CN110165587A - A kind of electrical energy metering tank of included installation guide rail - Google Patents
A kind of electrical energy metering tank of included installation guide rail Download PDFInfo
- Publication number
- CN110165587A CN110165587A CN201910517953.8A CN201910517953A CN110165587A CN 110165587 A CN110165587 A CN 110165587A CN 201910517953 A CN201910517953 A CN 201910517953A CN 110165587 A CN110165587 A CN 110165587A
- Authority
- CN
- China
- Prior art keywords
- cabinet
- antidusting
- type mounting
- mounting plate
- box
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/28—Casings; Parts thereof or accessories therefor dustproof, splashproof, drip-proof, waterproof or flameproof
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/40—Wall-mounted casings; Parts thereof or accessories therefor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/26—Casings; Parts thereof or accessories therefor
- H02B1/46—Boxes; Parts thereof or accessories therefor
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02B—BOARDS, SUBSTATIONS OR SWITCHING ARRANGEMENTS FOR THE SUPPLY OR DISTRIBUTION OF ELECTRIC POWER
- H02B1/00—Frameworks, boards, panels, desks, casings; Details of substations or switching arrangements
- H02B1/56—Cooling; Ventilation
- H02B1/565—Cooling; Ventilation for cabinets
Abstract
The invention discloses a kind of electrical energy metering tanks of included installation guide rail, including cabinet and partition, the partition is inserted on cabinet by sliding slot, the cabinet is internally provided with installation guide rail, and bolt hole is provided with below cabinet, there are two wire casings for the lower section setting of the cabinet, and the two sides of cabinet pass through first rotating shaft and are rotatably connected to L-type mounting plate, mounting hole there are two being opened up on the L-type mounting plate, and the side close to the cabinet of L-type mounting plate is provided with positioning bolt, is related to measurement of power equipment technical field.The electrical energy metering tank of the included installation guide rail passes through the L-type mounting plate convenient for adjusting, varying environment installed to, the stationary state of adjusting L-type mounting plate can be passed through, meet the structure being fixedly mounted in the installation, lifting or platform of vertical metope, so that electrical energy metering tank meets different installation environments, it is easy to adjust, meet the different installation requirements of user.
Description
Technical field
The present invention relates to measurement of power equipment technical field, specially a kind of electrical energy measurement of included installation guide rail
Case.
Background technique
In electric energy meter in use, normal use and safe handling in order to protect and protect electric energy meter,
Protective housing is arranged in the external of electric energy meter, which is electrical energy metering tank.
When in use, since mounting means is fixed, causing can only be by the fixed peace of electrical energy metering tank for existing electrical energy metering tank
On specific vertical metope or on vertical mounting rack, electrical energy metering tank is lifted when needing or is fixed on platform
When, it has not been convenient to it is fixed, brings installation trouble for user.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, the present invention provides a kind of electrical energy metering tank of included installation guide rail, electricity is solved
Can batch meter mounting means it is single, the problem of being unable to satisfy user's different installation requirements.
(2) technical solution
In order to achieve the above object, the present invention is achieved by the following technical programs: a kind of electric energy of included installation guide rail
Batch meter includes cabinet and partition, and the partition is inserted on cabinet by sliding slot, and the cabinet is internally provided with installation guide rail,
And bolt hole is provided with below cabinet, there are two wire casings for the lower section setting of the cabinet, and the two sides of cabinet pass through
First rotating shaft is rotatably connected to L-type mounting plate, opened up on the L-type mounting plate there are two mounting hole, and L-type mounting plate leans on
The side of the nearly cabinet is provided with positioning bolt, and multiple positioning compatible with the positioning bolt are offered on the cabinet
Hole.
Further, corresponding two location holes of each positioning bolt, and the surface of positioning bolt with it is described
The inner surface of location hole is threadedly coupled.
Further, the two sides of the cabinet offer multiple air holes, and the inner surface of multiple air holes is all provided with
It is equipped with air-permeable dampproof film.
Further, the outside that the two sides of the cabinet are located at multiple air holes is fixedly connected to antidusting box, institute
The side far from the cabinet for stating antidusting box is fixedly connected there are two the first stomata, and the inside of two first stomatas is all provided with
It is equipped with Air Filter.
Further, it is fixedly connected with fixed link between the top and bottom of the antidusting box inner wall, the fixed link
Surface is rotatably connected to air regulating board by the second shaft.
Further, offer the first regulating tank on the air regulating board, the inner surface of first regulating tank with it is described solid
The surface of fixed pole is adapted, and the side far from the fixed link of air regulating board offers the second regulating tank, and described second adjusts
Being internally located on the air regulating board for slot of section offers first sliding groove, and the inner surface sliding axle of the second sliding slot is sequentially connected with
Adjusting rod.
Further, third regulating tank is offered at the top of the antidusting box, the top of the adjusting rod is through described the
The inside of three regulating tanks and the outside for extending to the antidusting box.
Further, it is fixedly connected with support plate at the top of the antidusting box, the side of the support plate is rotatably connected to
Threaded rod is adjusted, the surface for adjusting threaded rod is provided with movable block, and the bottom of the movable block and the adjusting rod extend
Side outside to the antidusting box is fixedly connected.
Further, the side for adjusting threaded rod is fixedly connected with adjusting turntable, the bottom of the antidusting box inner wall
Two sides between be provided with auxiliary slide bar, the auxiliary slide bar is adapted with the adjusting rod, the bottom of the antidusting box inner wall
Offer second sliding slot, the surface of the second sliding slot is connect with the basal sliding of the adjusting rod, the antidusting box it is close
The side of the cabinet offers multiple second stomatas, and multiple second stomatas are adapted with multiple air holes.
Further, including following operating procedure:
Step 1: when needing electrical energy metering tank being mounted on a vertical metope, adjust L-type mounting plate to cabinet
In plumbness, and the mounting hole on L-type mounting plate is located at the positioning on the side of box back surface, L-type mounting plate
Bolt corresponds to one of location hole;
Step 2: by adjusting positioning bolt, so that the inner surface of positioning bolt is threadedly coupled with the inner surface of location hole, L
It is fixed between type mounting plate and cabinet, adjust four groups of L-type mounting plates of the two sides of cabinet respectively to the state vertical with cabinet and
It is fixed, it can be fixedly mounted on vertical metope by the mounting hole on four groups of L-type mounting plates at this time;
Step 3: when being fixed between lifting or top and bottom, positioning bolt is adjusted, so that positioning bolt is detached from
The inside of the location hole of plumbness, rotate L-type mounting plate so that the mounting hole on L-type mounting plate be located at cabinet lower section or
Top;
Step 4: the inside of just adjustable to the corresponding location hole of positioning bolt at this time on L-type mounting plate screws
Mounting hole on four groups of L-type mounting plates is successively adjusted to the state being located remotely from each other so that L-type mounting plate is fixed by positioning bolt,
To facilitate the bottom that the mounting means of cabinet is adjusted to lifting or cabinet to be fixed on specified position;
Step 5: when needing to adjust the rate of air circulation inside antidusting box, rotation adjusts turntable, to adjust air regulating board
Tilt angle, control antidusting box inside rate of air circulation, while the air regulating board of tilt distribution have certain antidusting effect
Fruit, achievees the effect that secondary dust-proof, facilitates the circulation and heat dissipation of the air of box house, while the effect of antidusting is good.
(3) beneficial effect
The invention has the following advantages:
(1), the electrical energy metering tank of the included installation guide rail is carried out by the L-type mounting plate convenient for adjusting in varying environment
Installation extremely, can be met and be consolidated in the installation, lifting or platform of vertical metope by the stationary state of adjusting L-type mounting plate
The structure of Dingan County's dress, so that electrical energy metering tank meets different installation environments, it is easy to adjust, meet the different installation need of user
It asks.
(2), the electrical energy metering tank of the included installation guide rail, by being provided with antidusting box, the side of antidusting box is provided with anti-
Dirt net, Air Filter can effectively keep out the inside of part dust antidusting box, have the function of ventilative, the inside of guarantee antidusting box
The circulation of air, while Air Filter can keep out winged insect and visible air floating object enters inside and the cabinet of antidusting box
Inside ensures that box house measuring equipment has good running environment, to ensure the electric energy measuring equipment work of box house
That makees is normal.
(3), the electrical energy metering tank of the included installation guide rail is controlled in antidusting box by being provided with adjustable air regulating board
The rate of air circulation in portion, while the air regulating board of tilt distribution has the effect of certain antidusting, achievees the effect that secondary dust-proof, side
Just the circulation and heat dissipation of the air of box house, while the effect of antidusting is good.
(4), the electrical energy metering tank of the included installation guide rail can both ensure air by being provided with air-permeable dampproof film
Permeability, while can be to avoid the moisture in air when rainy days enters the inside of cabinet and influences the electric elements of box house
The positive service life for producing operation and electrical component, ensure the humidity resistance of the electric energy measuring equipment of box house and using safe
Property, ensure the service life of box house equipment.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time
Detailed description of the invention
Fig. 1 is a kind of preferable structural schematic diagram of the present invention;
Fig. 2 is the present invention whole side view shown in FIG. 1;
Fig. 3 is the structural schematic diagram of the part of present invention antidusting box shown in FIG. 1;
Fig. 4 is the enlarged drawing at present invention A shown in Fig. 3;
Fig. 5 is the enlarged drawing at present invention B shown in Fig. 3;
Fig. 6 is the enlarged drawing at present invention C shown in Fig. 3;
In figure, 1- cabinet, 2- partition, 3- installation guide rail, 4- bolt hole, 5- wire casing, 6- first rotating shaft, 7-L type mounting plate,
8- mounting hole, 9- positioning bolt, 10- location hole, 11- air hole, 12- air-permeable dampproof film, 13- antidusting box, the first stomata of 14-,
15- Air Filter, 16- fixed link, the second shaft of 17-, 18- air regulating board, the first regulating tank of 19-, the second regulating tank of 20-, 21- first
Sliding slot, 22- sliding axle, 23- adjusting rod, 24- third regulating tank, 25- support plate, 26- adjust threaded rod, 27- movable block, 28-
Adjust turntable, 29- second sliding slot, the second stomata of 30-.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " aperture ", "upper", "lower", " thickness ", "top", " in ",
Indicating positions or the positional relationship such as " length ", "inner", " surrounding ", are merely for convenience of description of the present invention and simplification of the description, without
It is that the component of indication or suggestion meaning or element must have a particular orientation, is constructed and operated in a specific orientation, therefore not
It can be interpreted as limitation of the present invention.
Fig. 1-6 is please referred to, the embodiment of the present invention provides a kind of technical solution: a kind of electrical energy metering tank of included installation guide rail
It include: a kind of electrical energy metering tank of included installation guide rail, including cabinet 1 and partition 2, the partition 2 are inserted in cabinet 1 by sliding slot
On, the cabinet 1 is internally provided with installation guide rail 3, and the lower section of cabinet 1 is provided with bolt hole 4, under the cabinet 1
There are two wire casings 5 for side's setting, and the two sides of cabinet 1 pass through first rotating shaft 6 and are rotatably connected to L-type mounting plate 7, the L-type
Mounting hole 8 there are two being opened up on mounting plate 7, and the side close to the cabinet 1 of L-type mounting plate 7 is provided with positioning bolt
9, multiple location holes 10 compatible with the positioning bolt 9 are offered on the cabinet 1, each positioning bolt 9 is corresponding
Two location holes 10, and the surface of positioning bolt 9 is threadedly coupled with the inner surface of the location hole 10, when L-type is installed
The corresponding one of location hole 10 of positioning bolt 9 when plate 7 and cabinet 1 are in plumbness, and on L-type mounting plate 7, at this time
By adjusting positioning bolt 9, so that the inner surface of positioning bolt 9 is threadedly coupled with the inner surface of location hole 10, L-type mounting plate 7
Fixed between cabinet 1, the two sides of cabinet 1 are provided with four groups of L-type mounting plates 7 altogether, are adjusted to the state vertical with cabinet 1 respectively
And when fixing, facilitates and be mounted on cabinet 1 on vertical metope by the mounting hole 8 on L-type mounting plate 7, while working as mounting ring
Border is when being fixed between lifting or top and bottom, to adjust positioning bolt 9, so that positioning bolt 9 is detached from plumbness
The inside of location hole 10 rotates L-type mounting plate 7, so that the mounting hole 8 on L-type mounting plate 7 is located at the below or above of cabinet 1,
The inside of just adjustable to the corresponding location hole 10 of positioning bolt 9 on L-type mounting plate 7 simultaneously, successively pacifies four groups of L-types
Mounting hole 8 in loading board 7 is adjusted to the state being located remotely from each other, so that the mounting means of cabinet 1 is adjusted to lifting or cabinet 1
Bottom is fixed on specified position, so that electrical energy metering tank meets different installation environments, it is easy to adjust, meet user not
Same installation requirements, the two sides of the cabinet 1 offer multiple air holes 11, and the inner surface of multiple air holes 11 is all provided with
It is equipped with air-permeable dampproof film 12, air-permeable dampproof film 12 can both ensure the permeability of air, while can be to avoid air when rainy days
In moisture enter the inside of cabinet 1 and influence the electric elements inside cabinet 1 it is positive produce operation and electrical component use the longevity
Life ensures the humidity resistance and safety in utilization of the electric energy measuring equipment inside cabinet 1, ensures the use of 1 internal unit of cabinet
Service life, the outside that the two sides of the cabinet 1 are located at multiple air holes 11 are fixedly connected to antidusting box 13, the antidusting box
13 side far from the cabinet 1 is fixedly connected there are two the first stomata 14, and the inside of two first stomatas 14 is all provided with
It is equipped with Air Filter 15, Air Filter 15 can effectively keep out the inside that part dust enters antidusting box 13, has the function of breathing freely,
Ensure the circulation of the inner air of antidusting box 13, while Air Filter 15 can keep out winged insect and visible air floating object enters
The inside of antidusting box 13 and the inside of cabinet 1 ensure that 1 Internal Gauge device of cabinet has good running environment, to ensure
Inside cabinet 1 electric energy measuring equipment work it is normal, be fixedly connected between the top and bottom of 13 inner wall of antidusting box
The surface of fixed link 16, the fixed link 16 is rotatably connected to air regulating board 18 by the second shaft 17, opens on the air regulating board 18
Equipped with the first regulating tank 19, the inner surface of first regulating tank 19 is adapted with the surface of the fixed link 16, and adjusts wind
The side far from the fixed link 16 of plate 18 offers the second regulating tank 20, and being internally located at for second regulating tank 20 is described
First sliding groove 21 is offered on air regulating board 18, the inner surface sliding axle 22 of the second sliding slot 29 is sequentially connected with adjusting rod 23,
The top of the antidusting box 13 offers third regulating tank 24, and the top of the adjusting rod 23 is through the third regulating tank 24
Outside that is internal and extending to the antidusting box 13, the top of the antidusting box 13 is fixedly connected with support plate 25, the support
The side of plate 25, which is rotatably connected to, adjusts threaded rod 26, and the surface for adjusting threaded rod 26 is provided with movable block 27, the shifting
The bottom of motion block 27 is fixedly connected with the side that the adjusting rod 23 extends to outside the antidusting box 13, the adjusting threaded rod
26 side, which is fixedly connected with, adjusts turntable 28, is provided with auxiliary slide bar between the two sides of the bottom of 13 inner wall of antidusting box,
The auxiliary slide bar is adapted with the adjusting rod 23, and the bottom of 13 inner wall of antidusting box offers second sliding slot 29, described
The surface of second sliding slot 29 is connect with the basal sliding of the adjusting rod 23, adjusts turntable 28 by rotation, adjusting turntable 28 can
The synchronous rotation of threaded rod 26 is adjusted to drive, adjusting threaded rod 26 can drive movable block 27 synchronous and adjust screw thread in rotation
It is moved left and right on bar 26, movable block 27 can be moved when moving with synchronous drive adjusting rod 23, and the surface of adjusting rod 23 exists
The inside of third regulating tank 24 moves left and right, while the surface of adjusting rod 23 is smoothly slided on auxiliary slide bar, adjusting rod 23
Bottom slided in the internal synchronization of second sliding slot 29, to ensure the synchronism upper and lower when moving left and right of adjusting rod 23, and
And adjusting rod 23 is in vertical state always in the process of moving, and multiple groups are provided on adjusting rod 23 and are parallel to each other distribution
18 structure of air regulating board, when adjusting rod 23 horizontally slips, adjusting rod 23 drives air regulating board by sliding axle 22 and first sliding groove 21
18 rotate in fixed link 16, and the adjustable extent of adjusting rod 23 is in the length range of first sliding groove 21, and along with tune
When pole 23 moves closer to fixed link, the side of the close adjusting rod 23 of air regulating board 18 rotates gradually downward, and air regulating board 18
Horizontal tilt angle be gradually increased, the movement of adjusting rod 23 can carry out rotation adjusting, companion with synchronous drive multiple groups air regulating board 18
As the horizontal tilt angle of air regulating board 18 gradually increases, the rate of air circulation of multiple groups air regulating board 18 is gradually decreased, on the contrary then empty
Air-flow flux gradually increases, and in the adjustable extent of adjusting rod 23, when the horizontal tilt angle minimum of air regulating board 18, adjusts wind
The rate of air circulation of plate 18 is maximum, and when the horizontal tilt angle maximum of air regulating board 18, the rate of air circulation of air regulating board 18 is minimum,
By adjusting 18 tilt angle of multiple groups air regulating board, so that the rate of air circulation inside antidusting box 13 is controlled, while tilt distribution
Air regulating board 18 has the effect of certain antidusting, achieve the effect that it is secondary dust-proof, facilitate the air inside cabinet 1 circulation and dissipate
Heat, while the effect of antidusting is good, the side close to the cabinet 1 of the antidusting box 13 offers multiple second stomatas 30, more
A second stomata 30 is adapted with multiple air holes 11.
Including following operating procedure:
Step 1: when needing electrical energy metering tank being mounted on a vertical metope, adjust L-type mounting plate 7 to cabinet
1 is in plumbness, and the mounting hole 8 on L-type mounting plate 7 is located on the side at 1 back side of cabinet, L-type mounting plate 7
The corresponding one of location hole 10 of positioning bolt 9;
Step 2: by adjusting positioning bolt 9, so that the inner surface screw thread of the inner surface of positioning bolt 9 and location hole 10 connects
It connects, it is fixed between L-type mounting plate 7 and cabinet 1, four groups of L-type mounting plates 7 of the two sides of cabinet 1 are adjusted respectively to vertical with cabinet 1
State and fixation, can be fixedly mounted on vertical metope by the mounting hole 8 on four groups of L-type mounting plates 7 at this time;
Step 3: when being fixed between lifting or top and bottom, positioning bolt 9 is adjusted, so that positioning bolt 9 is de-
The inside of location hole 9 from plumbness rotates L-type mounting plate 7, so that the mounting hole 8 on L-type mounting plate 7 is located at cabinet 1
Below or above;
Step 4: the inside of just adjustable to the corresponding location hole 10 of the positioning bolt 9 on L-type mounting plate 7 at this time,
Positioning bolt 9 is screwed, so that L-type mounting plate 7 is fixed, is successively adjusted to the mounting hole 8 on four groups of L-type mounting plates 7 mutually remote
From state, to facilitate, the mounting means by cabinet 1 is adjusted to lifting or the bottom of cabinet 1 is fixed on specified position;
Step 5: when needing to adjust the rate of air circulation inside antidusting box 13, rotation adjusts turntable 28, to adjust
The tilt angle of aerofoil 18 controls the rate of air circulation inside antidusting box 13, while the air regulating board 18 of tilt distribution has centainly
Antidusting effect, achieve the effect that secondary dust-proof, facilitate the circulation and heat dissipation of the air inside cabinet 1, while the effect of antidusting
Fruit is good.
In use, adjusting L-type mounting plate 7 when needing for electrical energy metering tank to be mounted on vertical metope and being in cabinet 1
Plumbness, and the mounting hole 8 on L-type mounting plate 7 is located at the positioning on the side at 1 back side of cabinet, L-type mounting plate 7
The corresponding one of location hole 10 of bolt 9, at this time by adjusting positioning bolt 9, so that the inner surface and location hole of positioning bolt 9
10 inner surface is threadedly coupled, fixed between L-type mounting plate 7 and cabinet 1, adjusts four groups of L-types installation of the two sides of cabinet 1 respectively
Plate 7 can be fixedly mounted on perpendicular to the state vertical with cabinet 1 and after fixing by the mounting hole 8 on four groups of L-type mounting plates 7
On straight metope, when installation environment is to be fixed between lifting or top and bottom, positioning bolt 9 is adjusted, so that positioning
Bolt 9 is detached from the inside of the location hole 10 of plumbness, L-type mounting plate 7 is rotated, so that the mounting hole on L-type mounting plate 78
Just adjustable to the corresponding location hole 10 of positioning bolt 9 in the below or above of cabinet 1, while on L-type mounting plate 7
Inside screws positioning bolt 9, so that L-type mounting plate 7 is fixed, the mounting hole 8 on four groups of L-type mounting plates 7 is successively adjusted to phase
Mutually separate state, to facilitate, the mounting means by cabinet 1 is adjusted to lifting or the bottom of cabinet 1 is fixed on specified position
On, it can satisfy the different installation requirements of user, when passing through Air Filter 15 with dust or visible air floating object, prevent
Dirt net 15 can effectively keep out the inside that part dust enters antidusting box 13, while can ensure the circulation of air, need
When adjusting the rate of air circulation inside antidusting box 13, rotation adjusts turntable 28, and it is synchronous that the adjusting drive of turntable 28 adjusts threaded rod 26
Rotation adjusts threaded rod 26 and drives movable block 27 is synchronous to move left and right on adjusting threaded rod 26, and movable block 27 when moving may be used
It is moved with synchronous drive adjusting rod 23, adjusting rod 23 drives multiple groups air regulating board 18 to rotate in fixed link 16, in adjusting rod
In 23 adjustable extent, when the horizontal tilt angle minimum of air regulating board 18, the rate of air circulation of air regulating board 18 is maximum, works as tune
When the horizontal tilt angle maximum of aerofoil 18, the rate of air circulation of air regulating board 18 is minimum, is tilted by adjusting multiple groups air regulating board 18
Angle, to control the rate of air circulation inside antidusting box 13, while the air regulating board 18 of tilt distribution has certain antidusting
Effect, achievees the effect that secondary dust-proof, facilitates the circulation and heat dissipation of the air inside cabinet 1, while the effect of antidusting is good, contains
The air of moisture enters the inside of antidusting box 13 and by being blocked in the outer of cabinet 1 by air-permeable dampproof film 12 after the second air hole
Portion, effectively avoid moisture from entering the inside of cabinet 1 and influence the electric elements inside cabinet 1 positive production operation and electrical component
Service life, ensure cabinet 1 inside electric energy measuring equipment humidity resistance and safety in utilization.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment
All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification,
It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention
Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only
It is limited by claims and its full scope and equivalent.
Claims (10)
1. a kind of electrical energy metering tank of included installation guide rail, including cabinet (1) and partition (2), it is characterised in that: the partition
(2) it is inserted on cabinet (1) by sliding slot, the cabinet (1) is internally provided with installation guide rail (3), and the lower section of cabinet (1)
It is provided with bolt hole (4), the setting of the lower section of the cabinet (1) is there are two wire casing (5), and the two sides of cabinet (1) pass through the
One shaft (6) is rotatably connected to L-type mounting plate (7), is opened up on the L-type mounting plate (7) there are two mounting hole (8), and L-type
Mounting plate (7) is provided with positioning bolt (9) close to the side of the cabinet (1), offered on the cabinet (1) with it is described fixed
The compatible multiple location holes (10) of position bolt (9).
2. a kind of electrical energy metering tank of included installation guide rail according to claim 1, it is characterised in that: each positioning
Bolt (9) corresponds to two location holes (10), and the inner surface spiral shell on the surface of positioning bolt (9) and the location hole (10)
Line connection.
3. a kind of electrical energy metering tank of included installation guide rail according to claim 1, it is characterised in that: the cabinet (1)
Two sides offer multiple air holes (11), the inner surface of multiple air holes (11) is provided with air-permeable dampproof film
(12)。
4. a kind of electrical energy metering tank of included installation guide rail according to claim 3, it is characterised in that: the cabinet (1)
Two sides be located at the outsides of multiple air holes (11) and be fixedly connected to antidusting box (13), the antidusting box (13) it is separate
The side of the cabinet (1) is fixedly connected there are two the first stomata (14), and the inside of two first stomatas (14) is respectively provided with
There are Air Filter (15).
5. a kind of electrical energy metering tank of included installation guide rail according to claim 4, it is characterised in that: the antidusting box
(13) it is fixedly connected between the top and bottom of inner wall fixed link (16), the surface of the fixed link (16) passes through the second shaft
(17) air regulating board (18) are rotatably connected to.
6. a kind of electrical energy metering tank of included installation guide rail according to claim 5, it is characterised in that: the air regulating board
(18) it is offered on the first regulating tank (19), the inner surface and the surface phase of the fixed link (16) of first regulating tank (19)
Adaptation, and the side far from the fixed link (16) of air regulating board (18) offers the second regulating tank (20), and described second adjusts
Being internally located on the air regulating board (18) for slot (20) of section offers first sliding groove (21), the inner surface of the second sliding slot (29)
Sliding axle (22) is sequentially connected with adjusting rod (23).
7. a kind of electrical energy metering tank of included installation guide rail according to claim 6, it is characterised in that: the antidusting box
(13) it is offered at the top of third regulating tank (24), the top of the adjusting rod (23) is through the interior of the third regulating tank (24)
Portion and the outside for extending to the antidusting box (13).
8. a kind of electrical energy metering tank of included installation guide rail according to claim 7, it is characterised in that: the antidusting box
(13) it being fixedly connected at the top of support plate (25), the side of the support plate (25), which is rotatably connected to, adjusts threaded rod (26),
The surface for adjusting threaded rod (26) is provided with movable block (27), the bottom and the adjusting rod (23) of the movable block (27)
The external side of the antidusting box (13) is extended to be fixedly connected.
9. a kind of electrical energy metering tank of included installation guide rail according to claim 8, it is characterised in that: the adjusting screw thread
The side of bar (26), which is fixedly connected with, adjusts turntable (28), is provided between the two sides of the bottom of antidusting box (13) inner wall auxiliary
Slide bar is helped, the auxiliary slide bar is adapted with the adjusting rod (23), and the bottom of antidusting box (13) inner wall offers second
The surface of sliding slot (29), the second sliding slot (29) is connect with the basal sliding of the adjusting rod (23), the antidusting box (13)
The side close to the cabinet (1) offer multiple second stomatas (30), multiple second stomatas (30) with it is multiple described
Air hole (11) is adapted.
10. a kind of electrical energy metering tank of included installation guide rail according to claim 1, it is characterised in that;Including following behaviour
Make step:
Step 1: when needing electrical energy metering tank being mounted on a vertical metope, adjust L-type mounting plate (7) to cabinet
(1) it is in plumbness, and the mounting hole (8) on L-type mounting plate (7) is located at close to the side at cabinet (1) back side, L-type peace
The corresponding one of location hole (10) of positioning bolt (9) in loading board (7);
Step 2: by adjusting positioning bolt (9), so that the inner surface screw thread of the inner surface of positioning bolt (9) and location hole (10)
Connection, it is fixed between L-type mounting plate (7) and cabinet (1), respectively four groups of L-type mounting plates (7) of the two sides of adjusting cabinet (1) to
The state vertical with cabinet (1) and fixation, can be fixedly mounted at this time by the mounting hole (8) on four groups of L-type mounting plates (7)
On vertical metope;
Step 3: when being fixed between lifting or top and bottom, adjusting positioning bolt (9), so that positioning bolt (9) is de-
The inside of location hole (9) from plumbness rotates L-type mounting plate (7), so that mounting hole (8) position on L-type mounting plate (7)
Below or above in cabinet (1);
Step 4: just adjustable to the corresponding location hole (10) of the positioning bolt (9) on L-type mounting plate (7) is interior at this time
Portion screws positioning bolt (9), so that L-type mounting plate (7) is fixed, successively adjusts the mounting hole (8) on four groups of L-type mounting plates (7)
Section is to the state being located remotely from each other, to facilitate, the mounting means by cabinet (1) is adjusted to lifting or the bottom of cabinet (1) is fixed on
On specified position;
Step 5: when needing to adjust the rate of air circulation of antidusting box (13) inside, rotation adjusts turntable (28), to adjust
Air regulating board (18) tool of the tilt angle of aerofoil (18), the internal rate of air circulation of control antidusting box (13), while tilt distribution
There is the effect of certain antidusting, achievees the effect that the circulation and heat dissipation of secondary dust-proof, to facilitate cabinet (1) internal air, simultaneously
The effect of antidusting is good.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910517953.8A CN110165587A (en) | 2019-06-14 | 2019-06-14 | A kind of electrical energy metering tank of included installation guide rail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910517953.8A CN110165587A (en) | 2019-06-14 | 2019-06-14 | A kind of electrical energy metering tank of included installation guide rail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110165587A true CN110165587A (en) | 2019-08-23 |
Family
ID=67625115
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910517953.8A Pending CN110165587A (en) | 2019-06-14 | 2019-06-14 | A kind of electrical energy metering tank of included installation guide rail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110165587A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111628425A (en) * | 2020-06-19 | 2020-09-04 | 安庆市汇智科技咨询服务有限公司 | Assembled multi-functional low voltage distribution box |
-
2019
- 2019-06-14 CN CN201910517953.8A patent/CN110165587A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111628425A (en) * | 2020-06-19 | 2020-09-04 | 安庆市汇智科技咨询服务有限公司 | Assembled multi-functional low voltage distribution box |
CN111628425B (en) * | 2020-06-19 | 2022-03-22 | 山东万盛电气有限公司 | Assembled multi-functional low voltage distribution box |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205304065U (en) | Liftable rotatory dustproof heat dissipation voltage transformer cabinet that takes precautions against earthquakes | |
CN208189993U (en) | A kind of multifunction power cabinet | |
CN105945970A (en) | Robot device with screen capable of being automatically lifted and multi-angle rotated | |
CN110165587A (en) | A kind of electrical energy metering tank of included installation guide rail | |
CN210866810U (en) | Fireproof, explosion-proof and deformation-preventing constant temperature switch cabinet convenient to mount, dismount and maintain and easy to maintain | |
CN107740922B (en) | A kind of intellectual property projector convenient for adjusting | |
CN209618781U (en) | A kind of Quakeproof silencing double-side color-steel composite air duct construction high stability lifting device | |
CN209913314U (en) | From electric-energy metering box of taking installation guide rail | |
CN109185618A (en) | Free-standing pitch adjustment mechanism | |
CN208861595U (en) | A kind of packaged type counseling services instruction device | |
CN109469797A (en) | Illumination balancing device for Binocular Stereo Vision System positioning target | |
CN209526398U (en) | A kind of pressure change chamber damp-proof moisture removing apparatus | |
CN210690614U (en) | Portable air guide mechanism for measuring wind speed | |
CN206100672U (en) | Interval adjustable rack | |
CN211219305U (en) | Light screen for welding robot | |
CN212629031U (en) | Charger heat dissipation device | |
CN208567893U (en) | A kind of mechanical removable leveling base | |
CN220273994U (en) | Servo control cabinet convenient to installation | |
CN212691361U (en) | Electronic display screen | |
CN220272980U (en) | Electric control cabinet with cable shielding plate | |
CN214323300U (en) | Installation auxiliary assembly box of network rack | |
CN213333284U (en) | Self-adjusting hanger device for projector | |
CN215827281U (en) | Accurate weight is with accomodating placer | |
CN204190882U (en) | ZD6 notch of switch machine video surveillance fixture | |
CN207995481U (en) | A kind of Intelligent ion blower fan |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |