CN110162550A - Visualize statistical graph generation method, device, computer equipment and storage medium - Google Patents
Visualize statistical graph generation method, device, computer equipment and storage medium Download PDFInfo
- Publication number
- CN110162550A CN110162550A CN201910299360.9A CN201910299360A CN110162550A CN 110162550 A CN110162550 A CN 110162550A CN 201910299360 A CN201910299360 A CN 201910299360A CN 110162550 A CN110162550 A CN 110162550A
- Authority
- CN
- China
- Prior art keywords
- project
- statistical
- infringement
- information
- analyzed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 55
- 238000003860 storage Methods 0.000 title claims abstract description 20
- 238000012544 monitoring process Methods 0.000 claims abstract description 70
- 238000012800 visualization Methods 0.000 claims abstract description 54
- 238000004590 computer program Methods 0.000 claims description 14
- 230000000694 effects Effects 0.000 abstract description 10
- 230000015572 biosynthetic process Effects 0.000 abstract description 4
- 238000007619 statistical method Methods 0.000 abstract description 4
- 238000013079 data visualisation Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 24
- 230000007246 mechanism Effects 0.000 description 9
- 238000004458 analytical method Methods 0.000 description 7
- 230000006870 function Effects 0.000 description 7
- 238000012545 processing Methods 0.000 description 7
- 238000011161 development Methods 0.000 description 6
- 230000004044 response Effects 0.000 description 6
- 238000004891 communication Methods 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- RYAUSSKQMZRMAI-YESZJQIVSA-N (S)-fenpropimorph Chemical compound C([C@@H](C)CC=1C=CC(=CC=1)C(C)(C)C)N1C[C@H](C)O[C@H](C)C1 RYAUSSKQMZRMAI-YESZJQIVSA-N 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000014759 maintenance of location Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/245—Query processing
- G06F16/2458—Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
- G06F16/2462—Approximate or statistical queries
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/24—Querying
- G06F16/248—Presentation of query results
Abstract
The invention discloses visualization statistical graph generation method, device, computer equipment and storage mediums.Model, which is generated, according to preset monitoring figure generates infringement Mission Monitor figure, and the Information Statistics request fed back according to user generates and obtains project data information corresponding with the statistical item in infringement assignment database, generate model according to preset project chart and project statistical graph counted and generated to project data information, according to Information Statistics request in the quantity of project to be analyzed corresponding generate tendency chart or comparison tendency chart.The present invention is based on data visualization techniques, can be efficient, comprehensively for statistical analysis to data information included in infringement assignment database, improve the formation efficiency of visualization statistical graph, achieve good technical effect in actual application.
Description
Technical field
The present invention relates to field of computer technology more particularly to a kind of visualization statistical graph generation methods, device, calculating
Machine equipment and storage medium.
Background technique
Enterprise need to count infringing information relevant to enterprise itself, for self-management demand so that enterprise is more
Itself equity is safeguarded well.However tables of data is only generated by way of data accumulation to open up in existing technical method
Show specific statistical data, user can not watch the concrete condition of all infringing informations of enterprise from multiple angles, lead to user institute
The statistical data got is not comprehensive, and statistical efficiency is lower.Thus, existing in art methods can not efficiently, comprehensively
The problem of infringing information is counted.
Summary of the invention
The embodiment of the invention provides a kind of visualization statistical graph generation method, device, computer equipment and storages to be situated between
Matter, it is intended to solve the problems, such as can not efficiently, comprehensively count to infringing information in the presence of art methods.
In a first aspect, the embodiment of the invention provides a kind of visualization statistical graph generation methods comprising:
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into
Row counts and generates infringement Mission Monitor figure;
If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back, united according to the information
Statistical item in meter request obtains project data information corresponding with the statistical item in infringement assignment database;
The project data information is counted according to preset project chart generation model and generates project statistical chart
Table;
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart
And the project data information generates tendency chart corresponding with the project to be analyzed;
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to preset comparison tendency chart generation mould
Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.
Second aspect, the embodiment of the invention provides a kind of visualization statistical graph generating means comprising:
Monitoring figure generation unit wraps preset infringement assignment database for generating model according to preset monitoring figure
The doubtful infringement task contained is counted and generates infringement Mission Monitor figure;
Project data information acquisition unit, if the letter fed back for receiving user according to the infringement Mission Monitor figure
Breath statistics request, according to the Information Statistics request in statistical item obtain infringement assignment database in the statistical item
Corresponding project data information;
Project statistical graph generation unit, for generating model to the project data information according to preset project chart
It is counted and generates project statistical graph;
Whether project judging unit to be analyzed is greater than one for the quantity to project to be analyzed in Information Statistics request
Judged;
First trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is not more than one,
Model and the project data information, which are generated, according to preset tendency chart generates tendency chart corresponding with the project to be analyzed;
Second trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is greater than one, root
Model and the project data information, which are generated, according to preset comparison tendency chart generates comparison corresponding with the project to be analyzed
Tendency chart.
The third aspect, the embodiment of the present invention provide a kind of computer equipment again comprising memory, processor and storage
On the memory and the computer program that can run on the processor, the processor execute the computer program
Visualization statistical graph generation method described in the above-mentioned first aspect of Shi Shixian.
Fourth aspect, the embodiment of the invention also provides a kind of computer readable storage mediums, wherein the computer can
It reads storage medium and is stored with computer program, it is above-mentioned that the computer program when being executed by a processor executes the processor
Visualization statistical graph generation method described in first aspect.
The embodiment of the invention provides a kind of visualization statistical graph generation method, device, computer equipment and storages to be situated between
Matter.Model is generated according to preset monitoring figure and generates infringement Mission Monitor figure, and is requested according to the Information Statistics that user is fed back
Generate corresponding with Information Statistics request project statistical graph, according to Information Statistics request in the quantity correspondence of project to be analyzed give birth to
At tendency chart or comparison tendency chart.By the above method, can efficiently, comprehensively be counted to included in infringement assignment database
It is believed that breath is for statistical analysis, the formation efficiency of visualization statistical graph is improved, is achieved in actual application good
Technical effect.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description
Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field
For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 2 is the effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 3 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 4 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention
Fig. 5 is the sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 6 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 7 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 8 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 9 is the schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 10 is the subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 11 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 12 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 13 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 14 is the schematic block diagram of computer equipment provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " and "comprising" instruction
Described feature, entirety, step, operation, the presence of element and/or component, but one or more of the other feature, whole is not precluded
Body, step, operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this description of the invention merely for the sake of description specific embodiment
And be not intended to limit the present invention.As description of the invention and it is used in the attached claims, unless on
Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in description of the invention and the appended claims is
Refer to any combination and all possible combinations of one or more of associated item listed, and including these combinations.
Referring to Fig. 1, Fig. 1 is the flow diagram of visualization statistical graph generation method provided in an embodiment of the present invention.
The visualization statistical graph generation method is applied in user terminal, and this method passes through the application software that is installed in user terminal
It is executed, user terminal is to be set for executing visualization statistical graph generation method with the terminal for generating Visual Chart
It is standby, such as desktop computer, laptop, tablet computer or mobile phone etc..
As shown in Figure 1, the method comprising the steps of S110~S160.
S110, the doubtful infringement times that model is included to preset infringement assignment database is generated according to preset monitoring figure
Business is counted and generates infringement Mission Monitor figure.
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into
Row counts and generates infringement Mission Monitor figure.It all are completed and do not complete specifically, being stored in infringement assignment database
Doubtful infringement task is monitored to obtain enterprise's doubtful infringement the doubtful infringement task in infringement assignment database to realize
The overall condition of task can be generated model by monitoring figure and be carried out to doubtful infringement task included in infringement assignment database
It counts and infringement Mission Monitor figure is generated according to statistical result.Mission Monitor figure of encroaching right is for all doubtful infringements of enterprise
The statistical chart that the overall condition of task is monitored, the form of monitoring figure includes but is not limited to column in Mission Monitor figure of encroaching right
Figure, column stack figure, line chart, trend line chart, cake chart, geographical location information figure, wherein monitoring figure, which generates in model, includes
Statistical rules and monitoring figure template.
Wherein, in doubtful infringement task include multiple projects, according to each project to the data in doubtful infringement task into
Row statistics, and the data statistics result that statistics obtains is filled to monitoring figure to generate in model, infringement Mission Monitor can be obtained
Figure, detailed programs include mission number, doubtful infringement main body, infringement mechanism, processing date, source of evidence, infringement region, response
The amount of money, right-safeguarding are supported in timeliness, task items state, case delivery device, case state, case policing type, the case-involving amount of money, judgement
As a result etc., each project in doubtful infringement task includes specific item value.Mission number is that each doubtful infringement is appointed
The corresponding number information of business;Doubtful infringement main body is the main body letter that our company's legitimate rights and interests are invaded in the doubtful infringement task
Breath, each doubtful infringement task correspond to a doubtful infringement main body;Infringement mechanism that is to say that the doubtful infringement task is invaded
Violate branch's information in our company;Response timeliness be in our company branch from doubtful infringement task is received to first choosing
The duration of law teacher that is to say the processing response time of doubtful infringement task.
For example, the specifying information of doubtful infringement task is as shown in table 1.
Table 1
In one embodiment, as shown in figure 5, step S110 includes sub-step S111 and S112.
S111, the statistical rules in model is generated according to the monitoring figure to doubtful invading in the infringement assignment database
Power task is counted to obtain infringement statistical information.
The statistical rules in model is generated according to the monitoring figure to appoint the doubtful infringement in the infringement assignment database
Business is counted to obtain infringement statistical information.Statistical rules be for according to each project middle term mesh value to infringement number of tasks
According to the Rule Information that doubtful infringement tasks all in library are counted, according to each project middle term mesh value to doubtful infringement task into
It need to also be counted using encroaching right mechanism as dimension when row statistics, if item value is sky in a certain doubtful infringement task, not existed
To be counted in the empty corresponding project of item value to the doubtful infringement task, included by statistical rules, that is, statistics available
The infringement statistical information of all items.
For example, carrying out counting obtained information such as table 2 to " task items state " this project in infringement assignment database
It is shown.
Table 2
S112, the monitoring figure template that the infringement statistical information is added in the monitoring figure generation model is invaded with generating
Weigh Mission Monitor figure.
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement times
Business monitoring figure.Specifically, monitoring figure template is the template for filling specifying information to generate corresponding infringement Mission Monitor figure
Information will a certain item in infringement statistical information comprising the corresponding template of project each in infringement statistical information in monitoring figure template
Purpose numerical value fills and produces the corresponding monitoring figure of the project into template corresponding to monitoring figure template, obtains all items
The corresponding monitoring figure generated can finally obtain infringement Mission Monitor figure.It can intuitively be obtained by watching infringement Mission Monitor figure
Take the overall condition of the doubtful infringement task of enterprise.
If S120, the Information Statistics request that user is fed back according to the infringement Mission Monitor figure is received, according to described
Statistical item in Information Statistics request obtains project data information corresponding with the statistical item in infringement assignment database.
If receiving the Information Statistics that user (user of user terminal) is fed back according to the infringement Mission Monitor figure
Request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request
Project data information.If user needs to obtain the specifying information of a certain project in infringement assignment database, can be invaded by described
Power Mission Monitor figure feedback information statistics is requested to obtain the specific statistical information of a certain project.Wherein, Information Statistics request packet
Statistical item and project to be analyzed are included, statistical item that is to say some detailed programs in infringement assignment database, to be analyzed
Project is that the statistical magnitude of one or more projects for being inputted to user carries out the detailed programs of trend analysis, wait divide
Analysis project can be one or more.It can be obtained according to statistical item corresponding with the statistical item in infringement assignment database
Project data information this doubtful is not invaded if the corresponding item value of the statistical item is sky in a certain doubtful infringement task
Power task is added in project data information.
For example, statistical item is " right-safeguarding result ", since " right-safeguarding result " is corresponding in second doubtful infringement task in table 1
Item value be sky, then second in table 1 doubtful infringement task is not added in project data information.
S130, the project data information is counted according to preset project chart generation model and generates project system
Count chart.
The project data information is counted according to preset project chart generation model and generates project statistical chart
Table.Wherein, it includes project statistical rules and project template graph that project chart, which generates in model, specifically, being counted according to project
Rule counts the project data information of a certain project to obtain the corresponding data statistics of the project as a result, project chart mould
Include project artwork plate and project table template in plate, data statistics result is filled to project chart to the project table generated in model
Template produces statistics detail list, and data statistics result is filled to project chart to the project artwork plate generated in model
Generation project statistical chart that is to say bright comprising the corresponding project statistical chart of the project and statistics in project statistical graph generated
Thin table.
In one embodiment, as shown in fig. 6, step S130 includes sub-step S131 and S132.
S131, it is united according to the project statistical rules in project chart generation model to the project data information
Meter is to obtain project statistical information.
According to the project chart generate model in project statistical rules to the project data information counted with
Obtain project statistical information.Specifically, project statistical rules is for counting to accessed project data information
Rule, including statistical time section in project statistical rules need to be according to statistical time when counting to project data information
Section is counted at times, can finally be counted to obtain project statistical information according to project statistical rules.
For example, project corresponding to a certain project data information be infringement mechanism, Duan Weiliu calendar month of statistical time, then
Corresponding obtained project statistical information is as shown in table 3.
Table 3
S132, the project statistical information is added to the project chart generate in project template graph in model with
Generation project statistical graph.
The project statistical information is added in the project template graph in the project chart generation model to generate
Project statistical graph.Specifically, including the corresponding statistical chart of the project and statistics detail list in project statistical graph generated.
Wherein, statistics detail list is according to the corresponding statistical form generated of above-mentioned project statistical information;Using project as cross in statistical chart
Coordinate adds respective items purpose specific name, in ordinate using statistical magnitude as ordinate in the abscissa of corresponding template
Statistical magnitude corresponding to middle addition respective item, and can be final according to the histogram that each statistical magnitude adds corresponding length
Obtain statistical chart.
Fig. 2 is the effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, as shown in Fig. 2,
Figure (a) therein is the corresponding statistics detail list of the project that the data according to table 3 generate;Scheming (b) is according to institute in table 3
Registration according to generation the corresponding statistical chart of the project.
S140, judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.Further to obtain letter
The tendency information of statistical item at any time in breath statistics request, user can also be by inputting project to be analyzed in Information Statistics request
To obtain the tendency information counted according to project to be analyzed.Specifically, the quantity difference of project to be analyzed is then counted and is obtained
Tendency information it is different, therefore whether the quantity of project to be analyzed is greater than one and judge in need to requesting Information Statistics, and
Respectively obtain corresponding visualization trend statistical information according to judging result, visualization trend statistical information can by tendency chart or
Trend comparison diagram is embodied, and project to be analyzed can select in the corresponding item value of statistical item from Information Statistics request.
For example, the statistical item in Information Statistics request is " infringement mechanism ", the corresponding item value of infringement mechanism includes AA
Bank, AA trust, AA security, AA produce danger, AA life insurance, then project to be analyzed can be selected from above-mentioned 5 item values.
If the quantity of project to be analyzed is not more than one in S150, Information Statistics request, raw according to preset tendency chart
Tendency chart corresponding with the project to be analyzed is generated at model and the project data information.
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart
And the project data information generates tendency chart corresponding with the project to be analyzed.If wait divide in the Information Statistics request
The quantity of analysis project is not more than one, that is to say that project to be analyzed is only one, then generating corresponding generate of model according to tendency chart should
The tendency chart of project to be analyzed.Specifically, it includes tendency chart template that tendency chart, which generates in model, according to the system in tendency chart template
The meter period obtains the project to be analyzed in the corresponding statistical magnitude of per a statistical time section, and statistical magnitude is added to trend
In the abscissa of artwork plate, the hum pattern comprising the project overall development trend to be analyzed can be obtained, that is to say that this is to be analyzed
The corresponding tendency chart of project.
In one embodiment, as shown in fig. 7, step S150 includes sub-step S151 and S152.
S151, trend detail list corresponding with the project to be analyzed in the project data information is obtained.
Obtain trend detail list corresponding with the project to be analyzed in the project data information.Due to item to be analyzed
Mesh be select to obtain in the corresponding item value of statistical item from Information Statistics request, therefore can obtain in project data information and
The corresponding trend detail list of project to be analyzed, trend detail list is the project to be analyzed according to the statistics in project statistical rules
Period carries out counting obtained statistical form.
Fig. 3 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, if information
Project to be analyzed is " AA bank " in statistics request, then the quantity of project to be analyzed is not more than one in Information Statistics request, gained
The trend detail list arrived is as shown in figure (a).
S152, the data information in the trend detail list is corresponded to the trend being added in the tendency chart generation model
The tendency chart of the project to be analyzed is generated in artwork plate.
By the corresponding trend artwork being added in the tendency chart generation model of the data information in the trend detail list
The tendency chart of the project to be analyzed is generated in plate.Using statistical time section as abscissa in tendency chart, made with statistical magnitude
For ordinate, adds the project to be analyzed respectively in the abscissa of tendency chart template according to statistical time section and correspond to the period
Statistical magnitude can be obtained the hum pattern comprising the project overall development trend to be analyzed, that is to say to obtain tendency chart.Tendency chart
Based on histogram, the Trendline of the project to be analyzed can also be included in tendency chart.
For example, the corresponding tendency chart for generating the project to be analyzed of the trend detail list according to shown in Fig. 3 is as schemed (b) institute
Show.
If the quantity of project to be analyzed is greater than one in S160, Information Statistics request, according to preset comparison tendency chart
It generates model and the project data information and generates comparison tendency chart corresponding with the project to be analyzed.
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to default comparison tendency chart generate mould
Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.If Information Statistics request in
The quantity of analysis project is greater than one, namely need to compare the statistical magnitude between multiple projects to be analyzed, then according to comparison
Tendency chart generates the comparison tendency chart that the corresponding generation of model includes multiple projects to be analyzed.Specifically, comparison tendency chart generates mould
Include comparison tendency chart template in type, multiple projects to be analyzed are obtained every according to the statistical time section in comparison tendency chart template
The corresponding statistical magnitude of a statistical time section, and statistical magnitude is added in the abscissa of comparison tendency chart template, often unify
The statistical magnitude that the period includes corresponding multiple projects to be analyzed is counted, the comparison hair comprising multiple projects to be analyzed can be obtained
The hum pattern of exhibition trend that is to say to obtain comparison tendency chart.
In one embodiment, as shown in figure 8, step S160 includes sub-step S161 and S162.
S161, it obtains the corresponding system of each project to be analyzed in the project data information is obtained according to the project to be analyzed
Meter information obtains trend comparison detail list to obtain.
It obtains and the corresponding statistics of each project to be analyzed in the project data information is obtained according to the project to be analyzed believes
Breath obtains trend comparison detail list to obtain.Since project to be analyzed is the corresponding item of statistical item from Information Statistics request
Selection obtains in mesh value, therefore can obtain statistical information corresponding with each project to be analyzed in project data information to obtain
Trend compares detail list, and it is multiple projects to be analyzed according to the statistical time section in project statistical rules that trend, which compares detail list,
It carries out counting obtained statistical form respectively.
For example, the project to be analyzed in Information Statistics request includes AA bank, AA security, AA life insurance, then correspond to
It is as shown in table 4 that gesture compares detail list.
Table 4
S162, the data information correspondence in trend comparison detail list is added to the comparison tendency chart generation model
In comparison tendency chart template in generate the comparison tendency chart of the project to be analyzed;
Data information in trend comparison detail list is corresponded to and is added in the comparison tendency chart generation model
The comparison tendency chart of the project to be analyzed is generated in comparison tendency chart template.Compare tendency chart in using statistical time section as
Abscissa, per a statistical time section are included the accordingly corresponding statistical magnitude of multiple projects to be analyzed, are sat using statistical magnitude as vertical
Mark adds multiple projects to be analyzed in the abscissa of comparison tendency chart template according to statistical time section respectively and corresponds to the period
The hum pattern of the comparison development trend comprising multiple projects to be analyzed can be obtained in statistical magnitude, that is to say to obtain comparison trend
Figure.Tendency chart is compared based on histogram, comparing in tendency chart can also include the corresponding Trendline of each project to be analyzed.
Fig. 4 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, according to table 4
Shown in trend comparison detail list corresponding to generate the comparison tendency chart comprising multiple projects to be analyzed as shown in Figure 4.
In the visualization statistical graph generation method provided by the embodiment of the present invention, mould is generated according to preset monitoring figure
Type generates infringement Mission Monitor figure, and the Information Statistics request fed back according to user generates item corresponding with Information Statistics request
Mesh statistical graph, according to Information Statistics request in the quantity of project to be analyzed corresponding generate tendency chart or comparison tendency chart.Pass through
The above method, can be efficient, comprehensively for statistical analysis to data information included in infringement assignment database, improves
The formation efficiency for visualizing statistical graph, achieves good technical effect in actual application.
The embodiment of the present invention also provides a kind of visualization statistical graph generating means, the visualization statistical graph generating means
For executing any embodiment of aforementioned visualization statistical graph generation method.Specifically, referring to Fig. 9, Fig. 9 is of the invention real
The schematic block diagram of the visualization statistical graph generating means of example offer is provided.The visualization statistical graph generating means can configure
In the user terminals such as desktop computer, laptop, tablet computer or mobile phone.
As shown in figure 9, visualization statistical graph generating means 100 include monitoring figure generation unit 110, project data information
Acquiring unit 120, project statistical graph generation unit 130, project judging unit 140 to be analyzed, first trend figure generation unit
150 and second trend figure generation unit 160.
Monitoring figure generation unit 110, for generating model to preset infringement assignment database according to preset monitoring figure
The doubtful infringement task for being included is counted and generates infringement Mission Monitor figure.
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into
Row counts and generates infringement Mission Monitor figure.It all are completed and do not complete specifically, being stored in infringement assignment database
Doubtful infringement task is monitored to obtain enterprise's doubtful infringement the doubtful infringement task in infringement assignment database to realize
The overall condition of task can be generated model by monitoring figure and be carried out to doubtful infringement task included in infringement assignment database
It counts and infringement Mission Monitor figure is generated according to statistical result.Mission Monitor figure of encroaching right is for all doubtful infringements of enterprise
The statistical chart that the overall condition of task is monitored, the form of monitoring figure includes but is not limited to column in Mission Monitor figure of encroaching right
Figure, column stack figure, line chart, trend line chart, cake chart, geographical location information figure, wherein monitoring figure, which generates in model, includes
Statistical rules and monitoring figure template.
Wherein, in doubtful infringement task include multiple projects, according to each project to the data in doubtful infringement task into
Row statistics, and the data statistics result that statistics obtains is filled to monitoring figure to generate in model, infringement Mission Monitor can be obtained
Figure, detailed programs include mission number, doubtful infringement main body, infringement mechanism, processing date, source of evidence, infringement region, response
The amount of money, right-safeguarding are supported in timeliness, task items state, case delivery device, case state, case policing type, the case-involving amount of money, judgement
As a result etc., each project in doubtful infringement task includes specific item value.Mission number is that each doubtful infringement is appointed
The corresponding number information of business;Doubtful infringement main body is the main body letter that our company's legitimate rights and interests are invaded in the doubtful infringement task
Breath, each doubtful infringement task correspond to a doubtful infringement main body;Infringement mechanism that is to say that the doubtful infringement task is invaded
Violate branch's information in our company;Response timeliness be in our company branch from doubtful infringement task is received to first choosing
The duration of law teacher that is to say the processing response time of doubtful infringement task.
In other inventive embodiments, as shown in Figure 10, the monitoring figure generation unit 110 includes subelement: infringement statistics
Information acquisition unit 111 and infringement Mission Monitor figure generation unit 112.
Infringement statistical information acquisition unit 111, for generating the statistical rules in model according to the monitoring figure to described
Doubtful infringement task in infringement assignment database is counted to obtain infringement statistical information.
The statistical rules in model is generated according to the monitoring figure to appoint the doubtful infringement in the infringement assignment database
Business is counted to obtain infringement statistical information.Statistical rules be for according to each project middle term mesh value to infringement number of tasks
According to the Rule Information that doubtful infringement tasks all in library are counted, according to each project middle term mesh value to doubtful infringement task into
It need to also be counted using encroaching right mechanism as dimension when row statistics, if item value is sky in a certain doubtful infringement task, not existed
To be counted in the empty corresponding project of item value to the doubtful infringement task, included by statistical rules, that is, statistics available
The infringement statistical information of all items.
Infringement Mission Monitor figure generation unit 112 is generated for the infringement statistical information to be added to the monitoring figure
Monitoring figure template in model is to generate infringement Mission Monitor figure.
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement times
Business monitoring figure.Specifically, monitoring figure template is the template for filling specifying information to generate corresponding infringement Mission Monitor figure
Information will a certain item in infringement statistical information comprising the corresponding template of project each in infringement statistical information in monitoring figure template
Purpose numerical value fills and produces the corresponding monitoring figure of the project into template corresponding to monitoring figure template, obtains all items
The corresponding monitoring figure generated can finally obtain infringement Mission Monitor figure.It can intuitively be obtained by watching infringement Mission Monitor figure
Take the overall condition of the doubtful infringement task of enterprise.
Project data information acquisition unit 120, if being fed back for receiving user according to the infringement Mission Monitor figure
Information Statistics request, according to the Information Statistics request in statistical item obtain infringement assignment database in the statistics
The corresponding project data information of project.
If receiving the Information Statistics that user (user of user terminal) is fed back according to the infringement Mission Monitor figure
Request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request
Project data information.If user needs to obtain the specifying information of a certain project in infringement assignment database, can be invaded by described
Power Mission Monitor figure feedback information statistics is requested to obtain the specific statistical information of a certain project.Wherein, Information Statistics request packet
Statistical item and project to be analyzed are included, statistical item that is to say some detailed programs in infringement assignment database, to be analyzed
Project is the detailed programs that the statistical magnitude of one or more projects for being inputted to user is analyzed, item to be analyzed
Mesh can be one or more.Item corresponding with the statistical item in infringement assignment database can be obtained according to statistical item
Mesh data information appoints the doubtful infringement if the corresponding item value of the statistical item is sky in a certain doubtful infringement task
Business is added in project data information.
Project statistical graph generation unit 130, for generating model to the project data according to preset project chart
Information is counted and generates project statistical graph.
The project data information is counted according to preset project chart generation model and generates project statistical chart
Table.Wherein, it includes project statistical rules and project template graph that project chart, which generates in model, specifically, being counted according to project
Rule counts the project data information of a certain project to obtain the corresponding data statistics of the project as a result, project chart mould
Include project artwork plate and project table template in plate, data statistics result is filled to project chart to the project table generated in model
Template produces statistics detail list, and data statistics result is filled to project chart to the project artwork plate generated in model
Generation project statistical chart that is to say bright comprising the corresponding project statistical chart of the project and statistics in project statistical graph generated
Thin table.
In other inventive embodiments, as shown in figure 11, the project statistical graph generation unit 130 includes subelement: item
Mesh data information statistic unit 131 and project statistical information adding unit 132.
Project data Information Statistics unit 131, for generating the project statistical rules in model according to the project chart
The project data information is counted to obtain project statistical information.
According to the project chart generate model in project statistical rules to the project data information counted with
Obtain project statistical information.Specifically, project statistical rules is for counting to accessed project data information
Rule, including statistical time section in project statistical rules need to be according to statistical time when counting to project data information
Section is counted at times, can finally be counted to obtain project statistical information according to project statistical rules.
Project statistical information adding unit 132 is generated for the project statistical information to be added to the project chart
To generate project statistical graph in project template graph in model.
The project statistical information is added in the project template graph in the project chart generation model to generate
Project statistical graph.Specifically, including the corresponding statistical chart of the project and statistics detail list in project statistical graph generated.
Wherein, statistics detail list is according to the corresponding statistical form generated of above-mentioned project statistical information;Using project as cross in statistical chart
Coordinate adds respective items purpose specific name, in ordinate using statistical magnitude as ordinate in the abscissa of corresponding template
Statistical magnitude corresponding to middle addition respective item, and can be final according to the histogram that each statistical magnitude adds corresponding length
Obtain statistical chart.
Whether project judging unit 140 to be analyzed is big for the quantity to project to be analyzed in Information Statistics request
Judged in one.
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.Further to obtain letter
The tendency information of statistical item at any time in breath statistics request, user can also be by inputting project to be analyzed in Information Statistics request
To obtain the tendency information counted according to project to be analyzed.Specifically, the quantity difference of project to be analyzed is then counted and is obtained
Tendency information it is different, therefore whether the quantity of project to be analyzed is greater than one and judge in need to requesting Information Statistics, and
Respectively obtain corresponding visualization trend statistical information according to judging result, visualization trend statistical information can by tendency chart or
Trend comparison diagram is embodied, and project to be analyzed can select in the corresponding item value of statistical item from Information Statistics request.
First trend figure generation unit 150, if the quantity for project to be analyzed in Information Statistics request is not more than
One, model and the project data information are generated according to preset tendency chart and generate trend corresponding with the project to be analyzed
Figure.
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart
And the project data information generates tendency chart corresponding with the project to be analyzed.If wait divide in the Information Statistics request
The quantity of analysis project is not more than one, that is to say that project to be analyzed is only one, then generating corresponding generate of model according to tendency chart should
The tendency chart of project to be analyzed.Specifically, it includes tendency chart template that tendency chart, which generates in model, according to the system in tendency chart template
The meter period obtains the project to be analyzed in the corresponding statistical magnitude of per a statistical time section, and statistical magnitude is added to trend
In the abscissa of artwork plate, the hum pattern comprising the project overall development trend to be analyzed can be obtained, that is to say that this is to be analyzed
The corresponding tendency chart of project.
In other inventive embodiments, as shown in figure 12, the first trend figure generation unit 150 includes subelement: trend
Detail list acquiring unit 151 and tendency chart generation unit 152.
Trend detail list acquiring unit 151, it is opposite with the project to be analyzed in the project data information for obtaining
The trend detail list answered.
Obtain trend detail list corresponding with the project to be analyzed in the project data information.Due to item to be analyzed
Mesh be select to obtain in the corresponding item value of statistical item from Information Statistics request, therefore can obtain in project data information and
The corresponding trend detail list of project to be analyzed, trend detail list is the project to be analyzed according to the statistics in project statistical rules
Period carries out counting obtained statistical form.
Tendency chart generation unit 152, for the data information correspondence in the trend detail list to be added to the trend
Figure generates the tendency chart that the project to be analyzed is generated in the tendency chart template in model.
By the corresponding trend artwork being added in the tendency chart generation model of the data information in the trend detail list
The tendency chart of the project to be analyzed is generated in plate.Using statistical time section as abscissa in tendency chart, made with statistical magnitude
For ordinate, adds the project to be analyzed respectively in the abscissa of tendency chart template according to statistical time section and correspond to the period
Statistical magnitude can be obtained the hum pattern comprising the project overall development trend to be analyzed, that is to say to obtain tendency chart.Tendency chart
Based on histogram, the Trendline of the project to be analyzed can also be included in tendency chart.
Second trend figure generation unit 160, if the quantity for project to be analyzed in Information Statistics request is greater than one,
Model is generated according to preset comparison tendency chart and project data information generation is corresponding right with the project to be analyzed
Compare tendency chart.
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to default comparison tendency chart generate mould
Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.If Information Statistics request in
The quantity of analysis project is greater than one, namely need to compare the statistical magnitude between multiple projects to be analyzed, then according to comparison
Tendency chart generates the comparison tendency chart that the corresponding generation of model includes multiple projects to be analyzed.Specifically, comparison tendency chart generates mould
Include comparison tendency chart template in type, multiple projects to be analyzed are obtained every according to the statistical time section in comparison tendency chart template
The corresponding statistical magnitude of a statistical time section, and statistical magnitude is added in the abscissa of comparison tendency chart template, often unify
The statistical magnitude that the period includes corresponding multiple projects to be analyzed is counted, the comparison hair comprising multiple projects to be analyzed can be obtained
The hum pattern of exhibition trend that is to say to obtain comparison tendency chart.
In other inventive embodiments, as shown in figure 13, the second trend figure generation unit 160 includes subelement: trend
Compare detail list acquiring unit 161 and comparison tendency chart generation unit 162.
Trend compares detail list acquiring unit 161, the item number is obtained according to the project to be analyzed for obtaining it is believed that
The corresponding statistical information of each project to be analyzed obtains trend comparison detail list to obtain in breath.
It obtains and the corresponding statistics of each project to be analyzed in the project data information is obtained according to the project to be analyzed believes
Breath obtains trend comparison detail list to obtain.Since project to be analyzed is the corresponding item of statistical item from Information Statistics request
Selection obtains in mesh value, therefore can obtain statistical information corresponding with each project to be analyzed in project data information to obtain
Trend compares detail list, and it is multiple projects to be analyzed according to the statistical time section in project statistical rules that trend, which compares detail list,
It carries out counting obtained statistical form respectively.
Tendency chart generation unit 162 is compared, the data information correspondence for comparing the trend in detail list is added to
The comparison tendency chart generates the comparison tendency chart that the project to be analyzed is generated in the comparison tendency chart template in model;
Data information in trend comparison detail list is corresponded to and is added in the comparison tendency chart generation model
The comparison tendency chart of the project to be analyzed is generated in comparison tendency chart template.Compare tendency chart in using statistical time section as
Abscissa, each period in statistical time section includes corresponding multiple projects to be analyzed, using statistical magnitude as ordinate,
Add the system that multiple projects to be analyzed correspond to the period respectively in the abscissa of comparison tendency chart template according to statistical time section
The hum pattern of the comparison development trend comprising multiple projects to be analyzed can be obtained in count number, that is to say to obtain comparison tendency chart.
Tendency chart is compared based on histogram, comparing in tendency chart can also include the corresponding Trendline of each project to be analyzed.
The visualization statistical graph generating means provided by the embodiment of the present invention are raw using above-mentioned visualization statistical graph
At method, model is generated according to preset monitoring figure and generates infringement Mission Monitor figure, and the Information Statistics fed back according to user
Request generates corresponding with Information Statistics request project statistical graph, according to Information Statistics request in project to be analyzed quantity pair
Tendency chart or comparison tendency chart should be generated.By the above method, can efficiently, comprehensively to included in infringement assignment database
Data information it is for statistical analysis, improve visualization statistical graph formation efficiency, achieve in actual application
Good technical effect.
Above-mentioned visualization statistical graph generating means can be implemented as the form of computer program, which can be with
It is run in computer equipment as shown in figure 14.
Figure 14 is please referred to, Figure 14 is the schematic block diagram of computer equipment provided in an embodiment of the present invention.
Refering to fig. 14, which includes processor 502, memory and the net connected by system bus 501
Network interface 505, wherein memory may include non-volatile memory medium 503 and built-in storage 504.
The non-volatile memory medium 503 can storage program area 5031 and computer program 5032.The computer program
5032 are performed, and processor 502 may make to execute visualization statistical graph generation method.
The processor 502 supports the operation of entire computer equipment 500 for providing calculating and control ability.
The built-in storage 504 provides environment for the operation of the computer program 5032 in non-volatile memory medium 503, should
When computer program 5032 is executed by processor 502, processor 502 may make to execute visualization statistical graph generation method.
The network interface 505 is for carrying out network communication, such as the transmission of offer data information.Those skilled in the art can
To understand, structure shown in Figure 14, only the block diagram of part-structure relevant to the present invention program, is not constituted to this hair
The restriction for the computer equipment 500 that bright scheme is applied thereon, specific computer equipment 500 may include than as shown in the figure
More or fewer components perhaps combine certain components or with different component layouts.
Wherein, the processor 502 is for running computer program 5032 stored in memory, to realize following function
Can: the doubtful infringement task that model is included to preset infringement assignment database is generated according to preset monitoring figure and is counted
And generate infringement Mission Monitor figure;If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back,
Project corresponding with the statistical item in infringement assignment database is obtained according to the statistical item in Information Statistics request
Data information;The project data information is counted according to preset project chart generation model and generates project statistical chart
Table;Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;If the Information Statistics request
In the quantity of project to be analyzed be not more than one, model is generated according to preset tendency chart and the project data information generates and institute
State the corresponding tendency chart of project to be analyzed;If the quantity of project to be analyzed is greater than one in Information Statistics request, according to pre-
If comparison tendency chart generate model and the project data information and generate comparison trend corresponding with the project to be analyzed
Figure.
In one embodiment, processor 502 is being executed according to preset monitoring figure generation model to preset infringement task
When the doubtful infringement task that database is included is counted and generates the step of infringement Mission Monitor figure, perform the following operations:
The statistical rules in model is generated according to the monitoring figure to unite to the doubtful infringement task in the infringement assignment database
Meter is to obtain infringement statistical information;The infringement statistical information is added to the monitoring figure template in the monitoring figure generation model
To generate Mission Monitor figure of encroaching right.
In one embodiment, processor 502 is being executed according to preset project chart generation model to the project data
It when information is counted and generates the step of project statistical graph, performs the following operations: model is generated according to the project chart
In project statistical rules the project data information is counted to obtain project statistical information;The project is counted and is believed
Breath is added in the project template graph in the project chart generation model to generate project statistical graph.
In one embodiment, if the quantity of project to be analyzed in executing Information Statistics request of processor 502 is little
Yu Yi, according to preset tendency chart generate model and the project data information generate it is corresponding with the project to be analyzed become
It when the step of gesture figure, performs the following operations: obtaining trend corresponding with the project to be analyzed in the project data information
Detail list;By the corresponding tendency chart template being added in the tendency chart generation model of the data information in the trend detail list
In to generate the tendency chart of the project to be analyzed.
In one embodiment, if the quantity of project to be analyzed in executing Information Statistics request of processor 502 is greater than
One, model is generated according to preset comparison tendency chart and project data information generation is corresponding with the project to be analyzed
It when comparing the step of tendency chart, performs the following operations: obtaining and obtained in the project data information often according to the project to be analyzed
The corresponding statistical information of one project to be analyzed obtains trend comparison detail list to obtain;The trend is compared in detail list
Data information correspondence is added to described to be analyzed to generate in the comparison tendency chart template in the comparison tendency chart generation model
The comparison tendency chart of project.
It will be understood by those skilled in the art that the embodiment of computer equipment shown in Figure 14 is not constituted to computer
The restriction of equipment specific composition, in other embodiments, computer equipment may include components more more or fewer than diagram, or
Person combines certain components or different component layouts.For example, in some embodiments, computer equipment can only include depositing
Reservoir and processor, in such embodiments, the structure and function of memory and processor are consistent with embodiment illustrated in fig. 14,
Details are not described herein.
It should be appreciated that in embodiments of the present invention, processor 502 can be central processing unit (Central
Processing Unit, CPU), which can also be other general processors, digital signal processor (Digital
Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit,
ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic
Device, discrete gate or transistor logic, discrete hardware components etc..Wherein, general processor can be microprocessor or
Person's processor is also possible to any conventional processor etc..
Computer readable storage medium is provided in another embodiment of the invention.The computer readable storage medium can be with
For non-volatile computer readable storage medium.The computer-readable recording medium storage has computer program, wherein calculating
Machine program performs the steps of when being executed by processor generates model to preset infringement task data according to preset monitoring figure
The doubtful infringement task that library is included is counted and generates infringement Mission Monitor figure;If receiving user to be appointed according to the infringement
The Information Statistics request that business monitoring figure is fed back obtains infringement task data according to the statistical item in Information Statistics request
Project data information corresponding with the statistical item in library;Model is generated to the project data according to preset project chart
Information is counted and generates project statistical graph;Whether one is greater than to the quantity of project to be analyzed in Information Statistics request
Judged;If the quantity of project to be analyzed is not more than one in Information Statistics request, mould is generated according to preset tendency chart
Type and the project data information generate tendency chart corresponding with the project to be analyzed;If in Information Statistics request to
The quantity of analysis project be greater than one, according to preset comparison tendency chart generate model and the project data information generation with it is described
The corresponding comparison tendency chart of project to be analyzed.
In one embodiment, described to be included to preset infringement assignment database according to preset monitoring figure generation model
Doubtful infringement task counted and generate infringement Mission Monitor figure, comprising: according to the monitoring figure generate model in system
Meter rule counts to obtain infringement statistical information the doubtful infringement task in the infringement assignment database;It is invaded described
Power statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement Mission Monitor figure.
In one embodiment, described that the project data information is counted according to preset project chart generation model
And the step of generating project statistical graph, comprising: the project statistical rules in model is generated to described according to the project chart
Project data information is counted to obtain project statistical information;It is raw that the project statistical information is added to the project chart
At in the project template graph in model to generate project statistical graph.
In one embodiment, if the quantity of project to be analyzed is not more than one in Information Statistics request, according to pre-
If tendency chart generate the step of model and the project data information generate tendency chart corresponding with the project to be analyzed,
It include: to obtain trend detail list corresponding with the project to be analyzed in the project data information;By the trend detail
Data information in table, which corresponds to, to be added in the tendency chart template in the tendency chart generation model to generate the item to be analyzed
Purpose tendency chart.
In one embodiment, if the quantity of project to be analyzed is greater than one in Information Statistics request, according to default
Comparison tendency chart generate model and the project data information and generate comparison tendency chart corresponding with the project to be analyzed
The step of, comprising: it obtains and the corresponding system of each project to be analyzed in the project data information is obtained according to the project to be analyzed
Meter information obtains trend comparison detail list to obtain;The trend is compared into the data information correspondence in detail list and is added to institute
State the comparison tendency chart that the project to be analyzed is generated in the comparison tendency chart template in comparison tendency chart generation model.
It is apparent to those skilled in the art that for convenience of description and succinctly, foregoing description is set
The specific work process of standby, device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein.
Those of ordinary skill in the art may be aware that unit described in conjunction with the examples disclosed in the embodiments of the present disclosure and algorithm
Step can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and software
Interchangeability generally describes each exemplary composition and step according to function in the above description.These functions are studied carefully
Unexpectedly the specific application and design constraint depending on technical solution are implemented in hardware or software.Professional technician
Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed
The scope of the present invention.
In several embodiments provided by the present invention, it should be understood that disclosed unit and method, it can be with
It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit
It divides, only logical function partition, there may be another division manner in actual implementation, can also will be with the same function
Unit set is at a unit, such as multiple units or components can be combined or can be integrated into another system or some
Feature can be ignored, or not execute.In addition, shown or discussed mutual coupling, direct-coupling or communication connection can
Be through some interfaces, the indirect coupling or communication connection of device or unit, be also possible to electricity, mechanical or other shapes
Formula connection.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
In network unit.Some or all of unit therein can be selected to realize the embodiment of the present invention according to the actual needs
Purpose.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, is also possible to two or more units and is integrated in one unit.It is above-mentioned integrated
Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention substantially or
Person says that all or part of the part that contributes to existing technology or the technical solution can body in the form of software products
Reveal and, which is stored in a computer readable storage medium, including some instructions are used so that one
Platform computer equipment (can be personal computer, server or the network equipment etc.) executes described in each embodiment of the present invention
The all or part of the steps of method.And computer readable storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory
The various media that can store program code such as (ROM, Read-Only Memory), magnetic or disk.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any
Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace
It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right
It is required that protection scope subject to.
Claims (10)
1. a kind of visualization statistical graph generation method characterized by comprising
The doubtful infringement task that model is included to preset infringement assignment database is generated according to preset monitoring figure to unite
It counts and generates infringement Mission Monitor figure;
If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back, asked according to the Information Statistics
The statistical item asked obtains project data information corresponding with the statistical item in infringement assignment database;Wherein, described
Include one or more projects to be analyzed in Information Statistics request;
The project data information is counted according to preset project chart generation model and generates project statistical graph;
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;
If the quantity of project to be analyzed is not more than one in Information Statistics request, model and institute are generated according to preset tendency chart
It states project data information and generates tendency chart corresponding with the project to be analyzed;
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to preset comparison tendency chart generation model and
The project data information generates comparison tendency chart corresponding with the project to be analyzed.
2. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset monitoring
Figure generates model and is counted to the doubtful infringement task that preset infringement assignment database is included and generate infringement task prison
Control figure, comprising:
According to the monitoring figure generate model in statistical rules to it is described infringement assignment database in doubtful infringement task into
Row statistics is to obtain infringement statistical information;
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement task prison
Control figure.
3. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset project
Chart generates model and is counted to the project data information and generate project statistical graph, comprising:
The project statistical rules in model is generated according to the project chart to count to obtain the project data information
Project statistical information;
The project statistical information is added in the project template graph in the project chart generation model with generation project
Statistical graph.
4. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset trend
Figure generates model and the project data information and generates tendency chart corresponding with the project to be analyzed, comprising:
Obtain trend detail list corresponding with the project to be analyzed in the project data information;
Data information in the trend detail list is corresponded to and is added in the tendency chart template that the tendency chart generates in model
To generate the tendency chart of the project to be analyzed.
5. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset comparison
Tendency chart generates model and the project data information and generates comparison tendency chart corresponding with the project to be analyzed, comprising:
Obtain according to the project to be analyzed obtain the corresponding statistical information of each project to be analyzed in the project data information with
It obtains to obtain trend comparison detail list;
The trend is compared into the corresponding comparison being added in the comparison tendency chart generation model of the data information in detail list
The comparison tendency chart of the project to be analyzed is generated in tendency chart template.
6. a kind of visualization statistical graph generating means characterized by comprising
Monitoring figure generation unit, for being included to preset infringement assignment database according to preset monitoring figure generation model
Doubtful infringement task is counted and generates infringement Mission Monitor figure;
Project data information acquisition unit, if being united for receiving user according to the information that the infringement Mission Monitor figure is fed back
Meter request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request
Project data information;Wherein, include one or more projects to be analyzed in the Information Statistics request;
Project statistical graph generation unit carries out the project data information for generating model according to preset project chart
It counts and generates project statistical graph;
Whether project judging unit to be analyzed is greater than a progress for the quantity to project to be analyzed in Information Statistics request
Judgement;
First trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is not more than one, according to
Preset tendency chart generates model and the project data information generates tendency chart corresponding with the project to be analyzed;
Second trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is greater than one, according to pre-
If comparison tendency chart generate model and the project data information and generate comparison trend corresponding with the project to be analyzed
Figure.
7. visualization statistical graph generating means according to claim 6, which is characterized in that the monitoring figure generates single
Member, comprising:
Infringement statistical information acquisition unit, for generating the statistical rules in model according to the monitoring figure to the infringement task
Doubtful infringement task in database is counted to obtain infringement statistical information;
Infringement Mission Monitor figure generation unit generates in model for the infringement statistical information to be added to the monitoring figure
Monitoring figure template is to generate infringement Mission Monitor figure.
8. visualization statistical graph generating means according to claim 6, which is characterized in that the project statistical graph is raw
At unit, comprising:
Project data Information Statistics unit, for generating the project statistical rules in model according to the project chart to the item
Mesh data information is counted to obtain project statistical information;
Project statistical information adding unit generates in model for the project statistical information to be added to the project chart
To generate project statistical graph in project template graph.
9. a kind of computer equipment, including memory, processor and it is stored on the memory and can be on the processor
The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program
Any one of described in visualization statistical graph generation method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey
Sequence, the computer program make the processor execution is such as described in any one of claim 1 to 5 can when being executed by a processor
Depending on changing statistical graph generation method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910299360.9A CN110162550B (en) | 2019-04-15 | 2019-04-15 | Visualized statistical chart generation method and device, computer equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910299360.9A CN110162550B (en) | 2019-04-15 | 2019-04-15 | Visualized statistical chart generation method and device, computer equipment and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110162550A true CN110162550A (en) | 2019-08-23 |
CN110162550B CN110162550B (en) | 2024-03-01 |
Family
ID=67638614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910299360.9A Active CN110162550B (en) | 2019-04-15 | 2019-04-15 | Visualized statistical chart generation method and device, computer equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110162550B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116521465A (en) * | 2023-06-26 | 2023-08-01 | 深圳市晶存科技有限公司 | Hard disk test data processing method, device and medium |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201137598A (en) * | 2010-04-26 | 2011-11-01 | Chunghwa Telecom Co Ltd | Real-time service interface monitoring and alarming system of large-scale enterprise information integration platform |
US20130103677A1 (en) * | 2011-10-25 | 2013-04-25 | International Business Machines Corporation | Contextual data visualization |
CN104331354A (en) * | 2014-11-20 | 2015-02-04 | 普华基础软件股份有限公司 | Real-time comprehensive monitoring method for cloud computing |
CN109285063A (en) * | 2017-07-19 | 2019-01-29 | 上海臻客商务咨询有限公司 | A kind of credit card equity tendency judgement system based on big data analysis |
CN109299169A (en) * | 2018-10-24 | 2019-02-01 | 中国平安人寿保险股份有限公司 | Data visualization method, system, terminal and computer readable storage medium |
-
2019
- 2019-04-15 CN CN201910299360.9A patent/CN110162550B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW201137598A (en) * | 2010-04-26 | 2011-11-01 | Chunghwa Telecom Co Ltd | Real-time service interface monitoring and alarming system of large-scale enterprise information integration platform |
US20130103677A1 (en) * | 2011-10-25 | 2013-04-25 | International Business Machines Corporation | Contextual data visualization |
CN104331354A (en) * | 2014-11-20 | 2015-02-04 | 普华基础软件股份有限公司 | Real-time comprehensive monitoring method for cloud computing |
CN109285063A (en) * | 2017-07-19 | 2019-01-29 | 上海臻客商务咨询有限公司 | A kind of credit card equity tendency judgement system based on big data analysis |
CN109299169A (en) * | 2018-10-24 | 2019-02-01 | 中国平安人寿保险股份有限公司 | Data visualization method, system, terminal and computer readable storage medium |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116521465A (en) * | 2023-06-26 | 2023-08-01 | 深圳市晶存科技有限公司 | Hard disk test data processing method, device and medium |
CN116521465B (en) * | 2023-06-26 | 2023-10-13 | 深圳市晶存科技有限公司 | Hard disk test data processing method, device and medium |
Also Published As
Publication number | Publication date |
---|---|
CN110162550B (en) | 2024-03-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8112366B2 (en) | Expert system and visualization for multi-server capacity management | |
US7055149B2 (en) | Method and apparatus for automating software upgrades | |
CN110297855A (en) | Report Dynamic Display method, apparatus, computer equipment and storage medium | |
WO2006125274A1 (en) | System and method for risk assessment and presentment | |
US11334373B2 (en) | Controlling permissions for access to user interface features | |
Freeland et al. | Evaluating the effectiveness of a new method for computing approximately optimal (s, S) inventory policies | |
CN108733532A (en) | Health degree management-control method, device, medium and the electronic equipment of big data platform | |
CN109766158A (en) | Methods of exhibiting, device, computer equipment and the storage medium of user interface | |
US20230121667A1 (en) | Categorized time designation on calendars | |
CN115641019A (en) | Index anomaly analysis method and device, computer equipment and storage medium | |
Sagnol et al. | Robust allocation of operating rooms: A cutting plane approach to handle lognormal case durations | |
CN110162550A (en) | Visualize statistical graph generation method, device, computer equipment and storage medium | |
CN106686081A (en) | Resource allocation method and device of database service system | |
Hussain et al. | Is Customer Satisfaction Enough for Software Quality? | |
CN114997813A (en) | Flow chart generation method, device, equipment and storage medium | |
CN114091956A (en) | Service resource processing method and device, computer equipment and storage medium | |
CN115511644A (en) | Processing method for target policy, electronic device and readable storage medium | |
US20160110367A1 (en) | Services management system | |
CN114238724A (en) | Data visualization method and device | |
CN109857501A (en) | A kind of page display method of APP, device, storage medium and server | |
Rukhiran et al. | Multiconcerns circuit component diagram apply to improve on software development: Empirical study of house bookkeeping mobile software | |
US20220398129A1 (en) | Application prioritization system | |
CN115268884B (en) | Mobile terminal visual page configuration and rendering method based on aPaaS platform | |
CN116703588A (en) | Data analysis method, device, equipment and storage medium based on analysis template | |
Sallo et al. | Enriching computing simulators by generating realistic serverless traces |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |