CN110173241A CN201910544008.7A CN201910544008A CN110173241A CN 110173241 A CN110173241 A CN 110173241A CN 201910544008 A CN201910544008 A CN 201910544008A CN 110173241 A CN110173241 A CN 110173241A
Authority
CN
China
Prior art keywords
hydrate
situ
inner tube
recovery method
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910544008.7A
Other languages
Chinese (zh)
Inventor
王凡
王国荣
邱顺佐
冯桂弘
王广申
钟林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201910544008.7A priority Critical patent/CN110173241A/en
Publication of CN110173241A publication Critical patent/CN110173241A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B41/00Equipment or details not covered by groups E21B15/00 - E21B40/00
    • E21B41/0099Equipment or details not covered by groups E21B15/00 - E21B40/00 specially adapted for drilling for or production of natural hydrate or clathrate gas reservoirs; Drilling through or monitoring of formations containing gas hydrates or clathrates
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/01Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/18Drilling by liquid or gas jets, with or without entrained pellets
    • E21B7/185Drilling by liquid or gas jets, with or without entrained pellets underwater

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Disclosed herein is a kind of novel separation recovery method in situ of ocean gas hydrate and devices, belong to exploiting ocean natural gas hydrates technical field, it mainly comprises the steps that above decentralization riser pipe to hydrate layer mineral, continues to creep into using drill bit Mechanical Crushing, form vertical neck eye;It returns and drags drill string; hydrate ore bed is crushed using the jet hole of arranged tangential, water jets form high speed rotation flow field in exploitation chamber, and hydrate particle and impurity sand grain are layered under the influence of centrifugal force; to separation in situ, cavity is backfilled to positioned at outermost impurity sand grain;Hydrate after the separation recovery pump together with seawater serves sea.The original position that the present invention realizes sea-bottom shallow hydrate is broken, separates, backfill institutional operation, is able to carry out efficient, safety, duration exploitation, and while guaranteeing production efficiency, exploitation tool complexity, promotion backfill stability is effectively reduced.

Description

A kind of novel separation recovery method in situ of ocean gas hydrate and device
Technical field
The present invention relates to exploiting ocean natural gas hydrates technical field more particularly to ocean shallow layer gas hydrate are former Position separation backfill jet stream recovery method and device.
Background technique
The gas hydrates of referred to as " combustible ice " are the unconventional energy resource of a kind of high density, high heating value.It is complete according to statistics It is total that the carbon content of the total resources of ball gas hydrates is equivalent to the resources such as coal, oil and natural gas known to the current whole world Twice of reserves.China's ocean gas hydrate Resources Prospect is very wide, only the total resources of Gas Hydrate of The South China Sea It is equivalent to the half on about China land and offshore oil natural gas gross reserves.
There are four types of the gas hydrates storage forms for being currently known dawn self-assembling formation, respectively sandrock-type, sandstone crack Type, dispersing type, particulate crack type.It is mainly characterized by burying shallow, cementing weak, most of not fine and close cap rock or completeness The deep storage lid of state.The successful method of production testing operation has heat shock method, voltage drop method, note chemical-agent technique, CO in the world2Displacement method And several method is used in combination.But these methods have centainly hydrate cap rock without departing from traditional oil-gas mining thinking It is required that long-term exploitation may cause potential geological disaster.The basic principle of solid state fluidizing recovery method is not change seabed Hydrate mineral reserve temperature carries out digging to hydrate deposition ore body and is crushed, backfill in advance through second-time breakage and silt in the case where Sea is delivered to by closed conveying standpipe afterwards, while extra large exterior heat seawater being introduced into sea risers and is mixed with hydrate particle It is mixed, to realize Ordered Decomposition of the gas hydrates in standpipe, and then the density of blending agent in standpipe is reduced, generated vertical Pipe inside and outside differential pressure, and then realize the lifting certainly of blending agent in standpipe.
According to the buried depth of hydrate resource, solid state fluidizing recovery method can be divided into the exploitation of surface layer solid state fluidizing and shallow-layer Solid state fluidizing exploitation.Shallow-layer solid state fluidizing mining method needs individual separation module, broken module and recycling module, whole to tie Structure is complicated, and difficulty of processing is big, at high cost;And backfilling apparatus cannot be opened up in nearly bit part, otherwise because backfill channel it is long and narrow with It results in blockage, backfill sediment structure intensity is low, easily causes reservoir to collapse, or even the collapsing of hydrate ore bed is caused to cause address calamity Evil is unfavorable for business and exploits.
Summary of the invention
Aiming at the problems existing in the prior art, it is new for ocean gas hydrate that the object of the present invention is to provide one kind The recovery method and device that type separates in situ, exploitation reducig equipment configuration complexity increase backfill separative efficiency.
To realize the above goal of the invention, technical scheme is as follows: a kind of novel original position of ocean gas hydrate Separate recovery method, the exploitation for the non-diagenesis gas hydrates of sea-bottom shallow, which is characterized in that the sea-bottom natural gas water Closing the novel separation recovery method in situ of object includes:
Step S1: being drilled into hydrate reservoir by intelligent steering Drilling bore bit, forms the vertical neck eye of certain length;
Step S2: it returns and drags intelligent steering Drilling bore bit, and hydrate reservoir is crushed by jet stream spray-hole, is separated And backfill, the flow field of rotation is formed in the cavities, and hydrate and impurity sand separate under the influence of centrifugal force, and it is outermost to be located at flow field Layer impurity sand to goaf into
Row compensation backfill;
Step S3: positioned at flow field center hydrate under the effect of gravity, and be recovered module recovery holes sucking internal layer Among the annular space of pipe and outer layer sleeve, inner tube annular space is changed to by passageway bridge postposition, pump is finally recovered and is lifted to sea First processing platform simultaneously stores.
A kind of quarrying apparatus of the novel separation recovery method in situ of ocean gas hydrate, is hydrated for ocean natural gas The novel separation exploitation in situ of object, including it is processing platform at the beginning of sea, marine riser, packer, bimetallic tube, drive module, broken apart Backfill module, recycling module, intelligent steering Drilling bore bit.
Just processing platform connect for bimetallic tube, marine riser top and sea, using packer shape on the outside of marine riser at the mud layer At enclosure space, double layer continuous pipe is isolated with seawater.Mud line following double layer continuous pipe in seabed connects drive module, in drive module Passageway bridge is installed in portion, and the hydrate slurry that upper external layer pipe changes in aerial injection water and inner tube with inner tube is handed over It changes, inner tube is installed in passageway bridge lower part, and injection water, hydrate slurry are isolated, motor is installed inside inner tube, is lower die Block provides power, installs outer tube on the outside of passageway bridge, and injection water, hydrate slurry are isolated with seawater.It is connect under drive module Broken apart backfill module, this module can carry out broken hydrate ore bed, and initial gross separation hydrate and impurity are husky, and impurity is husky Backfill is in broken cavity.Passageway bridge is installed, by upper external layer pipe and internal layer pipe ring above broken apart backfill inside modules Injection water in aerial hydrate slurry and inner tube swaps.Inner tube, peace inside inner tube are installed under passageway bridge Armored pump adsorbs gas hydrate particle pre-separated at broken cavity center, and it is transported upwards.Outside passageway bridge Side is equipped with outer tube, opens up multilayer jet hole in the outer tube, same layer jet hole using outer tube axle center as rotation center into Row arrangement, it is interlaced between every layer of jet hole to be arranged, the axle center of all jet holes with the radial rectangular cloth of outer tube It sets.Broken apart recycling module can be formed in broken cavity using outer tube axle center as the rotational flow field of rotation axis, be broken Broken hydrate particle is pumped and is inhaled from recovery holes due to the smaller center that will stay on flow field under the influence of centrifugal force of quality Enter, and impurity sand will be dispersed under the action of the centrifugal force on the outside of flow field since quality is bigger, be filled up the cavity being pooled out, be prevented sky Chamber collapses.Recycling module is installed, recycling module inner upper installs passageway bridge, by upper external layer under broken apart backfill module Pipe is swapped with the hydrate slurry in the injection water and inner tube in inner tube annular space.Inner tube is connect under passageway bridge, it will Injection water is conducted to intelligent steering Drilling bore bit, provides power for it.Outer tube, the outer once Guan Shangkai are installed on the outside of passageway bridge If multiple rows of recovery holes.
The beneficial effects of the present invention are: recovery process does not change the temperature and pressure of hydrate reservoir, prevents hydrate The geological disaster of initiation is decomposed in recovery process;Vertical neck eye is formed, and goes back to the side for dragging the broken vertical neck eye of Mining Equipment, Broken cavity upper surface is avoided to be collapsed by broken impact;One broken apart recycling module has broken apart three kinds of recycling Function carries out separation in situ, backfill, the rear portion for avoiding the backfill of leading portion digging rear end caused in broken hydrate reservoir cavity The case where pipeline is buried, exploitation reducig equip complexity, reduce the technology degree and energy of vertical pipe pumping hydrate slurry Commercial mining cost is saved in consumption.
Detailed description of the invention
A kind of novel separation recovery method schematic diagram in situ of ocean gas hydrate of Fig. 1.
1. seas just processing platform, 2. marine risers, 3. bimetallic tubes, 4. packers, 5. outer tubes, 6. motors, 7. sprays in figure Perforation, 8. recovery holes, 9. impurity sand, 10. intelligent steering Drilling bore bits, 11. hydrate particles, 12. recycling modules, 13. pump, 14. broken apart backfill module, 15. inner tubes, 16. drive modules, 17. passageway bridges.
Sectional view at A in a kind of novel separation recovery method schematic diagram Fig. 1 in situ of ocean gas hydrate of Fig. 2.
Specific embodiment
The exemplary embodiments for embodying feature of the present invention will be illustrated specifically in the following description.It should be noted that the present invention There can be different variations in different embodiments, and the present embodiment and attached drawing are only purposes of discussion, not to limit this Invention.
The embodiment of the present invention is for the novel separation recovery method in situ of ocean gas hydrate, comprising the following steps:
Step S1: lower marine riser 2 processing platform 1 as at the beginning of sea is transferred, after transferring to seabed, intelligent steering Drilling bore bit 10 It leads whole system to continue to creep into the covering mud layer to hydrate reservoir, packer 4 is installed at this time, is fixed in water proof 2 outside of pipe, lower section mining area and seawater are separated.Intelligent steering Drilling bore bit 10 continues vertically to creep into, and in hydrate mine The vertical neck eye of certain length is formed in layer;
Step S2: returning and drag intelligent steering Drilling bore bit 10, keeps the intelligent steering Drilling bore bit 10 of bottom hanging, sprays water It is flowed downward by the outer tube 5 and 15 annular space of inner tube of bimetallic tube 3, the passageway bridge 17 through drive module 16 enters inner tube 15, then entered in the annular space of outer tube 5 and inner tube 15 by the passageway bridge 17 of broken apart backfill module 14, finally by Jet hole 7 is crushed hydrate reservoir, is separated, and forms the flow field of rotation in the cavities.Due to hydrate and impurity sand Quality is different, and hydrate and impurity sand separate under the influence of centrifugal force, be located at the outermost impurity sand in flow field to goaf into Row compensation backfill;
Step S3: since the quality of hydrate is smaller compared to the quality of impurity sand, the hydrate positioned at flow field center exists It is settled under gravity, and the recovery holes 8 for being recovered module 12 suck among the annular space of inner tube 15 and outer tube 5, by returning 17 postposition of passageway bridge for receiving module 12 changes to 15 annular space of inner tube, pressurizes via the pump 13 of broken apart backfill module 14, from Passageway bridge 17 enters 16 inner tube 15 of drive module and 5 annular space of outer tube, finally by 16 passageway bridge 17 of drive module into Enter in the inner tube 15 of bimetallic tube 3, processing platform 1 at the beginning of being lifted to sea by pump 13 simultaneously stores.

Claims (6)

1. a kind of novel separation recovery method in situ of ocean gas hydrate, is used for the non-diagenesis gas hydrates of sea-bottom shallow Exploitation, which is characterized in that the novel separation recovery method in situ of the ocean gas hydrate includes:
Step S1: being drilled into hydrate reservoir by intelligent steering Drilling bore bit (10), forms the vertical neck eye of certain length;
Step S2: it returns and drags intelligent steering Drilling bore bit (10), and hydrate reservoir is crushed by spray-hole (7), is separated And backfill, water jets form rotational flow field, hydrate particle (11) and impurity husky (9) in the effect of centrifugal force in exploitation cavity Lower leaf is to separate, and the biggish impurity of quality husky (9) is in the outermost layer of rotational flow field, so that split mined out chamber compensates Backfill;
Step S3: the lesser hydrate particle of quality (11) under centrifugal force under the action of, the center in flow field, and being recovered Among recovery holes sucking inner tube (15) of module and the annular space of outer tube (5), internal layer is changed to by passageway bridge c (17) postposition (15) annular space is managed, (13) recycling is finally pumped and is lifted to the first processing platform (1) in sea and stores.
2. a kind of quarrying apparatus for realizing the novel separation recovery method in situ of ocean gas hydrate described in claim 1, It is characterized by comprising processing platform at the beginning of sea (1), marine riser (2), packer (4), bimetallic tube (3), drive module (16), Broken apart backfill module (14), recycling module (12), intelligent steering Drilling bore bit (10).
3. the quarrying apparatus of the novel separation recovery method in situ of ocean gas hydrate according to claim 2, special Sign is that the drive module (16) inner upper installs passageway bridge a (17), and outer tube is installed on the outside of passageway bridge a (17) (5), inner tube (15) are installed in downside, are equipped with motor (6) in inner tube (15);Motor (6) and inner tube (15) coaxially, bridge-type Channel a (17) and inner tube (15) are coaxial.
4. the quarrying apparatus of the novel separation recovery method in situ of ocean gas hydrate according to claim 2, special Sign is broken apart backfill module (14) inner upper installation passageway bridge b (17), installation on the outside of passageway bridge b (17) Inner tube (15) are installed in outer tube (5), downside, are equipped with pump (13) in inner tube (15);Pump (13) and inner tube (5) coaxially, Passageway bridge b (13) and inner tube (15) are coaxial.
5. the quarrying apparatus of the novel separation recovery method in situ of ocean gas hydrate according to claim 2, special Sign is to be equipped with multilayer spray hole (7) in the outer tube (5) of broken apart backfill module (14), each spray-hole (7) Axial line and outer tube (5) radial shape angle in 90 °, and spray-hole (7) is rotated with outer tube (5) axial line and is arranged, every layer of spray Perforation (7) is arranged along outer tube (5) axial direction, and every layer of spray-hole (7) interlaced arrangement, and rotation can be generated in digging cavity Turn of tidal stream field.
6. the quarrying apparatus of the novel separation recovery method in situ of ocean gas hydrate according to claim 2, special Sign is that the recycling module (12) inner upper installs passageway bridge c (17), and outer tube is installed on the outside of passageway bridge c (17) (5), inner tube (5) are installed in downside, are equipped with recovery holes (8) in outer tube (5).
CN201910544008.7A 2019-06-21 2019-06-21 A kind of novel separation recovery method in situ of ocean gas hydrate and device Pending CN110173241A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910544008.7A CN110173241A (en) 2019-06-21 2019-06-21 A kind of novel separation recovery method in situ of ocean gas hydrate and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910544008.7A CN110173241A (en) 2019-06-21 2019-06-21 A kind of novel separation recovery method in situ of ocean gas hydrate and device

Publications (1)

Publication Number Publication Date
CN110173241A true CN110173241A (en) 2019-08-27

Family

ID=67698674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910544008.7A Pending CN110173241A (en) 2019-06-21 2019-06-21 A kind of novel separation recovery method in situ of ocean gas hydrate and device

Country Status (1)

Country Link
CN (1) CN110173241A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113976007A (en) * 2021-09-23 2022-01-28 超威电源集团有限公司 Mixing method of additive and auxiliary materials for paste mixing

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392646A (en) * 2011-12-07 2012-03-28 常州大学 Marine gas hydrate electronic-spraying pump composite exploitation method and apparatus
US20160341024A1 (en) * 2013-12-20 2016-11-24 Onesubsea Ip Uk Limited Systems and methods for subsea fluid phase separation
CN107448176A (en) * 2017-09-13 2017-12-08 西南石油大学 A kind of non-diagenesis gas hydrates mechanical jet unitized production method and device of sea-bottom shallow
CN107642346A (en) * 2017-09-06 2018-01-30 西南石油大学 A kind of non-diagenesis gas hydrates neck eye of sea-bottom shallow, which returns, drags jet recovery method and quarrying apparatus
CN108049845A (en) * 2018-02-02 2018-05-18 西南石油大学 A kind of non-diagenesis gas hydrates lifting method of sea-bottom shallow and device
CN108222894A (en) * 2018-03-09 2018-06-29 西南石油大学 It is a kind of to melt the silt particle backfilling apparatus adopted for gas hydrates time tractive current
CN108643869A (en) * 2018-04-24 2018-10-12 西南石油大学 A kind of sea-bottom shallow gas hydrates solid state fluidizing lasting exploit device and method
WO2018191991A1 (en) * 2017-04-17 2018-10-25 西南石油大学 Device and method for solid-state fluidized mining of seabed superficial zone non-diagenetic natural gas hydrate
CN108756828A (en) * 2018-05-25 2018-11-06 西南石油大学 Hydrate solid state fluidizing recovery method and system under the conditions of underbalance reacting cycle
CN109723410A (en) * 2019-03-24 2019-05-07 西南石油大学 A kind of umbrella-type exploitation tool of gas hydrates solid state fluidizing exploitation
CN211777348U (en) * 2019-06-21 2020-10-27 西南石油大学 Novel normal position of ocean natural gas hydrate is separated and is adopted device

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102392646A (en) * 2011-12-07 2012-03-28 常州大学 Marine gas hydrate electronic-spraying pump composite exploitation method and apparatus
US20160341024A1 (en) * 2013-12-20 2016-11-24 Onesubsea Ip Uk Limited Systems and methods for subsea fluid phase separation
WO2018191991A1 (en) * 2017-04-17 2018-10-25 西南石油大学 Device and method for solid-state fluidized mining of seabed superficial zone non-diagenetic natural gas hydrate
CN107642346A (en) * 2017-09-06 2018-01-30 西南石油大学 A kind of non-diagenesis gas hydrates neck eye of sea-bottom shallow, which returns, drags jet recovery method and quarrying apparatus
CN107448176A (en) * 2017-09-13 2017-12-08 西南石油大学 A kind of non-diagenesis gas hydrates mechanical jet unitized production method and device of sea-bottom shallow
CN108049845A (en) * 2018-02-02 2018-05-18 西南石油大学 A kind of non-diagenesis gas hydrates lifting method of sea-bottom shallow and device
CN108222894A (en) * 2018-03-09 2018-06-29 西南石油大学 It is a kind of to melt the silt particle backfilling apparatus adopted for gas hydrates time tractive current
CN108643869A (en) * 2018-04-24 2018-10-12 西南石油大学 A kind of sea-bottom shallow gas hydrates solid state fluidizing lasting exploit device and method
CN108756828A (en) * 2018-05-25 2018-11-06 西南石油大学 Hydrate solid state fluidizing recovery method and system under the conditions of underbalance reacting cycle
CN109723410A (en) * 2019-03-24 2019-05-07 西南石油大学 A kind of umbrella-type exploitation tool of gas hydrates solid state fluidizing exploitation
CN211777348U (en) * 2019-06-21 2020-10-27 西南石油大学 Novel normal position of ocean natural gas hydrate is separated and is adopted device

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
伍开松;贾同威;廉栋;严才秀;代茂林;: "海底表层天然气水合物藏采掘工具设计研究", 机械科学与技术 *
王国荣;钟林;周守为;刘清友;李清平;付强;王雷振;黄蓉;王广申;李学峰;: "天然气水合物射流破碎工具及其配套工艺技术", 天然气工业 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113976007A (en) * 2021-09-23 2022-01-28 超威电源集团有限公司 Mixing method of additive and auxiliary materials for paste mixing

Similar Documents

Publication Publication Date Title
US10822927B2 (en) Device and method for solid-state fluidized mining of natural gas hydrates in shallow seabed
CN107642346B (en) Pilot back-dragging jet mining method and mining device for seabed shallow layer non-diagenetic natural gas hydrate
CN107448176B (en) Mechanical jet combined mining method and device for seabed shallow layer non-diagenetic natural gas hydrate
CN108756828B (en) Hydrate solid fluidization exploitation method and system under underbalance reverse circulation condition
CN108049845B (en) Method and device for lifting non-diagenetic natural gas hydrate in shallow seabed layer
CN108678671B (en) A kind of sea bed gas hydrate digging sleeve type injection recyclable device
CN104806217B (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN101787854B (en) Subsection well completion system of bottom water reservoir horizontal well
CN108798608B (en) Natural gas hydrate exploitation system and method
CN102817603B (en) A kind of method being communicated with ground and underground coal seam gas
CN104024565B (en) The inflatable packer element being used together with bit adapter
CN108222894A (en) It is a kind of to melt the silt particle backfilling apparatus adopted for gas hydrates time tractive current
EP2857635A1 (en) Method for fluid carriage in deep-seam coal hydraulic mining
CN106089212B (en) Hard rock quickly digs courtyard blasting design method
CN109236186A (en) New well drilling casing and big wellbore multilateral well quick drill completion method
CN106499368A (en) A kind of deep seafloor top layer gas hydrate mining methods
JP7299643B2 (en) Offshore natural gas hydrate tubular mining equipment and method
CN108716361B (en) A kind of ocean gas hydrate original position Dynamic Separation backfilling apparatus
CN108678679A (en) A kind of sea bed gas hydrate layer composite drill bit
CN211777348U (en) Novel normal position of ocean natural gas hydrate is separated and is adopted device
CN113153235B (en) Underground hydraulic breaking, recovering and separating device for natural gas hydrate
CN110173241A (en) A kind of novel separation recovery method in situ of ocean gas hydrate and device
JP6432916B1 (en) Methane hydrate mining method
US3964792A (en) Explosive fluid transmitted shock method for mining deeply buried coal
CN109025830B (en) A kind of deep water shallow layer gas hydrate solid state fluidizing mine drilling bit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190827