CN110175736A - Automatically listed method is torn open in a kind of electric system regulation center - Google Patents
Automatically listed method is torn open in a kind of electric system regulation center Download PDFInfo
- Publication number
- CN110175736A CN110175736A CN201910276363.0A CN201910276363A CN110175736A CN 110175736 A CN110175736 A CN 110175736A CN 201910276363 A CN201910276363 A CN 201910276363A CN 110175736 A CN110175736 A CN 110175736A
- Authority
- CN
- China
- Prior art keywords
- listed
- task
- open
- regulation
- open automatically
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 15
- 238000004321 preservation Methods 0.000 claims abstract 2
- 230000005611 electricity Effects 0.000 claims description 4
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000005540 biological transmission Effects 0.000 description 5
- 230000009471 action Effects 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 238000012552 review Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 230000004069 differentiation Effects 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 230000008929 regeneration Effects 0.000 description 1
- 238000011069 regeneration method Methods 0.000 description 1
- 230000003252 repetitive effect Effects 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Alarm Systems (AREA)
Abstract
The invention discloses a kind of electric system regulation centers to tear listed method open automatically, read the task of regulation PMS system, it generates and pending tears listed task open, when in initialization task tear open extension task and electrical anti-error system task matching, generation is listed pending task, after receiving the task of PMS and message that electrical anti-error system task is completed simultaneously, just start to execute;The file with time series is sent when task execution gives regulation integral system;Power grid artwork file is read, it is whether consistent to the dbjective state and power grid artwork file that execute equipment, when inconsistent, the operation note of regulation integral system and preservation are read, provides and tears listed false alarm open automatically;When consistent, listed task is torn in completion open automatically.Listing operation is torn open in place automatically the invention has the advantages that being effectively guaranteed.
Description
Technical field
The present invention relates to a kind of electric system regulation centers to tear listed method open automatically.
Background technique
Regulation center carries as important component in electric system and carries out unified planning, coordinating pipe to entire power grid
The effects of reason, failure is disposed, action is related to extensively, work it is safe and reliable not only affect entire power generation with
And transmission quality, have an effect on the quality and safety of electricity consumption.And with the continuous development of national economy, the continuous expansion of power grid scale
Greatly, substation's quantity and O&M maintenance intensity are continuously increased, so that regulation increased pressure.Therefore how from details set about effectively,
It is reliable to solve in work cumbersome, repetitive operation to mitigate huge workload be instantly urgently to be solved.
Discovery is investigated for regulation person through practice, to carry out tearing extension open in regulation integral system before and after license work
Board, tears that listed action is Chong Die with anti-error system operation element content open, more because the inertial thinking of people influences, often makes
Think that the case where tearing listing operation open, omitting has been carried out in regulator control system to happen occasionally in the middle at subconsciousness.
Summary of the invention
The purpose of the present invention is to provide a kind of electric system regulation centers to tear listed method open automatically, can effectively solve the problem that tune
Control personnel forget to carry out the problem of tearing listing operation open.
In order to solve the above-mentioned technical problem, the present invention is achieved by the following technical solutions: a kind of electric system regulation
Automatically listed method is torn open in center, comprising the following steps:
A, the task of reading regulation PMS system, according to linkage rule base, initialization, which generates pending tearing open and is listed, appoints
Business;
B, when tearing extension task and the matching of electrical anti-error system task open in initialization task, this tears listed task ability open automatically
It is activated in pending state,
C, after tearing listed task open automatically and being activated, generation is listed pending task, while receiving the task of PMS
After the message completed with electrical anti-error system task, tears open automatically and listed just start to execute;
D, the file with time series is sent when tearing listed task execution open automatically gives regulation integral system;
E, the power grid artwork file that generates per minute of regulation integral system is read, to tearing listed task execution device open automatically
Dbjective state and power grid artwork file it is whether consistent, when there is inconsistency, read regulation integral system operation note and guarantor
It deposits, provides and tear listed false alarm open automatically;When consistent, listed task is torn in completion open automatically.
Preferably, the file with time series is sent when the step D tears listed task execution open automatically gives regulation integration
While system, itself also stays shelves to back up.
Preferably, the file in the step D includes and tears the listed time open, tear listed plant stand open, tear listed equipment open, tears extension open
Board equipment current state, the content of dbjective state.
Compared with prior art, the invention has the advantages that
One, develop regulator control system tear open automatically listed safety be based on electrical anti-error system, electrical anti-error system
Safety check mechanism is suitable for tearing hang tag system open automatically, it is ensured that is not in misplaced board, tears situations such as wrong board open, ensure that certainly
It is dynamic to tear listed safety open.
Two, it tears listed task open automatically and carrys out Self-controlled PMS system, and differentiate that tearing listed task start condition open automatically is then
PMS system and electrical anti-error system, only after the task of two systems all circulates completion, tearing listed program open just can be final
It is acted.Linkage decision rule and verification scheme based on dual system ensure that the execution for tearing listed task open and review system,
It ensure that tearing listed task open automatically is not in omission and mistake.
Three, tearing listed task execution open automatically is completed in regulation integral system, is torn open and is listed when executing on time automatically
Between sequence tags send instructions to regulation integral system.Regulate and control integral system and receives in chronological sequence sequence completion after instruction
It tears open listed.Tearing listed and regulation integral system communication open is unidirectional file transmission, meets electric system secondary safety protection
It is required that.
Four, the differentiation for tearing listed performance open automatically is the power grid mould generated per minute by reading regulation integral system
Type file carries out, when electric network model state and tear open listed dbjective state it is inconsistent when, tear listed issue open and unsuccessfully alert, mention
The regulation person that wakes up carries out inspection check, is effectively guaranteed and tears listing operation open in place automatically.
Five, tear listed program open automatically and automatically generated before regulation person relieves and tear listed report open, content include the operating time,
Task source, executive condition etc. carry out relieve situation explanation and tour of relieving for regulation person.
Specific embodiment
The embodiment of the present invention is described below in detail, it is intended to be used to explain the present invention, and should not be understood as to of the invention
Limitation.
The embodiment of listed method is torn at a kind of electric system regulation center open automatically, and a kind of electric system regulation center is torn open automatically
Listed method, comprising the following steps:
A, to formulate linkage between each system according to the practical circulation situation of regulation business regular, and according to state's net information norm,
Arrange electric network information decision rule library;Regulate and control and arrange in the work station of platform and tear listed program open automatically, and with PMS and electrical anti-error system
System interface inter-link starts simultaneously demons;The task for reading regulation PMS system, according to linkage rule base, initialization is generated
Pending tears listed task open;
B, when tearing extension task and the matching of electrical anti-error system task open in initialization task, this tears listed task ability open automatically
It is activated in pending state,
C, after tearing listed task open automatically and being activated, generation is listed pending task, while receiving the task of PMS
After the message completed with electrical anti-error system task, tears open automatically and listed just start to execute;
D, the file with time series is sent when tearing listed task execution open automatically gives regulation integral system, while itself
Shelves are stayed to back up, the file of transmission includes tearing the listed time open, tearing listed plant stand open, tear listed equipment open, tears the current shape of listed equipment open
State, the content of dbjective state;
E, the power grid artwork file that generates per minute of regulation integral system is read, to tearing listed task execution device open automatically
Dbjective state and power grid artwork file it is whether consistent, when there is inconsistency, read regulation integral system operation note and guarantor
It deposits, provides and tear listed false alarm open automatically;When consistent, listed task is torn in completion open automatically.
Regulation person executes the overall process and anti-misoperation torn listing operation open, and execute this operation on regulation integral system
Execution with review overall process it is consistent, belong to complicated heavy work, increase unnecessary workload.The safety of this method executes
Also it is built upon on the basis of the operating reliability of anti-error system, safety.
Automatically it tears listed task open and carrys out Self-controlled PMS system, the task of PMS system collects the full profession of regulation, reasonable to make
Determine rule base, can just filter out and need to tear open listed task, avoid omitting, rule base can be adjusted according to user demand.
The task triggering of electrical anti-error system is also most important simultaneously, and anti-error system triggering can guarantee the safe and reliable of operation, anti-error
System task triggering can specify the operation task time started, and PMS and anti-error system task complete message, can define automatic
It tears open the listed execution time, two time points summarise regulation person and carry out the listed beginning and ending time, must as tear listed event open
Condition is wanted to be stored.
Automatically tearing listed execute open is finally to be realized by sending text files to one change system of regulation.It is executing
File is transmitted in the form of text, it is contemplated that tears listed program open automatically in the management information great Qu of electricity secondary safety protection
In, and regulating and controlling tearing open listed for integral system is the control zone for producing control great Qu, that is, most safe highest level area.Text
The advantage of transfer ratio other modes is the passing through property of safety device, passes through lattice by lateral isolation between setting safety zone
Formula reaches electricity secondary safety protection transmission requirement, realizes effectively transmission.
Listed text is torn in regulation integral system reading open, carries out tearing listing operation open as required.Operating result is recorded in regulation
It can real-time perfoming inquiry in integral system.And tear the artwork that listed program is issued per minute by regulating and controlling integral system open automatically
Message file is compared with listed task object state is torn open, and judgement tears to be listed whether succeed open automatically, and unsuccessful failed regeneration is accused
It is alert.
Regulation person can automatically generate when relieving tears listed report open, content according to regulation person relieve demand set, use
In situation explanation and the tour of relieving of relieving.
Above is only a specific embodiment of the present invention, but technical characteristic of the invention is not limited thereto, Ren Heben
Within the field of the present invention, made changes or modifications all cover within the scope of the patent of the present invention the technical staff in field.
Claims (3)
1. listed method is torn at a kind of electric system regulation center open automatically, it is characterised in that: the following steps are included:
A, the task for reading regulation PMS system, according to linkage rule base, initialization, which generates, pending tears listed task open;
B, when tearing extension task and the matching of electrical anti-error system task open in initialization task, this tears listed task open automatically to be swashed
It is living to be in pending state,
C, after tearing listed task open automatically and being activated, generation is listed pending task, while receiving the task and electricity of PMS
After the message that power anti-error system task is completed, tears open automatically and listed just start to execute;
D, the file with time series is sent when tearing listed task execution open automatically gives regulation integral system;
E, the power grid artwork file that regulation integral system generates per minute is read, to the mesh for tearing listed task execution device open automatically
Whether mark state and power grid artwork file are consistent, when there is inconsistency, read the operation note of regulation integral system and preservation, give
Tear listed false alarm open automatically out;When consistent, listed task is torn in completion open automatically.
2. listed method is torn at a kind of electric system regulation center as described in claim 1 open automatically, it is characterised in that: the step
While D sends the file with time series to regulation integral system when tearing listed task execution open automatically, itself also stays shelves standby
Part.
3. listed method is torn at a kind of electric system regulation center as described in claim 1 open automatically, it is characterised in that: the step
File in D includes to tear the listed time open, tear listed plant stand open, tear listed equipment open, tears listed equipment current state, dbjective state open
Content.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910276363.0A CN110175736B (en) | 2019-04-08 | 2019-04-08 | Automatic card disassembling and hanging method for power system regulation and control center |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910276363.0A CN110175736B (en) | 2019-04-08 | 2019-04-08 | Automatic card disassembling and hanging method for power system regulation and control center |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110175736A true CN110175736A (en) | 2019-08-27 |
CN110175736B CN110175736B (en) | 2023-06-23 |
Family
ID=67689440
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910276363.0A Active CN110175736B (en) | 2019-04-08 | 2019-04-08 | Automatic card disassembling and hanging method for power system regulation and control center |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110175736B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117933949A (en) * | 2024-03-22 | 2024-04-26 | 广东电网有限责任公司中山供电局 | Execution method, device, storage medium and processor for power-supply-protection electric sheet |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080030587A (en) * | 2008-02-05 | 2008-04-04 | (주)모노시스 | Signboard information managing system using of a rfid and method of the same |
CN103853436A (en) * | 2013-12-19 | 2014-06-11 | 国家电网公司 | Novel method for intelligently hanging and detaching signboard |
CN104240152A (en) * | 2014-09-15 | 2014-12-24 | 陈慧超 | Power plant equipment on-line state and configuration state management system |
CN105405073A (en) * | 2015-12-23 | 2016-03-16 | 国网福建省电力有限公司 | Information comparison method based on power distribution automation main station system and GIS system |
CN107526768A (en) * | 2017-07-04 | 2017-12-29 | 国网冀北电力有限公司 | A kind of listed assistance system of intelligence and implementation method |
CN107657055A (en) * | 2017-10-18 | 2018-02-02 | 国网福建省电力有限公司 | A kind of back-up system method of data synchronization based on distribution main website |
CN107704739A (en) * | 2017-11-01 | 2018-02-16 | 珠海华伟电气科技股份有限公司 | Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock |
KR101827467B1 (en) * | 2017-06-01 | 2018-03-22 | 주식회사 빛컨 | Adaptive iot service system powered by detachable hardware module |
WO2018053947A1 (en) * | 2016-09-22 | 2018-03-29 | 国电南瑞科技股份有限公司 | Peer-to-peer mutual backup method suitable for multi-region integrated control of power grid |
CN108155717A (en) * | 2017-03-16 | 2018-06-12 | 国网福建省电力有限公司厦门供电公司 | The anti-error methods of calibration of distribution main website FA based on operation of power networks data |
-
2019
- 2019-04-08 CN CN201910276363.0A patent/CN110175736B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20080030587A (en) * | 2008-02-05 | 2008-04-04 | (주)모노시스 | Signboard information managing system using of a rfid and method of the same |
CN103853436A (en) * | 2013-12-19 | 2014-06-11 | 国家电网公司 | Novel method for intelligently hanging and detaching signboard |
CN104240152A (en) * | 2014-09-15 | 2014-12-24 | 陈慧超 | Power plant equipment on-line state and configuration state management system |
CN105405073A (en) * | 2015-12-23 | 2016-03-16 | 国网福建省电力有限公司 | Information comparison method based on power distribution automation main station system and GIS system |
WO2018053947A1 (en) * | 2016-09-22 | 2018-03-29 | 国电南瑞科技股份有限公司 | Peer-to-peer mutual backup method suitable for multi-region integrated control of power grid |
CN108155717A (en) * | 2017-03-16 | 2018-06-12 | 国网福建省电力有限公司厦门供电公司 | The anti-error methods of calibration of distribution main website FA based on operation of power networks data |
KR101827467B1 (en) * | 2017-06-01 | 2018-03-22 | 주식회사 빛컨 | Adaptive iot service system powered by detachable hardware module |
CN107526768A (en) * | 2017-07-04 | 2017-12-29 | 国网冀北电力有限公司 | A kind of listed assistance system of intelligence and implementation method |
CN107657055A (en) * | 2017-10-18 | 2018-02-02 | 国网福建省电力有限公司 | A kind of back-up system method of data synchronization based on distribution main website |
CN107704739A (en) * | 2017-11-01 | 2018-02-16 | 珠海华伟电气科技股份有限公司 | Microcomputer anti-error operating system and method, anti-error main frame with listed function, Intelligent key, intelligent lock |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117933949A (en) * | 2024-03-22 | 2024-04-26 | 广东电网有限责任公司中山供电局 | Execution method, device, storage medium and processor for power-supply-protection electric sheet |
Also Published As
Publication number | Publication date |
---|---|
CN110175736B (en) | 2023-06-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107092222B (en) | Based on the integrated power grid regulation operational administrative system of anti-error check analysis | |
CN104182902B (en) | A kind of monitoring method that operational system is concentrated based on dispatch data net | |
CN106451761B (en) | Large-area power failure automatic monitoring and analyzing system based on dynamic data driving | |
CN110033186A (en) | A kind of huge hydroelectric power plant's intelligence prison disc system | |
CN106685703A (en) | Data acquisition and visual monitoring intelligent system | |
CN106655158A (en) | Smart grid based distribution network self-healing control system and method | |
CN111931605B (en) | Nuclear power plant high-risk operation intelligent monitoring system and method | |
CN104502753A (en) | Networked on-line real-time analysis system for electric power fault recording device and application of system | |
CN104463696A (en) | Power grid operating risk recognition and prevention method and system | |
CN109519233A (en) | For nuclear power plant's steam turbine into the on-line monitoring method and system of steam control valve | |
CN110350660B (en) | Online monitoring method and system for relay protection function pressing plate | |
CN107390087A (en) | Platform is supported in a kind of power network repairing operation | |
CN106878466A (en) | A kind of Hydropower Unit data management and equipment control unified platform | |
CN113516399B (en) | Nuclear power plant operation risk database logic processing and intelligent analysis early warning system | |
CN109611815A (en) | A kind of the energy consumption alarm management method and device of gas-steam boiler | |
CN104063761A (en) | SCADA data development system based on smart grid | |
CN112448474A (en) | Intelligent substation primary and secondary state comparison intelligent inspection method and system | |
CN110175736A (en) | Automatically listed method is torn open in a kind of electric system regulation center | |
CN111030085A (en) | Electric power safety multi-engine checking and killing mechanism | |
CN112508384B (en) | Visual automatic monitoring equipment and method for power dispatching operation ticket | |
CN109190779A (en) | A kind of power network resources monitoring and managing method and system based on dipper system | |
CN103530824B (en) | A kind of template knowledge base production method of the substation intelligent alarm system based on template database | |
CN105844542B (en) | WAMS-based online detection method for single large disturbance of power grid | |
CN113592210A (en) | Internet of things integrated management platform for water supply non-negative-pressure secondary water supply facility | |
CN104035342A (en) | Real-time alarm intelligent auxiliary analysis system and method based on IFIX platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |