CN110162550A - Visualize statistical graph generation method, device, computer equipment and storage medium - Google Patents

Visualize statistical graph generation method, device, computer equipment and storage medium Download PDF

Info

Publication number
CN110162550A
CN110162550A CN201910299360.9A CN201910299360A CN110162550A CN 110162550 A CN110162550 A CN 110162550A CN 201910299360 A CN201910299360 A CN 201910299360A CN 110162550 A CN110162550 A CN 110162550A
Authority
CN
China
Prior art keywords
project
statistical
infringement
information
analyzed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910299360.9A
Other languages
Chinese (zh)
Other versions
CN110162550B (en
Inventor
唐玲莉
朱丽莎
田甜
谭志荣
魏尧东
鄢真
叶素兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201910299360.9A priority Critical patent/CN110162550B/en
Publication of CN110162550A publication Critical patent/CN110162550A/en
Application granted granted Critical
Publication of CN110162550B publication Critical patent/CN110162550B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2458Special types of queries, e.g. statistical queries, fuzzy queries or distributed queries
    • G06F16/2462Approximate or statistical queries
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/248Presentation of query results

Abstract

The invention discloses visualization statistical graph generation method, device, computer equipment and storage mediums.Model, which is generated, according to preset monitoring figure generates infringement Mission Monitor figure, and the Information Statistics request fed back according to user generates and obtains project data information corresponding with the statistical item in infringement assignment database, generate model according to preset project chart and project statistical graph counted and generated to project data information, according to Information Statistics request in the quantity of project to be analyzed corresponding generate tendency chart or comparison tendency chart.The present invention is based on data visualization techniques, can be efficient, comprehensively for statistical analysis to data information included in infringement assignment database, improve the formation efficiency of visualization statistical graph, achieve good technical effect in actual application.

Description

Visualize statistical graph generation method, device, computer equipment and storage medium
Technical field
The present invention relates to field of computer technology more particularly to a kind of visualization statistical graph generation methods, device, calculating Machine equipment and storage medium.
Background technique
Enterprise need to count infringing information relevant to enterprise itself, for self-management demand so that enterprise is more Itself equity is safeguarded well.However tables of data is only generated by way of data accumulation to open up in existing technical method Show specific statistical data, user can not watch the concrete condition of all infringing informations of enterprise from multiple angles, lead to user institute The statistical data got is not comprehensive, and statistical efficiency is lower.Thus, existing in art methods can not efficiently, comprehensively The problem of infringing information is counted.
Summary of the invention
The embodiment of the invention provides a kind of visualization statistical graph generation method, device, computer equipment and storages to be situated between Matter, it is intended to solve the problems, such as can not efficiently, comprehensively count to infringing information in the presence of art methods.
In a first aspect, the embodiment of the invention provides a kind of visualization statistical graph generation methods comprising:
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into Row counts and generates infringement Mission Monitor figure;
If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back, united according to the information Statistical item in meter request obtains project data information corresponding with the statistical item in infringement assignment database;
The project data information is counted according to preset project chart generation model and generates project statistical chart Table;
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart And the project data information generates tendency chart corresponding with the project to be analyzed;
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to preset comparison tendency chart generation mould Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.
Second aspect, the embodiment of the invention provides a kind of visualization statistical graph generating means comprising:
Monitoring figure generation unit wraps preset infringement assignment database for generating model according to preset monitoring figure The doubtful infringement task contained is counted and generates infringement Mission Monitor figure;
Project data information acquisition unit, if the letter fed back for receiving user according to the infringement Mission Monitor figure Breath statistics request, according to the Information Statistics request in statistical item obtain infringement assignment database in the statistical item Corresponding project data information;
Project statistical graph generation unit, for generating model to the project data information according to preset project chart It is counted and generates project statistical graph;
Whether project judging unit to be analyzed is greater than one for the quantity to project to be analyzed in Information Statistics request Judged;
First trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is not more than one, Model and the project data information, which are generated, according to preset tendency chart generates tendency chart corresponding with the project to be analyzed;
Second trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is greater than one, root Model and the project data information, which are generated, according to preset comparison tendency chart generates comparison corresponding with the project to be analyzed Tendency chart.
The third aspect, the embodiment of the present invention provide a kind of computer equipment again comprising memory, processor and storage On the memory and the computer program that can run on the processor, the processor execute the computer program Visualization statistical graph generation method described in the above-mentioned first aspect of Shi Shixian.
Fourth aspect, the embodiment of the invention also provides a kind of computer readable storage mediums, wherein the computer can It reads storage medium and is stored with computer program, it is above-mentioned that the computer program when being executed by a processor executes the processor Visualization statistical graph generation method described in first aspect.
The embodiment of the invention provides a kind of visualization statistical graph generation method, device, computer equipment and storages to be situated between Matter.Model is generated according to preset monitoring figure and generates infringement Mission Monitor figure, and is requested according to the Information Statistics that user is fed back Generate corresponding with Information Statistics request project statistical graph, according to Information Statistics request in the quantity correspondence of project to be analyzed give birth to At tendency chart or comparison tendency chart.By the above method, can efficiently, comprehensively be counted to included in infringement assignment database It is believed that breath is for statistical analysis, the formation efficiency of visualization statistical graph is improved, is achieved in actual application good Technical effect.
Detailed description of the invention
Technical solution in order to illustrate the embodiments of the present invention more clearly, below will be to needed in embodiment description Attached drawing is briefly described, it should be apparent that, drawings in the following description are some embodiments of the invention, general for this field For logical technical staff, without creative efforts, it is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 2 is the effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 3 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 4 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention
Fig. 5 is the sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 6 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 7 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 8 is another sub-process schematic diagram of visualization statistical graph generation method provided in an embodiment of the present invention;
Fig. 9 is the schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 10 is the subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 11 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 12 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 13 is another subelement schematic block diagram of visualization statistical graph generating means provided in an embodiment of the present invention;
Figure 14 is the schematic block diagram of computer equipment provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
It should be appreciated that ought use in this specification and in the appended claims, term " includes " and "comprising" instruction Described feature, entirety, step, operation, the presence of element and/or component, but one or more of the other feature, whole is not precluded Body, step, operation, the presence or addition of element, component and/or its set.
It is also understood that mesh of the term used in this description of the invention merely for the sake of description specific embodiment And be not intended to limit the present invention.As description of the invention and it is used in the attached claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singular, "one" and "the" are intended to include plural form.
It will be further appreciated that the term "and/or" used in description of the invention and the appended claims is Refer to any combination and all possible combinations of one or more of associated item listed, and including these combinations.
Referring to Fig. 1, Fig. 1 is the flow diagram of visualization statistical graph generation method provided in an embodiment of the present invention. The visualization statistical graph generation method is applied in user terminal, and this method passes through the application software that is installed in user terminal It is executed, user terminal is to be set for executing visualization statistical graph generation method with the terminal for generating Visual Chart It is standby, such as desktop computer, laptop, tablet computer or mobile phone etc..
As shown in Figure 1, the method comprising the steps of S110~S160.
S110, the doubtful infringement times that model is included to preset infringement assignment database is generated according to preset monitoring figure Business is counted and generates infringement Mission Monitor figure.
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into Row counts and generates infringement Mission Monitor figure.It all are completed and do not complete specifically, being stored in infringement assignment database Doubtful infringement task is monitored to obtain enterprise's doubtful infringement the doubtful infringement task in infringement assignment database to realize The overall condition of task can be generated model by monitoring figure and be carried out to doubtful infringement task included in infringement assignment database It counts and infringement Mission Monitor figure is generated according to statistical result.Mission Monitor figure of encroaching right is for all doubtful infringements of enterprise The statistical chart that the overall condition of task is monitored, the form of monitoring figure includes but is not limited to column in Mission Monitor figure of encroaching right Figure, column stack figure, line chart, trend line chart, cake chart, geographical location information figure, wherein monitoring figure, which generates in model, includes Statistical rules and monitoring figure template.
Wherein, in doubtful infringement task include multiple projects, according to each project to the data in doubtful infringement task into Row statistics, and the data statistics result that statistics obtains is filled to monitoring figure to generate in model, infringement Mission Monitor can be obtained Figure, detailed programs include mission number, doubtful infringement main body, infringement mechanism, processing date, source of evidence, infringement region, response The amount of money, right-safeguarding are supported in timeliness, task items state, case delivery device, case state, case policing type, the case-involving amount of money, judgement As a result etc., each project in doubtful infringement task includes specific item value.Mission number is that each doubtful infringement is appointed The corresponding number information of business;Doubtful infringement main body is the main body letter that our company's legitimate rights and interests are invaded in the doubtful infringement task Breath, each doubtful infringement task correspond to a doubtful infringement main body;Infringement mechanism that is to say that the doubtful infringement task is invaded Violate branch's information in our company;Response timeliness be in our company branch from doubtful infringement task is received to first choosing The duration of law teacher that is to say the processing response time of doubtful infringement task.
For example, the specifying information of doubtful infringement task is as shown in table 1.
Table 1
In one embodiment, as shown in figure 5, step S110 includes sub-step S111 and S112.
S111, the statistical rules in model is generated according to the monitoring figure to doubtful invading in the infringement assignment database Power task is counted to obtain infringement statistical information.
The statistical rules in model is generated according to the monitoring figure to appoint the doubtful infringement in the infringement assignment database Business is counted to obtain infringement statistical information.Statistical rules be for according to each project middle term mesh value to infringement number of tasks According to the Rule Information that doubtful infringement tasks all in library are counted, according to each project middle term mesh value to doubtful infringement task into It need to also be counted using encroaching right mechanism as dimension when row statistics, if item value is sky in a certain doubtful infringement task, not existed To be counted in the empty corresponding project of item value to the doubtful infringement task, included by statistical rules, that is, statistics available The infringement statistical information of all items.
For example, carrying out counting obtained information such as table 2 to " task items state " this project in infringement assignment database It is shown.
Table 2
S112, the monitoring figure template that the infringement statistical information is added in the monitoring figure generation model is invaded with generating Weigh Mission Monitor figure.
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement times Business monitoring figure.Specifically, monitoring figure template is the template for filling specifying information to generate corresponding infringement Mission Monitor figure Information will a certain item in infringement statistical information comprising the corresponding template of project each in infringement statistical information in monitoring figure template Purpose numerical value fills and produces the corresponding monitoring figure of the project into template corresponding to monitoring figure template, obtains all items The corresponding monitoring figure generated can finally obtain infringement Mission Monitor figure.It can intuitively be obtained by watching infringement Mission Monitor figure Take the overall condition of the doubtful infringement task of enterprise.
If S120, the Information Statistics request that user is fed back according to the infringement Mission Monitor figure is received, according to described Statistical item in Information Statistics request obtains project data information corresponding with the statistical item in infringement assignment database.
If receiving the Information Statistics that user (user of user terminal) is fed back according to the infringement Mission Monitor figure Request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request Project data information.If user needs to obtain the specifying information of a certain project in infringement assignment database, can be invaded by described Power Mission Monitor figure feedback information statistics is requested to obtain the specific statistical information of a certain project.Wherein, Information Statistics request packet Statistical item and project to be analyzed are included, statistical item that is to say some detailed programs in infringement assignment database, to be analyzed Project is that the statistical magnitude of one or more projects for being inputted to user carries out the detailed programs of trend analysis, wait divide Analysis project can be one or more.It can be obtained according to statistical item corresponding with the statistical item in infringement assignment database Project data information this doubtful is not invaded if the corresponding item value of the statistical item is sky in a certain doubtful infringement task Power task is added in project data information.
For example, statistical item is " right-safeguarding result ", since " right-safeguarding result " is corresponding in second doubtful infringement task in table 1 Item value be sky, then second in table 1 doubtful infringement task is not added in project data information.
S130, the project data information is counted according to preset project chart generation model and generates project system Count chart.
The project data information is counted according to preset project chart generation model and generates project statistical chart Table.Wherein, it includes project statistical rules and project template graph that project chart, which generates in model, specifically, being counted according to project Rule counts the project data information of a certain project to obtain the corresponding data statistics of the project as a result, project chart mould Include project artwork plate and project table template in plate, data statistics result is filled to project chart to the project table generated in model Template produces statistics detail list, and data statistics result is filled to project chart to the project artwork plate generated in model Generation project statistical chart that is to say bright comprising the corresponding project statistical chart of the project and statistics in project statistical graph generated Thin table.
In one embodiment, as shown in fig. 6, step S130 includes sub-step S131 and S132.
S131, it is united according to the project statistical rules in project chart generation model to the project data information Meter is to obtain project statistical information.
According to the project chart generate model in project statistical rules to the project data information counted with Obtain project statistical information.Specifically, project statistical rules is for counting to accessed project data information Rule, including statistical time section in project statistical rules need to be according to statistical time when counting to project data information Section is counted at times, can finally be counted to obtain project statistical information according to project statistical rules.
For example, project corresponding to a certain project data information be infringement mechanism, Duan Weiliu calendar month of statistical time, then Corresponding obtained project statistical information is as shown in table 3.
Table 3
S132, the project statistical information is added to the project chart generate in project template graph in model with Generation project statistical graph.
The project statistical information is added in the project template graph in the project chart generation model to generate Project statistical graph.Specifically, including the corresponding statistical chart of the project and statistics detail list in project statistical graph generated. Wherein, statistics detail list is according to the corresponding statistical form generated of above-mentioned project statistical information;Using project as cross in statistical chart Coordinate adds respective items purpose specific name, in ordinate using statistical magnitude as ordinate in the abscissa of corresponding template Statistical magnitude corresponding to middle addition respective item, and can be final according to the histogram that each statistical magnitude adds corresponding length Obtain statistical chart.
Fig. 2 is the effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, as shown in Fig. 2, Figure (a) therein is the corresponding statistics detail list of the project that the data according to table 3 generate;Scheming (b) is according to institute in table 3 Registration according to generation the corresponding statistical chart of the project.
S140, judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.Further to obtain letter The tendency information of statistical item at any time in breath statistics request, user can also be by inputting project to be analyzed in Information Statistics request To obtain the tendency information counted according to project to be analyzed.Specifically, the quantity difference of project to be analyzed is then counted and is obtained Tendency information it is different, therefore whether the quantity of project to be analyzed is greater than one and judge in need to requesting Information Statistics, and Respectively obtain corresponding visualization trend statistical information according to judging result, visualization trend statistical information can by tendency chart or Trend comparison diagram is embodied, and project to be analyzed can select in the corresponding item value of statistical item from Information Statistics request.
For example, the statistical item in Information Statistics request is " infringement mechanism ", the corresponding item value of infringement mechanism includes AA Bank, AA trust, AA security, AA produce danger, AA life insurance, then project to be analyzed can be selected from above-mentioned 5 item values.
If the quantity of project to be analyzed is not more than one in S150, Information Statistics request, raw according to preset tendency chart Tendency chart corresponding with the project to be analyzed is generated at model and the project data information.
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart And the project data information generates tendency chart corresponding with the project to be analyzed.If wait divide in the Information Statistics request The quantity of analysis project is not more than one, that is to say that project to be analyzed is only one, then generating corresponding generate of model according to tendency chart should The tendency chart of project to be analyzed.Specifically, it includes tendency chart template that tendency chart, which generates in model, according to the system in tendency chart template The meter period obtains the project to be analyzed in the corresponding statistical magnitude of per a statistical time section, and statistical magnitude is added to trend In the abscissa of artwork plate, the hum pattern comprising the project overall development trend to be analyzed can be obtained, that is to say that this is to be analyzed The corresponding tendency chart of project.
In one embodiment, as shown in fig. 7, step S150 includes sub-step S151 and S152.
S151, trend detail list corresponding with the project to be analyzed in the project data information is obtained.
Obtain trend detail list corresponding with the project to be analyzed in the project data information.Due to item to be analyzed Mesh be select to obtain in the corresponding item value of statistical item from Information Statistics request, therefore can obtain in project data information and The corresponding trend detail list of project to be analyzed, trend detail list is the project to be analyzed according to the statistics in project statistical rules Period carries out counting obtained statistical form.
Fig. 3 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, if information Project to be analyzed is " AA bank " in statistics request, then the quantity of project to be analyzed is not more than one in Information Statistics request, gained The trend detail list arrived is as shown in figure (a).
S152, the data information in the trend detail list is corresponded to the trend being added in the tendency chart generation model The tendency chart of the project to be analyzed is generated in artwork plate.
By the corresponding trend artwork being added in the tendency chart generation model of the data information in the trend detail list The tendency chart of the project to be analyzed is generated in plate.Using statistical time section as abscissa in tendency chart, made with statistical magnitude For ordinate, adds the project to be analyzed respectively in the abscissa of tendency chart template according to statistical time section and correspond to the period Statistical magnitude can be obtained the hum pattern comprising the project overall development trend to be analyzed, that is to say to obtain tendency chart.Tendency chart Based on histogram, the Trendline of the project to be analyzed can also be included in tendency chart.
For example, the corresponding tendency chart for generating the project to be analyzed of the trend detail list according to shown in Fig. 3 is as schemed (b) institute Show.
If the quantity of project to be analyzed is greater than one in S160, Information Statistics request, according to preset comparison tendency chart It generates model and the project data information and generates comparison tendency chart corresponding with the project to be analyzed.
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to default comparison tendency chart generate mould Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.If Information Statistics request in The quantity of analysis project is greater than one, namely need to compare the statistical magnitude between multiple projects to be analyzed, then according to comparison Tendency chart generates the comparison tendency chart that the corresponding generation of model includes multiple projects to be analyzed.Specifically, comparison tendency chart generates mould Include comparison tendency chart template in type, multiple projects to be analyzed are obtained every according to the statistical time section in comparison tendency chart template The corresponding statistical magnitude of a statistical time section, and statistical magnitude is added in the abscissa of comparison tendency chart template, often unify The statistical magnitude that the period includes corresponding multiple projects to be analyzed is counted, the comparison hair comprising multiple projects to be analyzed can be obtained The hum pattern of exhibition trend that is to say to obtain comparison tendency chart.
In one embodiment, as shown in figure 8, step S160 includes sub-step S161 and S162.
S161, it obtains the corresponding system of each project to be analyzed in the project data information is obtained according to the project to be analyzed Meter information obtains trend comparison detail list to obtain.
It obtains and the corresponding statistics of each project to be analyzed in the project data information is obtained according to the project to be analyzed believes Breath obtains trend comparison detail list to obtain.Since project to be analyzed is the corresponding item of statistical item from Information Statistics request Selection obtains in mesh value, therefore can obtain statistical information corresponding with each project to be analyzed in project data information to obtain Trend compares detail list, and it is multiple projects to be analyzed according to the statistical time section in project statistical rules that trend, which compares detail list, It carries out counting obtained statistical form respectively.
For example, the project to be analyzed in Information Statistics request includes AA bank, AA security, AA life insurance, then correspond to It is as shown in table 4 that gesture compares detail list.
Table 4
S162, the data information correspondence in trend comparison detail list is added to the comparison tendency chart generation model In comparison tendency chart template in generate the comparison tendency chart of the project to be analyzed;
Data information in trend comparison detail list is corresponded to and is added in the comparison tendency chart generation model The comparison tendency chart of the project to be analyzed is generated in comparison tendency chart template.Compare tendency chart in using statistical time section as Abscissa, per a statistical time section are included the accordingly corresponding statistical magnitude of multiple projects to be analyzed, are sat using statistical magnitude as vertical Mark adds multiple projects to be analyzed in the abscissa of comparison tendency chart template according to statistical time section respectively and corresponds to the period The hum pattern of the comparison development trend comprising multiple projects to be analyzed can be obtained in statistical magnitude, that is to say to obtain comparison trend Figure.Tendency chart is compared based on histogram, comparing in tendency chart can also include the corresponding Trendline of each project to be analyzed.
Fig. 4 is another effect diagram of visualization statistical graph generation method provided in an embodiment of the present invention, according to table 4 Shown in trend comparison detail list corresponding to generate the comparison tendency chart comprising multiple projects to be analyzed as shown in Figure 4.
In the visualization statistical graph generation method provided by the embodiment of the present invention, mould is generated according to preset monitoring figure Type generates infringement Mission Monitor figure, and the Information Statistics request fed back according to user generates item corresponding with Information Statistics request Mesh statistical graph, according to Information Statistics request in the quantity of project to be analyzed corresponding generate tendency chart or comparison tendency chart.Pass through The above method, can be efficient, comprehensively for statistical analysis to data information included in infringement assignment database, improves The formation efficiency for visualizing statistical graph, achieves good technical effect in actual application.
The embodiment of the present invention also provides a kind of visualization statistical graph generating means, the visualization statistical graph generating means For executing any embodiment of aforementioned visualization statistical graph generation method.Specifically, referring to Fig. 9, Fig. 9 is of the invention real The schematic block diagram of the visualization statistical graph generating means of example offer is provided.The visualization statistical graph generating means can configure In the user terminals such as desktop computer, laptop, tablet computer or mobile phone.
As shown in figure 9, visualization statistical graph generating means 100 include monitoring figure generation unit 110, project data information Acquiring unit 120, project statistical graph generation unit 130, project judging unit 140 to be analyzed, first trend figure generation unit 150 and second trend figure generation unit 160.
Monitoring figure generation unit 110, for generating model to preset infringement assignment database according to preset monitoring figure The doubtful infringement task for being included is counted and generates infringement Mission Monitor figure.
According to preset monitoring figure generate model to the preset infringement assignment database doubtful infringement task that is included into Row counts and generates infringement Mission Monitor figure.It all are completed and do not complete specifically, being stored in infringement assignment database Doubtful infringement task is monitored to obtain enterprise's doubtful infringement the doubtful infringement task in infringement assignment database to realize The overall condition of task can be generated model by monitoring figure and be carried out to doubtful infringement task included in infringement assignment database It counts and infringement Mission Monitor figure is generated according to statistical result.Mission Monitor figure of encroaching right is for all doubtful infringements of enterprise The statistical chart that the overall condition of task is monitored, the form of monitoring figure includes but is not limited to column in Mission Monitor figure of encroaching right Figure, column stack figure, line chart, trend line chart, cake chart, geographical location information figure, wherein monitoring figure, which generates in model, includes Statistical rules and monitoring figure template.
Wherein, in doubtful infringement task include multiple projects, according to each project to the data in doubtful infringement task into Row statistics, and the data statistics result that statistics obtains is filled to monitoring figure to generate in model, infringement Mission Monitor can be obtained Figure, detailed programs include mission number, doubtful infringement main body, infringement mechanism, processing date, source of evidence, infringement region, response The amount of money, right-safeguarding are supported in timeliness, task items state, case delivery device, case state, case policing type, the case-involving amount of money, judgement As a result etc., each project in doubtful infringement task includes specific item value.Mission number is that each doubtful infringement is appointed The corresponding number information of business;Doubtful infringement main body is the main body letter that our company's legitimate rights and interests are invaded in the doubtful infringement task Breath, each doubtful infringement task correspond to a doubtful infringement main body;Infringement mechanism that is to say that the doubtful infringement task is invaded Violate branch's information in our company;Response timeliness be in our company branch from doubtful infringement task is received to first choosing The duration of law teacher that is to say the processing response time of doubtful infringement task.
In other inventive embodiments, as shown in Figure 10, the monitoring figure generation unit 110 includes subelement: infringement statistics Information acquisition unit 111 and infringement Mission Monitor figure generation unit 112.
Infringement statistical information acquisition unit 111, for generating the statistical rules in model according to the monitoring figure to described Doubtful infringement task in infringement assignment database is counted to obtain infringement statistical information.
The statistical rules in model is generated according to the monitoring figure to appoint the doubtful infringement in the infringement assignment database Business is counted to obtain infringement statistical information.Statistical rules be for according to each project middle term mesh value to infringement number of tasks According to the Rule Information that doubtful infringement tasks all in library are counted, according to each project middle term mesh value to doubtful infringement task into It need to also be counted using encroaching right mechanism as dimension when row statistics, if item value is sky in a certain doubtful infringement task, not existed To be counted in the empty corresponding project of item value to the doubtful infringement task, included by statistical rules, that is, statistics available The infringement statistical information of all items.
Infringement Mission Monitor figure generation unit 112 is generated for the infringement statistical information to be added to the monitoring figure Monitoring figure template in model is to generate infringement Mission Monitor figure.
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement times Business monitoring figure.Specifically, monitoring figure template is the template for filling specifying information to generate corresponding infringement Mission Monitor figure Information will a certain item in infringement statistical information comprising the corresponding template of project each in infringement statistical information in monitoring figure template Purpose numerical value fills and produces the corresponding monitoring figure of the project into template corresponding to monitoring figure template, obtains all items The corresponding monitoring figure generated can finally obtain infringement Mission Monitor figure.It can intuitively be obtained by watching infringement Mission Monitor figure Take the overall condition of the doubtful infringement task of enterprise.
Project data information acquisition unit 120, if being fed back for receiving user according to the infringement Mission Monitor figure Information Statistics request, according to the Information Statistics request in statistical item obtain infringement assignment database in the statistics The corresponding project data information of project.
If receiving the Information Statistics that user (user of user terminal) is fed back according to the infringement Mission Monitor figure Request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request Project data information.If user needs to obtain the specifying information of a certain project in infringement assignment database, can be invaded by described Power Mission Monitor figure feedback information statistics is requested to obtain the specific statistical information of a certain project.Wherein, Information Statistics request packet Statistical item and project to be analyzed are included, statistical item that is to say some detailed programs in infringement assignment database, to be analyzed Project is the detailed programs that the statistical magnitude of one or more projects for being inputted to user is analyzed, item to be analyzed Mesh can be one or more.Item corresponding with the statistical item in infringement assignment database can be obtained according to statistical item Mesh data information appoints the doubtful infringement if the corresponding item value of the statistical item is sky in a certain doubtful infringement task Business is added in project data information.
Project statistical graph generation unit 130, for generating model to the project data according to preset project chart Information is counted and generates project statistical graph.
The project data information is counted according to preset project chart generation model and generates project statistical chart Table.Wherein, it includes project statistical rules and project template graph that project chart, which generates in model, specifically, being counted according to project Rule counts the project data information of a certain project to obtain the corresponding data statistics of the project as a result, project chart mould Include project artwork plate and project table template in plate, data statistics result is filled to project chart to the project table generated in model Template produces statistics detail list, and data statistics result is filled to project chart to the project artwork plate generated in model Generation project statistical chart that is to say bright comprising the corresponding project statistical chart of the project and statistics in project statistical graph generated Thin table.
In other inventive embodiments, as shown in figure 11, the project statistical graph generation unit 130 includes subelement: item Mesh data information statistic unit 131 and project statistical information adding unit 132.
Project data Information Statistics unit 131, for generating the project statistical rules in model according to the project chart The project data information is counted to obtain project statistical information.
According to the project chart generate model in project statistical rules to the project data information counted with Obtain project statistical information.Specifically, project statistical rules is for counting to accessed project data information Rule, including statistical time section in project statistical rules need to be according to statistical time when counting to project data information Section is counted at times, can finally be counted to obtain project statistical information according to project statistical rules.
Project statistical information adding unit 132 is generated for the project statistical information to be added to the project chart To generate project statistical graph in project template graph in model.
The project statistical information is added in the project template graph in the project chart generation model to generate Project statistical graph.Specifically, including the corresponding statistical chart of the project and statistics detail list in project statistical graph generated. Wherein, statistics detail list is according to the corresponding statistical form generated of above-mentioned project statistical information;Using project as cross in statistical chart Coordinate adds respective items purpose specific name, in ordinate using statistical magnitude as ordinate in the abscissa of corresponding template Statistical magnitude corresponding to middle addition respective item, and can be final according to the histogram that each statistical magnitude adds corresponding length Obtain statistical chart.
Whether project judging unit 140 to be analyzed is big for the quantity to project to be analyzed in Information Statistics request Judged in one.
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one.Further to obtain letter The tendency information of statistical item at any time in breath statistics request, user can also be by inputting project to be analyzed in Information Statistics request To obtain the tendency information counted according to project to be analyzed.Specifically, the quantity difference of project to be analyzed is then counted and is obtained Tendency information it is different, therefore whether the quantity of project to be analyzed is greater than one and judge in need to requesting Information Statistics, and Respectively obtain corresponding visualization trend statistical information according to judging result, visualization trend statistical information can by tendency chart or Trend comparison diagram is embodied, and project to be analyzed can select in the corresponding item value of statistical item from Information Statistics request.
First trend figure generation unit 150, if the quantity for project to be analyzed in Information Statistics request is not more than One, model and the project data information are generated according to preset tendency chart and generate trend corresponding with the project to be analyzed Figure.
If the quantity of project to be analyzed is not more than one in Information Statistics request, model is generated according to preset tendency chart And the project data information generates tendency chart corresponding with the project to be analyzed.If wait divide in the Information Statistics request The quantity of analysis project is not more than one, that is to say that project to be analyzed is only one, then generating corresponding generate of model according to tendency chart should The tendency chart of project to be analyzed.Specifically, it includes tendency chart template that tendency chart, which generates in model, according to the system in tendency chart template The meter period obtains the project to be analyzed in the corresponding statistical magnitude of per a statistical time section, and statistical magnitude is added to trend In the abscissa of artwork plate, the hum pattern comprising the project overall development trend to be analyzed can be obtained, that is to say that this is to be analyzed The corresponding tendency chart of project.
In other inventive embodiments, as shown in figure 12, the first trend figure generation unit 150 includes subelement: trend Detail list acquiring unit 151 and tendency chart generation unit 152.
Trend detail list acquiring unit 151, it is opposite with the project to be analyzed in the project data information for obtaining The trend detail list answered.
Obtain trend detail list corresponding with the project to be analyzed in the project data information.Due to item to be analyzed Mesh be select to obtain in the corresponding item value of statistical item from Information Statistics request, therefore can obtain in project data information and The corresponding trend detail list of project to be analyzed, trend detail list is the project to be analyzed according to the statistics in project statistical rules Period carries out counting obtained statistical form.
Tendency chart generation unit 152, for the data information correspondence in the trend detail list to be added to the trend Figure generates the tendency chart that the project to be analyzed is generated in the tendency chart template in model.
By the corresponding trend artwork being added in the tendency chart generation model of the data information in the trend detail list The tendency chart of the project to be analyzed is generated in plate.Using statistical time section as abscissa in tendency chart, made with statistical magnitude For ordinate, adds the project to be analyzed respectively in the abscissa of tendency chart template according to statistical time section and correspond to the period Statistical magnitude can be obtained the hum pattern comprising the project overall development trend to be analyzed, that is to say to obtain tendency chart.Tendency chart Based on histogram, the Trendline of the project to be analyzed can also be included in tendency chart.
Second trend figure generation unit 160, if the quantity for project to be analyzed in Information Statistics request is greater than one, Model is generated according to preset comparison tendency chart and project data information generation is corresponding right with the project to be analyzed Compare tendency chart.
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to default comparison tendency chart generate mould Type and the project data information generate comparison tendency chart corresponding with the project to be analyzed.If Information Statistics request in The quantity of analysis project is greater than one, namely need to compare the statistical magnitude between multiple projects to be analyzed, then according to comparison Tendency chart generates the comparison tendency chart that the corresponding generation of model includes multiple projects to be analyzed.Specifically, comparison tendency chart generates mould Include comparison tendency chart template in type, multiple projects to be analyzed are obtained every according to the statistical time section in comparison tendency chart template The corresponding statistical magnitude of a statistical time section, and statistical magnitude is added in the abscissa of comparison tendency chart template, often unify The statistical magnitude that the period includes corresponding multiple projects to be analyzed is counted, the comparison hair comprising multiple projects to be analyzed can be obtained The hum pattern of exhibition trend that is to say to obtain comparison tendency chart.
In other inventive embodiments, as shown in figure 13, the second trend figure generation unit 160 includes subelement: trend Compare detail list acquiring unit 161 and comparison tendency chart generation unit 162.
Trend compares detail list acquiring unit 161, the item number is obtained according to the project to be analyzed for obtaining it is believed that The corresponding statistical information of each project to be analyzed obtains trend comparison detail list to obtain in breath.
It obtains and the corresponding statistics of each project to be analyzed in the project data information is obtained according to the project to be analyzed believes Breath obtains trend comparison detail list to obtain.Since project to be analyzed is the corresponding item of statistical item from Information Statistics request Selection obtains in mesh value, therefore can obtain statistical information corresponding with each project to be analyzed in project data information to obtain Trend compares detail list, and it is multiple projects to be analyzed according to the statistical time section in project statistical rules that trend, which compares detail list, It carries out counting obtained statistical form respectively.
Tendency chart generation unit 162 is compared, the data information correspondence for comparing the trend in detail list is added to The comparison tendency chart generates the comparison tendency chart that the project to be analyzed is generated in the comparison tendency chart template in model;
Data information in trend comparison detail list is corresponded to and is added in the comparison tendency chart generation model The comparison tendency chart of the project to be analyzed is generated in comparison tendency chart template.Compare tendency chart in using statistical time section as Abscissa, each period in statistical time section includes corresponding multiple projects to be analyzed, using statistical magnitude as ordinate, Add the system that multiple projects to be analyzed correspond to the period respectively in the abscissa of comparison tendency chart template according to statistical time section The hum pattern of the comparison development trend comprising multiple projects to be analyzed can be obtained in count number, that is to say to obtain comparison tendency chart. Tendency chart is compared based on histogram, comparing in tendency chart can also include the corresponding Trendline of each project to be analyzed.
The visualization statistical graph generating means provided by the embodiment of the present invention are raw using above-mentioned visualization statistical graph At method, model is generated according to preset monitoring figure and generates infringement Mission Monitor figure, and the Information Statistics fed back according to user Request generates corresponding with Information Statistics request project statistical graph, according to Information Statistics request in project to be analyzed quantity pair Tendency chart or comparison tendency chart should be generated.By the above method, can efficiently, comprehensively to included in infringement assignment database Data information it is for statistical analysis, improve visualization statistical graph formation efficiency, achieve in actual application Good technical effect.
Above-mentioned visualization statistical graph generating means can be implemented as the form of computer program, which can be with It is run in computer equipment as shown in figure 14.
Figure 14 is please referred to, Figure 14 is the schematic block diagram of computer equipment provided in an embodiment of the present invention.
Refering to fig. 14, which includes processor 502, memory and the net connected by system bus 501 Network interface 505, wherein memory may include non-volatile memory medium 503 and built-in storage 504.
The non-volatile memory medium 503 can storage program area 5031 and computer program 5032.The computer program 5032 are performed, and processor 502 may make to execute visualization statistical graph generation method.
The processor 502 supports the operation of entire computer equipment 500 for providing calculating and control ability.
The built-in storage 504 provides environment for the operation of the computer program 5032 in non-volatile memory medium 503, should When computer program 5032 is executed by processor 502, processor 502 may make to execute visualization statistical graph generation method.
The network interface 505 is for carrying out network communication, such as the transmission of offer data information.Those skilled in the art can To understand, structure shown in Figure 14, only the block diagram of part-structure relevant to the present invention program, is not constituted to this hair The restriction for the computer equipment 500 that bright scheme is applied thereon, specific computer equipment 500 may include than as shown in the figure More or fewer components perhaps combine certain components or with different component layouts.
Wherein, the processor 502 is for running computer program 5032 stored in memory, to realize following function Can: the doubtful infringement task that model is included to preset infringement assignment database is generated according to preset monitoring figure and is counted And generate infringement Mission Monitor figure;If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back, Project corresponding with the statistical item in infringement assignment database is obtained according to the statistical item in Information Statistics request Data information;The project data information is counted according to preset project chart generation model and generates project statistical chart Table;Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;If the Information Statistics request In the quantity of project to be analyzed be not more than one, model is generated according to preset tendency chart and the project data information generates and institute State the corresponding tendency chart of project to be analyzed;If the quantity of project to be analyzed is greater than one in Information Statistics request, according to pre- If comparison tendency chart generate model and the project data information and generate comparison trend corresponding with the project to be analyzed Figure.
In one embodiment, processor 502 is being executed according to preset monitoring figure generation model to preset infringement task When the doubtful infringement task that database is included is counted and generates the step of infringement Mission Monitor figure, perform the following operations: The statistical rules in model is generated according to the monitoring figure to unite to the doubtful infringement task in the infringement assignment database Meter is to obtain infringement statistical information;The infringement statistical information is added to the monitoring figure template in the monitoring figure generation model To generate Mission Monitor figure of encroaching right.
In one embodiment, processor 502 is being executed according to preset project chart generation model to the project data It when information is counted and generates the step of project statistical graph, performs the following operations: model is generated according to the project chart In project statistical rules the project data information is counted to obtain project statistical information;The project is counted and is believed Breath is added in the project template graph in the project chart generation model to generate project statistical graph.
In one embodiment, if the quantity of project to be analyzed in executing Information Statistics request of processor 502 is little Yu Yi, according to preset tendency chart generate model and the project data information generate it is corresponding with the project to be analyzed become It when the step of gesture figure, performs the following operations: obtaining trend corresponding with the project to be analyzed in the project data information Detail list;By the corresponding tendency chart template being added in the tendency chart generation model of the data information in the trend detail list In to generate the tendency chart of the project to be analyzed.
In one embodiment, if the quantity of project to be analyzed in executing Information Statistics request of processor 502 is greater than One, model is generated according to preset comparison tendency chart and project data information generation is corresponding with the project to be analyzed It when comparing the step of tendency chart, performs the following operations: obtaining and obtained in the project data information often according to the project to be analyzed The corresponding statistical information of one project to be analyzed obtains trend comparison detail list to obtain;The trend is compared in detail list Data information correspondence is added to described to be analyzed to generate in the comparison tendency chart template in the comparison tendency chart generation model The comparison tendency chart of project.
It will be understood by those skilled in the art that the embodiment of computer equipment shown in Figure 14 is not constituted to computer The restriction of equipment specific composition, in other embodiments, computer equipment may include components more more or fewer than diagram, or Person combines certain components or different component layouts.For example, in some embodiments, computer equipment can only include depositing Reservoir and processor, in such embodiments, the structure and function of memory and processor are consistent with embodiment illustrated in fig. 14, Details are not described herein.
It should be appreciated that in embodiments of the present invention, processor 502 can be central processing unit (Central Processing Unit, CPU), which can also be other general processors, digital signal processor (Digital Signal Processor, DSP), specific integrated circuit (Application Specific Integrated Circuit, ASIC), ready-made programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic Device, discrete gate or transistor logic, discrete hardware components etc..Wherein, general processor can be microprocessor or Person's processor is also possible to any conventional processor etc..
Computer readable storage medium is provided in another embodiment of the invention.The computer readable storage medium can be with For non-volatile computer readable storage medium.The computer-readable recording medium storage has computer program, wherein calculating Machine program performs the steps of when being executed by processor generates model to preset infringement task data according to preset monitoring figure The doubtful infringement task that library is included is counted and generates infringement Mission Monitor figure;If receiving user to be appointed according to the infringement The Information Statistics request that business monitoring figure is fed back obtains infringement task data according to the statistical item in Information Statistics request Project data information corresponding with the statistical item in library;Model is generated to the project data according to preset project chart Information is counted and generates project statistical graph;Whether one is greater than to the quantity of project to be analyzed in Information Statistics request Judged;If the quantity of project to be analyzed is not more than one in Information Statistics request, mould is generated according to preset tendency chart Type and the project data information generate tendency chart corresponding with the project to be analyzed;If in Information Statistics request to The quantity of analysis project be greater than one, according to preset comparison tendency chart generate model and the project data information generation with it is described The corresponding comparison tendency chart of project to be analyzed.
In one embodiment, described to be included to preset infringement assignment database according to preset monitoring figure generation model Doubtful infringement task counted and generate infringement Mission Monitor figure, comprising: according to the monitoring figure generate model in system Meter rule counts to obtain infringement statistical information the doubtful infringement task in the infringement assignment database;It is invaded described Power statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement Mission Monitor figure.
In one embodiment, described that the project data information is counted according to preset project chart generation model And the step of generating project statistical graph, comprising: the project statistical rules in model is generated to described according to the project chart Project data information is counted to obtain project statistical information;It is raw that the project statistical information is added to the project chart At in the project template graph in model to generate project statistical graph.
In one embodiment, if the quantity of project to be analyzed is not more than one in Information Statistics request, according to pre- If tendency chart generate the step of model and the project data information generate tendency chart corresponding with the project to be analyzed, It include: to obtain trend detail list corresponding with the project to be analyzed in the project data information;By the trend detail Data information in table, which corresponds to, to be added in the tendency chart template in the tendency chart generation model to generate the item to be analyzed Purpose tendency chart.
In one embodiment, if the quantity of project to be analyzed is greater than one in Information Statistics request, according to default Comparison tendency chart generate model and the project data information and generate comparison tendency chart corresponding with the project to be analyzed The step of, comprising: it obtains and the corresponding system of each project to be analyzed in the project data information is obtained according to the project to be analyzed Meter information obtains trend comparison detail list to obtain;The trend is compared into the data information correspondence in detail list and is added to institute State the comparison tendency chart that the project to be analyzed is generated in the comparison tendency chart template in comparison tendency chart generation model.
It is apparent to those skilled in the art that for convenience of description and succinctly, foregoing description is set The specific work process of standby, device and unit, can refer to corresponding processes in the foregoing method embodiment, and details are not described herein. Those of ordinary skill in the art may be aware that unit described in conjunction with the examples disclosed in the embodiments of the present disclosure and algorithm Step can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and software Interchangeability generally describes each exemplary composition and step according to function in the above description.These functions are studied carefully Unexpectedly the specific application and design constraint depending on technical solution are implemented in hardware or software.Professional technician Each specific application can be used different methods to achieve the described function, but this realization is it is not considered that exceed The scope of the present invention.
In several embodiments provided by the present invention, it should be understood that disclosed unit and method, it can be with It realizes by another way.For example, the apparatus embodiments described above are merely exemplary, for example, the unit It divides, only logical function partition, there may be another division manner in actual implementation, can also will be with the same function Unit set is at a unit, such as multiple units or components can be combined or can be integrated into another system or some Feature can be ignored, or not execute.In addition, shown or discussed mutual coupling, direct-coupling or communication connection can Be through some interfaces, the indirect coupling or communication connection of device or unit, be also possible to electricity, mechanical or other shapes Formula connection.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple In network unit.Some or all of unit therein can be selected to realize the embodiment of the present invention according to the actual needs Purpose.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit It is that each unit physically exists alone, is also possible to two or more units and is integrated in one unit.It is above-mentioned integrated Unit both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention substantially or Person says that all or part of the part that contributes to existing technology or the technical solution can body in the form of software products Reveal and, which is stored in a computer readable storage medium, including some instructions are used so that one Platform computer equipment (can be personal computer, server or the network equipment etc.) executes described in each embodiment of the present invention The all or part of the steps of method.And computer readable storage medium above-mentioned includes: USB flash disk, mobile hard disk, read-only memory The various media that can store program code such as (ROM, Read-Only Memory), magnetic or disk.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or replace It changes, these modifications or substitutions should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with right It is required that protection scope subject to.

Claims (10)

1. a kind of visualization statistical graph generation method characterized by comprising
The doubtful infringement task that model is included to preset infringement assignment database is generated according to preset monitoring figure to unite It counts and generates infringement Mission Monitor figure;
If receiving user to be requested according to the Information Statistics that the infringement Mission Monitor figure is fed back, asked according to the Information Statistics The statistical item asked obtains project data information corresponding with the statistical item in infringement assignment database;Wherein, described Include one or more projects to be analyzed in Information Statistics request;
The project data information is counted according to preset project chart generation model and generates project statistical graph;
Judge whether the quantity of project to be analyzed in Information Statistics request is greater than one;
If the quantity of project to be analyzed is not more than one in Information Statistics request, model and institute are generated according to preset tendency chart It states project data information and generates tendency chart corresponding with the project to be analyzed;
If the quantity of project to be analyzed is greater than one in Information Statistics request, according to preset comparison tendency chart generation model and The project data information generates comparison tendency chart corresponding with the project to be analyzed.
2. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset monitoring Figure generates model and is counted to the doubtful infringement task that preset infringement assignment database is included and generate infringement task prison Control figure, comprising:
According to the monitoring figure generate model in statistical rules to it is described infringement assignment database in doubtful infringement task into Row statistics is to obtain infringement statistical information;
The infringement statistical information is added to the monitoring figure and generates the monitoring figure template in model to generate infringement task prison Control figure.
3. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset project Chart generates model and is counted to the project data information and generate project statistical graph, comprising:
The project statistical rules in model is generated according to the project chart to count to obtain the project data information Project statistical information;
The project statistical information is added in the project template graph in the project chart generation model with generation project Statistical graph.
4. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset trend Figure generates model and the project data information and generates tendency chart corresponding with the project to be analyzed, comprising:
Obtain trend detail list corresponding with the project to be analyzed in the project data information;
Data information in the trend detail list is corresponded to and is added in the tendency chart template that the tendency chart generates in model To generate the tendency chart of the project to be analyzed.
5. visualization statistical graph generation method according to claim 1, which is characterized in that described according to preset comparison Tendency chart generates model and the project data information and generates comparison tendency chart corresponding with the project to be analyzed, comprising:
Obtain according to the project to be analyzed obtain the corresponding statistical information of each project to be analyzed in the project data information with It obtains to obtain trend comparison detail list;
The trend is compared into the corresponding comparison being added in the comparison tendency chart generation model of the data information in detail list The comparison tendency chart of the project to be analyzed is generated in tendency chart template.
6. a kind of visualization statistical graph generating means characterized by comprising
Monitoring figure generation unit, for being included to preset infringement assignment database according to preset monitoring figure generation model Doubtful infringement task is counted and generates infringement Mission Monitor figure;
Project data information acquisition unit, if being united for receiving user according to the information that the infringement Mission Monitor figure is fed back Meter request obtains corresponding with the statistical item in infringement assignment database according to the statistical item in Information Statistics request Project data information;Wherein, include one or more projects to be analyzed in the Information Statistics request;
Project statistical graph generation unit carries out the project data information for generating model according to preset project chart It counts and generates project statistical graph;
Whether project judging unit to be analyzed is greater than a progress for the quantity to project to be analyzed in Information Statistics request Judgement;
First trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is not more than one, according to Preset tendency chart generates model and the project data information generates tendency chart corresponding with the project to be analyzed;
Second trend figure generation unit, if the quantity for project to be analyzed in Information Statistics request is greater than one, according to pre- If comparison tendency chart generate model and the project data information and generate comparison trend corresponding with the project to be analyzed Figure.
7. visualization statistical graph generating means according to claim 6, which is characterized in that the monitoring figure generates single Member, comprising:
Infringement statistical information acquisition unit, for generating the statistical rules in model according to the monitoring figure to the infringement task Doubtful infringement task in database is counted to obtain infringement statistical information;
Infringement Mission Monitor figure generation unit generates in model for the infringement statistical information to be added to the monitoring figure Monitoring figure template is to generate infringement Mission Monitor figure.
8. visualization statistical graph generating means according to claim 6, which is characterized in that the project statistical graph is raw At unit, comprising:
Project data Information Statistics unit, for generating the project statistical rules in model according to the project chart to the item Mesh data information is counted to obtain project statistical information;
Project statistical information adding unit generates in model for the project statistical information to be added to the project chart To generate project statistical graph in project template graph.
9. a kind of computer equipment, including memory, processor and it is stored on the memory and can be on the processor The computer program of operation, which is characterized in that the processor realizes such as claim 1 to 5 when executing the computer program Any one of described in visualization statistical graph generation method.
10. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage has computer journey Sequence, the computer program make the processor execution is such as described in any one of claim 1 to 5 can when being executed by a processor Depending on changing statistical graph generation method.
CN201910299360.9A 2019-04-15 2019-04-15 Visualized statistical chart generation method and device, computer equipment and storage medium Active CN110162550B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910299360.9A CN110162550B (en) 2019-04-15 2019-04-15 Visualized statistical chart generation method and device, computer equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910299360.9A CN110162550B (en) 2019-04-15 2019-04-15 Visualized statistical chart generation method and device, computer equipment and storage medium

Publications (2)

Publication Number Publication Date
CN110162550A true CN110162550A (en) 2019-08-23
CN110162550B CN110162550B (en) 2024-03-01

Family

ID=67638614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910299360.9A Active CN110162550B (en) 2019-04-15 2019-04-15 Visualized statistical chart generation method and device, computer equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110162550B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116521465A (en) * 2023-06-26 2023-08-01 深圳市晶存科技有限公司 Hard disk test data processing method, device and medium

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201137598A (en) * 2010-04-26 2011-11-01 Chunghwa Telecom Co Ltd Real-time service interface monitoring and alarming system of large-scale enterprise information integration platform
US20130103677A1 (en) * 2011-10-25 2013-04-25 International Business Machines Corporation Contextual data visualization
CN104331354A (en) * 2014-11-20 2015-02-04 普华基础软件股份有限公司 Real-time comprehensive monitoring method for cloud computing
CN109285063A (en) * 2017-07-19 2019-01-29 上海臻客商务咨询有限公司 A kind of credit card equity tendency judgement system based on big data analysis
CN109299169A (en) * 2018-10-24 2019-02-01 中国平安人寿保险股份有限公司 Data visualization method, system, terminal and computer readable storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TW201137598A (en) * 2010-04-26 2011-11-01 Chunghwa Telecom Co Ltd Real-time service interface monitoring and alarming system of large-scale enterprise information integration platform
US20130103677A1 (en) * 2011-10-25 2013-04-25 International Business Machines Corporation Contextual data visualization
CN104331354A (en) * 2014-11-20 2015-02-04 普华基础软件股份有限公司 Real-time comprehensive monitoring method for cloud computing
CN109285063A (en) * 2017-07-19 2019-01-29 上海臻客商务咨询有限公司 A kind of credit card equity tendency judgement system based on big data analysis
CN109299169A (en) * 2018-10-24 2019-02-01 中国平安人寿保险股份有限公司 Data visualization method, system, terminal and computer readable storage medium

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116521465A (en) * 2023-06-26 2023-08-01 深圳市晶存科技有限公司 Hard disk test data processing method, device and medium
CN116521465B (en) * 2023-06-26 2023-10-13 深圳市晶存科技有限公司 Hard disk test data processing method, device and medium

Also Published As

Publication number Publication date
CN110162550B (en) 2024-03-01

Similar Documents

Publication Publication Date Title
US8112366B2 (en) Expert system and visualization for multi-server capacity management
US7055149B2 (en) Method and apparatus for automating software upgrades
CN110297855A (en) Report Dynamic Display method, apparatus, computer equipment and storage medium
WO2006125274A1 (en) System and method for risk assessment and presentment
US11334373B2 (en) Controlling permissions for access to user interface features
Freeland et al. Evaluating the effectiveness of a new method for computing approximately optimal (s, S) inventory policies
CN108733532A (en) Health degree management-control method, device, medium and the electronic equipment of big data platform
CN109766158A (en) Methods of exhibiting, device, computer equipment and the storage medium of user interface
US20230121667A1 (en) Categorized time designation on calendars
CN115641019A (en) Index anomaly analysis method and device, computer equipment and storage medium
Sagnol et al. Robust allocation of operating rooms: A cutting plane approach to handle lognormal case durations
CN110162550A (en) Visualize statistical graph generation method, device, computer equipment and storage medium
CN106686081A (en) Resource allocation method and device of database service system
Hussain et al. Is Customer Satisfaction Enough for Software Quality?
CN114997813A (en) Flow chart generation method, device, equipment and storage medium
CN114091956A (en) Service resource processing method and device, computer equipment and storage medium
CN115511644A (en) Processing method for target policy, electronic device and readable storage medium
US20160110367A1 (en) Services management system
CN114238724A (en) Data visualization method and device
CN109857501A (en) A kind of page display method of APP, device, storage medium and server
Rukhiran et al. Multiconcerns circuit component diagram apply to improve on software development: Empirical study of house bookkeeping mobile software
US20220398129A1 (en) Application prioritization system
CN115268884B (en) Mobile terminal visual page configuration and rendering method based on aPaaS platform
CN116703588A (en) Data analysis method, device, equipment and storage medium based on analysis template
Sallo et al. Enriching computing simulators by generating realistic serverless traces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant