the undesirable data of format, are further constructed under different analysis targets Multidimensional electricity consumption big data;
(3) index system management subsystem sets corresponding index under different analysis targets, and stores in the database, at any time It calls;
(4) interaction prediction subsystem is theoretical using benchmark line model per capita and Causality Analysis, to the industry knot of analysis target Structure and economic development form are analyzed, and carry out prediction point to economic development situation in the case where panel data meets the requirements Analysis;
(5) early warning analysis subsystem handles resulting result to analysis and carries out pictorialization processing, while will divide according to user demand Analysis result is shown.
CN201910496767.0A 2019-06-10 2019-06-10 Economic factor analysis and evaluation system and operating method based on electricity consumption big data Pending CN110222985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910496767.0A CN110222985A (en) 2019-06-10 2019-06-10 Economic factor analysis and evaluation system and operating method based on electricity consumption big data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910496767.0A CN110222985A (en) 2019-06-10 2019-06-10 Economic factor analysis and evaluation system and operating method based on electricity consumption big data

Publications (1)

Publication Number Publication Date
CN110222985A true CN110222985A (en) 2019-09-10

Family

ID=67816069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910496767.0A Pending CN110222985A (en) 2019-06-10 2019-06-10 Economic factor analysis and evaluation system and operating method based on electricity consumption big data

Country Status (1)

Country Link
CN (1) CN110222985A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111832805A (en) * 2020-06-06 2020-10-27 国网河北省电力有限公司衡水供电分公司 Economic early warning analysis system and method based on electric power big data
CN114331308A (en) * 2021-08-12 2022-04-12 国网安徽省电力有限公司蚌埠供电公司 Self-trade district development analysis system based on electric big data and construction method thereof

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106485367A (en) * 2016-10-26 2017-03-08 贵州电网有限责任公司电力科学研究院 A kind of economic analysis platform based on the coupling of multiple enterprises electricity consumption data and Forecasting Methodology

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106485367A (en) * 2016-10-26 2017-03-08 贵州电网有限责任公司电力科学研究院 A kind of economic analysis platform based on the coupling of multiple enterprises electricity consumption data and Forecasting Methodology

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张秋雁等: "基于用电大数据的经济分析平台设计研究", 《电力大数据》 *
罗汉武等: "社会用电量与经济增长的协整检验和误差修正", 《统计与决策》 *
辛冲等: "战略导向型组织创新与技术创新的关联模型研究", 《中国软科学》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111832805A (en) * 2020-06-06 2020-10-27 国网河北省电力有限公司衡水供电分公司 Economic early warning analysis system and method based on electric power big data
CN114331308A (en) * 2021-08-12 2022-04-12 国网安徽省电力有限公司蚌埠供电公司 Self-trade district development analysis system based on electric big data and construction method thereof

Similar Documents

Publication Publication Date Title
CN107784397A (en) A kind of power network material requirements forecasting system and its Forecasting Methodology
CN103606018B (en) A kind of iron and steel enterprise electric load short-term dynamic prognoses system
CN110458195A (en) A kind of abnormal data discriminating method based on the fusion of more criterions
CN101320449A (en) Power distribution network estimation method based on combination appraisement method
CN106127388A (en) The energy efficiency evaluating method of high energy-consuming enterprises
CN110222985A (en) Economic factor analysis and evaluation system and operating method based on electricity consumption big data
CN107609794A (en) A kind of technology maturity evaluation information processing unit
CN111738331A (en) User classification method and device, computer-readable storage medium and electronic device
CN110570097A (en) business personnel risk identification method and device based on big data and storage medium
CN107369003A (en) A kind of intelligent laboratory management system method and system
CN111523572A (en) Real-time bridge structure damage state identification method and system
Huang Evaluating intelligent residential communities using multi-strategic weighting method in China
CN107133722A (en) Power distribution network difference characteristic diagnostic analysis method based on electric power enterprise big data technology
Shukla et al. Post-entry advancement of international service firms in Australia: A longitudinal approach
Juvenal et al. Export market diversification and productivity improvements: theory and evidence from Argentinean firms
CN117135034B (en) Rule analysis screening method and device for intelligent alarm convergence
Wang et al. A review of studies on urban energy performance evaluation
Shan et al. A new model for predicting the total tree height for stems cut-to-length by harvesters in Pinus radiata plantations
CN105224801A (en) A kind of multiple-factor reservoir reservoir inflow short-time forecast evaluation method
CN102147988A (en) Networking audit training device
CN114116667A (en) Data management system for power data application scene
CN111915056A (en) User practical load prediction system and prediction method based on big data analysis
Card et al. Status report: practical software measurement
Wang The Construction Cost Management Method Based on BIM Information Integration Platform
Zeng A Composited Framework for High-precision Network Public Opinion Risk Event Prediction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Qiuyan

Inventor after: Song Qiang

Inventor after: Zhang Junwei

Inventor after: Ding Chao

Inventor after: Shao Zheng

Inventor after: Wang Duorun

Inventor after: Li Shihua

Inventor before: Zhang Qiuyan

Inventor before: Song Qiang

Inventor before: Zhang Junwei

Inventor before: Ding Chao

Inventor before: Shao Zheng

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190910

RJ01 Rejection of invention patent application after publication