CN110145307B - 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法 - Google Patents

宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法 Download PDF

Info

Publication number
CN110145307B
CN110145307B CN201910509435.1A CN201910509435A CN110145307B CN 110145307 B CN110145307 B CN 110145307B CN 201910509435 A CN201910509435 A CN 201910509435A CN 110145307 B CN110145307 B CN 110145307B
Authority
CN
China
Prior art keywords
wall
coal
roadway
chamber
woven bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910509435.1A
Other languages
English (en)
Other versions
CN110145307A (zh
Inventor
潘立友
唐鹏
孙久政
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201910509435.1A priority Critical patent/CN110145307B/zh
Publication of CN110145307A publication Critical patent/CN110145307A/zh
Application granted granted Critical
Publication of CN110145307B publication Critical patent/CN110145307B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/18Methods of underground mining; Layouts therefor for brown or hard coal
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques

Abstract

本发明公开了一种宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法,其特征在于:首先将原留巷煤壁侧进行扩帮挖底,将扩帮下来的煤体装入编织袋,在扩帮后的煤壁上沿留巷人工制造出缓冲卸压带;在工作面一侧煤帮上开挖硐室,对硐室顶板进行常规锚杆支护,回填后形成一道道横向柔性墙;将已装好物料的编织袋为墙体材料,沿扩帮后的空间位置垒砌成纵向柔性墙;通过人工制造缓冲卸压带,改变了煤层应力分布,防止冲击地压发生;横向柔性墙和纵向柔性墙构成柔性结合体,起到分割、减缓动载、减缓冲击强度的作用。

Description

宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法
技术领域
本发明属于煤矿开采技术领域。
背景技术
沿空留巷(简称留巷)是煤矿在上一区段工作面采过后,将其运输巷扩修和用专门的支护材料进行维护,使此保留下来作为下一区段工作面的回风巷。这种一条巷道可以得到两次利用,是无煤柱开采技术中的一种方式。沿空留巷可以最大限度回收资源,避免煤炭损失。
冲击地压是最严重的动力灾害之一,影响冲击地压的地质因素包括构造、埋深、顶板、煤层硬度、开采因素等;越到深部地质因素越起到决定作用,且破坏显现日趋严重,其中坚硬顶板导致的冲击地压占据较大比重,且破坏性也较严重。由于坚硬顶板往往导致存在悬顶结构,面临较大的静态应力场,尤其工作面开采期间再附加侧向高动态应力,会导致应力场突然释放,冲击地压危险更加增大。采用常规方法的常规技术参数对坚硬顶板型冲击地压解危效果较差,且难以达到解除危险的效果。到目前为止,还没有针对坚硬顶板的具体煤层条件下,在沿空留巷扩修维护与回采期间的冲击地压能达到完全控制的相应技术措施。
发明内容
本发明的目的是针对目前坚硬顶板条件下沿空巷冲击地压的解危问题,提出一种宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法。
本发明的技术方案是:
一种宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法,其特征在于:
一、 首先将原留巷煤壁侧进行扩帮挖底,扩帮宽度1.5-1.6 m,挖底深度0.5 m,将扩帮下来的煤体装入编织袋中封口备用,将挖底下来的矸石和水泥混合后装入编织袋中封口,扩帮挖底后作为垒砌人工墙的空间位置;
二、按照常规方法在扩帮后的煤壁上进行打眼深孔爆破,爆破深度8-12m,沿留巷人工制造出一个宽度的8-12m缓冲卸压带;
三、在工作面一侧煤帮上开挖硐室,相邻硐室间距一般为15-20m,硐室深度5-6m,宽度和高度2m左右,同时将开挖硐室下来的煤体装入编织袋中,封口备用;在硐室形成后,对硐室顶板进行常规锚杆支护,再将装入煤体的袋编织袋回填到硐室中,形成一道道横向柔性墙;
四、在扩帮挖底后的空间位置,将已装好物料的编织袋为墙体材料,沿扩帮后的空间位置垒砌成宽度1.5-1.6m米的纵向柔性墙;垒砌高度至巷道顶板;垒砌时下部为矸石和水泥混合体编织袋,作为墙体底部承载,上部为煤体编制袋,构成可压缩变形的柔性墙。
本发明的积极效果是:
1、通过对煤帮侧实施爆破技术,人工制造缓冲卸压,带改变了煤层应力分布,将应力向深部转移,同时破坏了煤体,从根本上改变了煤体冲击属性,防止冲击地压发生;
2、在煤帮侧挖掘硐室,切断了煤层沿走向的连续性,使得顶板煤层发生冲击的面积明显减小,减缓顶板运动加载强度;
3、将硐室挖掘的煤体就地取材制作成煤体袋回填,将原巷道拓宽建墙、拓宽挖掘的煤体和矸石在原地制作成建墙矸石袋,再在原地用矸石袋垒砌成人工墙,就地取材,减少了取材运材环节,提高工作效率减少工程成本。
4、将硐室用煤体袋回填后构成一道道沿煤层走向的横向柔性墙,并与紧贴煤壁的纵向柔性墙构成柔性结合体,起到分割、减缓动载、减缓冲击强度的作用,起到保持支护与缓冲防护的双作用;再加上爆破形成的软煤体,从而实现留巷的彻底防冲,保证巷道内的工作人员的安全。
下面结合附图说明本发明的实施。
附图说明
图1是实施例的扩帮和缓冲卸压带效果平面示意图;图2是实施例的硐室布置效果平面示意图;图3是实施例的柔性墙效果平面示意图。
具体实施方式
本领域技术人员根据发明内容所述的技术方案和图1-3所示的的平面图示意图即可实施,在此不再详述。

Claims (1)

1.宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法,其特征在于:
1) 首先将原留巷煤壁侧进行扩帮挖底,扩帮宽度1.5-1.6 m,挖底深度0.5 m,将扩帮下来的煤体装入编织袋中封口备用,将挖底下来的矸石和水泥混合后装入编织袋中封口备用,原留巷煤壁侧扩帮挖底后作为垒砌柔性硐室墙的空间位置;
2)按照常规方法在扩帮后的煤壁上进行打眼深孔爆破,爆破深度8-12m,沿留巷人工制造出一个宽度8-12m的缓冲卸压带;
3)在工作面一侧煤帮上开挖硐室,相邻硐室间距为15-20m,硐室深度为5-6m,硐室宽度和高度为2m,同时将硐室开挖下来的煤体装入编织袋中,封口备用;在硐室形成后,对硐室顶板进行常规锚杆支护,再将装有煤体的编织袋回填到硐室中,形成一道道横向柔性墙;
4)在扩帮挖底后的空间位置,将已装好矸石和水泥的编织袋作为墙体材料,沿扩帮后的空间位置垒砌成宽度1.5-1.6m米的纵向柔性墙;垒砌纵向柔性墙高度至巷道顶板;垒砌时纵向柔性墙的下部为矸石和水泥混合体编织袋,作为墙体底部承载,纵向柔性墙的上部为煤体编织袋,构成可压缩变形的纵向柔性墙。
CN201910509435.1A 2019-06-13 2019-06-13 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法 Active CN110145307B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910509435.1A CN110145307B (zh) 2019-06-13 2019-06-13 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910509435.1A CN110145307B (zh) 2019-06-13 2019-06-13 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法

Publications (2)

Publication Number Publication Date
CN110145307A CN110145307A (zh) 2019-08-20
CN110145307B true CN110145307B (zh) 2020-12-18

Family

ID=67591018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910509435.1A Active CN110145307B (zh) 2019-06-13 2019-06-13 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法

Country Status (1)

Country Link
CN (1) CN110145307B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110984988B (zh) * 2019-12-26 2021-01-29 中原工学院 一种含块状夹矸软煤冲击地压防控方法
CN111259542B (zh) * 2020-01-15 2024-03-08 中国矿业大学 一种巷道顶板锚固支护抗冲击能力的计算方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1008444A1 (ru) * 1979-11-26 1983-03-30 Всесоюзный научно-исследовательский институт нерудных строительных материалов и гидромеханизации Способ разработки месторождений
SU1067214A1 (ru) * 1982-10-04 1984-01-15 Джезказганский Научно-Исследовательский И Проектный Институт Цветной Металлургии Способ разработки пологих залежей
CN102661169A (zh) * 2012-04-28 2012-09-12 山东科技大学 一种用于无煤柱开采的锚栓网矸石袋墙体沿空留巷方法
CN107386309A (zh) * 2017-08-15 2017-11-24 山东大学 凹陷矿山大流量高流速管道裂隙型岩溶突涌水封堵方法
CN108590747A (zh) * 2018-04-16 2018-09-28 贵州紫金矿业股份有限公司 壁式全面回采液压柱临时支护嗣后充填法
CN208364123U (zh) * 2018-06-28 2019-01-11 山西霍尔辛赫煤业有限责任公司 一种留顶煤巷道沿空留巷切顶卸压护巷结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1008444A1 (ru) * 1979-11-26 1983-03-30 Всесоюзный научно-исследовательский институт нерудных строительных материалов и гидромеханизации Способ разработки месторождений
SU1067214A1 (ru) * 1982-10-04 1984-01-15 Джезказганский Научно-Исследовательский И Проектный Институт Цветной Металлургии Способ разработки пологих залежей
CN102661169A (zh) * 2012-04-28 2012-09-12 山东科技大学 一种用于无煤柱开采的锚栓网矸石袋墙体沿空留巷方法
CN107386309A (zh) * 2017-08-15 2017-11-24 山东大学 凹陷矿山大流量高流速管道裂隙型岩溶突涌水封堵方法
CN108590747A (zh) * 2018-04-16 2018-09-28 贵州紫金矿业股份有限公司 壁式全面回采液压柱临时支护嗣后充填法
CN208364123U (zh) * 2018-06-28 2019-01-11 山西霍尔辛赫煤业有限责任公司 一种留顶煤巷道沿空留巷切顶卸压护巷结构

Also Published As

Publication number Publication date
CN110145307A (zh) 2019-08-20

Similar Documents

Publication Publication Date Title
CN103821558B (zh) 煤矿采空区充填采矿及沿空留巷充填工艺
CN104763432B (zh) 一种高应力巷道围岩卸压控制大变形的方法
CN110173264B (zh) 断顶与常规卸压防治坚硬顶板留巷冲击地压方法
CN111305876A (zh) 深部巷道锚固-劈裂注浆-水力压裂卸压协同控制方法
Singh et al. Sinkhole subsidence due to mining
CN104533467B (zh) 一种高承压水、断层破碎巷道的支护方法
CN110219649B (zh) 缓冲卸压带与宽巷柔性墙防治坚硬顶板留巷冲击地压方法
CN108915764B (zh) 一种预留巷道胶结充填回收房式煤柱的方法
CN108643907A (zh) 一种破碎直接顶沿空放顶成巷无煤柱开采方法
CN105317459A (zh) 一种用于控制坚硬顶板大面积垮落灾害的分区充填方法
AU2021355609B2 (en) Method for mining by filling and caving
CN104213919A (zh) 一种浅埋急倾斜煤层冲击地压的防治方法
CN110145307B (zh) 宽巷与柔性硐室墙防治坚硬顶板留巷冲击地压方法
CN110259448B (zh) 卸压破顶与宽巷柔性墙防治坚硬顶板留巷冲击地压方法
CN111005392A (zh) 一种含缓倾软弱夹层矿山高陡滑坡的治理方法
CN113586086B (zh) 一种半封闭式大断面巷道软弱破碎底板加固方法
CN110566238A (zh) 一种泥岩类顶板小煤柱沿空巷道支护结构及其方法
Wagner et al. Design considerations for pillar systems in deep mines
CN114562325B (zh) 一种基于耕地保护的矸石和超高水材料充填开采方法
CN111335896B (zh) 冲击地压煤层回采巷道宽掘窄用无煤柱防冲方法
CN112879010B (zh) 一种市政工程的地基施工方法
CN112174616B (zh) 一种小窑破坏区松散煤岩体井下固结材料及固结方法
CN112593939A (zh) 一种矸石双充填的全煤柱置换开采“三下”煤层的方法
CN113123358A (zh) 一种采煤不均匀沉降作用下船池变形防治结构及施工方法
CN113464140B (zh) 一种煤矿胎膜成巷无煤柱开采方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 266590 No. 579, Bay Road, Huangdao District, Shandong, Qingdao

Applicant after: Shandong University of Science and Technology

Address before: 271000 Shandong Province, Tai'an city Taishan District mountain Street No. 223 Tai'an campus of Shandong University of Science and Technology

Applicant before: Shandong University of Science and Technology

GR01 Patent grant
GR01 Patent grant