CN110208100A - A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation - Google Patents

A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation Download PDF

Info

Publication number
CN110208100A
CN110208100A CN201910503603.6A CN201910503603A CN110208100A CN 110208100 A CN110208100 A CN 110208100A CN 201910503603 A CN201910503603 A CN 201910503603A CN 110208100 A CN110208100 A CN 110208100A
Authority
CN
China
Prior art keywords
underwater
deep
pressure
oil gas
gas pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910503603.6A
Other languages
Chinese (zh)
Inventor
袁汝华
崔启利
奉虎
刘华东
王军
王洪力
郑松贤
张海波
李友行
徐壮
朱绍华
邓重强
兰学杰
柳斌
李秀乾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Yantai Jereh Petroleum Equipment and Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd, Yantai Jereh Petroleum Equipment and Technologies Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201910503603.6A priority Critical patent/CN110208100A/en
Publication of CN110208100A publication Critical patent/CN110208100A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/08Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces
    • G01N3/10Investigating strength properties of solid materials by application of mechanical stress by applying steady tensile or compressive forces generated by pneumatic or hydraulic pressure
    • G01N3/12Pressure testing
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0001Type of application of the stress
    • G01N2203/0003Steady
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/0014Type of force applied
    • G01N2203/0016Tensile or compressive
    • G01N2203/0019Compressive
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/003Generation of the force
    • G01N2203/0042Pneumatic or hydraulic means
    • G01N2203/0048Hydraulic means
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/026Specifications of the specimen
    • G01N2203/0262Shape of the specimen
    • G01N2203/0274Tubular or ring-shaped specimens
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N2203/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N2203/02Details not specific for a particular testing method
    • G01N2203/06Indicating or recording means; Sensing means
    • G01N2203/067Parameter measured for estimating the property
    • G01N2203/0676Force, weight, load, energy, speed or acceleration

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The invention discloses a kind of key equipments applied to deep-sea oil gas pipeline pressure test operation; it include: pressure testing adjusting and control system, chemical injection system, data acquisition and Transmission system, holding pressure control system, auxiliary system; immersion seawater filter, underwater pressure test pump, underwater throttling and control system, underwater flowmeter, underwater barometer and pressure sensor; system above no more than the application of the 2000m depth of water according to being designed and meet the requirement of underwater anti-corrosion material; and it is connected by skid module, the fender bracket of setting tower structure outside system above;Pressure testing operating equipment all underwater arrangements can be achieved in the present invention, reduce the disadvantages of conventional pigging operation ground installation is more, occupied space is big, input cost is high, high-voltage safety hidden danger is more, improve deep underwater pipes pressure testing operating efficiency.

Description

A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation
Technical field
The present invention relates to marine worker and deep-sea field more particularly to a kind of keys applied to deep-sea oil gas pipeline pressure test operation Equipment.
Background technique
Global deep sea equipment technology is flourishing, and technological innovation emerges one after another, and operating water depth is more far-reaching, ocean dress It is standby to develop to automation, greenization, integrated, intelligent direction.
Deep-sea is the following marine petroleum development " main battle ground ".It is limited by the factors such as engineering unit capability and technical level limit System, China's offshore oil and gas field exploitation depth of water temporarily concentrates within 300 meters, big with domestic and international blue water oil gas field resource Power exploitation, the extensive use of submarine pipeline and seabed underwater units, submarine pipeline work pressure test amount are also increasing year by year.It is new to be laid with Submerged pipeline be required to before operation to carry out it pressure testing processing construction, to guarantee that submerged pipeline internal pressure is stable, pipeline It is flawless, good condition is created for the offshore platform submerged pipeline that comes into operation, ensure that the normal use of submerged pipeline.
As marine drilling develops to deep-sea, associated more and more difficult, the ground pressure testing equipment of pipeline pressure test work The pressure testing job requirements that land and shallow water pipeline can be met, for deep underwater pipes pressure testing operation, required ground installation quantity It is more, in order to overcome deep-water pressure and on-way resistance, high-power complete operating equipment is needed, to ship arrangement space, high-power Equipment input cost proposes high requirement, meanwhile, ground installation causes the personal safety of operating personnel due to operating conditions such as high pressures It threatens.Domestic at present there are no the pressure testing job requirements that ground installation can satisfy deep-sea, long-distance pipe, while being suitable for deep The pipeline pressure test equipment of water is also blank.
Deepwater petroleum exploration is developed still in its infancy, is badly in need of advanced technology and equipment and is supported.It is more and more Pipelines in deep sea pressure testing operation, there is an urgent need to it is a kind of can operation under water pressure testing operating equipment.
Summary of the invention
The present invention overcomes the deficiencies in the prior art, a kind of key applied to deep-sea oil gas pipeline pressure test operation is provided and is set It is standby, i.e. underwater pressure test equipment, it can be achieved that the whole underwater arrangement of pressure testing operating equipment, reduce conventional pigging operation ground installation it is more, The disadvantages of occupied space is big, input cost is high, high-voltage safety hidden danger is more improves deep underwater pipes pressure testing operating efficiency.
In order to achieve the above objectives, the technical solution adopted by the present invention are as follows: one kind is applied to the operation of deep-sea oil gas pipeline pressure test Key equipment, comprising: pressure testing adjusting and control system, chemical injection system, data acquisition and Transmission system, pressure maintaining control System processed, auxiliary system, immersion seawater filter, underwater pressure test pump, underwater throttling and control system, underwater flowmeter, water Lower pressure gauge and pressure sensor, system above are designed according to no more than the application of the 2000m depth of water and meet underwater anti-corrosion Material requirement, and connected by skid module, the fender bracket of setting tower structure outside system above.
In a preferred embodiment of the present invention, the pressure testing adjusting and control system include at least three cylinder columns of submerged applications Fill in pump, seawater isolating valve, submerged applications hydraulic system.
In a preferred embodiment of the present invention, the plunger pump provides liquid as pressure testing equipment using the auxiliary hydraulic system of ROV Pressure power.The quick connection that ROV and equipment are realized by underwater hydraulic hot plug tool, by controlling ROV flow rate of hydraulic system And pressure, it realizes bath flow and the pressure control from plunger pump not less than 20L/min@75MPa and adjusts.Submerged applications are hydraulic System designs deep-water pressure compensation and balance system, can be according to different sea water advanced automatic adjustment hydraulic systems and extraneous hydraulic pressure Balance.
In a preferred embodiment of the present invention, the holding pressure control system includes at least double isolating devices, temperature and pressure Sensing detection device and safety relief device.
In a preferred embodiment of the present invention, the chemical injection system include at least underwater chemical agent tank 10, Chemical agent exhaust system, chemical agent injected system, chemical agent filtering and regulating system, chemical agent supplement fast interface under water.Change It learns agent and realizes according to main pipeline changes in flow rate and chemical agent filtering and regulating system by venturi principle and be not less than 300ppm It is injected with the proportion of the various concentration of 1000ppm.Chemical agent tank 10 itself has Underwater Pressure compensation ability, can be according in tank The consumption of chemical agent constantly adjusts volume, realizes internal and external pressure balance, it can be achieved that being not less than the application of 2000 meters of depth of water, and each Injection, discharge, control can be implemented separately in independent chemical agent tank 10, and underwater ROV hot-plug interface is separately configured in each tank, The underwater supply filling of chemical agent in real time can be achieved.
In a preferred embodiment of the present invention, the chemical agent tank 10 is one or more, each chemical agent Tank 10 is respectively provided with underwater ROV hot-plug interface.
In a preferred embodiment of the present invention, the data acquisition and Transmission system include at least injection seawater flow metering And control system, chemical agent inject flow measurement and control system, sea water advanced and temperature measurement system, system discharge pressure meter Amount system, underwater data display system, underwater data wireless transmitting system.Whole system can be to the flow in operation process, pressure The data such as power, depth, temperature are acquired in real time, and are sent by underwater sound transmitter, receive number by nautical receiving set on ROV According to being sent to Chuan Shang control centre by umbilical cables, it can be achieved that the functions such as underwater real-time display and data waterborne downloading.This sets It is standby to go back innovative design with ROV docking platform and for the valve and meter interface of ROV operation, to realize ROV to underwater clear The operation of tube apparatus.
In a preferred embodiment of the present invention, the underwater data display system connects instrument face plate.
In a preferred embodiment of the present invention, the auxiliary system includes at least mud mat, anti-corrosion protection, external equipment and connects It connects.Complete equipment design has the mud mat for adapting to seabed difference soil property, can control contact pressure within 5kpa, to differently Matter can ensure operation stability completely.Complete equipment designs two sets of anti-corrosion measures, first is that design is suitable for the sun of underwater equipment Equipment and component are protected in pole protection in the way of sacrificial anode, and the whole design service life is not less than 5 years, on the other hand, according to water The spraying of lower equipment surface layer and requirement for anticorrosion design spraying.To adapt to underwater quick despatch, extend hose on deep-sea pressure testing equipment As charging pipe, there is the quick coupling of underwater hot plug in the design of water-filling tube end, can assist realizing and serving a ball on cylinder by ROV The underwater quick connection of interface.After operation, bath hose can be directly wound in around equipment, reduced underwater ROV and made The workload of industry.
In a preferred embodiment of the present invention, the immersion seawater filter implemented the seawater for flowing through its own Filter, chemical agent injection, pressure/flow metering, and operation and continuous data are recorded in self-contained data collection system On.
Immersion seawater filter, underwater pressure test pump, underwater section are integrated in a preferred embodiment of the present invention, in equipment Stream and all pressure testing holding equipments such as control system, underwater flowmeter, underwater barometer and pressure sensor, data collection system It is a kind of highly integrated underwater equipment.
In a preferred embodiment of the present invention, equipment is integral frame-type structure, and outer framework is pumping system, chemical agent note The offers such as system, electrical system, hydraulic system protection and the fixed installation of ancillary equipment are provided.
In a preferred embodiment of the present invention, in pressure testing operation process, the hydraulic pump of ROV provides dynamic for the hydraulic test pump in sledge Power implements extra large pipe pressure testing.
In a preferred embodiment of the present invention, pigging sledge entry design filter, filtering accuracy is not less than 50 μm, avoids This stage enters gravel and organic-biological in pipeline, and is not less than 5 μm of filtering in plunger pump entry design filtering accuracy Device is prolonged the service life with protecting plunger pump.
In a preferred embodiment of the present invention, which implements filtering to the seawater for flowing through its own, chemical agent injects, The operations such as pressure/flow metering, and operation and continuous data are recorded in self-contained data collection system.
In a preferred embodiment of the present invention, multiple chemical agent injection tanks are configured, realize the same of at least two chemical agents When inject, can the corresponding underwater chemical agent tank 10 of external extension as needed.
In a preferred embodiment of the present invention, to adapt to underwater connection, extend seabed jumper hose on underwater pressure test sledge As pressure testing pipe, the quick coupling of underwater hot plug is had in pressure testing tube end, can be achieved and served a ball on cylinder under the auxiliary of ROV The underwater quick connection of interface.
The invention solves the defect existing in the background technology, the present invention have it is following the utility model has the advantages that
(1) a complete set of equipment of the present invention may be directly applied to underwater 2000 meters of depth of water, can avoid causing because the depth of water increases Pressure testing operating equipment quantity in ground is more, required power is big, occupies ship area reaches, input cost height, high pressure operating risk etc. Disadvantage minimizes resource needed for operation, assigns extra large pipe pressure testing safer, economic operation mode, it is pre- to promote deep water sea pipe The economy of Task of Debugging, while pressure testing operation investment is greatly reduced.
(2) pressure testing adjusting of the present invention and control system realize the quick of ROV and equipment by underwater hydraulic hot plug tool Connection realizes the bath flow for being not less than 20L/min@75MPa from plunger pump by control ROV flow rate of hydraulic system and pressure And pressure is controlled and is adjusted.The compensation of submerged applications design of Hydraulic System deep-water pressure and balance system, can be deep according to different seawater Spend the balance of flexible automatic adjusting hydraulic system and extraneous hydraulic pressure;Holding pressure control system can realize pressure maintaining, inspection after pressure testing It surveys, and can realize the setting of at least three kinds or more of safety relief value.
(3) chemical agent is filtered and is adjusted according to main pipeline changes in flow rate and chemical agent by venturi principle in the present invention System realizes the proportion injection of the various concentration not less than 300ppm and 1000ppm.Chemical agent tank 10 itself has underwater pressure Force compensating ability can constantly adjust volume according to the consumption of chemical agent in tank, realize internal and external pressure balance, it can be achieved that being not less than The application of 2000 meters of depth of water, and injection, discharge, control, and each tank list can be implemented separately in each independent chemical agent tank 10 Underwater ROV hot-plug interface is solely configured, it can be achieved that the underwater supply filling of chemical agent in real time.
(4) whole system of the present invention can adopt in real time the data such as flow, pressure, depth, temperature in operation process Collection, and sent by underwater sound transmitter, data are received by nautical receiving set on ROV, is sent on ship and is controlled by umbilical cables Center is, it can be achieved that the functions such as underwater real-time display and data waterborne downloading.This equipment also innovative design and ROV docking platform With the valve and meter interface operated for ROV, to realize operation of the ROV to underwater pigging equipment.
(5) complete equipment of the present invention designs two sets of anti-corrosion measures, first is that design is suitable for the anodic protection of underwater equipment, benefit Equipment and component are protected with the mode of sacrificial anode, the whole design service life is not less than 5 years, on the other hand, according to underwater equipment table Layer spraying and requirement for anticorrosion design spraying, the fender bracket of tower structure can provide protection and ancillary equipment for internal unit It is fixedly mounted.
(6) achievable pressure testing operating equipment of the invention is all underwater arranges, the conventional pigging operation ground installation of reduction is more, accounts for With the disadvantages of space is big, input cost is high, high-voltage safety hidden danger is more, deep underwater pipes pressure testing operating efficiency is improved.
Detailed description of the invention
Present invention will be further explained below with reference to the attached drawings and examples;
Fig. 1 is the three-dimensional structure diagram of the preferred embodiment of the present invention;
Fig. 2 is the schematic illustration of the preferred embodiment of the present invention;
In figure: fender bracket 1;Mud mat 2;Valve 3;Data actuation 4;Instrument face plate 5;Underwater plunger pump 6;Underwater motor 7; Chemical agent tank expands interface 88;Anodic protection 9;Chemical agent tank 10.
Specific embodiment
Presently in connection with drawings and examples, the present invention is described in further detail, these attached drawings are simplified signal Figure, the basic structure of the invention will be illustrated schematically only, therefore it only shows the composition relevant to the invention.
It should be noted that it can directly on the other part when component is referred to as " being fixed on " another component Or there may also be components placed in the middle.When a component is considered as " connection " another component, it, which can be, is directly connected to To another component or it may be simultaneously present component placed in the middle.Term as used herein "upper", "lower", "inner", "outside", "left", "right" and similar statement for illustrative purposes only, are not meant to be the only embodiment.
As shown in Figure 1 and Figure 2, a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation, comprising: pressure testing is adjusted And control system, chemical injection system, data acquire and Transmission system, holding pressure control system, auxiliary system, immersion sea Water filter, underwater pressure test pump, underwater throttling and control system, underwater flowmeter, underwater barometer and pressure sensor, it is above System passes through skid module company according to the requirement of underwater anti-corrosion material is designed and met no more than the application of the 2000m depth of water It connects, the fender bracket 1 of setting tower structure outside system above.
Specifically, pressure testing adjusting and control system include at least the three-cylinder plunger pump of submerged applications, seawater isolating valve, underwater Using hydraulic system.
Specifically, plunger pump provides hydraulic power as pressure testing equipment using the auxiliary hydraulic system of ROV.Pass through underwater hydraulic heat Plug-pull tool realizes the quick connection of ROV and equipment, by control ROV flow rate of hydraulic system and pressure, realizes from plunger pump not Bath flow and pressure control and adjusting lower than 20L/min@75MPa.The compensation of submerged applications design of Hydraulic System deep-water pressure And balance system, it can be according to the balance of different sea water advanced automatic adjustment hydraulic systems and extraneous hydraulic pressure.
Specifically, holding pressure control system includes at least double isolating devices, temperature and pressure sensing detection device and safety Bleeder.
Specifically, chemical injection system includes at least underwater chemical agent tank 10, chemical agent exhaust system, chemical agent Injected system, chemical agent filtering and regulating system, chemical agent supplement fast interface under water.Chemical agent by venturi principle according to Main pipeline changes in flow rate and chemical agent filtering and regulating system realize matching for the various concentration not less than 300ppm and 1000ppm Than injection.Chemical agent tank 10 itself has Underwater Pressure compensation ability, can be according to the continuous adjusting body of consumption of chemical agent in tank Product realizes internal and external pressure balance, it can be achieved that being not less than the application of 2000 meters of depth of water, and each independent chemical agent tank 10 can be single Solely realize that underwater ROV hot-plug interface is separately configured, it can be achieved that underwater chemical agent in real time is mended in injection, discharge, control, and each tank To filling.
Specifically, chemical agent tank 10 is one or more, and each chemical agent tank 10 is respectively provided with underwater ROV hot plug and connects Mouthful.
Specifically, data acquisition and Transmission system include at least the metering of injection seawater flow and control system, chemical agent note Inbound traffics metering and control system, sea water advanced and temperature measurement system, system discharge pressure metering system, underwater data are shown System, underwater data wireless transmitting system.Whole system can to the data such as flow, pressure, depth, temperature in operation process into Row acquisition in real time, and sent by underwater sound transmitter, data are received by nautical receiving set on ROV, are sent to by umbilical cables Chuan Shang control centre is, it can be achieved that the functions such as underwater real-time display and data waterborne downloading.This equipment also innovative design and ROV Docking platform and the valve 3 and meter interface operated for ROV, to realize operation of the ROV to underwater pigging equipment.
Specifically, underwater data display system connects instrument face plate 5.
Specifically, auxiliary system includes at least mud mat 2, anti-corrosion protection, external equipment connection.Complete equipment design has suitable The mud mat 2 of seabed difference soil property is answered, contact pressure can be controlled within 5kpa, operation can be ensured completely to differently matter Stability.Complete equipment designs two sets of anti-corrosion measures, first is that design is suitable for the anodic protection 9 of underwater equipment, it is positive using sacrificing The mode of pole protects equipment and component, and the whole design service life is not less than 5 years, on the other hand, according to the spraying of underwater equipment surface layer and Requirement for anticorrosion design spraying.To adapt to underwater quick despatch, extend hose as charging pipe, in water-filling on deep-sea pressure testing equipment Tube end designs the quick coupling for having underwater hot plug, and realization can be assisted quickly to connect with the underwater of interface on service cylinder by ROV It connects.After operation, bath hose can be directly wound in around equipment, reduce the workload of underwater ROV operation.
Specifically, immersion seawater filter to flow through its own seawater implement filtering, chemical agent injection, pressure/ Flow measurement, and operation and continuous data are recorded in self-contained data collection system.
As shown in Figure 1, being pressure testing equipment structural schematic diagram.Immersion seawater filter, underwater pressure test are integrated in equipment All examinations such as pump, underwater throttling and control system, underwater flowmeter, underwater barometer and pressure sensor, data collection system Pressure holding equipment is a kind of highly integrated underwater equipment;
Specifically, equipment be integral frame-type structure, outer framework be pumping system, chemical agent injected system, electrical system, The fixed installation of the offers such as hydraulic system protection and ancillary equipment;
Specifically, in pressure testing operation process, the hydraulic pump of ROV provides power for the hydraulic test pump in sledge, implements extra large pipe pressure testing;
Specifically, pigging sledge entry design filter, filtering accuracy be not less than 50 μm, avoid this stage make gravel and Organic-biological enters in pipeline, and is not less than 5 μm of filter device in plunger pump entry design filtering accuracy, to protect plunger Pump, prolongs the service life;
Specifically, which implements filtering, chemical agent injection, pressure/flow metering etc. to the seawater for flowing through its own Operation, and operation and continuous data are recorded in self-contained data collection system;
Specifically, multiple chemical agent injection tanks are configured, are injected while realizing at least two chemical agents, it can be outer as needed Connect the corresponding underwater chemical agent tank 10 of extension;
Specifically, to adapt to underwater connection, extend seabed jumper hose as pressure testing pipe, in pressure testing on underwater pressure test sledge Tube end has the quick coupling of underwater hot plug, can be achieved quickly to connect with the underwater of interface on service cylinder under the auxiliary of ROV It connects;
As shown in Fig. 2, the seawater injection that filtration system can meet minimum 60L/min requires, and at least 50 μm of filtering Precision, a whole set of filtration system are finished detachably by flanged joint, operation, and carry out clean and maintenance to equipment inside.Operation is opened Beginning is operated with ROV first, and ROV itself hydraulic system is quickly established connection by underwater hot plug device and pressure testing equipment. By in the seawater isolating device and chemical agent injected system in seawater filtering system chemical agent isolating device, in pressure-retaining system Double isolating devices are opened, and are opened ROV hydraulic system feed system and are driven the underwater work of plunger pump 6, it can be achieved that not low 20L/min The bath flow and pressure of 75MPa is controlled and is adjusted, and passes through the characteristic of the venturi pump in chemical agent injected system, flow tune Section requires the proportion injection for realizing the various concentration not less than 300ppm and 1000ppm.
The above operation can directly be operated by the underwater ROV control panel in Fig. 2, reduce motion range and the movement of ROV Amount, avoids the risk for twining cable under water.Meanwhile the data such as flow, pressure, depth, temperature in operation process are acquired in real time, And sent by underwater sound transmitter, data are received by nautical receiving set on ROV, are sent on ship in control by umbilical cables The heart is, it can be achieved that the functions such as underwater real-time display and data waterborne downloading.
Based on the above description of the preferred embodiments of the present invention, through the above description, related personnel completely can be with Without departing from the scope of the technological thought of the present invention', various changes and amendments are carried out.The technical scope of this invention It is not limited to the contents of the specification, it is necessary to determine the technical scope according to the scope of the claims.

Claims (10)

1. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation characterized by comprising pressure testing adjusts and control System, chemical injection system, data acquisition and Transmission system, holding pressure control system, auxiliary system, immersion sea water filter Device, underwater pressure test pump, underwater throttling and control system, underwater flowmeter, underwater barometer and pressure sensor, system above are equal It requires according to being designed no more than the application of the 2000m depth of water and meeting underwater anti-corrosion material, and is connected by skid module, it is above The fender bracket of exterior setting tower structure.
2. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, it is characterised in that: The pressure testing adjusting and control system include at least three-cylinder plunger pump, seawater isolating valve, the submerged applications hydraulic pressure system of submerged applications System.
3. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 2, it is characterised in that: The plunger pump provides hydraulic power as pressure testing equipment using the auxiliary hydraulic system of ROV.
4. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, it is characterised in that: The holding pressure control system includes at least double isolating devices, temperature and pressure sensing detection device and safety relief device.
5. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, it is characterised in that: The chemical injection system includes at least underwater chemical agent tank 10, chemical agent exhaust system, chemical agent injected system, changes It learns agent filtering and regulating system, chemical agent supplements fast interface under water.
6. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 5, it is characterised in that: The chemical agent tank 10 is one or more, and each chemical agent tank 10 is respectively provided with underwater ROV hot-plug interface.
7. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, it is characterised in that: Data acquisition and Transmission system include at least the metering of injection seawater flow and control system, chemical agent injection flow measurement and Control system, sea water advanced and temperature measurement system, system discharge pressure metering system, underwater data display system, underwater number According to wireless transmitting system.
8. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 7, it is characterised in that: The underwater data display system connects instrument face plate.
9. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, it is characterised in that: The auxiliary system includes at least mud mat, anti-corrosion protection, external equipment connection.
10. a kind of key equipment applied to deep-sea oil gas pipeline pressure test operation according to claim 1, feature exist In: the immersion seawater filter implements filtering, chemical agent injection, pressure flow metering to the seawater for flowing through its own, And operation and continuous data are recorded in self-contained data collection system.
CN201910503603.6A 2019-06-12 2019-06-12 A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation Pending CN110208100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910503603.6A CN110208100A (en) 2019-06-12 2019-06-12 A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910503603.6A CN110208100A (en) 2019-06-12 2019-06-12 A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation

Publications (1)

Publication Number Publication Date
CN110208100A true CN110208100A (en) 2019-09-06

Family

ID=67792135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910503603.6A Pending CN110208100A (en) 2019-06-12 2019-06-12 A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation

Country Status (1)

Country Link
CN (1) CN110208100A (en)

Cited By (33)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
CN114414382A (en) * 2021-12-13 2022-04-29 烟台杰瑞石油装备技术有限公司 Simulation deep sea pressure resistance test system and method
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088658A2 (en) * 2001-05-02 2002-11-07 Progenitive Services Limited Apparatus for and method of flooding and/or pressure testing pipelines
CN101017372A (en) * 2006-12-29 2007-08-15 四川科特石油工业井控质量安全监督测评中心 Measurement and control pressure testing system of petroleum well control device
US20090288836A1 (en) * 2008-05-21 2009-11-26 Valkyrie Commissioning Services Inc. Apparatus and Methods for Subsea Control System Testing
WO2013040296A2 (en) * 2011-09-16 2013-03-21 Baker Hughes Incorporated Apparatus and methods for providing fluid into a subsea pipeline
CN203050632U (en) * 2012-11-14 2013-07-10 中原特种车辆有限公司 Chemical agent injection device
CN104865129A (en) * 2014-02-20 2015-08-26 重庆瀚海石油技术有限公司 Skid-mounted multifunctional anti-blowout pipe pressure test system
CN105042338A (en) * 2015-06-16 2015-11-11 中国海洋石油总公司 Method for detecting leak of deepwater submerged pipeline through pressure test
CN205047202U (en) * 2015-02-02 2016-02-24 中海石油深海开发有限公司 Deep water is control allocation unit and manifold integrated system under water
CN206627252U (en) * 2017-04-07 2017-11-10 中石化南京工程有限公司 A kind of oil-gas pipeline water filling, pressure testing, drainage system
CN107525659A (en) * 2017-06-29 2017-12-29 中国石油天然气集团公司 A kind of pressure-volume curve drawing system for pipeline pressure test
CN109339754A (en) * 2018-12-13 2019-02-15 美钻深海能源科技研发(上海)有限公司 Marine oil field closing well robotics injection device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002088658A2 (en) * 2001-05-02 2002-11-07 Progenitive Services Limited Apparatus for and method of flooding and/or pressure testing pipelines
CN101017372A (en) * 2006-12-29 2007-08-15 四川科特石油工业井控质量安全监督测评中心 Measurement and control pressure testing system of petroleum well control device
US20090288836A1 (en) * 2008-05-21 2009-11-26 Valkyrie Commissioning Services Inc. Apparatus and Methods for Subsea Control System Testing
WO2013040296A2 (en) * 2011-09-16 2013-03-21 Baker Hughes Incorporated Apparatus and methods for providing fluid into a subsea pipeline
CN203050632U (en) * 2012-11-14 2013-07-10 中原特种车辆有限公司 Chemical agent injection device
CN104865129A (en) * 2014-02-20 2015-08-26 重庆瀚海石油技术有限公司 Skid-mounted multifunctional anti-blowout pipe pressure test system
CN205047202U (en) * 2015-02-02 2016-02-24 中海石油深海开发有限公司 Deep water is control allocation unit and manifold integrated system under water
CN105042338A (en) * 2015-06-16 2015-11-11 中国海洋石油总公司 Method for detecting leak of deepwater submerged pipeline through pressure test
CN206627252U (en) * 2017-04-07 2017-11-10 中石化南京工程有限公司 A kind of oil-gas pipeline water filling, pressure testing, drainage system
CN107525659A (en) * 2017-06-29 2017-12-29 中国石油天然气集团公司 A kind of pressure-volume curve drawing system for pipeline pressure test
CN109339754A (en) * 2018-12-13 2019-02-15 美钻深海能源科技研发(上海)有限公司 Marine oil field closing well robotics injection device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
戚晓宁等: "大管径长距离深水海底管道预调试新技术", 《石油工程建设》 *
王长涛等: "深水海管水下清管试压技术", 《清洗世界》 *

Cited By (132)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US11624326B2 (en) 2017-05-21 2023-04-11 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11560845B2 (en) 2019-05-15 2023-01-24 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11608725B2 (en) 2019-09-13 2023-03-21 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11619122B2 (en) 2019-09-13 2023-04-04 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11236739B2 (en) 2019-09-13 2022-02-01 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US10982596B1 (en) 2019-09-13 2021-04-20 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11473503B1 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11002189B2 (en) 2019-09-13 2021-05-11 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11460368B2 (en) 2019-09-13 2022-10-04 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11015536B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11015594B2 (en) 2019-09-13 2021-05-25 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11473997B2 (en) 2019-09-13 2022-10-18 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11761846B2 (en) 2019-09-13 2023-09-19 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11060455B1 (en) 2019-09-13 2021-07-13 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11655763B1 (en) 2019-09-13 2023-05-23 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11649766B1 (en) 2019-09-13 2023-05-16 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11092152B2 (en) 2019-09-13 2021-08-17 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11767791B2 (en) 2019-09-13 2023-09-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11512642B1 (en) 2019-09-13 2022-11-29 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11629584B2 (en) 2019-09-13 2023-04-18 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11149726B1 (en) 2019-09-13 2021-10-19 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11971028B2 (en) 2019-09-13 2024-04-30 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11156159B1 (en) 2019-09-13 2021-10-26 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11408794B2 (en) 2019-09-13 2022-08-09 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11867118B2 (en) 2019-09-13 2024-01-09 Bj Energy Solutions, Llc Methods and systems for supplying fuel to gas turbine engines
US11725583B2 (en) 2019-09-13 2023-08-15 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11401865B1 (en) 2019-09-13 2022-08-02 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11613980B2 (en) 2019-09-13 2023-03-28 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11530602B2 (en) 2019-09-13 2022-12-20 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11859482B2 (en) 2019-09-13 2024-01-02 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11346280B1 (en) 2019-09-13 2022-05-31 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10989180B2 (en) 2019-09-13 2021-04-27 Bj Energy Solutions, Llc Power sources and transmission networks for auxiliary equipment onboard hydraulic fracturing units and associated methods
US11719234B2 (en) 2019-09-13 2023-08-08 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US10895202B1 (en) 2019-09-13 2021-01-19 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11852001B2 (en) 2019-09-13 2023-12-26 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11268346B2 (en) 2019-09-13 2022-03-08 Bj Energy Solutions, Llc Fuel, communications, and power connection systems
US11604113B2 (en) 2019-09-13 2023-03-14 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11280266B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11280331B2 (en) 2019-09-13 2022-03-22 Bj Energy Solutions, Llc Systems and method for use of single mass flywheel alongside torsional vibration damper assembly for single acting reciprocating pump
US11287350B2 (en) 2019-09-13 2022-03-29 Bj Energy Solutions, Llc Fuel, communications, and power connection methods
US11598263B2 (en) 2019-09-13 2023-03-07 Bj Energy Solutions, Llc Mobile gas turbine inlet air conditioning system and associated methods
US11578660B1 (en) 2019-09-13 2023-02-14 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US11555756B2 (en) 2019-09-13 2023-01-17 Bj Energy Solutions, Llc Fuel, communications, and power connection systems and related methods
US11319878B2 (en) 2019-09-13 2022-05-03 Bj Energy Solutions, Llc Direct drive unit removal system and associated methods
US10907459B1 (en) 2019-09-13 2021-02-02 Bj Energy Solutions, Llc Methods and systems for operating a fleet of pumps
US11635074B2 (en) 2020-05-12 2023-04-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US11708829B2 (en) 2020-05-12 2023-07-25 Bj Energy Solutions, Llc Cover for fluid systems and related methods
US10968837B1 (en) 2020-05-14 2021-04-06 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11898504B2 (en) 2020-05-14 2024-02-13 Bj Energy Solutions, Llc Systems and methods utilizing turbine compressor discharge for hydrostatic manifold purge
US11434820B2 (en) 2020-05-15 2022-09-06 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11542868B2 (en) 2020-05-15 2023-01-03 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11428165B2 (en) 2020-05-15 2022-08-30 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11698028B2 (en) 2020-05-15 2023-07-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11624321B2 (en) 2020-05-15 2023-04-11 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11959419B2 (en) 2020-05-15 2024-04-16 Bj Energy Solutions, Llc Onboard heater of auxiliary systems using exhaust gases and associated methods
US11603745B2 (en) 2020-05-28 2023-03-14 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11365616B1 (en) 2020-05-28 2022-06-21 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11814940B2 (en) 2020-05-28 2023-11-14 Bj Energy Solutions Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11208880B2 (en) 2020-05-28 2021-12-28 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11313213B2 (en) 2020-05-28 2022-04-26 Bj Energy Solutions, Llc Bi-fuel reciprocating engine to power direct drive turbine fracturing pumps onboard auxiliary systems and related methods
US11598264B2 (en) 2020-06-05 2023-03-07 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11746698B2 (en) 2020-06-05 2023-09-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11208953B1 (en) 2020-06-05 2021-12-28 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11723171B2 (en) 2020-06-05 2023-08-08 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11627683B2 (en) 2020-06-05 2023-04-11 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US10961908B1 (en) 2020-06-05 2021-03-30 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11300050B2 (en) 2020-06-05 2022-04-12 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11129295B1 (en) 2020-06-05 2021-09-21 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11891952B2 (en) 2020-06-05 2024-02-06 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11378008B2 (en) 2020-06-05 2022-07-05 Bj Energy Solutions, Llc Systems and methods to enhance intake air flow to a gas turbine engine of a hydraulic fracturing unit
US11109508B1 (en) 2020-06-05 2021-08-31 Bj Energy Solutions, Llc Enclosure assembly for enhanced cooling of direct drive unit and related methods
US11015423B1 (en) 2020-06-09 2021-05-25 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11208881B1 (en) 2020-06-09 2021-12-28 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11566506B2 (en) 2020-06-09 2023-01-31 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11339638B1 (en) 2020-06-09 2022-05-24 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11066915B1 (en) 2020-06-09 2021-07-20 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11085281B1 (en) 2020-06-09 2021-08-10 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11022526B1 (en) 2020-06-09 2021-06-01 Bj Energy Solutions, Llc Systems and methods for monitoring a condition of a fracturing component section of a hydraulic fracturing unit
US11319791B2 (en) 2020-06-09 2022-05-03 Bj Energy Solutions, Llc Methods and systems for detection and mitigation of well screen out
US11512570B2 (en) 2020-06-09 2022-11-29 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11939854B2 (en) 2020-06-09 2024-03-26 Bj Energy Solutions, Llc Methods for detection and mitigation of well screen out
US11261717B2 (en) 2020-06-09 2022-03-01 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11629583B2 (en) 2020-06-09 2023-04-18 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11867046B2 (en) 2020-06-09 2024-01-09 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US10954770B1 (en) 2020-06-09 2021-03-23 Bj Energy Solutions, Llc Systems and methods for exchanging fracturing components of a hydraulic fracturing unit
US11236598B1 (en) 2020-06-22 2022-02-01 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11933153B2 (en) 2020-06-22 2024-03-19 Bj Energy Solutions, Llc Systems and methods to operate hydraulic fracturing units using automatic flow rate and/or pressure control
US11408263B2 (en) 2020-06-22 2022-08-09 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11952878B2 (en) 2020-06-22 2024-04-09 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11898429B2 (en) 2020-06-22 2024-02-13 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11939853B2 (en) 2020-06-22 2024-03-26 Bj Energy Solutions, Llc Systems and methods providing a configurable staged rate increase function to operate hydraulic fracturing units
US11125066B1 (en) 2020-06-22 2021-09-21 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11732565B2 (en) 2020-06-22 2023-08-22 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11598188B2 (en) 2020-06-22 2023-03-07 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11639655B2 (en) 2020-06-22 2023-05-02 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11028677B1 (en) 2020-06-22 2021-06-08 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11208879B1 (en) 2020-06-22 2021-12-28 Bj Energy Solutions, Llc Stage profiles for operations of hydraulic systems and associated methods
US11572774B2 (en) 2020-06-22 2023-02-07 Bj Energy Solutions, Llc Systems and methods to operate a dual-shaft gas turbine engine for hydraulic fracturing
US11661832B2 (en) 2020-06-23 2023-05-30 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11649820B2 (en) 2020-06-23 2023-05-16 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11566505B2 (en) 2020-06-23 2023-01-31 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11466680B2 (en) 2020-06-23 2022-10-11 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11939974B2 (en) 2020-06-23 2024-03-26 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11415125B2 (en) 2020-06-23 2022-08-16 Bj Energy Solutions, Llc Systems for utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11428218B2 (en) 2020-06-23 2022-08-30 Bj Energy Solutions, Llc Systems and methods of utilization of a hydraulic fracturing unit profile to operate hydraulic fracturing units
US11719085B1 (en) 2020-06-23 2023-08-08 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11473413B2 (en) 2020-06-23 2022-10-18 Bj Energy Solutions, Llc Systems and methods to autonomously operate hydraulic fracturing units
US11255174B2 (en) 2020-06-24 2022-02-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11506040B2 (en) 2020-06-24 2022-11-22 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11746638B2 (en) 2020-06-24 2023-09-05 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11692422B2 (en) 2020-06-24 2023-07-04 Bj Energy Solutions, Llc System to monitor cavitation or pulsation events during a hydraulic fracturing operation
US11668175B2 (en) 2020-06-24 2023-06-06 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11149533B1 (en) 2020-06-24 2021-10-19 Bj Energy Solutions, Llc Systems to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11220895B1 (en) 2020-06-24 2022-01-11 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11274537B2 (en) 2020-06-24 2022-03-15 Bj Energy Solutions, Llc Method to detect and intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11299971B2 (en) 2020-06-24 2022-04-12 Bj Energy Solutions, Llc System of controlling a hydraulic fracturing pump or blender using cavitation or pulsation detection
US11542802B2 (en) 2020-06-24 2023-01-03 Bj Energy Solutions, Llc Hydraulic fracturing control assembly to detect pump cavitation or pulsation
US11391137B2 (en) 2020-06-24 2022-07-19 Bj Energy Solutions, Llc Systems and methods to monitor, detect, and/or intervene relative to cavitation and pulsation events during a hydraulic fracturing operation
US11512571B2 (en) 2020-06-24 2022-11-29 Bj Energy Solutions, Llc Automated diagnostics of electronic instrumentation in a system for fracturing a well and associated methods
US11255175B1 (en) 2020-07-17 2022-02-22 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11365615B2 (en) 2020-07-17 2022-06-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11920450B2 (en) 2020-07-17 2024-03-05 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11603744B2 (en) 2020-07-17 2023-03-14 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11608727B2 (en) 2020-07-17 2023-03-21 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193360B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11193361B1 (en) 2020-07-17 2021-12-07 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11994014B2 (en) 2020-07-17 2024-05-28 Bj Energy Solutions, Llc Methods, systems, and devices to enhance fracturing fluid delivery to subsurface formations during high-pressure fracturing operations
US11867045B2 (en) 2021-05-24 2024-01-09 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11732563B2 (en) 2021-05-24 2023-08-22 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
US11639654B2 (en) 2021-05-24 2023-05-02 Bj Energy Solutions, Llc Hydraulic fracturing pumps to enhance flow of fracturing fluid into wellheads and related methods
CN114414382A (en) * 2021-12-13 2022-04-29 烟台杰瑞石油装备技术有限公司 Simulation deep sea pressure resistance test system and method
CN114414382B (en) * 2021-12-13 2023-12-01 烟台杰瑞石油装备技术有限公司 System and method for simulating deep sea withstand voltage test

Similar Documents

Publication Publication Date Title
CN110208100A (en) A kind of key equipment applied to deep-sea oil gas pipeline pressure test operation
AU2009201961B2 (en) Apparatus and methods for subsea control system testing
US4371037A (en) Transfer terminal for offshore production
AU2008216285B2 (en) Subsea pipeline service skid
CN110252750A (en) A kind of equipment applied to deep-sea oil gas pipeline cleaning operation
CN102536175B (en) Gas processer, riser assemblies and method
US8240191B2 (en) Universal power and testing platform
CN103587653B (en) Oceanographic observation subsurface buoy
AU2003300390A1 (en) Subsea oil collector
CN106401539B (en) Subsea manifold device with the automatic emission function of spherical pig
CN103806422A (en) Seabed leaked oil collecting system
CN103252330B (en) Simple underwater tube cleaner
CN110208101A (en) A kind of key equipment applied to deep-sea oil gas pipeline pre-debug operation
CN209305805U (en) Modularization buoyancy regulating device for deep-sea
CN112556937B (en) Underwater umbilical cable pressure testing device
CN101265995B (en) Underwater pump tube and its construction method and concrete conveying method
CN204754801U (en) Underwater drilling marine riser connects
CN103273172B (en) Underwater wet process welding wire feeding mechanism of flux-cored wire
CN207717432U (en) Vapour-pressure type deepwater substrate sludge sampling device
CN217584097U (en) Linkage device for marine pipe operation
CN205327338U (en) Ultrashort baseline poling installation device
CN204220571U (en) A kind of hydrate administers sledge
CN206128186U (en) Municipal water supply pipe network terminal water supply installation
CN104324916B (en) Hydrate administers sledge
CN105510041B (en) A kind of pipeline applied to water flow testing stand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190906