CN110172911A - A kind of guiding installing type bridge concrete tamping equipment - Google Patents

A kind of guiding installing type bridge concrete tamping equipment Download PDF

Info

Publication number
CN110172911A
CN110172911A CN201810280472.5A CN201810280472A CN110172911A CN 110172911 A CN110172911 A CN 110172911A CN 201810280472 A CN201810280472 A CN 201810280472A CN 110172911 A CN110172911 A CN 110172911A
Authority
CN
China
Prior art keywords
mounting
transverse shifting
mounting plate
vibrating
guiding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810280472.5A
Other languages
Chinese (zh)
Other versions
CN110172911B (en
Inventor
王利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Yunduanqi Construction Engineering Co ltd
Original Assignee
Nanjing Hai Chen Xia Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Hai Chen Xia Engineering Technology Co Ltd filed Critical Nanjing Hai Chen Xia Engineering Technology Co Ltd
Priority to CN201810280472.5A priority Critical patent/CN110172911B/en
Publication of CN110172911A publication Critical patent/CN110172911A/en
Application granted granted Critical
Publication of CN110172911B publication Critical patent/CN110172911B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/06Solidifying concrete, e.g. by application of vacuum before hardening
    • E04G21/08Internal vibrators, e.g. needle vibrators

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of guiding installing type bridge concrete tamping equipments, including the fixed mounting plate being symmetrically vertically arranged, the upper semisection middle position level of the fixed mounting plate of the left and right sides is provided through longitudinal movement mounting hole, it vertically moves in the fixed mounting plate of mounting groove upper and lower ends and is vertically arranged with guide extension slot, the guide extension slot of two sides up and down is cooperated to be symmetrically arranged with limition orientation mounting plate, the limition orientation mounting plate cooperates guide extension slot to be provided with guide extension column, and guide extension column cooperates guide extension slot to be provided with reset spring, longitudinal movement mounting cylinder is provided between limition orientation mounting post, the middle position level of longitudinal movement mounting cylinder is provided through guiding mounting hole, the present invention has structure compact to design, operation of vibrating is wide, depth of vibrating is deep, without personnel in operation area The advantages that domain, vibration efficiency is high, and quality of vibrating is good.

Description

A kind of guiding installing type bridge concrete tamping equipment
Technical field
The present invention relates to a kind of bridge machine, specifically a kind of guiding installing type bridge concrete tamping equipment.
Background technique
Bridge machine is that road administration builds common building equipment, and the quality of vibrating of concrete is core in the construction of Bridge Heart index, but traditional bridge concrete tamping equipment cause to vibrate due to using traditional single tube internal vibration structure Artificial frequently lifting is needed when operation, and work surface is narrow, effect of vibrating is poor, and noise is big, and operating personnel is difficult to long working, effect The problems such as rate is low, it is difficult to meet current production needs.
To solve the above-mentioned problems, it proposes the present invention, currently used bridge concrete tamping equipment is overcome, due to adopting With traditional single tube internal vibration structure, cause to vibrate operation when need artificial frequently lifting, and work surface is narrow, effect of vibrating The problems such as difference, noise is big, and operating personnel is difficult to long working, low efficiency, solves currently used bridge concrete and vibrates Device is caused depth as shallow of vibrating, needs repeatedly to add concrete, just can guarantee construction matter due to being vibrated structure using floating-board type The problems such as amount, duty cycle is long, so that the present invention has structure compact to design, operation of vibrating is wide, and depth of vibrating is deep, is not necessarily to people Member is in operating area, the advantages that vibration efficiency is high, and quality of vibrating is good.
Summary of the invention
The purpose of the present invention is to provide a kind of guiding installing type bridge concrete tamping equipments, to solve above-mentioned background skill The problem of being proposed in art.
To achieve the above object, the invention provides the following technical scheme:
A kind of guiding installing type bridge concrete tamping equipment, including the fixed mounting plate being symmetrically vertically arranged, the left side The upper semisection middle position level of the fixed mounting plate of right two sides is provided through longitudinal movement mounting hole, vertically moves mounting groove It is vertically arranged with guide extension slot in the fixed mounting plate of upper and lower ends, the guide extension slot of two sides up and down is cooperated to be symmetrical arranged There is limition orientation mounting plate, the limition orientation mounting plate cooperates guide extension slot to be provided with guide extension column, and guiding is stretched Contracting column cooperates guide extension slot to be provided with reset spring, and longitudinal movement mounting cylinder is provided between limition orientation mounting post, indulges It is provided through guiding mounting hole to the middle position level of mobile mounting cylinder, the guiding installation hole horizontal of the left and right sides is cooperated to set It is equipped with transverse shifting mounting post, the rear and front end of transverse shifting mounting post is provided with transverse shifting guide groove, laterally Cooperation transverse shifting guide groove spaced set has several transverse shifting mounting cylinders, the transverse shifting peace on the outside of mobile mounting post Front and rear sides cooperation transverse shifting guide groove inside fitted tube passes through Mobile mounting rack and is provided with laterally automatically controlled guide wheel, laterally moves The lower end of dynamic mounting cylinder is provided with mounting post of vibrating straight down, and the lower end for mounting post of vibrating, which is horizontally disposed with to have to vibrate, occurs disk, The inner vertical for mounting post of vibrating, which is inlayed, is provided with unhurried current chamber, and the upper right comer horizontal of the unhurried current chamber, which stretches out to the right, is provided with air inlet Installing pipe, the right end of air inlet installing pipe are provided with air-tight connection flange, and vibrating occurs the bosom position of disk and inlay set vertically It is equipped with current divider, and the upper end of current divider is connected to unhurried current chamber by main flow pipe, the current divider is angularly provided with several points Conductance pipe, the end of shunt catheter, which cooperates to vibrate, to be occurred plate inlaid and is provided with pneumatic reed vibration generator, and pneumatic reed plays shake Device occurs disk and is provided with overflow hole through vibrating straight up.
As a further solution of the present invention: the upper and lower ends of the longitudinal movement mounting cylinder cooperate limition orientation mounting post It partly inlays and is vertically arranged with longitudinal automatically controlled guide wheel.
As a further solution of the present invention: the equal level in lower semisection middle position of the fixed mounting plate, which is inlayed, to be provided with Internal screw thread mounting cylinder.
As a further solution of the present invention: the upper left comer horizontal of the unhurried current chamber stretches out to the left is provided with safety overflow Pipe, and the right end of safety overflow pipe is inlayed and is provided with electromagnetic relief valve.
As a further solution of the present invention: the upper and lower ends middle position of the guiding mounting hole is provided with sliding and leads Xiang Zhu, and the horizontally disposed slot that is slidably installed of upper and lower ends cooperation slide-and-guide column of transverse shifting mounting post.
As a further solution of the present invention: the fit inside of the transverse shifting mounting cylinder slot that is slidably installed is provided with Power supply slide post, and the equal cooperated power supply slide post in the slot middle position that is slidably installed of upper and lower ends is vertically arranged with power supply brush.
As the present invention further scheme: it is described vibrate occur disk lower end be angularly provided with straight down it is several Internal vibration mounting cylinder, and the lower end of internal vibration mounting cylinder is provided with counterweight and vibrates column.
Compared with prior art, the beneficial effects of the present invention are: overcoming currently used bridge concrete tamping equipment, Due to using traditional single tube internal vibration structure, cause to vibrate operation when need artificial frequently lifting, and work surface is narrow, vibration It is poor to smash effect, the problems such as noise is big, and operating personnel is difficult to long working, low efficiency, solves currently used bridge coagulation Native tamping equipment is caused depth as shallow of vibrating, needs repeatedly to add concrete, just can guarantee due to being vibrated structure using floating-board type The problems such as construction quality, duty cycle is long, so that the present invention has structure compact to design, operation of vibrating is wide, and depth of vibrating is deep, Without personnel in operating area, the advantages that vibration efficiency is high, and quality of vibrating is good.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram for being oriented to installing type bridge concrete tamping equipment.
Fig. 2 is a kind of structural schematic diagram for being oriented to mounting post of vibrating in installing type bridge concrete tamping equipment.
Fig. 3 is a kind of structural schematic diagram for being oriented to transverse shifting mounting cylinder in installing type bridge concrete tamping equipment.
Fig. 4 is a kind of structural schematic diagram for being oriented to fixed mounting plate in installing type bridge concrete tamping equipment.
Fig. 5 is to vibrate that the structural schematic diagram of disk occurs in a kind of guiding installing type bridge concrete tamping equipment.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~5, in the embodiment of the present invention, a kind of guiding installing type bridge concrete tamping equipment, including left and right The fixed mounting plate 8 being symmetrically vertically arranged, the equal level in lower semisection middle position of the fixed mounting plate 8, which is inlayed, is provided with interior spiral shell Line mounting cylinder 9, the upper semisection middle position level of the fixed mounting plate 8 of the left and right sides are provided through longitudinal movement installation Hole vertically moves and is vertically arranged with guide extension slot 23 in the fixed mounting plate 8 of mounting groove upper and lower ends, cooperates two sides up and down Guide extension slot 23 be symmetrically arranged with limition orientation mounting plate 5, the limition orientation mounting plate 5 cooperates guide extension slot 23 It is provided with guide extension column, and guide extension column cooperates guide extension slot 23 to be provided with reset spring 7, limition orientation mounting plate Longitudinal movement mounting cylinder 22 is provided between 5, the upper and lower ends of the longitudinal movement mounting cylinder 22 cooperate limition orientation mounting plate 5 It partly inlays and is vertically arranged with longitudinal automatically controlled guide wheel 19, the middle position level of longitudinal movement mounting cylinder 22 is provided through guiding peace Hole is filled, cooperates the guiding mounting hole of the left and right sides is horizontally disposed to have a transverse shifting mounting post 6, up and down the two of the guiding mounting hole End middle position is provided with slide-and-guide column 21, and the upper and lower ends of transverse shifting mounting post 6 cooperate 21 water of slide-and-guide column Flat to be provided with the slot 20 that is slidably installed, the rear and front end of transverse shifting mounting post 6 is provided with transverse shifting guide groove 24, The fit inside of the transverse shifting mounting cylinder 4 slot 20 that is slidably installed is provided with power supply slide post 26, and the cunning of upper and lower ends The dynamic equal cooperated power supply slide post 26 in 20 middle position of mounting groove is vertically arranged with power supply brush 27,6 outside of transverse shifting mounting post Cooperation 24 spaced set of transverse shifting guide groove has several transverse shifting mounting cylinders 4, inside the transverse shifting mounting cylinder 4 Cooperation transverse shifting guide groove 24 in front and rear sides is provided with laterally automatically controlled guide wheel 25, transverse shifting installation by Mobile mounting rack The lower end of cylinder 4 is provided with mounting post 10 of vibrating straight down, and the lower end of mounting post of vibrating 10, which is horizontally disposed with to have to vibrate, occurs disk 3, The inner vertical of mounting post of vibrating 10, which is inlayed, is provided with unhurried current chamber 12, and the upper right comer horizontal of the unhurried current chamber 12 stretches out to the right setting There is air inlet installing pipe 14, the right end of air inlet installing pipe 14 is provided with air-tight connection flange 15, the upper left corner water of the unhurried current chamber 12 Flat stretch out to the left is provided with safety overflow pipe, and the right end of safety overflow pipe is inlayed and is provided with electromagnetic relief valve 11, generation of vibrating The bosom position of disk 3 is inlayed vertically is provided with current divider 13, and the upper end of current divider 13 and unhurried current chamber 12 pass through main flow pipe Connection, the current divider 13 are angularly provided with several shunt catheters 18, and the end of shunt catheter 18, which cooperates to vibrate, occurs disk 3 It inlays and is provided with pneumatic reed vibration generator 17, and pneumatic reed vibration generator 17 occurs disk 3 and be provided with through vibrating straight up Overflow hole 16, described vibrate occurs the lower end of disk 3 and is angularly provided with several internal vibration mounting cylinders 2 straight down, and inserts Enter the vibrate lower end of mounting cylinder 2 of formula to be provided with counterweight and vibrate column 1.
The working principle of the invention is: according to the spacing of fixed mounting plate 8 at left and right sides of the width adjusting of bridge pier, and It is fixed on the pre- supporting plate being arranged on the outside of bridge pier by internal screw thread mounting cylinder 9, concrete injection, by internal vibration mounting cylinder 2 It is inserted into concrete, air inlet installing pipe 14 connects the high-pressure pump of external setting by air-tight connection flange 15, and air enters slow Stream chamber 12 subsequently enters current divider 13, so that air-flow drives pneumatic reed to play shake even into each pneumatic reed vibration generator 17 17 operation of device vibration, and disk 3 occurs pass to the concrete that each internal vibration mounting cylinder 2 acts on lower end by vibrating, When pressure value is excessively high, pressure value control electric must stablized job area by electromagnetic relief valve 11, prevented component wear, driven respectively Dynamic longitudinal automatically controlled guide wheel 19 and laterally automatically controlled guide wheel 25 change the job area to vibrate so that transverse shifting mounting cylinder 4 is mobile, So that operation of vibrating is wide, vibrates uniformly, overcome currently used bridge concrete tamping equipment, due to using traditional list Pipe internal vibration structure, cause to vibrate operation when need artificial frequently lifting, and work surface is narrow, and effect of vibrating is poor, and noise is big, The problems such as operating personnel is difficult to long working, low efficiency, solves currently used bridge concrete tamping equipment, due to adopting It is vibrated structure with floating-board type, causes depth as shallow of vibrating, need repeatedly to add concrete, just can guarantee construction quality, duty cycle The problems such as long, so that the present invention has structure compact to design, operation of vibrating is wide, and depth of vibrating is deep, without personnel in operation area The advantages that domain, vibration efficiency is high, and quality of vibrating is good.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case where without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Benefit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent elements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiments being understood that.

Claims (7)

1. a kind of guiding installing type bridge concrete tamping equipment, including the fixed mounting plate (8) being symmetrically vertically arranged, It is characterized in that, the upper semisection middle position level of the fixed mounting plate (8) of the left and right sides is provided through longitudinal movement peace Hole is filled, vertically moves in the fixed mounting plate (8) of mounting groove upper and lower ends and is vertically arranged with guide extension slot (23), with closing The guide extension slot (23) of lower two sides is symmetrically arranged with limition orientation mounting plate (5), and the limition orientation mounting plate (5) cooperates Guide extension slot (23) is provided with guide extension column, and guide extension column cooperates guide extension slot (23) to be provided with reset spring (7), it is provided with longitudinal movement mounting cylinder (22) between limition orientation mounting plate (5), vertically moves the interposition of mounting cylinder (22) The level of setting is provided through guiding mounting hole, cooperates the guiding mounting hole of the left and right sides is horizontally disposed to have transverse shifting mounting post (6), the rear and front end of transverse shifting mounting post (6) is provided with transverse shifting guide groove (24), transverse shifting installation Cooperation transverse shifting guide groove (24) spaced set has several transverse shifting mounting cylinders (4), the transverse shifting on the outside of column (6) Internal front and rear sides cooperation transverse shifting guide groove (24) of mounting cylinder (4) is provided with laterally automatically controlled lead by Mobile mounting rack It takes turns (25), the lower end of transverse shifting mounting cylinder (4) is provided with mounting post of vibrating (10) straight down, under mounting post of vibrating (10) End, which is horizontally disposed with to have to vibrate, to be occurred disk (3), and the inner vertical of mounting post of vibrating (10), which is inlayed, is provided with unhurried current chamber (12), described slow The upper right comer horizontal of stream chamber (12), which stretches out to the right, to be provided with air inlet installing pipe (14), and the right end of air inlet installing pipe (14) is provided with gas Close connecting flange (15), vibrating occurs the bosom position of disk (3) and inlays be provided with current divider (13) vertically, and current divider (13) upper end is connected to unhurried current chamber (12) by main flow pipe, and the current divider (13) is angularly provided with several shunt catheters (18), the end of shunt catheter (18) cooperates to vibrate and disk (3) occurs inlays to be provided with pneumatic reed vibration generator (17), and pneumatic Reed vibration generator (17) occurs disk (3) and is provided with overflow hole (16) through vibrating straight up.
2. a kind of guiding installing type bridge concrete tamping equipment according to claim 1, which is characterized in that the longitudinal direction Upper and lower ends cooperation limition orientation mounting plate (5) of mobile mounting cylinder (22), which is partly inlayed, is vertically arranged with longitudinal automatically controlled guide wheel (19).
3. a kind of guiding installing type bridge concrete tamping equipment according to claim 1, which is characterized in that the fixation The equal level in lower semisection middle position of mounting plate (8), which is inlayed, is provided with internal screw thread mounting cylinder (9).
4. a kind of guiding installing type bridge concrete tamping equipment according to claim 1, which is characterized in that the unhurried current The upper left comer horizontal of chamber (12) stretches out to the left is provided with safety overflow pipe, and the right end of safety overflow pipe inlay be provided with electromagnetism overflow It flows valve (11).
5. a kind of guiding installing type bridge concrete tamping equipment according to claim 1, which is characterized in that the guiding The upper and lower ends middle position of mounting hole is provided with slide-and-guide column (21), and the upper and lower ends of transverse shifting mounting post (6) Cooperation slide-and-guide column (21) is horizontally disposed to be slidably installed slot (20).
6. a kind of according to claim 1, guiding installing type bridge concrete tamping equipment described in 5, which is characterized in that the cross Power supply slide post (26), and the cunning of upper and lower ends are provided with to the fit inside of mobile mounting cylinder (4) slot (20) that is slidably installed The dynamic equal cooperated power supply slide post (26) in mounting groove (20) middle position is vertically arranged with power supply brush (27).
7. a kind of guiding installing type bridge concrete tamping equipment according to claim 1, which is characterized in that described to vibrate The lower end that disk (3) occur angularly is provided with several internal vibration mounting cylinders (2), and internal vibration mounting cylinder straight down (2) lower end is provided with counterweight and vibrates column (1).
CN201810280472.5A 2018-04-02 2018-04-02 Guide installation formula bridge concrete vibrating device Expired - Fee Related CN110172911B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810280472.5A CN110172911B (en) 2018-04-02 2018-04-02 Guide installation formula bridge concrete vibrating device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810280472.5A CN110172911B (en) 2018-04-02 2018-04-02 Guide installation formula bridge concrete vibrating device

Publications (2)

Publication Number Publication Date
CN110172911A true CN110172911A (en) 2019-08-27
CN110172911B CN110172911B (en) 2020-12-01

Family

ID=67688859

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810280472.5A Expired - Fee Related CN110172911B (en) 2018-04-02 2018-04-02 Guide installation formula bridge concrete vibrating device

Country Status (1)

Country Link
CN (1) CN110172911B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114438885A (en) * 2021-12-10 2022-05-06 北京住总集团有限责任公司 Pouring auxiliary system for cast-in-place bent cap construction and method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201933790U (en) * 2011-02-28 2011-08-17 浙江天晟梁板有限公司 Intelligent concrete vibrating device
KR20130031071A (en) * 2011-09-20 2013-03-28 윤종수 Exhaust device for vibrator of concrete vibrating compaction
CN203084536U (en) * 2013-02-21 2013-07-24 中国水电顾问集团成都勘测设计研究院 Concrete vibrating quality intelligent monitor
CN205935703U (en) * 2016-08-03 2017-02-08 中天建设集团有限公司天津分公司 Admitting air of concrete vibrating rod , air guide structure
CN205976535U (en) * 2016-06-24 2017-02-22 临沂市金泰混凝土有限公司 Light aggregate concrete jolt ramming is equipped
CN107227689A (en) * 2017-07-11 2017-10-03 中国铁建大桥工程局集团有限公司 Plate bridge pier column concrete vibrating equipment
CN206971093U (en) * 2017-07-11 2018-02-06 中国铁建大桥工程局集团有限公司 Plate bridge pier column concrete vibrating equipment

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201933790U (en) * 2011-02-28 2011-08-17 浙江天晟梁板有限公司 Intelligent concrete vibrating device
KR20130031071A (en) * 2011-09-20 2013-03-28 윤종수 Exhaust device for vibrator of concrete vibrating compaction
CN203084536U (en) * 2013-02-21 2013-07-24 中国水电顾问集团成都勘测设计研究院 Concrete vibrating quality intelligent monitor
CN205976535U (en) * 2016-06-24 2017-02-22 临沂市金泰混凝土有限公司 Light aggregate concrete jolt ramming is equipped
CN205935703U (en) * 2016-08-03 2017-02-08 中天建设集团有限公司天津分公司 Admitting air of concrete vibrating rod , air guide structure
CN107227689A (en) * 2017-07-11 2017-10-03 中国铁建大桥工程局集团有限公司 Plate bridge pier column concrete vibrating equipment
CN206971093U (en) * 2017-07-11 2018-02-06 中国铁建大桥工程局集团有限公司 Plate bridge pier column concrete vibrating equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114438885A (en) * 2021-12-10 2022-05-06 北京住总集团有限责任公司 Pouring auxiliary system for cast-in-place bent cap construction and method thereof
CN114438885B (en) * 2021-12-10 2024-04-12 北京住总集团有限责任公司 Pouring auxiliary system and method for cast-in-situ bent cap construction

Also Published As

Publication number Publication date
CN110172911B (en) 2020-12-01

Similar Documents

Publication Publication Date Title
CN105544470B (en) Layered water intake gate and layered water intake method
CN106944406A (en) A kind of medical apparatus cleaning equipment
CN110158468A (en) A kind of installing type bridge concrete noise abatement tamping equipment
CN110172911A (en) A kind of guiding installing type bridge concrete tamping equipment
CN209602955U (en) A kind of guiding installing type bridge concrete tamping equipment
CN114776637A (en) Electric control booster pump
CN202974640U (en) Valve pressure testing machine
CN207355049U (en) A kind of mushroom bacteria stick water injection machine
CN106015122A (en) High-efficiency hydraulic ram
CN116222508B (en) Horizontal testing arrangement of prefabricated bridge installation
CN105139746A (en) Pumping station inlet pool whirlpool experiment bench
CN2883723Y (en) Electromagnetic micropump
CN205701741U (en) A kind of orientable automatic drainage wiper
CN204924396U (en) Swing nozzle formula commutator
CN103104433A (en) Large-discharge built-in automatic reversing hydraulic plunger pump
CN105840575A (en) Slowly open-close electro-hydraulic directional valve
CN107990533A (en) A kind of wall-hung boiler fixing device
CN205533167U (en) Novel emulsion pump pump head structure
CN211145968U (en) Rotor pump installation base
CN109731707B (en) Paint spraying head for processing ecological waterproof floor
CN208300552U (en) The energy-saving irrigation rig of hole tray tea shoot
CN207526232U (en) A kind of water conservancy guardrail easy to repair
CN206806890U (en) A kind of electric wire lift stand base
CN110524712A (en) A kind of integrated hydraulic formula template applied to prefabricated box -beam
CN204753511U (en) Highly automated's water conservancy gate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201113

Address after: No. 201, annex building, No. 88, Lihu Avenue, Binhu District, Wuxi City, Jiangsu Province, 214000

Applicant after: Jiangsu yunduanqi Construction Engineering Co.,Ltd.

Address before: 210000 room 62077, East Business District, Olympic Sports Center Stadium, 222 Jiangdong Road, Jianye District, Nanjing, Jiangsu.

Applicant before: NANJING HAICHENXIA ENGINEERING TECHNOLOGY Co.,Ltd.

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201201