CN110153335A - A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage - Google Patents

A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage Download PDF

Info

Publication number
CN110153335A
CN110153335A CN201910350101.4A CN201910350101A CN110153335A CN 110153335 A CN110153335 A CN 110153335A CN 201910350101 A CN201910350101 A CN 201910350101A CN 110153335 A CN110153335 A CN 110153335A
Authority
CN
China
Prior art keywords
steel
reinforcement cage
steel reinforcement
pointed cone
long screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910350101.4A
Other languages
Chinese (zh)
Other versions
CN110153335B (en
Inventor
刘军
贾荣谷
沈家仁
刘克文
郭光八
段志超
杨纬卿
余建强
聂建微
陈锦文
徐俊波
农礼辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Construction Investment First Survey And Design Co Ltd
Original Assignee
Yunnan Construction Investment First Survey And Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Construction Investment First Survey And Design Co Ltd filed Critical Yunnan Construction Investment First Survey And Design Co Ltd
Priority to CN201910350101.4A priority Critical patent/CN110153335B/en
Publication of CN110153335A publication Critical patent/CN110153335A/en
Application granted granted Critical
Publication of CN110153335B publication Critical patent/CN110153335B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F27/00Making wire network, i.e. wire nets
    • B21F27/12Making special types or portions of network by methods or means specially adapted therefor
    • B21F27/20Making special types or portions of network by methods or means specially adapted therefor of plaster-carrying network

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The processing method that the present invention discloses a kind of long screw auger drilling deposited pile steel reinforcement cage, is related to borehole filling pile cage of reinforcement technical field.The processing method of the long screw auger drilling deposited pile steel reinforcement cage includes: prefabricated fixed steelring, pointed cone into steel rings and fastening steel ring;The production of reinforcement cage skeleton;The molding of steel reinforcement cage front end pointed cone;Circular and steel reinforcement cage the welding of stiffener.Efficient quick is made to bottom is pointed cone type, specification error is smaller, long screw auger drilling deposited pile steel reinforcement cage that is integrally standardizing, long screw auger drilling deposited pile steel reinforcement cage after molding is stable, firm, it can guarantee that vibration force is effectively conducted to steel reinforcement cage bottom when placement, insert steel reinforcement cage Pile Grouting after being suitable for long auger guncreting.

Description

A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage
Technical field
The present invention relates to borehole filling pile cage of reinforcement technical fields, are specifically related to a kind of long screw auger drilling deposited pile reinforcing bar The processing method of cage.
Background technique
Bored concrete pile, which refers to, passes through means shapes in foundation soil such as machine drilling, steel pipe soil compaction or manpower excavation in engineering site At stake holes, and steel reinforcement cage, concrete perfusion and the stake being made into are placed in it, according to forming hole method difference, bored concrete pile can divide again For several classes such as driven cast-in-place pile, cast-in-situ bored pile and digging hole filling pile.Steel reinforcement cage primarily function is with pillar longitudinal reinforcement Stress is similarly, mainly to play drawing-resistant function, the compression strength of concrete is high but tensile strength is very low.Pile concrete is played The effect of constraint makes it to bear certain horizontal force.In bridges and culverts or high-building construction, according to requiring to may require base Plinth is driven piles, and method is to be drilled with using machine punching and water mill, and hole depth reaches design requirement, is then transferred to stake holes Steel reinforcement cage is inserted into conduit and carries out concrete casting.
It is different with traditional filling pile construction technology, steel reinforcement cage filling pile construction skill is inserted after long auger guncreting The characteristics of art, is that the pressure for first carrying out concrete fills, then carries out the insertion of steel reinforcement cage, wherein difference highly significant.Utilize this skill Art is constructed, it is possible to reduce the links such as retaining wall reduce construction pollution and noise, improve construction efficiency, to promotion construction project Overall efficiency and quality have positive effect.
So the production of long screw auger drilling deposited pile steel reinforcement cage is particularly important, the production of steel reinforcement cage is except satisfaction design and correlation Outside acceptance specification, the bottom 3-5m of steel reinforcement cage need to be made into pointed cone type, and should have reinforcement construct, with guarantee vibration force be effectively conducted to Steel reinforcement cage bottom;The method for having no convenient and efficient and suitable production long screw auger drilling deposited pile steel reinforcement cage at present, is especially a lack of Specification, efficiently the bottom of steel reinforcement cage is made as specification pointed cone type method.
Summary of the invention
In view of the above-mentioned problems existing in the prior art, adding the present invention provides a kind of long screw auger drilling deposited pile steel reinforcement cage The bottom of steel reinforcement cage effectively can be processed as pointed cone type by work method, insert reinforcing bar after being suitable for long auger guncreting Cage Pile Grouting.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage, comprising the following steps:
Step 1: prefabricated fixed steelring, pointed cone are at steel rings and fastening steel ring
It makes that several specifications are identical and edge circumferentially opens up the fixed steelring of uniform through bore;It is opposite to make at least three diameter Pointed cone that fixed steelring is sequentially reduced and with through-hole is at steel rings;Make a fastening steel ring;
Step 2: the production of reinforcement cage skeleton
Steel reinforcement cage main reinforcement is sequentially passed through to the through-hole of fixed steelring, adjusts the spacing distance between fixed steelring, main reinforcement is worn The distance of front end fixed steelring through-hole 3-5m out;
Step 3: steel reinforcement cage front end pointed cone forms
The main reinforcement for being pierced by front end fixed steelring is bent to steel reinforcement cage axle center, is inserted in pointed cone into fashioned iron from main reinforcement head end Circle, and repeat to bend and be inserted in pointed cone that diameter is sequentially reduced into steel rings, the main reinforcement of front end mutually joins and puts on fastening steel Circle;
Step 4: circular and steel reinforcement cage the welding of stiffener
Using stiffener from steel reinforcement cage tip cone end spiral surrounding, and steel ring, pointed cone will be successively fastened into steel rings, fixation Steel ring and stiffener welding fabrication.
Further, the circumferential direction of the outer marginal end of the fixed steelring opens up equally distributed through-hole, through-hole diameter specification It is bigger than main reinforcement outer diameter, 30 ° or 45 ° of through-hole interval.
One fixed steelring shaft core position of the front end welds a steel pipe being overlapped with axle center by support spoke, Length is 3-5m.
Further, the pointed cone is the steel ring that successively successively decreases of at least three diameter at steel rings, equally distributed on steel ring Number of openings is the half of fixed steelring, and the angle at through-hole interval is twice of fixed steelring.
Further, the fastening steel ring is the steel ring of the adjustable locking of diameter.
Further, the reinforcement cage skeleton make when, after main reinforcement is pierced by front end fixed steelring through-hole 3-5m, successively between Every by the main reinforcement being pierced by from fastening steel ring end face dissection, keeping the main reinforcement number being pierced by is the half of former main reinforcement number.
Further, pointed cone molding in the steel reinforcement cage front end is bent from the front end of main reinforcement to axis direction, from main reinforcement head End cap enters the maximum pointed cone of diameter into steel rings, and progress later is inserted in diameter to steel reinforcement cage axle center bending main reinforcement for the second time and is successively subtracted Small pointed cone is at steel rings, when the main reinforcement front end of bending reaches axle center or from the beginning end cap enters to fasten steel ring when close to shaft core position And lock, it thus obtains using the symmetrical front end in axle center as the steel reinforcement cage of pointed cone.
Further, the circular and steel reinforcement cage of the stiffener is welded as to fasten steel ring and steel reinforcement cage fixation simultaneously After welding, carried out from fastening steel ring end spiral surrounding through pointed cone at steel rings and main reinforcement, fixed steelring and main reinforcement by stiffener Successively reinforcement of weld.
Further, the welding uses arc welding.
Another object of the present invention is to provide a kind of processing methods of long screw auger drilling deposited pile steel reinforcement cage in long spire The application in steel reinforcement cage Pile Grouting is inserted after drilling & grouting piling concrete.
Beneficial effects of the present invention: the processing method of long screw auger drilling deposited pile steel reinforcement cage of the invention, by prefabricated solid Steel ring, pointed cone are determined into steel rings and fastening steel ring;The production of reinforcement cage skeleton;The molding of steel reinforcement cage front end pointed cone;Stiffener Circular and steel reinforcement cage welding;Efficient quick is made to bottom is pointed cone type, specification error is smaller, length that is integrally standardizing Auger boring pouring pile steel reinforcement cage, long screw auger drilling deposited pile steel reinforcement cage after molding is stable, firm, and when placement can guarantee vibration Power is effectively conducted to steel reinforcement cage bottom, inserts steel reinforcement cage Pile Grouting after being suitable for long auger guncreting.
Certainly, it implements any of the products of the present invention and does not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will be described below to embodiment required Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for ability For the those of ordinary skill of domain, without creative efforts, it can also be obtained according to these attached drawings other attached Figure.
Fig. 1 is the processing method flow chart of long screw auger drilling deposited pile steel reinforcement cage described in the embodiment of the present invention;
Fig. 2 is the long screw auger drilling deposited pile reinforcement cage structure schematic diagram of processing described in the embodiment of the present invention;
Fig. 3 is the connection schematic diagram of main ribs of the embodiment of the present invention and fixed steelring;
Fig. 4 is the structural schematic diagram of fixed steelring described in the embodiment of the present invention;
Fig. 5 is the structural schematic diagram of front end fixed steelring described in the embodiment of the present invention;
Fig. 6 is that fixed steelring described in the embodiment of the present invention and main reinforcement and pointed cone are illustrated at the molding of steel rings and fastening steel ring Figure;
In attached drawing, parts list represented by the reference numerals are as follows:
1- fixed steelring, 2- pointed cone fasten steel ring at steel rings, 3- main reinforcement, 4-.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts all other Embodiment shall fall within the protection scope of the present invention.
As shown in figures 1 to 6
A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage, comprising the following steps:
Step 1: prefabricated fixed steelring 1, pointed cone are at steel rings 2 and fastening steel ring 4
It makes that several specifications are identical and edge circumferentially opens up the fixed steelring 1 of uniform through bore;It is opposite to make at least three diameter Pointed cone that fixed steelring 1 is sequentially reduced and with through-hole is at steel rings 2;Make a fastening steel ring 4;
Step 2: the production of reinforcement cage skeleton
Steel reinforcement cage main reinforcement 3 is sequentially passed through to the through-hole of fixed steelring 1, adjusts the spacing distance between fixed steelring 1, main reinforcement 3 are pierced by the distance of 1 through-hole 3-5m of front end fixed steelring;
Step 3: steel reinforcement cage front end pointed cone forms
The main reinforcement 3 for being pierced by front end fixed steelring 1 is bent to steel reinforcement cage axle center, is inserted in pointed cone molding from 3 head end of main reinforcement Steel ring 2, and repeat to bend and be inserted in pointed cone that diameter is sequentially reduced into steel rings 2, the main reinforcement of front end mutually joins and covers make-up Gu steel ring 4;
Step 4: circular and steel reinforcement cage the welding of stiffener
Using stiffener from steel reinforcement cage tip cone end spiral surrounding, and successively will fastening steel ring 4, pointed cone at steel rings 2, solid Determine steel ring 1 and stiffener welding fabrication.
The circumferential direction of the outer marginal end of the fixed steelring 1 opens up equally distributed through-hole, through-hole diameter specification than main reinforcement outside Diameter is big, 30 ° or 45 ° of through-hole interval.
One 1 shaft core position of fixed steelring of the front end welds a steel being overlapped with axle center by support spoke Pipe, length 3-5m.
The pointed cone is the steel ring that successively successively decreases of at least three diameter, equally distributed number of openings on steel ring at steel rings 2 For the half of fixed steelring, the angle at through-hole interval is twice of fixed steelring 1.
The fastening steel ring 4 is the steel ring of the adjustable locking of diameter.
The reinforcement cage skeleton make when, after main reinforcement 3 is pierced by 1 through-hole 3-5m of front end fixed steelring, be successively spaced general For the main reinforcement 3 being pierced by from the 1 face dissection of fixed steelring end, keeping the main reinforcement number being pierced by is the half of the former number of main reinforcement 3.
Pointed cone molding in the steel reinforcement cage front end is bent from the front end of main reinforcement 3 to axis direction, is inserted in directly from 3 head end of main reinforcement The maximum pointed cone of diameter carries out second later and is inserted in the point that diameter is sequentially reduced to steel reinforcement cage axle center bending main reinforcement 3 at steel rings 2 Steel rings 3 are bored into, when 3 front end of main reinforcement of bending reaches axle center or from the beginning end cap enters to fasten steel ring 4 simultaneously when close to shaft core position Locking, thus obtains using the symmetrical front end in axle center as the steel reinforcement cage of pointed cone.
Surrounding for the stiffener and being welded as fasten after steel ring 4 and steel reinforcement cage fix and weld for steel reinforcement cage, It is carried out successively through pointed cone at steel rings and main reinforcement 3, fixed steelring 1 and main reinforcement 3 by stiffener from fastening 4 end spiral surrounding of steel ring Reinforcement of weld.
The welding uses arc welding.
The present invention is specifically described combined with specific embodiments below:
Embodiment 1
As shown in figures 1 to 6
A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage, comprising the following steps:
Step 1: prefabricated fixed steelring 1, pointed cone are at steel rings 2 and fastening steel ring 4
It makes that several specifications are identical and edge circumferentially opens up the fixed steelring 1 of uniform through bore;It is opposite to make at least three diameter Pointed cone that fixed steelring 1 is sequentially reduced and with through-hole is at steel rings 2;Make a fastening steel ring 4;
The circumferential direction of the outer marginal end of the fixed steelring 1 opens up equally distributed through-hole, through-hole diameter specification than main reinforcement outside Diameter is big, 30 ° or 45 ° of through-hole interval.
One 1 shaft core position of fixed steelring of the front end welds a steel being overlapped with axle center by support spoke Pipe, length 3-5m.
The pointed cone is the steel ring that successively successively decreases of at least three diameter, equally distributed number of openings on steel ring at steel rings 2 For the half of fixed steelring, the angle at through-hole interval is twice of fixed steelring 1.
The fastening steel ring 4 is the steel ring of the adjustable locking of diameter.
Step 2: the production of reinforcement cage skeleton
Steel reinforcement cage main reinforcement 3 is sequentially passed through to the through-hole of fixed steelring 1, adjusts the spacing distance between fixed steelring 1, main reinforcement 3 are pierced by the distance of 1 through-hole 3-5m of front end fixed steelring;
The reinforcement cage skeleton make when, after main reinforcement 3 is pierced by 1 through-hole 3-5m of front end fixed steelring, be successively spaced general For the main reinforcement 3 being pierced by from the 1 face dissection of fixed steelring end, keeping the main reinforcement number being pierced by is the half of the former number of main reinforcement 3.
When being pierced by the fixed steelring 1 of front end, interval is welded after cutting off the main reinforcement 3 being pierced by.
Step 3: steel reinforcement cage front end pointed cone forms
The main reinforcement 3 for being pierced by front end fixed steelring 1 is bent to steel reinforcement cage axle center, is inserted in pointed cone molding from 3 head end of main reinforcement Steel ring 2, and repeat to bend and be inserted in pointed cone that diameter is sequentially reduced into steel rings 2, the main reinforcement of front end mutually joins and covers make-up Gu steel ring 4;
Pointed cone molding in the steel reinforcement cage front end is bent from the front end of main reinforcement 3 to axis direction, is inserted in directly from 3 head end of main reinforcement The maximum pointed cone of diameter carries out second later and is inserted in the point that diameter is sequentially reduced to steel reinforcement cage axle center bending main reinforcement 3 at steel rings 2 Steel rings 3 are bored into, when 3 front end of main reinforcement of bending reaches axle center or from the beginning end cap enters to fasten steel ring 4 simultaneously when close to shaft core position Locking, thus obtains using the symmetrical front end in axle center as the steel reinforcement cage of pointed cone.
Step 4: circular and steel reinforcement cage the welding of stiffener
Using stiffener from steel reinforcement cage tip cone end spiral surrounding, and successively will fastening steel ring 4, pointed cone at steel rings 2, solid Determine steel ring 1 and stiffener welding fabrication.
Surrounding for the stiffener and being welded as fasten after steel ring 4 and steel reinforcement cage fix and weld for steel reinforcement cage, It is carried out successively through pointed cone at steel rings and main reinforcement 3, fixed steelring 1 and main reinforcement 3 by stiffener from fastening 4 end spiral surrounding of steel ring Reinforcement of weld.
The welding uses arc welding.
Long screw auger drilling deposited pile steel reinforcement cage is obtained using quick, the regular processing of above method energy.
Embodiment 2
A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage slotting steel reinforcement cage after long auger guncreting Application in Pile Grouting.
Suitable fixed steelring 4 is selected according to the length of long screw auger drilling deposited pile steel reinforcement cage according to aforesaid operations method And fastening steel ring 4 is made, to obtain long screw auger drilling deposited pile steel reinforcement cage for after long auger guncreting Insert the application in steel reinforcement cage Pile Grouting.
The processing method of long screw auger drilling deposited pile steel reinforcement cage of the invention, by prefabricated fixed steelring, pointed cone at fashioned iron Circle and fastening steel ring;The production of reinforcement cage skeleton;The molding of steel reinforcement cage front end pointed cone;Circular and steel reinforcement cage the weldering of stiffener It connects;Efficient quick is made to bottom is pointed cone type, specification error is smaller, long screw auger drilling deposited pile reinforcing bar that is integrally standardizing Cage, long screw auger drilling deposited pile steel reinforcement cage after molding is stable, firm, and when placement can guarantee that vibration force is effectively conducted to steel reinforcement cage Steel reinforcement cage Pile Grouting is inserted after being suitable for long auger guncreting in bottom.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (9)

1. a kind of processing method of long screw auger drilling deposited pile steel reinforcement cage, it is characterised in that: the following steps are included:
Step 1: prefabricated fixed steelring, pointed cone are at steel rings and fastening steel ring
It makes that several specifications are identical and edge circumferentially opens up the fixed steelring of uniform through bore;It is relatively fixed to make at least three diameter Pointed cone that steel ring is sequentially reduced and with through-hole is at steel rings;Make a fastening steel ring;
Step 2: the production of reinforcement cage skeleton
Steel reinforcement cage main reinforcement is sequentially passed through to the through-hole of fixed steelring, adjusts the spacing distance between fixed steelring, main reinforcement is pierced by most The distance of front end fixed steelring through-hole 3-5m;
Step 3: steel reinforcement cage front end pointed cone forms
The main reinforcement for being pierced by front end fixed steelring is bent to steel reinforcement cage axle center, is inserted in pointed cone into steel rings from main reinforcement head end, and It repeats bending and is inserted in pointed cone that diameter is sequentially reduced into steel rings, the main reinforcement of front end mutually joins and puts on fastening steel ring;
Step 4: circular and steel reinforcement cage the welding of stiffener
Using stiffener from steel reinforcement cage tip cone end spiral surrounding, and steel ring, pointed cone will be successively fastened into steel rings, fixed steelring With stiffener welding fabrication.
2. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the fixed steel The circumferential direction for enclosing outer marginal end opens up equally distributed through-hole, and through-hole diameter specification is bigger than main reinforcement outer diameter, 30 ° of through-hole interval or 45°;
One fixed steelring shaft core position of the front end welds a steel pipe being overlapped with axle center, length by support spoke For 3-5m.
3. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the pointed cone at Steel rings are the steel ring that at least three diameter successively successively decreases, and equally distributed number of openings is the half of fixed steelring on steel ring, are led to The angle at hole interval is twice of fixed steelring.
4. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the fastening steel Circle is the steel ring of the adjustable locking of diameter.
5. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the steel reinforcement cage When carcasing, after main reinforcement is pierced by front end fixed steelring through-hole 3-5m, be successively spaced by the main reinforcement being pierced by from fastening steel ring End face dissection, keeping the main reinforcement number being pierced by is the half of former main reinforcement number.
6. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the steel reinforcement cage Pointed cone molding in front end is bent from the front end of main reinforcement to axis direction, is inserted in the maximum pointed cone of diameter into fashioned iron from main reinforcement head end Circle carries out second later and is inserted in pointed cone that diameter is sequentially reduced at steel rings, when bending to steel reinforcement cage axle center bending main reinforcement Main reinforcement front end reaches axle center or from the beginning end cap enters to fasten steel ring and locks when close to shaft core position, thus obtains symmetrical with axle center Front end be pointed cone steel reinforcement cage.
7. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the reinforcement steel Muscle surround and steel reinforcement cage be welded as fasten steel ring and after steel reinforcement cage fixes and welds, by stiffener from fastening steel ring Spiral surrounding is held to carry out successively reinforcement of weld at steel rings and main reinforcement, fixed steelring and main reinforcement through pointed cone.
8. the processing method of long screw auger drilling deposited pile steel reinforcement cage as described in claim 1, it is characterised in that: the welding is adopted Use arc welding.
9. the processing method of the long screw auger drilling deposited pile steel reinforcement cage as described in claim 1-8 any one is in long auger The application in steel reinforcement cage Pile Grouting is inserted after guncreting.
CN201910350101.4A 2019-04-28 2019-04-28 Processing method of long spiral drilling cast-in-place pile reinforcement cage Active CN110153335B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910350101.4A CN110153335B (en) 2019-04-28 2019-04-28 Processing method of long spiral drilling cast-in-place pile reinforcement cage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910350101.4A CN110153335B (en) 2019-04-28 2019-04-28 Processing method of long spiral drilling cast-in-place pile reinforcement cage

Publications (2)

Publication Number Publication Date
CN110153335A true CN110153335A (en) 2019-08-23
CN110153335B CN110153335B (en) 2021-09-03

Family

ID=67640251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910350101.4A Active CN110153335B (en) 2019-04-28 2019-04-28 Processing method of long spiral drilling cast-in-place pile reinforcement cage

Country Status (1)

Country Link
CN (1) CN110153335B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419052A (en) * 2022-08-09 2022-12-02 河南黄河河务局工程建设中心 Overlong reinforcement cage suitable for overlong cast-in-place pile and manufacturing method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101054799A (en) * 2007-01-12 2007-10-17 建研地基基础工程有限责任公司 Post-grouting construction method for long helical bore grouting pile and its grouting device
CN101761071A (en) * 2009-12-31 2010-06-30 上海广联建设发展有限公司 Manufacturing method of reinforcement cage of pouring pile with large diameter
KR20110062537A (en) * 2009-12-03 2011-06-10 진성토건 주식회사 Manufacturing apparatus for cylinder type reinforcement cage
CN106906955A (en) * 2017-03-15 2017-06-30 上海建工四建集团有限公司 A kind of integral prefabricated reinforcing bar web frame of shear wall and its construction method
CN107030450A (en) * 2016-12-14 2017-08-11 中国二十冶集团有限公司 A kind of flange form that carries is by the preparation method of the steel reinforcement cage of strong stirrup
CN207032675U (en) * 2017-08-09 2018-02-23 江苏华都建设有限公司 A kind of steel reinforcement cage

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101054799A (en) * 2007-01-12 2007-10-17 建研地基基础工程有限责任公司 Post-grouting construction method for long helical bore grouting pile and its grouting device
KR20110062537A (en) * 2009-12-03 2011-06-10 진성토건 주식회사 Manufacturing apparatus for cylinder type reinforcement cage
CN101761071A (en) * 2009-12-31 2010-06-30 上海广联建设发展有限公司 Manufacturing method of reinforcement cage of pouring pile with large diameter
CN107030450A (en) * 2016-12-14 2017-08-11 中国二十冶集团有限公司 A kind of flange form that carries is by the preparation method of the steel reinforcement cage of strong stirrup
CN106906955A (en) * 2017-03-15 2017-06-30 上海建工四建集团有限公司 A kind of integral prefabricated reinforcing bar web frame of shear wall and its construction method
CN207032675U (en) * 2017-08-09 2018-02-23 江苏华都建设有限公司 A kind of steel reinforcement cage

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115419052A (en) * 2022-08-09 2022-12-02 河南黄河河务局工程建设中心 Overlong reinforcement cage suitable for overlong cast-in-place pile and manufacturing method thereof

Also Published As

Publication number Publication date
CN110153335B (en) 2021-09-03

Similar Documents

Publication Publication Date Title
KR101147510B1 (en) Complex pile with improved end bearing capacity and piling method of complex pile using the same
CN100360746C (en) Support free construction method for super large diameter circular deep foundation ditch
JP2008255730A (en) Spiral steel pipe pile
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
KR101674656B1 (en) CIP retaining wall with steel tube
KR101195235B1 (en) Underground structure construction method using composite pile
JP2014091929A (en) Ground reinforcing method with small-diameter cast-in-place concrete pile
CN110153335A (en) A kind of processing method of long screw auger drilling deposited pile steel reinforcement cage
JP2011017248A (en) Prefabricated pile
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
KR101812463B1 (en) Rrotating-press type pile construction method by using tip-enlarged pile
CN202194127U (en) Reducing high-pressure jet grouting rigid pile
KR101727206B1 (en) The smart front end cap for adjusting phc file length and the method using thereof
KR101124203B1 (en) Pile structure
JP4724879B2 (en) Foundation pile structure
CN217174729U (en) Bored concrete pile structure for water conservancy bridge
KR20130103929A (en) Complex pile for improving end bearing capacity of bored precast pile
CN106640118B (en) A kind of underground cavern crown structure, underground chamber and Cavity Construction method
JP2006207320A (en) Structure of steel pipe pile end for pile installation by inner excavation
KR101680106B1 (en) The screw anchor pile with extended reinforcing plate for earth reinforcement
KR101794112B1 (en) Rrotating-press type pile construction device by using tip-enlarged pile
CN101761348A (en) Multi-directional anchor pile one-step formed drilling tool
KR101876414B1 (en) Pile with reinforced tip and its construction method thereof
JP2020029703A (en) Pile body and construction method of pile
JP2014091930A (en) Ground reinforcing method with small-diameter cast-in-place concrete pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A processing method for steel cage of long spiral drilled cast-in-place pile

Granted publication date: 20210903

Pledgee: Kunming Branch of China Everbright Bank Co.,Ltd.

Pledgor: YUNNAN CONSTRUCTION FIRST PROSPECTING DESIGN Co.,Ltd.

Registration number: Y2024530000017

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20210903

Pledgee: Kunming Branch of China Everbright Bank Co.,Ltd.

Pledgor: YUNNAN CONSTRUCTION FIRST PROSPECTING DESIGN Co.,Ltd.

Registration number: Y2024530000017

PC01 Cancellation of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A processing method for steel cage of long spiral drilled cast-in-place pile

Granted publication date: 20210903

Pledgee: Kunming Branch of China Everbright Bank Co.,Ltd.

Pledgor: YUNNAN CONSTRUCTION FIRST PROSPECTING DESIGN Co.,Ltd.

Registration number: Y2024530000023

PE01 Entry into force of the registration of the contract for pledge of patent right