Prior art keywords
bar
column
accessory
guide rail
elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201780084207.3A
Other languages
Chinese (zh)
Other versions
CN110198906B (en
Inventor
高桥芳直
山田洋平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Building Solutions Corp
Original Assignee
Mitsubishi Electric Building Techno Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Building Techno Service Co Ltd filed Critical Mitsubishi Electric Building Techno Service Co Ltd
Publication of CN110198906A publication Critical patent/CN110198906A/en
Application granted granted Critical
Publication of CN110198906B publication Critical patent/CN110198906B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B7/00Other common features of elevators

Abstract

The elevator of time required for transport of the bar in hoistway can be shortened by, which providing, transports accessory with bar.Elevator bar transport accessory (1) of the invention has: bottom beam (2), it is formed as that multiple bar (25) of erected state can be loaded than being arranged short to the interval reused between guide rail (15) in hoistway (16);1st column (3), the one end connection of lower end and bottom beam (2);2nd column (4), the other end connection of lower end and bottom beam (2), the 2nd column are opposed with the 1st column (3) on the length direction of bottom beam (2);1st guide shoe installing component (10) is protruded outward from the 1st column (3), for installing along one to the guide shoe (14) for reusing guide rail (15) movement;And the 2nd guide shoe installing component (11), it is protruded outward from the 2nd column (4), for install along another to the guide shoe (14) for reusing guide rail (15) and moving.

Description

Elevator transports accessory, the guide rail method for dismounting of elevator and the guide rail of elevator with bar Setting method
Technical field
The present invention relates to elevator bar to transport accessory, the guide rail method for dismounting of elevator and the guide rail setting side of elevator Method.
Background technique
The movement of the carriage of elevator and counterweight is by the rail guidance that is arranged in hoistway.As the side for removing or being arranged guide rail Method has documented technology in for example following patent document 1.
Existing technical literature
Patent document
Patent document 1: Japanese Unexamined Patent Publication 11-349255 bulletin
Summary of the invention
Subject to be solved by the invention
In the past, when the bar that dismounting or setting guide rail etc. use in hoistway, bar is by mobile one by one.Cause This needs the plenty of time to transport bar in hoistway.
The present invention is to complete in order to solve above-mentioned problem.Its purpose is to provide can shorten to transport in hoistway The elevator of time required for bar transports accessory, the guide rail method for dismounting of elevator and the guide rail setting side of elevator with bar Method.
Means for solving the problems
Elevator bar transport accessory of the invention has: bottom beam, be formed as than be arranged in hoistway to reuse Interval between guide rail is short, can load multiple bar of erected state;The one end of 1st column, lower end and bottom beam Connection;The other end of 2nd column, lower end and bottom beam links, the 2nd column on the length direction of bottom beam with the 1st column It is opposed;1st guide shoe installing component is protruded outward from the 1st column, is led along one to what reuse guide rail moved for installing Boots;And the 2nd guide shoe installing component, it is protruded outward from the 2nd column, for installing along another to reusing what guide rail moved Guide shoe.
The guide rail method for dismounting of elevator of the invention has: accessory setting process, by above-mentioned bar transport accessory with It can be suspended in hoistway along the state moved to reuse guide rail;Preparatory process is dismantled, bar transport accessory is moved to In the position of current time No. 2 guide rail of number from top to bottom;Process is dismantled, multiple guide rails of top side will be located at current time It is loaded into bar transport accessory;Preparatory process is transported, the bar for being loaded with existing guide rail transport accessory is made to be moved to cargo Load and unload layer;And process is transported, the multiple guide rails for being loaded into bar transport accessory are transported to the stop of cargo handling layer.
The guide rail setting method of elevator of the invention has: accessory setting process, by above-mentioned bar transport accessory with It can be suspended in hoistway along the state moved to reuse guide rail;It is transported into process, by what is be transported into from the stop of cargo handling layer Multiple guide rails are loaded into bar transport accessory;Preparatory process is installed, is moved to bar transport accessory in current time position In the position of the guide rail of top side;Installation procedure installs the multiple guide rails for being loaded into bar transport accessory;And fortune Enter preparatory process, bar transport accessory is made to be moved to cargo handling layer.
Invention effect
In accordance with the invention it is possible to load multiple bar in the elevator bottom beam that bar transports accessory.Therefore, it can contract Time required for transport of the short bar in hoistway.
Detailed description of the invention
Fig. 1 is the main view of the elevator bar transport accessory in embodiment 1.
Fig. 2 is the side view of the elevator bar transport accessory in embodiment 1.
Fig. 3 is the top view of the elevator bar transport accessory in embodiment 1.
Fig. 4 is the top view for showing the elevator in embodiment 1 and transporting the state of accessory when in use with bar.
Fig. 5 is for illustrating the schematic diagram of the application method of bar transport accessory of the elevator in embodiment 1.
Fig. 6 is that the elevator shown in the embodiment 1 transports the main view that accessory is loaded with the state of bar with bar Figure.
Fig. 7 is that the elevator shown in the embodiment 1 transports the side view that accessory is loaded with the state of bar with bar Figure.
Fig. 8 is that the elevator shown in the embodiment 1 transports the vertical view that accessory is loaded with the state of bar with bar Figure.
Fig. 9 is the guide rail method for dismounting for illustrating to have used the elevator in embodiment 1 with bar transport accessory Flow chart.
Figure 10 is the guide rail setting method for illustrating to have used the elevator in embodiment 1 with bar transport accessory Flow chart.
Specific embodiment
Referring to attached drawing, mode for carrying out the present invention is illustrated.In each figure, same or equivalent part is marked Identical label.For repeat description, is suitably simplified or omitted.
Embodiment 1.
Fig. 1 is the main view of the elevator bar transport accessory in embodiment 1.Fig. 2 is the elevator in embodiment 1 With the side view of bar transport accessory.Fig. 3 is the top view of the elevator bar transport accessory in embodiment 1.
As shown in Figure 1 to Figure 3, bar transport accessory 1 have bottom beam 2, the 1st column 3, the 2nd column 4, fixation member 5, 1st link plate 6, the 2nd link plate 7, the 3rd link plate 8, cable mounts part 9, the 1st guide shoe installing component 10 and the installation of the 2nd guide shoe Component 11.Fixation member 5, the 1st guide shoe installing component 10 and the 2nd guide shoe installing component 11 are for example using multiple.Bar transport Each component of accessory 1 is for example formed by materials such as iron.
As bottom beam 2, the 1st column 3 and the 2nd column 4, such as use channel steel or H profile steel etc..2nd column 4 for example formed as Form and dimension identical with the 1st column 3.Fixation member 5 is for example plate-like.
The lower end of 1st column 3 for example links by the one end of fixation member 5 and bottom beam 2.The lower end of 2nd column 4 Such as link by the other end of fixation member 5 and bottom beam 2.Fixation member 5 is such as by being fixed on bottom bolt and nut The front or the back side of beam 2, the 1st column 3 and the 2nd column 4.2nd column 4 is opposed with the 1st column 3 on the length direction of bottom beam 2.
1st link plate 6, the 2nd link plate 7 and the 3rd link plate 8 are for example plate-like.2nd link plate 7 and the 3rd link plate 8 It such as can have multiple supporting parts 12.Supporting part 12 is for example formed as prominent from a face of the 2nd link plate 7 or the 3rd link plate 8 Out.Supporting part 12 is for example arranged along the length direction of the 2nd link plate 7 or the 3rd link plate 8.The 3rd such as shape of link plate 8 As form and dimension identical with the 2nd link plate 7.
As cable mounts part 9, such as use H profile steel.Cable mounts part 9 is for example with mounting hole 13.Mounting hole 13 are for example formed in the center of the cable mounts part 9 from up and down direction.
1st link plate 6 for example links the front and the front of the 2nd column 4 of the 1st column 3.1st link plate 6 for example passes through spiral shell Bolt and nut etc. are fixed on the front of the 1st column 3 and the 2nd column 4.1st link plate 6 is for example configured to parallel with bottom beam 2.1st Link plate 6 for example configures the upper position in the center on the length direction than the 1st column 3 and the 2nd column 4.
2nd link plate 7 for example make to be formed with supporting part 12 facing towards nearby in the state of, link the back of the 1st column 3 The back side in face and the 2nd column 4.2nd link plate 7 is such as the back by being fixed on the 1st column 3 and the 2nd column 4 bolt and nut Face.2nd link plate 7 is for example configured to parallel with bottom beam 2.2nd link plate 7 is for example configured than the 1st column 3 and the 2nd column 4 The upper position in center on length direction.2nd link plate 7 is for example configured in height identical with the 1st link plate 6.That is, the 2 link plates 7 are opposed with the 1st link plate 6 for example on depth direction.
3rd link plate 8 for example make to be formed with supporting part 12 facing towards nearby in the state of, link the back of the 1st column 3 The back side in face and the 2nd column 4.3rd link plate 8 is such as the back by being fixed on the 1st column 3 and the 2nd column 4 bolt and nut Face.3rd link plate 8 is for example configured to parallel with bottom beam 2.3rd link plate 8 is for example configured in the position more upper than the 2nd link plate 7 It sets.3rd link plate 8 for example configures near the upper end of the 1st column 3 and the 2nd column 4.
Cable mounts part 9 for example links the 1st link plate 6 and the 2nd link plate 7.Cable mounts part 9 for example passes through bolt And nut etc. is fixed on the 1st link plate 6 and the 2nd link plate 7.Cable mounts part 9 for example configures when from up and down direction The position being overlapped with the center on the length direction of bottom beam 2.At the bottom of when cable mounts part 9 is for example configured to from up and down direction Center on the length direction of beam 2 is overlapped with mounting hole 13.
1st guide shoe installing component 10 and the 2nd guide shoe installing component 11 are for example in L-shaped.2nd guide shoe installing component 11 is for example Be formed as form and dimension identical with the 1st guide shoe installing component 10.
1st guide shoe installing component 10 is for example arranged to protrude outward from the 1st column 3.1st guide shoe installing component 10 is for example logical Cross the side that bolt and nut etc. are fixed on the 1st column 3.For example, using 2 the 1st guide shoe installing components 10, one The upper position in center of a 1st guide shoe installing component 10 configuration on the length direction than the 1st column 3, another the 1st is led Boots installing component 10 is configured in the position than the center on the lower.
2nd guide shoe installing component 11 is for example arranged to protrude outward from the 2nd column 4.2nd guide shoe installing component 11 is for example logical Cross the side that bolt and nut etc. are fixed on the 2nd column 4.Such as using 2 the 2nd guide shoe installing components 11, one The upper position in center of a 2nd guide shoe installing component 11 configuration on the length direction than the 2nd column 4, another the 2nd is led Boots installing component 11 is configured in the position than the center on the lower.2nd guide shoe installing component 11 is for example configured pacifies with the 1st guide shoe Fill the identical height of component 10.
1st column 3 and the 2nd column 4 can be dismounted relative to bottom beam 2.1st link plate 6, the 2nd link plate 7 and the 3rd Link plate 8 can be dismounted relative to the 1st column 3 and the 2nd column 4.Cable mounts part 9 can be relative to the 2nd link plate 7 And the 3rd link plate 8 dismounted.1st guide shoe installing component 10 can be dismounted relative to the 1st column 3.The installation of 2nd guide shoe Component 11 can be dismounted relative to the 2nd column 4.That is, bar transport accessory 1 can disintegrate as needed as each component and It is assembled by each component.
Fig. 4 is the top view for showing the elevator in embodiment 1 and transporting the state of accessory when in use with bar.
Not shown hawser etc. is suspended in the hoistway of elevator bar transport accessory 1 when in use.Hawser etc. by The mounting hole 13 of cable mounts part 9 is fixed.As shown in figure 4, in the 1st guide shoe installing component 10 and the 2nd guide shoe installing component 11 Guide shoe 14 is installed.These guide shoes 14 can be moved along a pair being arranged in hoistway to guide rail 15 is reused.That is, bar is transported Defeated accessory 1 along the state moved to reuse guide rail 15 can be suspended in hoistway.
1st guide shoe installing component 10 and the 2nd guide shoe installing component 11 are for example formed as can dismount a variety of guide shoes 14.Guide shoe 14 for example can be sliding guide shoe, be also possible to roller guide shoe.
Bottom beam 2, the 1st link plate 6, the 2nd link plate 7 and the 3rd link plate 8 are formed as comparing the interval reused between guide rail 15 It is short.Bar transport accessory 1 for example has multiple 1st guide shoe installing components 10 and the 2nd guide shoe installing component 11 of different sizes. 1st guide shoe installing component 10 and the 2nd guide shoe installing component 11 are for example correspondingly substituted for to the interval reused between guide rail 15 Appropriately sized guide shoe installing component.
Fig. 5 is for illustrating the schematic diagram of the application method of bar transport accessory of the elevator in embodiment 1.Fig. 5 Dismounting is shown as an example or the state of the operation midway of the guide rail of elevator is set.
As shown in figure 5, bar transport accessory 1 is arranged on when in use in hoistway 16.It is for example temporarily set in computer room 17 It is equipped with winch 18 and winch 19.Bar transport accessory 1 is for example suspended in midair by the hawser 20 of winch 18.Carriage 21 is for example by winch 19 Hawser 22 suspend in midair.In addition, winch 18 and winch 19 for example can be set in the beam (not shown) etc. in hoistway 16.
Under the state shown in fig. 5, it is acted by winch 18, bar transport accessory 1 can be along being set to hoistway 16 It is a pair of mobile to guide rail 15 is reused.Under the state shown in fig. 5, it is acted by winch 19, carriage 21 can be along being set to A pair of of carriage of hoistway 16 is mobile with guide rail 23.Winch 18 and winch 19 are for example by taking the operating personnel 24 on carriage 21 It is operated by operation portion (not shown).
In the case where removing guide rail, operating personnel 24 makes the bar transport accessory 1 for being loaded with the existing guide rail removed It is moved to cargo handling layer.In the case where guide rail is arranged, operating personnel 24 make to be loaded with newly set guide rail bar transport it is auxiliary Tool 1 is moved to installation site from cargo handling layer.So-called cargo handling layer be carry out out of hoistway 16 to stop transport and From the floor of stop being transported into hoistway 16.Cargo handling layer is, for example, the lowest level that carriage 21 can be moved to.In addition, leading Rail is for example carried out using devices such as other winches (not shown) to the handling of bar transport accessory 1.
Fig. 6 is that the elevator shown in the embodiment 1 transports the main view that accessory is loaded with the state of bar with bar Figure.Fig. 7 is that the elevator shown in the embodiment 1 transports the side view that accessory is loaded with the state of bar with bar.Fig. 8 It is that the elevator shown in the embodiment 1 transports the top view that accessory is loaded with the state of bar with bar.Fig. 6 to Fig. 8 Show while being loaded into 4 bar 25 state of bar transport accessory 1.
As shown in FIG. 6 and 7, bar 25 is for example loaded into bar transport in the state that lower end and bottom beam 2 contact Accessory 1.4 bar 25 of erected state can be for example loaded in bottom beam 2.
Such as supported portion 12 of bar 25 for being loaded into the state of bar transport accessory 1 is limited to transverse shifting.Fig. 8 Example goes out the case where bar 25 loaded is guide rail.Guide rail shown in Fig. 8 with protrusion be sandwiched in 2 adjacent supporting parts 12 it Between mode load.In this case, the interval of 2 adjacent supporting parts 12 is for example set according to the thickness of the protrusion of guide rail It is fixed.
Fig. 9 is the guide rail method for dismounting for illustrating to have used the elevator in embodiment 1 with bar transport accessory Flow chart.
In step s101, implement accessory setting process.In accessory setting process, operating personnel transports bar auxiliary Tool 1 along the state moved to reuse guide rail 15 can be suspended in hoistway 16.Accessory setting process may include by each portion The process that part assembles bar transport accessory 1.Step S101 be in next step implementation steps S102 process.
In step s 102, implement disassembly preparatory process.In disassembly preparatory process, operating personnel keeps bar transport auxiliary Tool 1 is moved to the position in current time No. 2 guide rail of number from top to bottom.That step S102 is implementation steps S103 in next step Process.
In step s 103, implement disassembly process.In disassembly process, operating personnel will be located at top side at current time Multiple guide rails be loaded into bar transport accessory 1.In disassembly process, such as 2 are dismantled to reuse guide rail 15 and 2 carriages With guide rail 23, and it is loaded into bar transport accessory 1.Step S103 be in next step implementation steps S104 process.
In step S104, implementation transports preparatory process.In transporting preparatory process, operating personnel, which makes to be loaded with, to be removed The bar transport accessory 1 of existing guide rail is moved to cargo handling layer.Step S104 be in next step implementation steps S105 work Sequence.
In step s105, implement to transport process.In transporting process, operating personnel will be loaded into bar transport accessory 1 multiple guide rails are transported to the stop of cargo handling layer.
Step S105's is the judgement (step S106) for being made whether still to remain the guide rail that should be dismantled in next step.It is answered in residual In the case where the guide rail of disassembly, the process that repeats step S102 to step S105.In the case where not remaining the guide rail that should be dismantled, The process of implementation steps S107.
In step s 107, implement accessory and remove process.It is removed in process in accessory, operating personnel transports bar auxiliary Tool 1 is removed out of hoistway 16.It may include that bar transport accessory 1 disintegrates as the process of each component that accessory, which removes process,.
Figure 10 is the guide rail setting method for illustrating to have used the elevator in embodiment 1 with bar transport accessory Flow chart.
In step s 201, implement accessory setting process same as step S101.Step S201's is to implement in next step The process of step S202.
In step S202, implementation is transported into process.In being transported into process, operating personnel will transport from the stop of cargo handling layer The multiple guide rails entered are loaded into bar transport accessory 1.In being transported into process, such as by 2 to reuse guide rail 15 and 2 carriages Bar transport accessory 1 is loaded into guide rail 23.Step S202 be in next step implementation steps S203 process.
In step S203, implement installation preparatory process.In installation preparatory process, operating personnel keeps bar transport auxiliary Tool 1, which is moved to, is located at the position of the guide rail of top side at current time.Step S203 be in next step implementation steps S204 work Sequence.
In step S204, implement installation procedure.In installation procedure, operating personnel transports accessory to bar is loaded into 1 multiple guide rails are installed.Step S204 be in next step implementation steps S205 process.
In step S205, implementation is transported into preparatory process.In being transported into preparatory process, operating personnel keeps bar transport auxiliary Tool 1 is moved to cargo handling layer.
Step S205's is the judgement (step S206) for being made whether still to remain the guide rail that should be installed in next step.It is answered in residual In the case where the guide rail of installation, the process that repeats step S202 to step S205.In the case where not remaining the guide rail that should be installed, The process of implementation steps S207.
In step S207, implements accessory same as step S107 and remove process.
In the embodiment 1, bottom beam 2 is formed as more a pair of to the interval reused between guide rail 15 in hoistway 16 than being arranged in It is short, multiple bar 25 of erected state can be loaded.It is equipped in the 1st guide shoe installing component 10 from the 1st column 3 and protrudes outward And the guide shoe 14 that reuse guide rail 15 is moved along one be arranged in hoistway 16.It is equipped in the 2nd guide shoe installing component 11 It is protruded outward from the 2nd column 4 and along another guide shoe 14 moved to reuse guide rail 15 being arranged in hoistway 16.Therefore, It can shorten and transport the time required for bar in hoistway.The elevator that especially can substantially shorten in high-rise is applied Time required for work.Furthermore it is possible to improve stability of the bar in transport.
In the embodiment 1, the 1st column 3 and the 2nd column 4 are formed to be dismounted relative to bottom beam 2.That is, strip Object transport accessory 1 can be assembled and be decomposed.Therefore, bar transport accessory is easy to be transported into and transport to operation field.
In the embodiment 1, the 1st guide shoe installing component 10 can be dismounted relative to the 1st column 3.The installation of 2nd guide shoe Component 11 can be dismounted relative to the 2nd column 4.Therefore, it replaces with as needed different from the outside overhang of column Guide shoe installing component, thus, it is possible to transport accessory using bar in the different multiple elevators in interval between the guide rails.
In the embodiment 1, center of the 1st link plate 6 on the length direction than the 1st column 3 and the 2nd column 4 is top At the position of side, the front and the front of the 2nd column 4 of the 1st column 3 of connection.2nd link plate 7 link the 1st column 3 the back side with The back side of 2nd column 4, and it is opposed with the 1st link plate 6.That is, cable mounts part 9 is located at the length than bar transport accessory 1 The high position in the center in direction.Therefore, stability of the bar in transport can be further increased.
In the embodiment 1, the 3rd link plate 8 links the back of the 1st column 3 at the position more upper than the 2nd link plate 7 The back side in face and the 2nd column 4.That is, only overleaf side is provided with link plate in the upper end of bar transport accessory 1.Therefore, It is able to achieve and transports accessory with the high-intensitive and easy bar for loading bar from face side.
In the embodiment 1, guide rail method for dismounting, which has, is loaded into the multiple guide rails for being located at top side at current time The disassembly process of bar transport accessory 1.Guide rail setting method has the multiple guide rails that will be transported into from the stop of cargo handling layer Be loaded into bar transport accessory 1 is transported into process.Therefore, when can shorten required for transport of the bar in hoistway Between.
In the embodiment 1, bar transport accessory 1 can for example have multiple 1st link plates 6.Bar transport is auxiliary Tool 1 can for example have multiple 2nd link plates 7.1st link plate 6 and the 2nd link plate 7 for example can be only fitted to than the 1st column 3 And the 2nd column 4 length direction on center position on the lower.1st link plate 6 and the 2nd link plate 7 for example can be only fitted to Near the upper end of 1st column 3 and the 2nd column 4.Cable mounts part 9 for example can be only fitted to than the 1st column 3 and the 2nd column 4 Length direction on height of the center on the lower or near upper end.
In addition, the bar 25 for being loaded into bar transport accessory 1 is not limited to guide rail.As long as bar 25 is in hoistway 16 It inside uses, can be such as beam, H profile steel, I fashioned iron or single tube.Shape, size and the quantity of supporting part 12 for example can be with The cross sectional shape of bar 25 as object correspondingly changes.
Industrial availability
As described above, the present invention can use the transport in bar in the hoistway of elevator.
Label declaration
1: bar transports accessory;
2: bottom beam;
3: the 1 columns;
4: the 2 columns;
5: fixation member;
6: the 1 link plates;
7: the 2 link plates;
8: the 3 link plates;
9: cable mounts part;
10: the 1 guide shoe installing components;
11: the 2 guide shoe installing components;
12: supporting part;
13: mounting hole;
14: guide shoe;
15: to reuse guide rail;
16: hoistway;
17: computer room;
18: winch;
19: winch;
20: hawser;
21: carriage;
22: hawser;
23: carriage guide rail;
24: operating personnel;
25: bar.

Claims (7)

1. a kind of elevator transports accessory with bar, have:
Bottom beam is formed as shorter to the interval reused between guide rail in hoistway than being arranged in, can load the more of erected state A bar;
The one end of 1st column, lower end and the bottom beam links;
The other end of 2nd column, lower end and the bottom beam links, and the 2nd column is on the length direction of the bottom beam It is opposed with the 1st column;
1st guide shoe installing component protrudes outward from the 1st column, moves along one to guide rail is reused for installing Guide shoe;And
2nd guide shoe installing component is protruded outward from the 2nd column, is moved along another to guide rail is reused for installing Guide shoe.
2. elevator according to claim 1 transports accessory with bar, wherein
1st column and the 2nd column are formed to be dismounted relative to the bottom beam.
3. elevator according to claim 1 or 2 transports accessory with bar, wherein
The 1st guide shoe installing component is formed to be dismounted relative to the 1st column,
The 2nd guide shoe installing component is formed to be dismounted relative to the 2nd column.
4. transporting accessory to the bar of elevator described in any one in 3 according to claim 1, wherein
The elevator bar transport accessory has:
1st link plate, at the upper position in center on the length direction than the 1st column and the 2nd column Link the front and the front of the 2nd column of the 1st column;
2nd link plate, links the back side of the 1st column and the back side of the 2nd column, and with the 1st link plate pair It sets;And
Cable mounts part links the 1st link plate and the 2nd link plate, for installing rope.
5. elevator according to claim 4 transports accessory with bar, wherein
The elevator bar transport accessory has the 3rd link plate, and the 3rd link plate is more top than the 2nd link plate Link the back side of the 1st column and the back side of the 2nd column at the position of side.
6. a kind of guide rail method for dismounting of elevator, has following process:
Bar described in any one in claim 1 to 5 is transported accessory with can be along counterweight by accessory setting process It is suspended in hoistway with the mobile state of guide rail;
Preparatory process is dismantled, bar transport accessory is made to be moved to the position in current time No. 2 guide rail of number from top to bottom It sets;
Process is dismantled, the multiple guide rails for being located at top side at current time are loaded into the bar and transport accessory;
Preparatory process is transported, the bar for being loaded with existing guide rail transport accessory is made to be moved to cargo handling layer;And
Process is transported, the multiple guide rails for being loaded into the bar transport accessory are transported to the stop of the cargo handling layer.
7. a kind of guide rail setting method of elevator, has following process:
Bar described in any one in claim 1 to 5 is transported accessory with can be along counterweight by accessory setting process It is suspended in hoistway with the mobile state of guide rail;
It is transported into process, the multiple guide rails being transported into from the stop of cargo handling layer are loaded into the bar and transport accessory;
Preparatory process is installed, the bar transport accessory is moved to and is located at the position of the guide rail of top side at current time;
Installation procedure installs the multiple guide rails for being loaded into the bar transport accessory;And
It is transported into preparatory process, the bar transport accessory is made to be moved to the cargo handling layer.
CN201780084207.3A 2017-05-09 2017-05-09 Elevator long article transportation auxiliary tool, elevator guide rail removing method and elevator guide rail setting method Active CN110198906B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/JP2017/017574 WO2018207263A1 (en) 2017-05-09 2017-05-09 Elevator-use elongated article transportation tool, method for dismantling elevator guide rail, and method for installing elevator guide rail

Publications (2)

Publication Number Publication Date
CN110198906A true CN110198906A (en) 2019-09-03
CN110198906B CN110198906B (en) 2020-09-18

Family

ID=64105366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201780084207.3A Active CN110198906B (en) 2017-05-09 2017-05-09 Elevator long article transportation auxiliary tool, elevator guide rail removing method and elevator guide rail setting method

Country Status (3)

Country Link
JP (1) JP6439880B1 (en)
CN (1) CN110198906B (en)
WO (1) WO2018207263A1 (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH061568A (en) * 1992-06-17 1994-01-11 Mitsubishi Denki Bill Techno Service Kk Erection method for elevator counter weight and counter weight
JP2000344445A (en) * 1999-06-04 2000-12-12 Hitachi Building Systems Co Ltd Method and device for loading elevator counterweight
JP5058001B2 (en) * 2008-01-17 2012-10-24 三菱電機株式会社 Elevator parts transport container
CN204823593U (en) * 2015-07-03 2015-12-02 广东省工业设备安装有限公司 Perpendicular conveying system of high -rise electromechanical material
JP2016132516A (en) * 2015-01-16 2016-07-25 三菱電機ビルテクノサービス株式会社 Elevator balance weight shipping and carrying-in device
CN106144846A (en) * 2015-05-12 2016-11-23 通力股份公司 For transporting the apparatus and method of material in elevator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009044481A1 (en) * 2007-10-05 2009-04-09 Mitsubishi Electric Corporation Lifting device for elevator, elevator car frame, and lifting method for elevator

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH061568A (en) * 1992-06-17 1994-01-11 Mitsubishi Denki Bill Techno Service Kk Erection method for elevator counter weight and counter weight
JP2000344445A (en) * 1999-06-04 2000-12-12 Hitachi Building Systems Co Ltd Method and device for loading elevator counterweight
JP5058001B2 (en) * 2008-01-17 2012-10-24 三菱電機株式会社 Elevator parts transport container
JP2016132516A (en) * 2015-01-16 2016-07-25 三菱電機ビルテクノサービス株式会社 Elevator balance weight shipping and carrying-in device
CN106144846A (en) * 2015-05-12 2016-11-23 通力股份公司 For transporting the apparatus and method of material in elevator
CN204823593U (en) * 2015-07-03 2015-12-02 广东省工业设备安装有限公司 Perpendicular conveying system of high -rise electromechanical material

Also Published As

Publication number Publication date
JP6439880B1 (en) 2018-12-19
JPWO2018207263A1 (en) 2019-06-27
CN110198906B (en) 2020-09-18
WO2018207263A1 (en) 2018-11-15

Similar Documents

Publication Publication Date Title
US9676596B2 (en) Elevator refurbishing method
CN112955398B (en) Method for installing an elevator installation
JP4694859B2 (en) Inclined passenger conveyor equipment, installation method thereof, and delivery method thereof
CN110198906A (en) Elevator transports accessory, the guide rail method for dismounting of elevator and the guide rail setting method of elevator with bar
JP5955280B2 (en) Lifting method for heavy elevators
CN108217405B (en) Work platform device
CN105800417A (en) Method for carrying elevator counterweight
JP2007290826A (en) Method for carrying in/out component of passenger conveyor, method for modifying passenger conveyor using the method, and device for carrying in/out component of passenger conveyor used for the method
JP6368726B2 (en) Belt conveyor lifting device
JP2006008390A (en) Renewal construction method of passenger conveyer
AU2014253678B2 (en) A method of moving a component or a material to and within a level of a shaft boring system
JP2018204292A (en) Rail track structure girder replacement method and carriage used for replacement
CN109057718B (en) Movable installation method for sinking derrick of mine vertical shaft
CN112792780B (en) Facility for replacing, disassembling and installing trolley bus travelling wheel
JP4978218B2 (en) Elevator installation apparatus and installation method
CN109562911B (en) Elevator transformation method and elevator guide rail
JP5925952B1 (en) Continuous furnace manufacturing method
CN113226969A (en) Device for transporting escalator equipment
SU969634A1 (en) Construction mast hoist
JP2011246227A (en) Method of installing elevator car
JP2009062147A (en) Renewal method for elevator, and structure for elevator renewal
CN102489984A (en) Method for quickly replacing crane beam without using hoist for construction
CN101824911A (en) The elevator lifting path die carrier unit for upmost end construction
JP2007176632A (en) Temporary work floor device for elevator and assembling method of temporary work floor device for elevator
JP2017149553A (en) Elevator equipment carry-in/out method and elevator equipment carry-in/out device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: Tokyo, Japan

Patentee after: Mitsubishi Electric Building Solutions Co.,Ltd.

Address before: Tokyo, Japan

Patentee before: MITSUBISHI ELECTRIC BUILDING TECHNO-SERVICE Co.,Ltd.

CP01 Change in the name or title of a patent holder