CN110163388A - A kind of distribution net equipment maintenance request slip distribution system - Google Patents

A kind of distribution net equipment maintenance request slip distribution system Download PDF

Info

Publication number
CN110163388A
CN110163388A CN201910431029.8A CN201910431029A CN110163388A CN 110163388 A CN110163388 A CN 110163388A CN 201910431029 A CN201910431029 A CN 201910431029A CN 110163388 A CN110163388 A CN 110163388A
Authority
CN
China
Prior art keywords
banquet
group number
maintenance
attend
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910431029.8A
Other languages
Chinese (zh)
Other versions
CN110163388B (en
Inventor
阮志杰
李永健
白一鸣
张欢欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Zhongshan Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910431029.8A priority Critical patent/CN110163388B/en
Publication of CN110163388A publication Critical patent/CN110163388A/en
Application granted granted Critical
Publication of CN110163388B publication Critical patent/CN110163388B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/20Administration of product repair or maintenance
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The present invention provides a kind of distribution net equipments to overhaul request slip distribution system, including maintenance forms data obtains module, maintenance forms data screening module, maintenance forms data distribution module and maintenance forms data display module;The maintenance forms data obtains module and is used to obtain maintenance forms data from distribution OMS;The maintenance forms data screening module is used to obtain the maintenance forms data that module obtains to maintenance forms data and screen;The maintenance forms data distribution module is used to singly carry out overhauling single distribution to the maintenance that maintenance forms data screening module screens;The maintenance forms data display module is for showing the maintenance forms data distributed.

Description

A kind of distribution net equipment maintenance request slip distribution system
Technical field
The present invention relates to power scheduling technical fields, more particularly, to a kind of distribution net equipment maintenance request slip distribution system System.
Background technique
The target of power scheduling work be guarantee power network safety operation, but equipment in power grid can not forever without Stagnantly operation is gone down, it needs replacing, maintains, overhauls, and sometimes be there is also failure and is had to stop transport, in addition, for New equipment or user access electric system, are required to plant maintenance unit application distribution net equipment maintenance request slip to complete this and are The work of column.As city and expanding economy need, the scale of power distribution network increases year by year, and maintenance workload is growing day by day, with Corresponding distribution net equipment maintenance request slip it is also more and more.And the distribution of distribution net equipment maintenance request slip is all according to chief operator Rule of thumb it is averagely allocated to each distribution scheduling person.
But distribution net equipment maintenance request slip, using manually come mean allocation, there are inefficient assignments, unreasonable distribution The case where.
Summary of the invention
The present invention is to solve the technological deficiency of inefficient assignment existing for manual allocation distribution net equipment maintenance request slip, is mentioned A kind of distribution net equipment maintenance request slip distribution system is supplied.
To realize the above goal of the invention, the technical solution adopted is that:
A kind of distribution net equipment maintenance request slip distribution system, including maintenance forms data obtain module, maintenance forms data screening Module, maintenance forms data distribution module and maintenance forms data display module;The maintenance forms data obtains module and is used for from matching It nets OMS and obtains maintenance forms data;The maintenance forms data screening module is used to obtain the inspection that module obtains to maintenance forms data Forms data is repaired to be screened;The maintenance forms data distribution module is used for the inspection screened to maintenance forms data screening module It repairs and singly carries out overhauling single distribution;The maintenance forms data display module is for showing the maintenance forms data distributed.
Preferably, the maintenance single packet contains following column: overhaul single number, scope of power outage, the scheduled outage time, Whether plan telegram in reply time, plant maintenance unit influence user's power failure.
Preferably, the maintenance forms data screening module is divided into two parts for forms data is overhauled by the watch time, respectively For night shift periods part, day shift period part.
Preferably, the night shift periods part refers to that the scheduled outage time is the maintenance list of 19:31-09:00, described The day shift period part refer to the scheduled outage time be 09:01-19:30 maintenance list.
Preferably, maintenance odd number of the maintenance forms data distribution module to night shift periods part, day shift period part According to being allocated respectively.
Preferably, the maintenance forms data distribution module is allocated the maintenance forms data of night shift periods part specific Process is as follows:
Maintenance is singly divided into back segment line maintenance list and main ring route by the S1. maintenance list that scanning night shift periods screen Single two classes are overhauled, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TAfter night, corresponding workload is denoted asEvery group of master Ring line maintenance list is denoted as TNight master, corresponding workload is denoted asBy the workload of every group of back segment line maintenance list and every group The workload descending sort of main ring line maintenance list obtains two groups of maintenance simple sequences,
Wherein n1、n2Respectively indicate the group number that two groups of maintenance simple sequences include;
Wherein
S3. it calculates to two groups of maintenance simple sequence QAfter nightAnd QNight masterWorkload average value:With
S4. from QAfter nightAnd QNight masterThe maintenance list for extracting 19:30 to the 07:00 period, is fully allocated to attend a banquet with 1, and update QAfter nightAnd QNight masterGroup number n1And n2
S5. Q is countedAfter nightAnd QNight masterIn the amount of work of the maintenance single group number of 07:01 to 07:30, if amount of work is less than Or be equal to 4, then it is fully allocated to attend a banquet with 1, and execute S6, and update QAfter nightAnd QNight masterGroup number n1And n2;If amount of work is big In 4, then S5.1 is executed;
S5.1. ifGroup number be more than 2 parts, then fromIn take out 2 parts be individually assigned to attend a banquet with 2, It attends a banquet with 1, and updatesGroup number, execute S5.2, whereinIndicate QAfter nightIn the inspection of 07:01 to 07:30 Repair the amount of work of single group number;IfGroup number then will less than 2 partsBe singly distributed directly to attend a banquet and match 2, and execute S5.3;
S5.2. ifGroup number is 0, updates QAfter nightGroup number n1, then S5.3 is executed;Otherwise S5.1 is returned;
S5.3. ifGroup number be more than 2 parts, then fromIn take out 2 parts be individually assigned to attend a banquet with 2, It attends a banquet with 1, and updatesGroup number, execute S5.4;IfGroup number then will less than 2 parts Be singly distributed directly to attend a banquet with 2, and terminate to distribute, be performed simultaneously S6;
S5.4. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, and execute S6;Otherwise it returns S5.3;
S6. from QAfter nightAnd QNight masterThe maintenance list of 07:31 to 08:30 period is extracted, and is calculatedWith Workload average valueWithWhereinIt indicatesIn the workload of 07:31 to 08:30 period;Indicate n1In 07:31 to 08:30 Between section group number;
S7. if attend a banquet with 2 workloadThen execute S7.1.1;IfThen execute S7.2.1;
S7.1.1. fromIt takes out m-2 parts be individually assigned to attend a banquet with 3, attend a banquet with 4 ... and attend a banquet with m, and updatesGroup number;IfGroup number is less than m-2 parts, then distributes since attending a banquet with 3, be assigned to attend a banquet and matchAnd execute S7.1.5;
S7.1.2. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.3. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and divide one by one It is sorted in dispensing S7.1.2. to attend a banquet, and updateGroup number, execute S7.1.4;IfGroup number is small In m-2 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.2, and execute S7.1.5;
S7.1.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.1.5 is executed;Otherwise it returns S7.1.2;
S7.1.5. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.6. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and divide one by one It is sorted in dispensing S7.1.5 to attend a banquet, and updateGroup number, execute S7.1.7;IfGroup number is small In m-2 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.5, and terminate to distribute, execute S8;
S7.1.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.1.5;
S7.2.1. fromIt takes out m-1 parts be individually assigned to attend a banquet with 2, attend a banquet with 3 ... and attend a banquet with m, and more NewlyGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with 2, be assigned to attend a banquet and matchAnd execute S7.2.5;
S7.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and divide one by one It is sorted in dispensing S7.2.2 to attend a banquet, and updateGroup number, execute S7.2.4;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.2, and execute S7.2.5;
S7.2.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.2.5 is executed;Otherwise it returns S7.2.2;
S7.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and divide one by one It is sorted in dispensing S7.2.5 to attend a banquet, and updateGroup number, execute S7.2.7;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.5, and terminate to distribute, execute S8;
S7.2.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.2.5;
S8. from QAfter nightAnd QNight masterThe maintenance list of 08:31 to 09:00 period is extracted, and is calculatedWith Workload average valueWith
S9. distribution maintenance is single is attended a banquet with 1;
S9.1.It then no longer shares out the work and matches 1 to attending a banquet, and execute S10;IfThen execute S9.2;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, 1 workload is matched until attending a banquet Just above80% until, and updateGroup number;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, 1 workload is matched until attending a banquet Just above80% until, and updateGroup number;
S10. it distributesWithMaintenance list:
S10.2.1. fromM-1 parts are taken out to be individually assigned to attend a banquet with m, attend a banquet with m-1 ... and attend a banquet with 2, and It updatesGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with m, untilMaintenance be singly assigned, and execute S10.2.5;
S10.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts one by one Distribute to it is sorted in S10.2.2 attend a banquet, and updateGroup number, execute S10.2.4;IfGroup Number is less than m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.2, and execute S10.2.5;
S10.2.4. ifGroup number is 0, then executes S10.2.5;Otherwise S10.2.2 is returned;
S10.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts one by one Distribute to it is sorted in S10.2.5 attend a banquet, and updateGroup number, execute S10.2.7;IfGroup Number is less than m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.5, and terminate to distribute;
S10.2.7. ifGroup number is 0, then terminates to distribute;Otherwise S10.2.5 is returned.
Preferably, the maintenance forms data distribution module is allocated the maintenance forms data of day shift period part specific Process is as follows:
Maintenance is singly divided into back segment line maintenance list and main ring route by the S1. maintenance list that the scanning day shift period screens Single two classes are overhauled, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TIn the future, corresponding workload is denoted asEvery group of main ring Line maintenance list is denoted as TDay is main, corresponding workload is denoted asBy the workload of every group of back segment line maintenance list and every group of master The workload descending sort of ring line maintenance list obtains two groups of maintenance simple sequences,
Wherein
S3. it calculates to two groups of maintenance simple sequence QIn the futureAnd QDay is mainWorkload average value:With
S4. preferential distribution maintenance is single is attended a banquet with 1:
S4.1. by QIn the futureFrom TIn the future 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above's Until 80%, and update QIn the futureGroup number n3
S4.2. by QDay is mainFrom TDay main 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above's Until 80%, and update QDay is mainGroup number n4
S5: distribution QIn the futureAnd QDay is mainMaintenance list:
S5.1. from QIn the futureIt takes out m-1 parts to be individually assigned to attend a banquet with 2, attends a banquet with 3 ... and attend a banquet with m, and update QIn the futureGroup Number;If QIn the futureGroup number is less than m-1 parts, then distributes, be assigned to n since attending a banquet with 23+ 1, and execute S5.5;
S5.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.3. if QIn the futureGroup number is greater than or equal to m-1 parts, then from QIn the futureIn take out m-1 parts and be individually assigned to arrange in S5.2 Good sequence is attended a banquet, and updates QIn the futureGroup number, execute S5.4;If QIn the futureGroup number is less than m-1 parts, then by QIn the futureIndividual palpation shine S5.2 In sorted attend a banquet be allocated, and execute S5.5;
S5.4. if QIn the futureGroup number is 0, then executes S5.5;Otherwise S5.2 is returned;
S5.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.6. if QDay is mainGroup number is greater than or equal to m-1 parts, then from QDay is mainIn take out m-1 parts and be individually assigned to arrange in S5.5 Good sequence is attended a banquet, and updates QDay is mainGroup number, execute S5.7;If QDay is mainGroup number is less than m-1 parts, then by QDay is mainIndividual palpation shine S5.5 In sorted attend a banquet be allocated, and terminate to distribute;
S5.7. if QDay is mainGroup number is 0, then terminates to distribute;Otherwise S5.5 is returned.
Compared with prior art, the beneficial effects of the present invention are:
The present invention provides a kind of distribution net equipments to overhaul request slip distribution system, can be realized and automatically examines distribution net equipment Request slip is repaired to distribute on time according to quantity, with it is existing in such a way that manual type is allocated compared with, distribution efficiency obtain It improves, and the assigning process is to have fully considered the work of service personnel based on the workload of each service personnel come what is carried out Work amount situation, it is ensured that service work is completed safely.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of system.
Fig. 2 is the flow diagram being allocated to the maintenance forms data of night shift periods part.
Fig. 3 is the flow diagram being allocated to the maintenance forms data of day shift period part.
Specific embodiment
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;
Below in conjunction with drawings and examples, the present invention is further elaborated.
Embodiment 1
As shown in Figure 1, the present invention provides a kind of distribution net equipments to overhaul request slip distribution system, including maintenance forms data obtains Modulus block, maintenance forms data screening module, maintenance forms data distribution module and maintenance forms data display module;The maintenance list Data acquisition module is used to obtain maintenance forms data from distribution OMS;The maintenance forms data screening module is used for single to maintenance The maintenance forms data that data acquisition module obtains is screened;The maintenance forms data distribution module is used for maintenance forms data The maintenance that screening module screens singly carries out overhauling single distribution;The maintenance forms data display module is used for distributing Maintenance forms data is shown.
As preferred embodiment, the maintenance single packet contains following column: overhaul single number, scope of power outage, Whether the scheduled outage time plan telegram in reply time, plant maintenance unit, influences user's power failure.
As preferred embodiment, the maintenance forms data screening module is divided by the watch time by forms data is overhauled Two parts, respectively night shift periods part, day shift period part.
As preferred embodiment, the night shift periods part refers to that the scheduled outage time is 19:31-09:00 Maintenance list, the described day shift period part refers to that the scheduled outage time is the maintenance list of 09:01-19:30.
As preferred embodiment, the maintenance forms data distribution module is to night shift periods part, day shift period portion The maintenance forms data divided is allocated respectively.
Embodiment 2
In existing work, because of actual motion need of work, every value can all specify attend a banquet with 1 personnel except complete be assigned Plan distribution net equipment maintenance request slip outside, also take into account processing other operation concerns, such as processing non-plan repair, accident Processing, remote control are checked and accepted, business links up the work such as connection.One value personnel is relatively fixed, is worth interior all distribution scheduling persons by one It is attending a banquet in turn with working on 1, it is fair and reasonable to ensure that, and has prevented the feelings of the unmanned follow-up of night emergency event or Linan row people Condition occurs.Simultaneously, it is ensured that other dispatchers can have sufficient time rest.
But it attends a banquet with 1 often because the work of distribution net equipment maintenance request slip is superimposed other operation concerns Work is chronically at excess load operating state, is easy to appear maloperation, accidentally orders, the serious power grid accident event such as mistuning degree. It attends a banquet and continues the scheduled overhaul on the same day with the next morning after 1 night shift follow-up emergency event, be easy to appear fatigue, spirit does not collect In, can not safety, high quality complete work, but work was all not assigned to and attended a banquet with 1 morning, then easily made remaining dispatcher super Load operation will cause same day work not have a power failure on time, the consequences such as power transmission, operator fall into a long wait, customer complaint.
For this purpose, the present invention provides the distribution mechanism of a kind of night shift periods part, day shift period part, which fills Point consider to attend a banquet with 1 and remaining workload situation for attending a banquet, realize the single reasonable distribution of maintenance, avoid attend a banquet it is long with 1 night After time service, the next morning continues the scheduled overhaul on the same day again, fatigue, distraction occurs, can not safety, high quality The case where completing work, the next morning presses period reasonable distribution, so that attend a banquet with 1 available " rest " period appropriate, To ensure that service work is completed safely, smoothly join.
Wherein, as shown in Fig. 2, what maintenance forms data distribution module was allocated the maintenance forms data of night shift periods part Detailed process is as follows:
Maintenance is singly divided into back segment line maintenance list and main ring route by the S1. maintenance list that scanning night shift periods screen Single two classes are overhauled, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TAfter night, corresponding workload is denoted asEvery group of master Ring line maintenance list is denoted as TNight master, corresponding workload is denoted asBy the workload of every group of back segment line maintenance list and every group The workload descending sort of main ring line maintenance list obtains two groups of maintenance simple sequences,
Wherein n1、n2Respectively indicate the group number that two groups of maintenance simple sequences include;
Wherein
S3. it calculates to two groups of maintenance simple sequence QAfter nightAnd QNight masterWorkload average value:With
S4. from QAfter nightAnd QNight masterThe maintenance list for extracting 19:30 to the 07:00 period, is fully allocated to attend a banquet with 1, and update QAfter nightAnd QNight masterGroup number n1And n2
S5. Q is countedAfter nightAnd QNight masterIn the amount of work of the maintenance single group number of 07:01 to 07:30, if amount of work is less than Or be equal to 4, then it is fully allocated to attend a banquet with 1, and execute S6, and update QAfter nightAnd QNight masterGroup number n1And n2;If amount of work is big In 4, then S5.1 is executed;
S5.1. ifGroup number be more than 2 parts, then fromIn take out 2 parts be individually assigned to attend a banquet with 2, It attends a banquet with 1, and updatesGroup number, execute S5.2, whereinIndicate QAfter nightIn the inspection of 07:01 to 07:30 Repair the amount of work of single group number;IfGroup number then will less than 2 partsBe singly distributed directly to attend a banquet and match 2, and execute S5.3;
S5.2. ifGroup number is 0, updates QAfter nightGroup number n1, then S5.3 is executed;Otherwise S5.1 is returned;
S5.3. ifGroup number be more than 2 parts, then fromIn take out 2 parts be individually assigned to attend a banquet with 2, It attends a banquet with 1, and updatesGroup number, execute S5.4;IfGroup number then will less than 2 parts Be singly distributed directly to attend a banquet with 2, and terminate to distribute, be performed simultaneously S6;
S5.4. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, and execute S6;Otherwise it returns S5.3;
S6. from QAfter nightAnd QNight masterThe maintenance list of 07:31 to 08:30 period is extracted, and is calculatedWith Workload average valueWithWhereinIt indicatesIn the workload of 07:31 to 08:30 period;Indicate n1In 07:31 to 08:30 Between section group number;
S7. if attend a banquet with 2 workloadThen execute S7.1.1;IfThen execute S7.2.1;
S7.1.1. fromIt takes out m-2 parts be individually assigned to attend a banquet with 3, attend a banquet with 4 ... and attend a banquet with m, and updatesGroup number;IfGroup number is less than m-2 parts, then distributes since attending a banquet with 3, be assigned to attend a banquet and matchAnd execute S7.1.5;
S7.1.2. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.3. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and divide one by one It is sorted in dispensing S7.1.2. to attend a banquet, and updateGroup number, execute S7.1.4;IfGroup number is small In m-2 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.2, and execute S7.1.5;
S7.1.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.1.5 is executed;Otherwise it returns S7.1.2;
S7.1.5. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.6. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and divide one by one It is sorted in dispensing S7.1.5 to attend a banquet, and updateGroup number, execute S7.1.7;IfGroup number is small In m-2 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.5, and terminate to distribute, execute S8;
S7.1.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.1.5;
S7.2.1. fromIt takes out m-1 parts be individually assigned to attend a banquet with 2, attend a banquet with 3 ... and attend a banquet with m, and updatesGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with 2, be assigned to attend a banquet and matchAnd execute S7.2.5;
S7.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and divide one by one It is sorted in dispensing S7.2.2 to attend a banquet, and updateGroup number, execute S7.2.4;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.2, and execute S7.2.5;
S7.2.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.2.5 is executed;Otherwise it returns S7.2.2;
S7.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and divide one by one It is sorted in dispensing S7.2.5 to attend a banquet, and updateGroup number, execute S7.2.7;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.5, and terminate to distribute, execute S8;
S7.2.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.2.5;
S8. from QAfter nightAnd QNight masterThe maintenance list of 08:31 to 09:00 period is extracted, and is calculatedWith Workload average valueWith
S9. distribution maintenance is single is attended a banquet with 1;
S9.1.It then no longer shares out the work and matches 1 to attending a banquet, and execute S10;IfThen execute S9.2;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, 1 workload is matched until attending a banquet Just above80% until, and updateGroup number;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, 1 workload is matched until attending a banquet Just above80% until, and updateGroup number;
S10. it distributesWithMaintenance list:
S10.2.1. fromM-1 parts are taken out to be individually assigned to attend a banquet with m, attend a banquet with m-1 ... and attend a banquet with 2, and It updatesGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with m, untilMaintenance be singly assigned, and execute S10.2.5;
S10.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts one by one Distribute to it is sorted in S10.2.2 attend a banquet, and updateGroup number, execute S10.2.4;IfGroup Number is less than m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.2, and execute S10.2.5;
S10.2.4. ifGroup number is 0, then executes S10.2.5;Otherwise S10.2.2 is returned;
S10.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts one by one Distribute to it is sorted in S10.2.5 attend a banquet, and updateGroup number, execute S10.2.7;IfGroup Number is less than m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.5, and terminate to distribute;
S10.2.7. ifGroup number is 0, then terminates to distribute;Otherwise S10.2.5 is returned.
As shown in figure 3, maintenance forms data distribution module the maintenance forms data of day shift period part is allocated it is specific Process is as follows:
Maintenance is singly divided into back segment line maintenance list and main ring route by the S1. maintenance list that the scanning day shift period screens Single two classes are overhauled, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TIn the future, corresponding workload is denoted asEvery group of main ring Line maintenance list is denoted as TDay is main, corresponding workload is denoted asBy the workload of every group of back segment line maintenance list and every group of master The workload descending sort of ring line maintenance list obtains two groups of maintenance simple sequences,
Wherein
S3. it calculates to two groups of maintenance simple sequence QIn the futureAnd QDay is mainWorkload average value:With
S4. preferential distribution maintenance is single is attended a banquet with 1:
S4.1. by QIn the futureFrom TIn the future 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above's Until 80%, and update QIn the futureGroup number n3
S4.2. by QDay is mainFrom TDay main 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above's Until 80%, and update QDay is mainGroup number n4
S5: distribution QIn the futureAnd QDay is mainMaintenance list:
S5.1. from QIn the futureIt takes out m-1 parts to be individually assigned to attend a banquet with 2, attends a banquet with 3 ... and attend a banquet with m, and update QIn the futureGroup Number;If QIn the futureGroup number is less than m-1 parts, then distributes, be assigned to n since attending a banquet with 23+ 1, and execute S5.5;
S5.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.3. if QIn the futureGroup number is greater than or equal to m-1 parts, then from QIn the futureIn take out m-1 parts and be individually assigned to arrange in S5.2 Good sequence is attended a banquet, and updates QIn the futureGroup number, execute S5.4;If QIn the futureGroup number is less than m-1 parts, then by QIn the futureIndividual palpation shine S5.2 In sorted attend a banquet be allocated, and execute S5.5;
S5.4. if QIn the futureGroup number is 0, then executes S5.5;Otherwise S5.2 is returned;
S5.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.6. if QDay is mainGroup number is greater than or equal to m-1 parts, then from QDay is mainIn take out m-1 parts and be individually assigned to arrange in S5.5 Good sequence is attended a banquet, and updates QDay is mainGroup number, execute S5.7;If QDay is mainGroup number is less than m-1 parts, then by QDay is mainIndividual palpation shine S5.5 In sorted attend a banquet be allocated, and terminate to distribute;
S5.7. if QDay is mainGroup number is 0, then terminates to distribute;Otherwise S5.5 is returned.
In above scheme, the main ring line maintenance list is that scope of power outage includes " Arabic numerals " | | " section " content Maintenance is single;The back segment line maintenance list is not comprising " Arabic numerals " | | the maintenance list of " section " content;" I Uncle's number " includes 1,2,3.......100;The workload quantification of main ring line maintenance list is 2, the work of back segment line maintenance list It is quantified as 1;The group forming criterion is that the consistent maintenance of scope of power outage is singly same group.
Obviously, the above embodiment of the present invention be only to clearly illustrate example of the present invention, and not be pair The restriction of embodiments of the present invention.For those of ordinary skill in the art, may be used also on the basis of the above description To make other variations or changes in different ways.There is no necessity and possibility to exhaust all the enbodiments.It is all this Made any modifications, equivalent replacements, and improvements etc., should be included in the claims in the present invention within the spirit and principle of invention Protection scope within.

Claims (7)

1. a kind of distribution net equipment overhauls request slip distribution system, it is characterised in that: obtain module, maintenance list including maintenance forms data Data screening module, maintenance forms data distribution module and maintenance forms data display module;The maintenance forms data obtains module For obtaining maintenance forms data from distribution OMS;The maintenance forms data screening module is used to obtain module to maintenance forms data The maintenance forms data of acquisition is screened;The maintenance forms data distribution module is used for maintenance forms data screening module screening Maintenance out singly carries out overhauling single distribution;The maintenance forms data display module be used for the maintenance forms data distributed into Row display.
2. distribution net equipment according to claim 1 overhauls request slip distribution system, it is characterised in that: the maintenance odd number According to including following column: overhaul single number, scope of power outage, scheduled outage time, plan send a telegram in reply the time, plant maintenance unit, be No influence user has a power failure.
3. distribution net equipment according to claim 1 overhauls request slip distribution system, it is characterised in that: the maintenance odd number It is divided into two parts, respectively night shift periods part, day shift period part for forms data is overhauled by the watch time according to screening module.
4. distribution net equipment according to claim 4 overhauls request slip distribution system, it is characterised in that: the night shift periods Part refers to that the scheduled outage time is the maintenance list of 19:31-09:00, and the day shift period part refers to scheduled outage Time is the maintenance list of 09:01-19:30.
5. distribution net equipment according to claim 4 overhauls request slip distribution system, it is characterised in that: the maintenance odd number It is allocated respectively according to maintenance forms data of the distribution module to night shift periods part, day shift period part.
6. distribution net equipment according to claim 5 overhauls request slip distribution system, it is characterised in that: the maintenance forms data Distribution module is allocated that detailed process is as follows to the maintenance forms data of night shift periods part:
Maintenance is singly divided into back segment line maintenance list and main ring line maintenance by the S1. maintenance list that scanning night shift periods screen Single two classes, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TAfter night, corresponding workload is denoted asEvery group of main ring route Maintenance is singly denoted as TNight master, corresponding workload is denoted asBy the workload and every group of main ring line of every group of back segment line maintenance list The single workload descending sort of road maintenance, obtains two groups of maintenance simple sequences,
Wherein n1、n2Respectively indicate the group number that two groups of maintenance simple sequences include;
Wherein
S3. it calculates to two groups of maintenance simple sequence QAfter nightAnd QNight masterWorkload average value:With
S4. from QAfter nightAnd QNight masterThe maintenance list for extracting 19:30 to the 07:00 period, is fully allocated to attend a banquet with 1, and update QAfter nightWith QNight masterGroup number n1And n2
S5. Q is countedAfter nightAnd QNight masterIn the amount of work of the maintenance single group number of 07:01 to 07:30, if amount of work is less than or waits In 4, then it is fully allocated to attend a banquet with 1, and execute S6, and update QAfter nightAnd QNight masterGroup number n1And n2;If amount of work is greater than 4, Then execute S5.1;
S5.1. ifGroup number be more than 2 parts, then fromIn take out 2 parts and be individually assigned to attend a banquet with 2, attend a banquet With 1, and updateGroup number, execute S5.2, whereinIndicate QAfter nightIn the maintenance list of 07:01 to 07:30 The amount of work of group number;IfGroup number then will less than 2 partsBe singly distributed directly to attend a banquet with 2, and Execute S5.3;
S5.2. ifGroup number is 0, updates QAfter nightGroup number n1, then S5.3 is executed;Otherwise S5.1 is returned;
S5.3. ifGroup number be more than 2 parts, then fromIn take out 2 parts and be individually assigned to attend a banquet with 2, attend a banquet With 1, and updateGroup number, execute S5.4;IfGroup number then will less than 2 partsList It is distributed directly to attend a banquet with 2, and terminates to distribute, be performed simultaneously S6;
S5.4. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, and execute S6;Otherwise it returns S5.3;
S6. from QAfter nightAnd QNight masterThe maintenance list of 07:31 to 08:30 period is extracted, and is calculatedWithWork The average value that work is measuredWithWherein It indicatesIn the workload of 07:31 to 08:30 period;Indicate n1In the group of 07:31 to 08:30 period Number;
S7. if attend a banquet with 2 workloadThen execute S7.1.1;IfThen execute S7.2.1;
S7.1.1. fromIt takes out m-2 parts be individually assigned to attend a banquet with 3, attend a banquet with 4 ... and attend a banquet with m, and updatesGroup number;IfGroup number is less than m-2 parts, then distributes since attending a banquet with 3, be assigned to attend a banquet and matchAnd execute S7.1.5;
S7.1.2. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.3. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and be individually assigned to S7.1.2. sorted in attend a banquet, and updateGroup number, execute S7.1.4;IfGroup number is less than m- 2 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.2, and execute S7.1.5;
S7.1.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.1.5 is executed;Otherwise S7.1.2 is returned;
S7.1.5. this m-2 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.1.6. ifGroup number be greater than or equal to m-2 parts, then fromIn take out m-2 parts and be individually assigned to It is sorted in S7.1.5 to attend a banquet, and updateGroup number, execute S7.1.7;IfGroup number is less than m-2 Part then willIndividual palpation be allocated according to sorted attend a banquet in S7.1.5, and terminate to distribute, execute S8;
S7.1.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.1.5;
S7.2.1. fromIt takes out m-1 parts be individually assigned to attend a banquet with 2, attend a banquet with 3 ... and attend a banquet with m, and updatesGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with 2, be assigned to attend a banquet and matchAnd execute S7.2.5;
S7.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and be individually assigned to It is sorted in S7.2.2 to attend a banquet, and updateGroup number, execute S7.2.4;IfGroup number is less than m-1 Part then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.2, and execute S7.2.5;
S7.2.4. ifGroup number is 0, updates QAfter nightGroup number n1, then S7.2.5 is executed;Otherwise S7.2.2 is returned;
S7.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S7.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and be individually assigned to It is sorted in S7.2.5 to attend a banquet, and updateGroup number, execute S7.2.7;IfGroup number is less than m-1 Part then willIndividual palpation be allocated according to sorted attend a banquet in S7.2.5, and terminate to distribute, execute S8;
S7.2.7. ifGroup number is 0, then terminates to distribute, and updates QNight masterGroup number n2, execute S8;Otherwise it returns S7.2.5;
S8. from QAfter nightAnd QNight masterThe maintenance list of 08:31 to 09:00 period is extracted, and is calculatedWithWork The average value that work is measuredWith
S9. distribution maintenance is single is attended a banquet with 1;
S9.1.It then no longer shares out the work and matches 1 to attending a banquet, and execute S10;IfThen execute S9.2;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, match 1 workload until attending a banquet and just surpassed It crosses80% until, and updateGroup number;
S9.2. willIndividual palpation workload distribute to attend a banquet with 1 from small to large, match 1 workload until attending a banquet and just surpassed It crosses80% until, and updateGroup number;
S10. it distributesWithMaintenance list:
S10.2.1. fromIt takes out m-1 parts be individually assigned to attend a banquet with m, attend a banquet with m-1 ... and attend a banquet with 2, and updatesGroup number;IfGroup number is less than m-1 parts, then distributes since attending a banquet with m, until's Maintenance is singly assigned, and executes S10.2.5;
S10.2.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.3. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and distribute one by one It attends a banquet, and updates to sorted in S10.2.2Group number, execute S10.2.4;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.2, and execute S10.2.5;
S10.2.4. ifGroup number is 0, then executes S10.2.5;Otherwise S10.2.2 is returned;
S10.2.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S10.2.6. ifGroup number be greater than or equal to m-1 parts, then fromIn take out m-1 parts and distribute one by one It attends a banquet, and updates to sorted in S10.2.5Group number, execute S10.2.7;IfGroup number is small In m-1 parts, then willIndividual palpation be allocated according to sorted attend a banquet in S10.2.5, and terminate to distribute;
S10.2.7. ifGroup number is 0, then terminates to distribute;Otherwise S10.2.5 is returned.
7. distribution net equipment according to claim 5 overhauls request slip distribution system, it is characterised in that: the maintenance forms data Distribution module is allocated that detailed process is as follows to the maintenance forms data of day shift period part:
Maintenance is singly divided into back segment line maintenance list and main ring line maintenance by the S1. maintenance list that the scanning day shift period screens Single two classes, then processing is grouped to back segment line maintenance list and main ring line maintenance individual palpation scope of power outage;
S2. overhaul single sequence: every group of back segment line maintenance list is denoted as TIn the future, corresponding workload is denoted asEvery group of main ring route Maintenance is singly denoted as TDay is main, corresponding workload is denoted asBy the workload and every group of main ring line of every group of back segment line maintenance list The single workload descending sort of road maintenance, obtains two groups of maintenance simple sequences,
Wherein
S3. it calculates to two groups of maintenance simple sequence QIn the futureAnd QDay is mainWorkload average value:
S4. preferential distribution maintenance is single is attended a banquet with 1:
S4.1. by QIn the futureFrom TIn the future 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above80% be Only, and Q is updatedIn the futureGroup number n3
S4.2. by QDay is mainFrom TDay main 1It arrivesDistribute to and attend a banquet with 1, until attend a banquet match 1 workload just above80% be Only, and Q is updatedDay is mainGroup number n4
S5: distribution QIn the futureAnd QDay is mainMaintenance list:
S5.1. from QIn the futureIt takes out m-1 parts to be individually assigned to attend a banquet with 2, attends a banquet with 3 ... and attend a banquet with m, and update QIn the futureGroup number; If QIn the futureGroup number is less than m-1 parts, then distributes, be assigned to n since attending a banquet with 23+ 1, and execute S5.5;
S5.2. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.3. if QIn the futureGroup number is greater than or equal to m-1 parts, then from QIn the futureIn take out m-1 parts and be individually assigned to sequence sequence in S5.2 Attend a banquet, and update QIn the futureGroup number, execute S5.4;If QIn the futureGroup number is less than m-1 parts, then by QIn the futureIndividual palpation according to arranging in S5.2 Good attending a banquet for sequence is allocated, and executes S5.5;
S5.4. if QIn the futureGroup number is 0, then executes S5.5;Otherwise S5.2 is returned;
S5.5. this m-1 are attended a banquet and is sorted from small to large by the workload being assigned to;
S5.6. if QDay is mainGroup number is greater than or equal to m-1 parts, then from QDay is mainIn take out m-1 parts and be individually assigned to sequence sequence in S5.5 Attend a banquet, and update QDay is mainGroup number, execute S5.7;If QDay is mainGroup number is less than m-1 parts, then by QDay is mainIndividual palpation according to arranging in S5.5 Good attending a banquet for sequence is allocated, and terminates to distribute;
S5.7. if QDay is mainGroup number is 0, then terminates to distribute;Otherwise S5.5 is returned.
CN201910431029.8A 2019-05-22 2019-05-22 Distribution network equipment overhaul application form distribution system Active CN110163388B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910431029.8A CN110163388B (en) 2019-05-22 2019-05-22 Distribution network equipment overhaul application form distribution system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910431029.8A CN110163388B (en) 2019-05-22 2019-05-22 Distribution network equipment overhaul application form distribution system

Publications (2)

Publication Number Publication Date
CN110163388A true CN110163388A (en) 2019-08-23
CN110163388B CN110163388B (en) 2023-04-28

Family

ID=67631940

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910431029.8A Active CN110163388B (en) 2019-05-22 2019-05-22 Distribution network equipment overhaul application form distribution system

Country Status (1)

Country Link
CN (1) CN110163388B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111199460A (en) * 2019-12-30 2020-05-26 云南电网有限责任公司 Power grid dispatching and maintenance application form processing method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020007289A1 (en) * 2000-07-11 2002-01-17 Malin Mark Elliott Method and apparatus for processing automobile repair data and statistics
CN1980379A (en) * 2005-12-05 2007-06-13 厦门雅迅网络股份有限公司 Vehicle networked video advertisement broadcasting peroid automatic management method and system
CN107067195A (en) * 2017-06-09 2017-08-18 国网山东省电力公司济宁供电公司 A kind of grid maintenance task and power failure planning data processing method, apparatus and system
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020007289A1 (en) * 2000-07-11 2002-01-17 Malin Mark Elliott Method and apparatus for processing automobile repair data and statistics
CN1980379A (en) * 2005-12-05 2007-06-13 厦门雅迅网络股份有限公司 Vehicle networked video advertisement broadcasting peroid automatic management method and system
CN107067195A (en) * 2017-06-09 2017-08-18 国网山东省电力公司济宁供电公司 A kind of grid maintenance task and power failure planning data processing method, apparatus and system
CN108876140A (en) * 2018-06-12 2018-11-23 广东电网有限责任公司 A kind of dispatching method, device, server and the medium of power communication maintenance task

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111199460A (en) * 2019-12-30 2020-05-26 云南电网有限责任公司 Power grid dispatching and maintenance application form processing method and system

Also Published As

Publication number Publication date
CN110163388B (en) 2023-04-28

Similar Documents

Publication Publication Date Title
US5913201A (en) Method and apparatus for assigning a plurality of work projects
CN111311129A (en) Automatic work distribution method, system and computer equipment for power distribution network on-duty task allocation
Alfares Aircraft maintenance workforce schedulingA case study
CN106815373B (en) Distribution network first-aid repair big data display method and system based on BI analysis
CN103955409B (en) Method for operation dispatching
CN108183869A (en) A kind of electric quantity data acquisition system based on Distributed Message Queue
CN110346661A (en) A kind of method and system of user's electric voltage exception automatic detecting
CN110163388A (en) A kind of distribution net equipment maintenance request slip distribution system
Segal et al. Turfing
CN109635510A (en) The parallel repair line setting method of railway freight-car
CN108648030B (en) Travel group grouping system and method and travel agency business processing device
CN109166051A (en) A kind of dispatching of power netwoks data programming count and multidimensional visualize application method
CN207320950U (en) The integrated anti-error system of regulation and control
DE202022106297U1 (en) Intelligent system for energy demand forecasting and sustainable energy management through machine learning and artificial intelligence
CN108921420A (en) A kind of electric power plant station equipment generates the method and system of production plan
CN110705815A (en) Shop scheduling system and method
Ashford et al. Passenger behavior and design of airport terminals
Bard et al. Improving through-flight schedules
CN105186506A (en) Regional power grid real-time scheduling plan adjustment method
CN112232542A (en) Power grid maintenance mode auxiliary generation system based on load prediction
DE102017212334A1 (en) TRANSPORT SYSTEM AND METHOD FOR ALLOCATING FREQUENCIES OF TRANSITSERVICES THEREIN
Moodie et al. Experiments with priority dispatching rules in a parallel processor shop
CN113657620A (en) System and method for plan balance assistance based on electric power big data
Lilly et al. Four-day service-staff work-week in order to complete maintenance operations more effectively in a Nigerian power-generating station
CN110796363A (en) Dispatching method and system for work scheduling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant