CN110209104A - The system and method for intelligent monitoring and operation and maintenance - Google Patents
The system and method for intelligent monitoring and operation and maintenance Download PDFInfo
- Publication number
- CN110209104A CN110209104A CN201910441256.9A CN201910441256A CN110209104A CN 110209104 A CN110209104 A CN 110209104A CN 201910441256 A CN201910441256 A CN 201910441256A CN 110209104 A CN110209104 A CN 110209104A
- Authority
- CN
- China
- Prior art keywords
- data
- equipment
- maintenance
- unit
- data acquisition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B19/00—Programme-control systems
- G05B19/02—Programme-control systems electric
- G05B19/04—Programme control other than numerical control, i.e. in sequence controllers or logic controllers
- G05B19/048—Monitoring; Safety
Abstract
The invention discloses the system and methods of a kind of intelligent monitoring and operation and maintenance, it is related to urban track traffic field of communication technology, which includes: device data acquisition unit, device data processing unit, equipment performance analysis and anticipation unit and operation maintenance management unit;The device data acquisition unit is used to acquire the equipment fault data and/or device performance data of each equipment;The device data processing unit is for sending the device performance data to the equipment performance analysis and anticipation unit, by the equipment fault data transmission to the operation maintenance management unit;The equipment performance analysis and anticipation unit are used for analytical equipment performance data, and generate corresponding anticipation data;The operation maintenance management unit forms maintenance management data for obtaining and analyzing the equipment fault data and the anticipation data.The present invention can the performance degradation trend to equipment prejudge, instruct staff to equipment carry out operation and maintenance.
Description
Technical field
The present invention relates to urban track traffic fields of communication technology, and in particular to a kind of intelligent monitoring and operation and maintenance are
System and method.
Background technique
Urban track traffic includes: subway system, light rail systems, monorail system, tramcar, magnetic floating system, leads automatically
To rail system, administrative region of a city fast railway system.The many cities in China are in the stage of high speed development, urban track traffic also with
Carry out Large scale construction, Urban Rail Transit Communication System is the control core of urban track traffic, as city rail is handed over
The operation and maintenance of logical Large scale construction, Urban Rail Transit Communication System become increasingly complex.
Currently, the operation and maintenance of rail traffic communication system have the following problems:
1, rail traffic communication system is typically provided fault warning unit, but general collecting device of fault warning unit
Fault data, then these equipment fault data are shown into equipment fault on the display device, it has a single function, lacks to equipment
The guidance of operation and maintenance.
2, existing equipment alarm and upkeep operation are independent from each other in process, and shortage is subsequent to equipment to be tieed up again
The guidance of shield is in particular in that each upkeep operation is isolated cases, and the valuable information of process is difficult to be worked below point
It enjoys and uses for reference.
Summary of the invention
In view of the deficiencies in the prior art, the purpose of the present invention is to provide a kind of intelligent monitoring and operation and maintenance
System and method, can the performance degradation trend to equipment prejudge, instruct staff to equipment carry out operation and maintenance.
To achieve the above objectives, the technical solution adopted by the present invention is that: a kind of system of intelligent monitoring and operation and maintenance, use
It is monitored and operation and maintenance in the equipment to Urban Rail Transit Communication System, comprising: device data acquisition unit, number of devices
According to processing unit, equipment performance analysis and anticipation unit and operation maintenance management unit;
The device data acquisition unit is used to acquire the equipment fault data and/or equipment performance number of each equipment
According to, and it is sent to the device data processing unit;
The device data processing unit is used to send to the device performance data equipment performance analysis and pre-
Sentence unit, by the equipment fault data transmission to the operation maintenance management unit;
Equipment performance analysis and anticipation unit be used for the device performance parameters value in the device performance data into
Row analysis of trend determines that this sets if one or more of which device performance parameters value is inferior to preset threshold values
Standby failure will occur and generate corresponding anticipation data;
The operation maintenance management unit is used to obtaining and analyzing the equipment fault data and the anticipation data, according to
The result of analysis forms maintenance management data.
Based on the above technical solution, the system also includes:
Mobile terminal processing unit is used to obtain the maintenance management data and carries out corresponding maintenance processing, and will maintenance
The maintenance result data that processing obtains is transferred to the operation maintenance management unit and is stored.
Based on the above technical solution, the device data processing unit includes server end and client, described
Server end is equipped with warning data acquisition module, and the client is equipped with alarm display module;
The warning data acquisition module is sent for receiving the equipment fault data and the maintenance result data
To the client;
The alarm display module is for showing the equipment fault data and the maintenance result data.
Based on the above technical solution, the device data acquisition unit is acquired equipped with three-level: sub- device data is adopted
Collect unit, line level device data acquisition unit and gauze grade device data acquisition unit;
The sub- device data acquisition unit is used to acquire the equipment fault data and/or equipment of the equipment from a certain equipment
Performance data;
The line level device data acquisition unit be used to obtain the data of the line level device data acquisition unit into
Row parsing and regular, and is sent to the gauze grade device data acquisition unit;
The gauze grade device data acquisition unit be used to obtain the data of the gauze grade device data acquisition unit into
Row parsing and regular, and is sent to the device data acquisition unit.
Based on the above technical solution, the equipment performance analysis and anticipation unit include device performance data management
Component, device performance data analytic unit and equipment fault prejudge component;
The device performance data management assembly is for being managed the device performance data;
The device performance data analytic unit is for the change to all properties parameter value in the device performance data
Change trend is analyzed;
The equipment fault anticipation component is used for the variation tendency according to the performance parameter value, carries out with preset threshold values
Compare, if one or more device parameter values are inferior to preset threshold values, judges that equipment fault will occur and generate corresponding
Prejudge data.
It is an object of the invention to also provide a kind of method of intelligent monitoring and the operation and maintenance of above system, including it is following
Step:
Device data acquisition unit acquires the equipment fault data and/or device performance data of each equipment, and is sent to
Device data processing unit;
Device data processing unit sends device performance data to equipment performance analysis and anticipation unit, by equipment fault
Data transmission gives operation maintenance management unit;
Equipment performance analysis and anticipation unit carry out trend analysis to the device performance parameters value in device performance data, if
When one or more of which device performance parameters value is inferior to preset threshold values, then determine that the equipment fault will occur and give birth to
At corresponding anticipation data;
Device data processing unit obtains simultaneously analytical equipment fault data and anticipation data, is formed and is tieed up according to the result of analysis
Pillar manages data.
Based on the above technical solution, further comprising the steps of:
Mobile terminal processing unit obtains maintenance management data and carries out corresponding maintenance processing, and the dimension that maintenance is handled
Shield result data is transferred to operation maintenance management unit and is stored.
Based on the above technical solution, operation maintenance management unit includes server end and client, server end
Equipped with warning data acquisition module, client is equipped with alarm display module;
Warning data acquisition module receiving device fault data, and it is sent to client;
Alarm display module shows equipment fault data.
Based on the above technical solution, device data acquisition unit is acquired equipped with three-level: sub- device data acquisition list
Member, line level device data acquisition unit and gauze grade device data acquisition unit;
Sub- device data acquisition unit acquires the equipment fault data and/or equipment performance number of the equipment from a certain equipment
According to;
Line level device data acquisition unit obtain line level device data acquisition unit data carry out parsing and it is regular,
And it is sent to gauze grade device data acquisition unit;
The data that gauze grade device data acquisition unit obtains the gauze grade device data acquisition unit carry out parsing and
It is regular, and it is sent to device data acquisition unit.
Based on the above technical solution, equipment performance analysis and anticipation unit include device performance data management group
Part, device performance data analytic unit and equipment fault prejudge component;
Device performance data management assembly is managed device performance data;
Device performance data analytic unit divides the variation tendency of the device performance parameters value in device performance data
Analysis;
Equipment fault prejudges component according to the variation tendency of device performance parameters value, is compared with preset threshold values, if
Wherein one or more device performance parameters values are inferior to preset threshold values, then judge that equipment fault will occur and generate corresponding
Prejudge data.
Compared with the prior art, the advantages of the present invention are as follows: the system of intelligent monitoring and operation and maintenance of the invention and side
Method is analyzed and is prejudged by equipment performance unit and analyzes the device performance data of equipment, and then bad to the performance of equipment
Change trend is prejudged, and staff is instructed to carry out operation and maintenance to equipment.
Detailed description of the invention
Fig. 1 is a schematic diagram of the system of intelligent monitoring and operation and maintenance in the embodiment of the present invention;
Fig. 2 is another schematic diagram of the system of intelligent monitoring and operation and maintenance in the embodiment of the present invention;
Fig. 3 is the schematic diagram for the comprising modules that device data acquisition unit includes in the embodiment of the present invention;
Fig. 4 is the flow chart of the method for intelligent monitoring and operation and maintenance in the embodiment of the present invention.
Specific embodiment
Invention is further described in detail with reference to the accompanying drawings and embodiments.
Shown in Figure 1, the embodiment of the present invention provides the system of a kind of intelligent monitoring and operation and maintenance, for city rail
The equipment of road traffic communications system is monitored and operation and maintenance, comprising: device data acquisition unit, device data processing are single
Member, equipment performance analysis and anticipation unit and operation maintenance management unit;
Device data acquisition unit is used to acquire the equipment fault data and/or device performance data of each equipment, concurrently
It send to device data processing unit;
Device data processing unit is used to send to device performance data equipment performance analysis and anticipation unit, by equipment
Fault data sends operation maintenance management unit to;
Equipment performance analysis and anticipation unit to the device performance parameters value in device performance data for being changed
Potential analysis determines the equipment fault i.e. if one or more of which device performance parameters value is inferior to preset threshold values
It will occur and generate corresponding anticipation data;
Operation maintenance management unit is for obtaining simultaneously analytical equipment fault data and anticipation data, according to the result shape of analysis
At maintenance management data.
Compared with prior art, the system of intelligent monitoring and the operation and maintenance of the embodiment of the present invention passes through equipment performance point
Analysis and anticipation unit analyze the device performance data of equipment, and then prejudge to the performance degradation trend of equipment, refer to
It leads staff and operation and maintenance is carried out to equipment.
It is shown in Figure 2 as preferred embodiment, the system of intelligent monitoring and the operation and maintenance of the embodiment of the present invention
It further include mobile terminal processing unit, mobile terminal processing unit obtains maintenance management data and carries out corresponding maintenance processing, and will dimension
The maintenance result data that shield is handled is transferred to operation maintenance management unit and is stored.Preferably, mobile terminal processing unit
Android (Android) and apple (IOS) system of support.
Specifically, equipment fault warning information generation-equipment alarm information is sent to maintenance personnel-maintenance personnel and receives dimension
Shield information processing equipment failure-maintenance processing result feeds back to maintenance management unit and is stored, and carries out when subsequent to the equipment
When maintenance, related data can be extracted, follow-up maintenance personnel is instructed to safeguard, the embodiment of the present invention by equipment fault alarm and
The maintenance processing of maintenance personnel is associated, the closed-loop process of realization operation and maintenance event, operation and maintenance process real-time tracking, and
When understand work disposal progress, be conducive to resource rational allocation, valuable operation and maintenance information shared and used for reference, is mentioned
High experience precipitates effectiveness, and the Centralized Monitoring and operation maintenance management for improving equipment in Urban Rail Transit Communication System are horizontal.
Shown in Figure 3 as preferred embodiment, device data acquisition unit includes at least private communication and transmits mould
Block, official telephone module, telephone for special use module, dedicated video monitoring module, Customer information module, clock module, broadcast module,
Private communication power module.Private communication transmission module, official telephone module, telephone for special use module, dedicated video monitoring module,
Customer information module, clock module, broadcast module and power source special module are by respective northbound interface by equipment fault number
According to and/or device performance data, be sent to device data acquisition unit.
As preferred embodiment, device data processing unit includes server end and client, and server end is equipped with
Warning data acquisition module, client are equipped with alarm display module;
Warning data acquisition module is used for receiving device fault data, and is sent to client.By the association appointed in advance
Specification is discussed, the data of script various criterion can also be carried out consistency conversion by warning data acquisition module, after data
Phase processing.
Alarm display module is for showing equipment fault data, and according to the care degree of user, alarm display module can be with thing
Several templates are first set, these templates can be text, be also possible to figure, realize the visualization of data.
As preferred embodiment, device data acquisition unit is acquired equipped with three-level: sub- device data acquisition unit, line
Road grade device data acquisition unit and gauze grade device data acquisition unit;
Sub- device data acquisition unit is used to acquire the equipment fault data and/or equipment performance of the equipment from a certain equipment
Data;
Line level device data acquisition unit be used for obtain line level device data acquisition unit data carry out parsing and
It is regular, and it is sent to gauze grade device data acquisition unit;
Gauze grade device data acquisition unit be used for obtain gauze grade device data acquisition unit data carry out parsing and
It is regular, and it is sent to device data acquisition unit.
The embodiment of the present invention uses sub- device data acquisition unit-line level device data acquisition unit-gauze grade equipment
The deployment of data acquisition unit three-level, it is ensured that equipment level and clear logic, the adjustment of any equipment and change do not influence be
System operation.
As preferred embodiment, equipment performance analysis and anticipation unit include device performance data management assembly, set
Standby performance data analysis component and equipment fault prejudge component;
Device performance data management assembly is for being managed device performance data;
Device performance data analytic unit be used for the variation tendency of all properties parameter value in device performance data into
Row analysis;
Equipment fault prejudges component for the variation tendency according to performance parameter value, is compared with preset threshold values, if
One or more device parameter values are inferior to preset threshold values, then judge that equipment fault will occur and generate corresponding anticipation number
According to.
Shown in Figure 4, the embodiment of the present invention also provides the method for a kind of intelligent monitoring and operation and maintenance, including following step
It is rapid:
Device data acquisition unit acquires the equipment fault data and/or device performance data of each equipment, and is sent to
Device data processing unit;
Device data processing unit sends device performance data to equipment performance analysis and anticipation unit, by equipment fault
Data transmission gives operation maintenance management unit;
Equipment performance analysis and anticipation unit carry out trend analysis to the device performance parameters value in device performance data, if
When one or more of which device performance parameters value is inferior to preset threshold values, then determine that the equipment fault will occur and give birth to
At corresponding anticipation data;
Operation maintenance management unit obtains simultaneously analytical equipment fault data and anticipation data, is formed and is tieed up according to the result of analysis
Pillar manages data.
Compared with prior art, the method for intelligent monitoring and the operation and maintenance of the embodiment of the present invention passes through equipment performance point
Analysis and anticipation unit analyze the device performance data of equipment, and then prejudge to the performance degradation trend of equipment, can
To instruct staff to carry out operation and maintenance to equipment.
As preferred embodiment, mobile terminal processing unit obtains maintenance management data and carries out corresponding maintenance processing,
And the maintenance result data that maintenance is handled is transferred to operation maintenance management unit and is stored.
As preferred embodiment, the device data processing unit includes server end and client, server end
Equipped with warning data acquisition module, client is equipped with alarm display module;
Warning data acquisition module receiving device fault data and maintenance result data, and it is sent to client;
Alarm display module shows equipment fault data and maintenance result data.
As preferred embodiment, device data acquisition unit is acquired equipped with three-level: sub- device data acquisition unit, line
Road grade device data acquisition unit and gauze grade device data acquisition unit;
Sub- device data acquisition unit acquires the equipment fault data and/or equipment performance number of the equipment from a certain equipment
According to;
Line level device data acquisition unit obtain line level device data acquisition unit data carry out parsing and it is regular,
And it is sent to gauze grade device data acquisition unit;
Gauze grade device data acquisition unit obtain gauze grade device data acquisition unit data carry out parsing and it is regular,
And it is sent to device data acquisition unit.
As preferred embodiment, equipment performance analysis and anticipation unit include device performance data management assembly, set
Standby performance data analysis component and equipment fault prejudge component;
Device performance data management assembly is managed device performance data;
Device performance data analytic unit divides the variation tendency of the device performance parameters value in device performance data
Analysis;
Equipment fault prejudges component according to the variation tendency of device performance parameters value, is compared with preset threshold values, if
Wherein one or more device performance parameters values are inferior to preset threshold values, then judge that equipment fault will occur and generate corresponding
Prejudge data.
The present invention is not limited to the above-described embodiments, for those skilled in the art, is not departing from
Under the premise of the principle of the invention, several improvements and modifications can also be made, these improvements and modifications are also considered as protection of the invention
Within the scope of.The content being not described in detail in this specification belongs to the prior art well known to professional and technical personnel in the field.
Claims (10)
1. the system of a kind of intelligent monitoring and operation and maintenance, for the equipment to Urban Rail Transit Communication System be monitored with
Operation and maintenance characterized by comprising device data acquisition unit, device data processing unit, equipment performance analysis and anticipation
Unit and operation maintenance management unit;
The device data acquisition unit is used to acquire the equipment fault data and/or device performance data of each equipment,
And it is sent to the device data processing unit;
The device data processing unit is used to send to the device performance data equipment performance and analyzes and prejudge list
Member gives the equipment fault data transmission to the operation maintenance management unit;
The equipment performance analysis and anticipation unit are for becoming the device performance parameters value in the device performance data
Change trend analysis, if one or more of which device performance parameters value is inferior to preset threshold values, determines equipment event
Barrier will occur and generate corresponding anticipation data;
The operation maintenance management unit is for obtaining and analyzing the equipment fault data and the anticipation data, according to analysis
Result formed maintenance management data.
2. the system of intelligent monitoring as described in claim 1 and operation and maintenance, which is characterized in that the system also includes:
Mobile terminal processing unit is used to obtain the maintenance management data and carries out corresponding maintenance processing, and maintenance is handled
Obtained maintenance result data is transferred to the operation maintenance management unit and is stored.
3. the system of intelligent monitoring as described in claim 1 and operation and maintenance, it is characterised in that:
The device data processing unit includes server end and client, and the server end is equipped with warning data acquisition mould
Block, the client are equipped with alarm display module;
The warning data acquisition module is sent to institute for receiving the equipment fault data and the maintenance result data
State client;
The alarm display module is for showing the equipment fault data and the maintenance result data.
4. the system of intelligent monitoring as described in claim 1 and operation and maintenance, it is characterised in that:
The device data acquisition unit is acquired equipped with three-level: sub- device data acquisition unit, line level device data acquisition list
Member and gauze grade device data acquisition unit;
The sub- device data acquisition unit is used to acquire the equipment fault data and/or equipment performance of the equipment from a certain equipment
Data;
The data that the line level device data acquisition unit is used to obtain the line level device data acquisition unit are solved
It analyses and regular, and is sent to the gauze grade device data acquisition unit;
The data that the gauze grade device data acquisition unit is used to obtain the gauze grade device data acquisition unit are solved
It analyses and regular, and is sent to the device data acquisition unit.
5. the system of intelligent monitoring as described in claim 1 and operation and maintenance, it is characterised in that:
Equipment performance analysis and anticipation unit include device performance data management assembly, device performance data analytic unit with
And equipment fault prejudges component;
The device performance data management assembly is for being managed the device performance data;
The device performance data analytic unit is for becoming to the variation of all properties parameter value in the device performance data
Gesture is analyzed;
The equipment fault anticipation component is used for the variation tendency according to the performance parameter value, is compared with preset threshold values
Compared with judging that equipment fault will occur and generate corresponding pre- if one or more device parameter value is inferior to preset threshold values
Sentence data.
6. a kind of side of intelligent monitoring and the operation and maintenance of the system based on intelligent monitoring described in claim 1 and operation and maintenance
Method, which comprises the following steps:
Device data acquisition unit acquires the equipment fault data and/or device performance data of each equipment, and is sent to equipment
Data processing unit;
Device data processing unit sends device performance data to equipment performance analysis and anticipation unit, by equipment fault data
Send operation maintenance management unit to;
Equipment performance analysis and anticipation unit carry out trend analysis to the device performance parameters value in device performance data, if wherein
One or more device performance parameters value when being inferior to preset threshold values, then determine that the equipment fault will occur and generate phase
The anticipation data answered;
Operation maintenance management unit obtains simultaneously analytical equipment fault data and anticipation data, forms maintenance according to the result of analysis and manages
Manage data.
7. the method for intelligent monitoring as claimed in claim 6 and operation and maintenance, which is characterized in that further comprising the steps of:
Mobile terminal processing unit obtains maintenance management data and carries out corresponding maintenance processing, and the maintenance knot that maintenance is handled
Fruit data are transferred to operation maintenance management unit and are stored.
8. the method for intelligent monitoring as claimed in claim 6 and operation and maintenance, it is characterised in that:
Device data processing unit includes server end and client, and server end is equipped with warning data acquisition module, client
Equipped with alarm display module;
Warning data acquisition module receiving device fault data, and it is sent to client;
Alarm display module shows equipment fault data.
9. the method for intelligent monitoring as claimed in claim 6 and operation and maintenance, it is characterised in that:
Device data acquisition unit equipped with three-level acquire: sub- device data acquisition unit, line level device data acquisition unit and
Gauze grade device data acquisition unit;
Sub- device data acquisition unit acquires the equipment fault data and/or device performance data of the equipment from a certain equipment;
Line level device data acquisition unit obtain line level device data acquisition unit data carry out parsing and it is regular, concurrently
It send to gauze grade device data acquisition unit;
The data that gauze grade device data acquisition unit obtains the gauze grade device data acquisition unit carry out parsing and it is regular,
And it is sent to device data acquisition unit.
10. the method for intelligent monitoring as claimed in claim 6 and operation and maintenance, it is characterised in that:
Equipment performance analysis and anticipation unit include device performance data management assembly, device performance data analytic unit and set
Standby failure prejudges component;
Device performance data management assembly is managed device performance data;
Device performance data analytic unit analyzes the variation tendency of the device performance parameters value in device performance data;
Equipment fault prejudges component according to the variation tendency of device performance parameters value, is compared with preset threshold values, if wherein
One or more device performance parameters values are inferior to preset threshold values, then judge that equipment fault will occur and generate corresponding anticipation
Data.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910441256.9A CN110209104A (en) | 2019-05-24 | 2019-05-24 | The system and method for intelligent monitoring and operation and maintenance |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910441256.9A CN110209104A (en) | 2019-05-24 | 2019-05-24 | The system and method for intelligent monitoring and operation and maintenance |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110209104A true CN110209104A (en) | 2019-09-06 |
Family
ID=67788620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910441256.9A Pending CN110209104A (en) | 2019-05-24 | 2019-05-24 | The system and method for intelligent monitoring and operation and maintenance |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110209104A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110633189A (en) * | 2019-09-20 | 2019-12-31 | 深圳市广通软件有限公司 | Intelligent operation and maintenance monitoring method and intelligent operation and maintenance monitoring system of IT system |
CN116700092A (en) * | 2023-06-16 | 2023-09-05 | 广州正奇科技有限公司 | Operation control intelligent early warning system suitable for industrial personal computer |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102407867A (en) * | 2011-08-09 | 2012-04-11 | 河南辉煌科技股份有限公司 | Urban rail transit signal maintenance supporting system |
CN103674586A (en) * | 2013-12-12 | 2014-03-26 | 同济大学 | Method for hidden danger and fault feature extraction for train running system |
CN104442931A (en) * | 2014-11-20 | 2015-03-25 | 上海富欣智能交通控制有限公司 | Comprehensive rail transit maintenance and management system |
CN104661891A (en) * | 2012-09-18 | 2015-05-27 | 西门子公司 | Method for diagnosing railroad components of a railroad network for rail transport |
CN109413614A (en) * | 2018-09-27 | 2019-03-01 | 北京全路通信信号研究设计院集团有限公司 | A kind of vehicle ground integrated synthesis analysis platform |
-
2019
- 2019-05-24 CN CN201910441256.9A patent/CN110209104A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102407867A (en) * | 2011-08-09 | 2012-04-11 | 河南辉煌科技股份有限公司 | Urban rail transit signal maintenance supporting system |
CN104661891A (en) * | 2012-09-18 | 2015-05-27 | 西门子公司 | Method for diagnosing railroad components of a railroad network for rail transport |
CN103674586A (en) * | 2013-12-12 | 2014-03-26 | 同济大学 | Method for hidden danger and fault feature extraction for train running system |
CN104442931A (en) * | 2014-11-20 | 2015-03-25 | 上海富欣智能交通控制有限公司 | Comprehensive rail transit maintenance and management system |
CN109413614A (en) * | 2018-09-27 | 2019-03-01 | 北京全路通信信号研究设计院集团有限公司 | A kind of vehicle ground integrated synthesis analysis platform |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110633189A (en) * | 2019-09-20 | 2019-12-31 | 深圳市广通软件有限公司 | Intelligent operation and maintenance monitoring method and intelligent operation and maintenance monitoring system of IT system |
CN110633189B (en) * | 2019-09-20 | 2023-04-07 | 深圳市广通软件有限公司 | Intelligent operation and maintenance monitoring method and intelligent operation and maintenance monitoring system of IT system |
CN116700092A (en) * | 2023-06-16 | 2023-09-05 | 广州正奇科技有限公司 | Operation control intelligent early warning system suitable for industrial personal computer |
CN116700092B (en) * | 2023-06-16 | 2024-02-09 | 广州正奇科技有限公司 | Operation control intelligent early warning system suitable for industrial personal computer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105868075A (en) | System and method for monitoring and analyzing great deal of logs in real time | |
CN106026405A (en) | Relay protection on-line monitoring and analyzing system based on EMS system | |
CN205901441U (en) | Management and control system is concentrated in new forms of energy power station | |
CN104410163B (en) | A kind of safety in production based on electric energy management system and power-economizing method | |
CN105416343A (en) | Comprehensive early warning method and system for track construction | |
CN104574557A (en) | Alarm-based site polling method, alarm-based site polling manipulation device and alarm-based site polling system | |
CN110209104A (en) | The system and method for intelligent monitoring and operation and maintenance | |
CN103964268A (en) | Elevator cloud system for achieving lifelong responsibility of manufacturer for elevator and elevator operation control method of elevator cloud system | |
CN106570781B (en) | Intelligent substation monitoring information step-by-step acceptance method based on three-layer two-network structure | |
CN109142978B (en) | Active monitoring method for running state of railway contact net | |
CN110135598A (en) | A kind of high-speed railway electricity business maintenance auxiliary system of knowledge based service | |
CN107958019A (en) | Graphical application process based on Regulation system | |
CN110601751A (en) | Power grid communication optical cable interruption monitoring method and device | |
CN104967812A (en) | Video conference comprehensive intelligent monitoring system and control method | |
CN109067602A (en) | Electric power adapted electric industry business method for diagnosing faults and Related product based on communication monitoring | |
CN103607048B (en) | An electric power network device fault diagnosis method and a system | |
CN102984013A (en) | Alarm analysis method for communication transmission network | |
CN202772926U (en) | Motor train unit maintenance apparatus remote diagnosis and management system based on wide-area Internet | |
CN209842406U (en) | Railway energy consumption data acquisition device and energy management system | |
CN112613790A (en) | Cooperative data processing method, device and medium applied to multi-station fusion environment | |
CN218276763U (en) | Contact net fault prediction and health management system based on industrial internet technology | |
CN208477056U (en) | A kind of railway power perforation online fault locator of cable run | |
CN207149078U (en) | A kind of low-voltage collecting meter reading system fault locator | |
CN203630603U (en) | Sewage treatment system | |
CN103414595B (en) | Power dispatch data network link monitoring system topological drawing generating method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190906 |
|
RJ01 | Rejection of invention patent application after publication |