CN110186067A - A kind of cigarette air duct coupled system preventing fan stall - Google Patents

A kind of cigarette air duct coupled system preventing fan stall Download PDF

Info

Publication number
CN110186067A
CN110186067A CN201910378320.3A CN201910378320A CN110186067A CN 110186067 A CN110186067 A CN 110186067A CN 201910378320 A CN201910378320 A CN 201910378320A CN 110186067 A CN110186067 A CN 110186067A
Authority
CN
China
Prior art keywords
air
fan
line
introduced machine
communication channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910378320.3A
Other languages
Chinese (zh)
Inventor
吕洪坤
张晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU, State Grid Zhejiang Electric Power Co Ltd, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical YINENG ELECTRIC TECHNOLOGY Co Ltd HANGZHOU
Priority to CN201910378320.3A priority Critical patent/CN110186067A/en
Publication of CN110186067A publication Critical patent/CN110186067A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/003Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids by throttling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F04POSITIVE - DISPLACEMENT MACHINES FOR LIQUIDS; PUMPS FOR LIQUIDS OR ELASTIC FLUIDS
    • F04DNON-POSITIVE-DISPLACEMENT PUMPS
    • F04D27/00Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids
    • F04D27/009Control, e.g. regulation, of pumps, pumping installations or pumping systems specially adapted for elastic fluids by bleeding, by passing or recycling fluid
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23NREGULATING OR CONTROLLING COMBUSTION
    • F23N3/00Regulating air supply or draught
    • F23N3/06Regulating air supply or draught by conjoint operation of two or more valves or dampers

Abstract

The invention discloses a kind of cigarette air duct coupled systems for preventing fan stall.Currently, primary air fan and air-introduced machine stall problem are not yet solved very well, existing solution is unsatisfactory, and there are exhaust gas temperatures to increase, combustion stability is impacted, damper is easy the defects of stuck.Cigarette air duct coupled system of the invention include First air channel to secondary air channel the first communication channel and secondary air channel to back-end ductwork the second communication channel, by the through-current capacity for adjusting the first communication channel and the second communication channel, optimize the running operating point of primary air fan and air-introduced machine, so that air-introduced machine and primary air fan is maintained at safety zone operation, prevents fan stall.Cigarette air duct provided by the invention coupled system can effectively prevent fan stall suitable for different load conditions, and have energy-saving effect.

Description

A kind of cigarette air duct coupled system preventing fan stall
Technical field
The invention belongs to air-blower control technical field, specifically a kind of cigarette air duct coupled systemes for preventing fan stall System.
Background technique
Position of the fan operation operating point on fan performance curve than pressure energy and flow by determining, when running operating point is moved Fan stall when moving stall line, blower pressure and flow become very unstable at this time, seriously affect the safety and stability of unit Operation.Fan stall accident is likely to occur in arbitrary load operating condition, but most commonly seen with fan stall under running on the lower load.Low Under load condition, primary air pressure is still very high, and the stoppage in transit of coal pulverizer majority keeps First air channel insufficient, when certain coal pulverizer is prominent So when tripping, the First air channel moment of the coal pulverizer is closed, and primary air fan pressure moment increases, and induces primary air fan stall. Equally, for air-introduced machine, exhaust gas volumn is significantly reduced under underload, and air-introduced machine stall risk increases.
Primary air fan stall in order to prevent, the common countermeasure of power plant are to open the cold air damper of stoppage in transit coal pulverizer, are increased Add First air channel and a cold wind flow.There are obvious drawbacks for this operating method: on the one hand, since cold First air enters furnace Thorax is reduced by the heat primary air amount and secondary air flow of air preheater, is made under the operation control strategy for keeping oxygen amount constant Exhaust gas temperature rises, and boiler efficiency reduces;On the other hand, cold First air is sent directly into burner hearth and generates not to combustion stability in furnace Benefit influences.
Stall occurs for air-introduced machine in order to prevent, and some units are provided with air-introduced machine and import and export bypass flue, other by adjusting The recirculating mass of road flue makes air-introduced machine operate in safety zone.Because flue gas has corrosivity, bypass flue baffle is easy corrosion It is stuck, influence regulation performance.
In conclusion primary air fan and air-introduced machine stall problem are not yet solved very well, existing solution is unsatisfactory, There are exhaust gas temperatures to increase, combustion stability is impacted, damper is easy the defects of stuck.
Summary of the invention
In view of this, the present invention provides a kind of cigarette air duct coupled system for preventing fan stall, it is used to prevent First air Machine and air-introduced machine stall, and minimize the adverse effect caused by combustion stability.
For this purpose, the technical solution adopted by the present invention are as follows: a kind of cigarette air duct coupled system for preventing fan stall, the cigarette Air duct coupled system includes First air channel to the first communication channel of secondary air channel and secondary air channel to the of back-end ductwork Two communication channels;By adjusting the through-current capacity of the first communication channel and the second communication channel, optimize the operation work of primary air fan and air-introduced machine Condition point makes air-introduced machine and primary air fan be maintained at safety zone operation, prevents fan stall.
Further, first communication channel is equipped with isolating door and adjusts door, enters air preheater for connecting First air channel and the secondary air channel for entering air preheater.
Further, second communication channel is equipped with isolating door and adjusts door, enters air preheater for connecting Secondary air channel and the back-end ductwork for leaving air preheater.
Further, the through-current capacity is adjusted by following operating procedure:
1) air-introduced machine alarming line, air-introduced machine nargin line, primary air fan alarming line and primary are set separately on fan performance curve Blower nargin line;
2) running operating point of real-time monitoring air-introduced machine: when air-introduced machine running operating point reaches at or above air-introduced machine alarming line, Air-introduced machine is run to adjust air-introduced machine flow by the through-current capacity that the adjusting door of the second communication channel adjusts the second communication channel Operating point is maintained at the control area between air-introduced machine alarming line and air-introduced machine nargin line;
3) running operating point of real-time monitoring primary air fan: when primary air fan running operating point reaches at or above primary air fan alarm When line, the through-current capacity of the first communication channel is adjusted by the door that adjusts of the first communication channel, to adjust primary air fan flow, is made primary Fan operation operating point is maintained at the control area between primary air fan alarming line and primary air fan nargin line;
4) when primary air fan trips, the first ipsilateral communication channel is closed with tripping primary air fan;When fan trip, with jump The second ipsilateral communication channel of lock air-introduced machine is closed;When secondary air fan tripping, the first ipsilateral communication channel with tripping secondary air fan It is closed with the second communication channel.
Further, in the step 2), if second further, channel, which adjusts door standard-sized sheet, can not still make air inducing Machine running operating point enters the control area between air-introduced machine alarming line and air-introduced machine nargin line, then first increases secondary air fan and go out Power, then adjust the second communication channel and adjust door aperture;If the increase of combustion product gases amount makes air-introduced machine running operating point from air-introduced machine report Control area between alert line and air-introduced machine nargin line, which moves down, reaches nargin line, then reduces the through-current capacity of the second communication channel, until Air-introduced machine running operating point returns to the control area between air-introduced machine alarming line and air-introduced machine nargin line, or until the second communication channel Adjust Men Quanguan.
Further, in the step 3), when the primary air flow increase by coal pulverizer makes primary air fan run work Control area of the condition point between primary air fan alarming line and primary air fan nargin line moves down when reaching nargin line, passes through first and connects Channel adjusts the through-current capacity that door reduces the first communication channel, until primary air fan running operating point returns to primary air fan alarming line and one Control area between secondary blower nargin line, or until the first communication channel adjusts Men Quanguan.
Further, the air-introduced machine alarming line is moved down to obtain by air-introduced machine stall line, the air-introduced machine nargin line It moving down to obtain by air-introduced machine alarming line, the primary air fan alarming line is moved down to obtain by primary air fan stall line, and described one Secondary blower nargin line is moved down to obtain by primary air fan alarming line.
Further, the offset between the stall line and alarming line is determined according to operating experience, increases offset Amount adjusts door for cigarette air duct coupled system and acts earlier, to solve the problems, such as fan stall under more high load capacity;Reduce offset to use Men Gengchi movement is adjusted in cigarette air duct coupled system, to solve the problems, such as fan stall under more underload.
Further, the offset between the alarming line and nargin line is determined according to operating experience, increases offset The operating frequency for adjusting door for reducing cigarette air duct coupled system is measured, reduces offset for reducing blower power consumption.
Cigarette air duct provided by the invention coupled system can effectively prevent fan stall suitable for different load conditions, And also have the advantages that the through-flow medium in the first communication channel and the second communication channel is dustless non-corrosive air, It is beneficial to prevent isolating door and adjusting badge is puckery;Air in first communication channel forms hot wind after first passing through air preheater heating It is sent into burner hearth, avoids the too low influence hearth combustion stability of temperature, while reducing exhaust gas temperature, there is energy-saving effect.
Detailed description of the invention
Fig. 1 is the schematic diagram of cigarette air duct coupled system in the specific embodiment of the invention;
Fig. 2 is air-introduced machine performance diagram in the specific embodiment of the invention;
Fig. 3 is primary air fan performance diagram in the specific embodiment of the invention.
Specific embodiment
Technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only It is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
Offset numerical quantity between alarming line and nargin line as described below is not unique, only to specific embodiment into Row citing description.
Establish cigarette air duct coupled system, the cigarette air duct coupled system includes First air channel to the of secondary air channel One communication channel and secondary air channel to back-end ductwork the second communication channel;As shown in Figure 1, the connection of the first communication channel is pre- into air The First air channel of hot device and the secondary air channel for entering air preheater, the connection of the second communication channel enter the two of air preheater Secondary wind channel and the back-end ductwork for leaving air preheater, the first communication channel and the second communication channel are equipped with isolating door and adjusting Door.
Through-current capacity is adjusted according to following operation method:
1) such as Fig. 2, air-introduced machine alarming line and air-introduced machine nargin line are set on air-introduced machine characteristic curve according to practical operating experiences, Air-introduced machine alarming line moves down 1250Nm/kg by air-introduced machine stall line and obtains, and the air-introduced machine nargin line is by air-introduced machine alarming line 2500Nm/kg is moved down to obtain;Such as Fig. 3, primary air fan alarm is set on primary air fan characteristic curve according to practical operating experiences Line and primary air fan nargin line, primary air fan alarming line move down 2000Nm/kg by primary air fan stall line and obtain, and primary air fan is abundant Degree line moves down 4500Nm/kg by primary air fan alarming line and obtains.
2) running operating point of real-time monitoring air-introduced machine: when air-introduced machine running operating point reaches at or above air-introduced machine alarming line When, air-introduced machine is transported to adjust air-introduced machine flow by the through-current capacity that the adjusting door of the second communication channel adjusts the second communication channel Row operating point is maintained at the control area between air-introduced machine alarming line and air-introduced machine nargin line;If it is complete that the second communication channel adjusts door The control area that air-introduced machine running operating point can not still entered between air-introduced machine alarming line and air-introduced machine nargin line is opened, then is first increased Add secondary air fan to contribute, then door aperture is adjusted by the second communication channel;If the increase of combustion product gases amount makes air-introduced machine operating condition Control area of the point between air-introduced machine alarming line and air-introduced machine nargin line, which moves down, reaches nargin line, then reduces the second communication channel Through-current capacity, until air-introduced machine running operating point returns to the control area between air-introduced machine alarming line and air-introduced machine nargin line, or straight Men Quanguan is adjusted to the second communication channel.
3) running operating point of real-time monitoring primary air fan: when primary air fan running operating point reaches at or above primary air fan When alarming line, made by the through-current capacity that the adjusting door of the first communication channel adjusts the first communication channel to adjust primary air fan flow Primary air fan running operating point is maintained at the control area between primary air fan alarming line and primary air fan nargin line;It is ground when passing through The primary air flow increase of coal machine makes primary air fan running operating point between primary air fan alarming line and primary air fan nargin line Control area moves down when reaching nargin line, adjusts the through-current capacity that door reduces the second communication channel by the first communication channel, until primary Fan operation operating point returns to the control area between primary air fan alarming line and primary air fan nargin line, or until the first connection Road adjusts Men Quanguan.
4) when primary air fan trips, the first ipsilateral communication channel is closed with tripping primary air fan;When fan trip, The second ipsilateral communication channel is closed with tripping air-introduced machine;When secondary air fan tripping, ipsilateral with tripping secondary air fan first connects Channel and the second communication channel are closed.

Claims (9)

1. a kind of cigarette air duct coupled system for preventing fan stall, it is characterised in that: the cigarette air duct coupled system includes one Secondary wind channel to secondary air channel the first communication channel and secondary air channel to back-end ductwork the second communication channel;By adjusting the The through-current capacity of one communication channel and the second communication channel optimizes the running operating point of primary air fan and air-introduced machine, makes air-introduced machine and primary Blower is maintained at safety zone operation.
2. a kind of cigarette air duct coupled system for preventing fan stall according to claim 1, which is characterized in that described One communication channel is equipped with isolating door and adjusts door, enters the First air channel of air preheater and into air preheater for connect Secondary air channel.
3. a kind of cigarette air duct coupled system for preventing fan stall according to claim 2, which is characterized in that described Two communication channels be equipped with isolating door and adjust door, for connect enter air preheater secondary air channel with leave air preheater Back-end ductwork.
4. a kind of cigarette air duct coupled system for preventing fan stall according to claim 3, which is characterized in that described is logical Flow is adjusted by following operating procedure:
1) air-introduced machine alarming line, air-introduced machine nargin line, primary air fan alarming line and primary are set separately on fan performance curve Blower nargin line;
2) running operating point of real-time monitoring air-introduced machine: when air-introduced machine running operating point reaches at or above air-introduced machine alarming line, Air-introduced machine is run to adjust air-introduced machine flow by the through-current capacity that the adjusting door of the second communication channel adjusts the second communication channel Operating point is maintained at the control area between air-introduced machine alarming line and air-introduced machine nargin line;
3) running operating point of real-time monitoring primary air fan: when primary air fan running operating point reaches at or above primary air fan alarm When line, the through-current capacity of the first communication channel is adjusted by the door that adjusts of the first communication channel, to adjust primary air fan flow, is made primary Fan operation operating point is maintained at the control area between primary air fan alarming line and primary air fan nargin line;
4) when primary air fan trips, the first ipsilateral communication channel is closed with tripping primary air fan;When fan trip, with jump The second ipsilateral communication channel of lock air-introduced machine is closed;When secondary air fan tripping, the first ipsilateral communication channel with tripping secondary air fan It is closed with the second communication channel.
5. a kind of cigarette air duct coupled system for preventing fan stall according to claim 4, which is characterized in that the step It is rapid 2) in, if the second communication channel adjust door standard-sized sheet still air-introduced machine running operating point can not be made to enter air-introduced machine alarming line and air inducing Control area between machine nargin line then first increases secondary air fan power output, then adjusts the second communication channel and adjust door aperture;If combustion Burning exhaust gas volumn increase moves down control area of the air-introduced machine running operating point between air-introduced machine alarming line and air-introduced machine nargin line Reach nargin line, then reduce the through-current capacity of the second communication channel, until air-introduced machine running operating point returns to air-introduced machine alarming line and draws Control area between blower nargin line, or until the second communication channel adjusts Men Quanguan.
6. a kind of cigarette air duct coupled system for preventing fan stall according to claim 4, which is characterized in that the step It is rapid 3) in, when making primary air fan running operating point from primary air fan alarming line and First air by the increase of the primary air flow of coal pulverizer Control area between machine nargin line moves down when reaching nargin line, passes through the first communication channel and adjusts door and reduces the logical of the first communication channel Flow, until primary air fan running operating point returns to the control area between primary air fan alarming line and primary air fan nargin line, Or until the first communication channel adjusts Men Quanguan.
7. a kind of cigarette air duct coupled system for preventing fan stall according to claim 4, which is characterized in that described draws Blower alarming line is moved down to obtain by air-introduced machine stall line, and the air-introduced machine nargin line is moved down to obtain by air-introduced machine alarming line, institute The primary air fan alarming line stated is moved down to obtain by primary air fan stall line, and the primary air fan nargin line is alarmed by primary air fan Line moves down to obtain.
8. a kind of cigarette air duct coupled system for preventing fan stall according to claim 7, which is characterized in that the mistake Offset between fast line and alarming line is determined according to operating experience, is increased offset for cigarette air duct coupled system and is adjusted door more Early movement, to solve the problems, such as fan stall under more high load capacity;It is dynamic for cigarette air duct coupled system adjusting Men Gengchi to reduce offset Make, to solve the problems, such as fan stall under more underload.
9. a kind of cigarette air duct coupled system for preventing fan stall according to claim 7, which is characterized in that the report Offset between alert line and nargin line is determined according to operating experience, increases offset for reducing the adjusting of cigarette air duct coupled system The operating frequency of door reduces offset for reducing blower power consumption.
CN201910378320.3A 2019-05-08 2019-05-08 A kind of cigarette air duct coupled system preventing fan stall Pending CN110186067A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910378320.3A CN110186067A (en) 2019-05-08 2019-05-08 A kind of cigarette air duct coupled system preventing fan stall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910378320.3A CN110186067A (en) 2019-05-08 2019-05-08 A kind of cigarette air duct coupled system preventing fan stall

Publications (1)

Publication Number Publication Date
CN110186067A true CN110186067A (en) 2019-08-30

Family

ID=67715996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910378320.3A Pending CN110186067A (en) 2019-05-08 2019-05-08 A kind of cigarette air duct coupled system preventing fan stall

Country Status (1)

Country Link
CN (1) CN110186067A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113153798A (en) * 2021-05-13 2021-07-23 西安热工研究院有限公司 System for solving stall and surge of axial flow type primary fan
CN114165466A (en) * 2020-09-11 2022-03-11 上海申能电力科技有限公司 Method for recovering stalled one fan in double-row parallel axial flow primary fan
CN114992150A (en) * 2022-05-19 2022-09-02 西安热工研究院有限公司 Early warning method and device for coal-fired power plant fan stall and storage medium

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR810001685B1 (en) * 1977-12-15 1981-10-27 엔 · 브이 · 페트로우 Control system for variable pitch oxial fan for utility boiler
CN201747645U (en) * 2010-03-16 2011-02-16 武汉龙净环保工程有限公司 Fan bypass structure
CN102606464A (en) * 2011-12-15 2012-07-25 西安兴仪启动发电试运有限公司 Real-time monitoring and preventing method for surge and stall of axial flow fan
CN102840182A (en) * 2012-09-10 2012-12-26 中国能源建设集团广东省电力设计研究院 Low-load vibration control method for axial flow fan of thermal power plant and bypass air duct control loop
CN103423183A (en) * 2013-07-15 2013-12-04 上海申能能源科技有限公司 Thermal power plant fan optimal configuration system and thermal power plant fan optimal configuration method
CN106704241A (en) * 2017-02-27 2017-05-24 杭州志驱传动技术有限公司 Fan stable operation control method
CN107219809A (en) * 2016-11-24 2017-09-29 浙江浙能中煤舟山煤电有限责任公司 The prevention method of primary air fan stall in primary air system
CN207920901U (en) * 2018-01-19 2018-09-28 国电科学技术研究院有限公司 Axle induced-draft fan system
CN210088915U (en) * 2019-05-08 2020-02-18 国网浙江省电力有限公司电力科学研究院 Smoke and air duct coupling system for preventing fan stall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR810001685B1 (en) * 1977-12-15 1981-10-27 엔 · 브이 · 페트로우 Control system for variable pitch oxial fan for utility boiler
CN201747645U (en) * 2010-03-16 2011-02-16 武汉龙净环保工程有限公司 Fan bypass structure
CN102606464A (en) * 2011-12-15 2012-07-25 西安兴仪启动发电试运有限公司 Real-time monitoring and preventing method for surge and stall of axial flow fan
CN102840182A (en) * 2012-09-10 2012-12-26 中国能源建设集团广东省电力设计研究院 Low-load vibration control method for axial flow fan of thermal power plant and bypass air duct control loop
CN103423183A (en) * 2013-07-15 2013-12-04 上海申能能源科技有限公司 Thermal power plant fan optimal configuration system and thermal power plant fan optimal configuration method
CN107219809A (en) * 2016-11-24 2017-09-29 浙江浙能中煤舟山煤电有限责任公司 The prevention method of primary air fan stall in primary air system
CN106704241A (en) * 2017-02-27 2017-05-24 杭州志驱传动技术有限公司 Fan stable operation control method
CN207920901U (en) * 2018-01-19 2018-09-28 国电科学技术研究院有限公司 Axle induced-draft fan system
CN210088915U (en) * 2019-05-08 2020-02-18 国网浙江省电力有限公司电力科学研究院 Smoke and air duct coupling system for preventing fan stall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
叶勇健;冯琰磊;: "火电机组部分负荷下烟风系统风机的节能运行", 中国电力, no. 04, pages 58 - 61 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114165466A (en) * 2020-09-11 2022-03-11 上海申能电力科技有限公司 Method for recovering stalled one fan in double-row parallel axial flow primary fan
CN113153798A (en) * 2021-05-13 2021-07-23 西安热工研究院有限公司 System for solving stall and surge of axial flow type primary fan
CN114992150A (en) * 2022-05-19 2022-09-02 西安热工研究院有限公司 Early warning method and device for coal-fired power plant fan stall and storage medium

Similar Documents

Publication Publication Date Title
CN110186067A (en) A kind of cigarette air duct coupled system preventing fan stall
CN202158666U (en) Internal pressure feedback regulation system of gas water heater
CN101709882A (en) Coal-fired boiler hot primary wind heating system
CN103712233A (en) Intelligent water wall high temperature corrosion preventing system suitable for large power station boiler and method
CN203642223U (en) Intelligent high-temperature corrosion prevention system applicable to water-cooled walls of large power station boilers
CN201028791Y (en) Anti-corrosion energy-saving boiler flue gas residual heat utilization device
CN105909326A (en) Steam extraction heat supply structure and heat supply system of power plant steam unit
CN201262408Y (en) Hot primary air bypass apparatus of coal-burning boiler
CN212493436U (en) System for reducing cold air volume of coal mill
CN107420933B (en) Exhaust-heat primary air heat exchanger system for hot air powder feeding system of ball mill
CN101334170A (en) Coal-burning boiler heat primary air side road device
CN205607235U (en) Hot media water tubular heat exchanger control system
CN107917536A (en) One kind fires hot equipment thermic load adaptive approach and device
CN207262700U (en) A kind of flue gas waste heat recovery water jacket furnace
CN107166428B (en) Layer combustion boiler flue gas oxygen content control system based on flue gas recirculation
CN205919533U (en) Complete intelligent hanging stove
CN210088915U (en) Smoke and air duct coupling system for preventing fan stall
CN201014754Y (en) Flue gas waste heat utilization device of corrosion-proof energy-saving type industry boiler
CN201259210Y (en) Non-phase-change composite heat exchanger
CN203927882U (en) Warm economizer system in one
CN110500184B (en) Waste heat utilization system for improving gas turbine combined cycle economy
CN210320143U (en) System for reducing boiler exhaust gas temperature and inhibiting low-temperature corrosion of air preheater
CN202648451U (en) Outlet smoke temperature regulating system of kiln head waste heat boiler
CN203274527U (en) High-temperature exhaust gas waste heat utilizing system of continuous casting and rolling machine set pit furnace
CN208365576U (en) A kind of boiler smoke wind blending heating regulating system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination