CN110144966A - A kind of round no node underground pipe gallery of assembled waterproof dual-layer - Google Patents
A kind of round no node underground pipe gallery of assembled waterproof dual-layer Download PDFInfo
- Publication number
- CN110144966A CN110144966A CN201910517776.3A CN201910517776A CN110144966A CN 110144966 A CN110144966 A CN 110144966A CN 201910517776 A CN201910517776 A CN 201910517776A CN 110144966 A CN110144966 A CN 110144966A
- Authority
- CN
- China
- Prior art keywords
- piping lane
- arc
- wall
- lane wall
- rib
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Chemical & Material Sciences (AREA)
- Hydrology & Water Resources (AREA)
- Building Environments (AREA)
Abstract
The invention belongs to underground construction technology fields, more particularly to a kind of round no node underground pipe gallery of assembled waterproof dual-layer.Including arc piping lane wall one, arc piping lane wall two, end piping lane wall, arc concrete casing, piping lane body connects rib, corridor wall groove, cage connection rib, water proof rubber bed course, U-bolt, high-strength bolt, prepared screw-bolt hole, U-bolt hole, the arc piping lane wall one and arc piping lane wall two is symmetrically arranged in the two sides up and down of pipe gallery and the left and right sides, constitute internal layer piping lane wall, shape is circle, it is corresponding that arc piping lane wall one with the piping lane body on arc piping lane wall two connects rib position, piping lane body connection rib on arc piping lane wall one is arranged outward, piping lane body connection rib on arc piping lane wall two is inwardly arranged;Advantages of the present invention effect is that waterproof measure is novel, comprehensive, and simple structure, convenient transportation, piping lane body is secured, construction is simple, adapts to assembled development.
Description
Technical field
The invention belongs to underground construction technology fields, more particularly to a kind of round no node underground of assembled waterproof dual-layer
Pipe gallery.
Background technique
The concept of underground utilities pipe gallery is built in city, the Europe originating from 19th century primarily occur ins France.
Paris since 1833 has been born after first underground utilities pipe gallery system in the world, has been had so far nearly 182 years
Development course.It explored by a century, research, improve and practice, many cities at home, outside have obtained tremendous expansion, and
Become state, the modernization of inside and outside flourishing urban municipal construction management signifies and a part of city public administration.
But at this stage there is also: underground pipe gallery globality poor, structure are not sufficiently stable, and waterproof measure is poor, imperfect,
There are also installations to build time-consuming and laborious situation, brings very big inconvenience to Urban Underground construction, is urgent problem at this stage.
Summary of the invention
In order to solve above-mentioned technical problem, it is novel, comprehensive that the present invention provides a kind of waterproof measures, construction letter
Single, convenient transportation, piping lane body is secured, the round no node underground pipe gallery of the assembled waterproof dual-layer of construction is simple, effectively
Solving underground pipe gallery globality poor, structure is not sufficiently stable, and waterproof measure is poor, and it is imperfect, take there are also time-consuming when installing
The problem of power.
The technical solution adopted by the invention is as follows:
A kind of round no node underground pipe gallery of assembled waterproof dual-layer, including arc piping lane wall one, arc piping lane wall two, end
Portion's piping lane wall, arc concrete casing, piping lane body connect rib, corridor wall groove, cage connection rib, water proof rubber bed course, U-shaped spiral shell
Bolt, high-strength bolt, prepared screw-bolt hole, U-bolt hole, the arc piping lane wall one and arc piping lane wall two are symmetrically arranged
In the two sides up and down of pipe gallery and the left and right sides, internal layer piping lane wall is constituted, shape is circle, arc piping lane wall one and arc
Piping lane body connection rib position on piping lane wall two is corresponding, and the piping lane body connection rib on arc piping lane wall one is arranged outward, arc
Piping lane body connection rib on shape piping lane wall two is inwardly arranged;Setting on the outside of the arc middle position of the arc piping lane wall one
Corridor wall groove, the both side ends of arc piping lane wall one are arranged symmetrically piping lane body connection rib, and interposition installs on piping lane body connection rib
Set prepared screw-bolt hole;Wall groove in corridor is arranged on the outside of the arc middle position of the arc piping lane wall two, arc piping lane wall two
Both side ends are arranged symmetrically piping lane body connection rib, and piping lane body connects middle position on rib and prepared screw-bolt hole is arranged;Using high-strength spiral shell
Arc piping lane wall one and arc piping lane wall two are correspondingly connected with by bolt by prepared screw-bolt hole;The end piping lane wall and curved pipe
Corridor wall two is arranged in the left and right sides of piping lane body, and end piping lane wall is set to the end of the left and right sides of entire underground pipe gallery
Portion, the length of end piping lane wall is the half of arc piping lane wall two, using high-strength bolt to end piping lane wall and arc piping lane wall
Two are attached;The arc concrete casing shape is quarter circular arc, and shell is arranged in arc concrete casing both ends
Rib is connected, cage connection rib size is the half of corridor wall groove, the cage connection rib on two adjacent arc concrete casings
The cross sectional shape of the same corridor wall groove of cross sectional shape after docking is identical;Arc piping lane wall one is inserted into after the docking of cage connection rib
With corridor wall groove prefabricated on arc piping lane wall two, U-shaped spiral shell is arranged in the cage connection rib other side on arc concrete casing
Keyhole, the U-bolt hole site on adjacent arc concrete casing is corresponding, and 4 arc concrete casings pass through U-bolt company
It connects.
Further, the arc piping lane wall two is set to the center of first and second arc piping lane wall one, that
This interlocks, and is attached along piping lane direction always, and arc piping lane wall one is more by 1 than two numbers of arc piping lane wall above whole piping lane
It is a.
Further, corridor wall groove depth of groove prefabricated on the arc piping lane wall one and arc piping lane wall two is equal to
The height of cage connection rib adds the thickness of a water proof rubber bed course.
Further, it is carried out between the adjacent arc concrete casing arranged along piping lane direction with building marine glue band
Gap water-proofing treatment.
Further, water proof rubber bed course is placed in the corridor wall groove.
Further, the water proof rubber bed course area of section is identical with corridor wall groove section area.
Beneficial effects of the present invention:
The advantages of the present invention are that waterproof measure is novel, comprehensive, and simple structure, convenient transportation, piping lane body is secured, applies
The simply novel piping lane body structure of work;The cooperation of rib and groove between ectonexine round casing of the present invention keeps ectonexine structure firm
Gu can increase overall stability, internal layer piping lane body is all disposed between outer layer piping lane body and ectonexine and is bolted, outer layer
Adhesive waterproof tape and internal waterproof bed course cover structure gap, being capable of high-effective water-proof;Piping lane of the invention simultaneously, which connects, to be used
Endothecium structure interlaced arrangement is connected without node, adapts to assembled development.
Detailed description of the invention
Fig. 1 is the round pipe gallery schematic cross-section of the present invention.
Fig. 2 is that schematic diagram is spliced in piping lane section.
Fig. 3 arc piping lane wall one and arc piping lane wall two splice schematic diagram.
Fig. 4 is arc piping lane wall one, arc piping lane wall two, end piping lane wall continuously splice schematic diagram.
Fig. 5 is whole side view after installing arc concrete casing outside piping lane wall.
Fig. 6 connects Local map between arc piping lane wall one or arc piping lane wall two and arc concrete casing.
Fig. 7 is arc piping lane wall one, two connection schematic diagram of arc piping lane wall.
In figure: 1 be arc piping lane wall one, 2 be arc piping lane wall two, 3 be end piping lane wall, 4 be arc concrete casing,
5 it is piping lane body connection rib, 6 be corridor wall groove, 7 be cage connection rib, 8 be water proof rubber bed course, 9 be U-bolt, 10 is high-strength
Bolt, 11 be prepared screw-bolt hole, 12 be buildings waterproof adhesive tape, 13 be U-bolt hole.
Specific embodiment
In order to further illustrate the present invention, the present invention is described in detail with reference to the accompanying drawings and embodiments, but not
They can be interpreted as limiting the scope of the present invention.
Embodiment 1: as shown in Fig. 1-7, a kind of round no node underground pipe gallery of assembled waterproof dual-layer of the present invention,
Rib 5, corridor are connected including arc piping lane wall 1, arc piping lane wall 22, end piping lane wall 3, arc concrete casing 4, piping lane body
Wall groove 6, cage connection rib 7, water proof rubber bed course 8, U-bolt 9, high-strength bolt 10, prepared screw-bolt hole 11, U-bolt hole
13, it is characterised in that: the arc piping lane wall 1 and arc piping lane wall 22 is symmetrically arranged above and below pipe gallery
Two sides and the left and right sides constitute internal layer piping lane wall, and shape is round, on arc piping lane wall 1 and arc piping lane wall 22
Piping lane body connection 5 position of rib is corresponding, and the piping lane body connection rib 5 on arc piping lane wall 1 is arranged outward, arc piping lane wall 22
On piping lane body connection rib 5 inwardly be arranged;Wall groove in corridor is set on the outside of the arc middle position of the arc piping lane wall 1
6, the both side ends of arc piping lane wall 1 are arranged symmetrically piping lane body connection rib 5, and it is pre- that piping lane body connects middle position setting on rib 5
Stay bolt hole 11;Corridor wall groove 6 is arranged on the outside of the arc middle position of the arc piping lane wall 22, arc piping lane wall 22
Both side ends are arranged symmetrically piping lane body connection rib 5, and piping lane body connects middle position on rib 5 and prepared screw-bolt hole 11 is arranged;Using height
Arc piping lane wall 1 and arc piping lane wall 22 are correspondingly connected with by strength bolt 10 by prepared screw-bolt hole 11;The end piping lane
Wall 3 and arc piping lane wall 22 are arranged in the left and right sides of piping lane body, and end piping lane wall 3 is set to entire underground pipe gallery
The left and right sides end, the length of end piping lane wall 3 is the half of arc piping lane wall 22, using high-strength bolt 10 to end
Piping lane wall 3 is attached with arc piping lane wall 22;4 shape of arc concrete casing is quarter circular arc, and arc is mixed
Cage connection rib 7 is arranged in solidifying soil 4 both ends of shell, and 7 size of cage connection rib is the half of corridor wall groove 6, two adjacent arcs
The cross sectional shape of the same corridor wall groove 6 of cross sectional shape after the docking of cage connection rib 7 on concrete casing 4 is identical;Shell
It connects after rib 7 docks and is inserted into corridor wall groove 6 prefabricated on arc piping lane wall 1 and arc piping lane wall 22, outside arc concrete
U-bolt hole 13,13, U-bolt hole on adjacent arc concrete casing 4 are arranged in 7 other side of cage connection rib on shell 4
Correspondence is set, 4 arc concrete casings 4 are connected by U-bolt 9.The arc piping lane wall 22 is set to first and
The center of two arc piping lane walls 1, it is interlaced with each other, it is attached along piping lane direction always, arc above whole piping lane
Piping lane wall 1 is 1 more than 22 numbers of arc piping lane wall.
Prefabricated 6 depth of groove of corridor wall groove connects equal to shell on the arc piping lane wall 1 and arc piping lane wall 22
The height of rib 7 adds the thickness of a water proof rubber bed course 8.
Gap is carried out with buildings waterproof adhesive tape 12 between the adjacent arc concrete casing 4 arranged along piping lane direction to prevent
Water process.
Water proof rubber bed course 8 is placed in the corridor wall groove 6;8 area of section of water proof rubber bed course is cut with corridor wall groove 6
Face area is identical.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (6)
1. a kind of round no node underground pipe gallery of assembled waterproof dual-layer, including arc piping lane wall one (1), arc piping lane wall
Two (2), end piping lane wall (3), arc concrete casing (4), piping lane body connect rib (5), corridor wall groove (6), cage connection rib
(7), U-bolt (9), high-strength bolt (10), prepared screw-bolt hole (11), U-bolt hole (13), it is characterised in that: the arc
Shape piping lane wall one (1) and arc piping lane wall two (2) are symmetrically arranged in the two sides up and down of pipe gallery and the left and right sides, are constituted
Internal layer piping lane wall, shape are circle, and arc piping lane wall one (1) connects rib (5) with the piping lane body on arc piping lane wall two (2)
Position is corresponding, and piping lane body connection rib (5) on arc piping lane wall one (1) is arranged outward, the pipe on arc piping lane wall two (2)
Corridor body connects rib (5) and is inwardly arranged;Corridor wall groove (6) are set on the outside of the arc middle position of the arc piping lane wall one (1),
The both side ends of arc piping lane wall one (1) are arranged symmetrically piping lane body connection rib (5), and interposition installs in piping lane body connection rib (5)
Set prepared screw-bolt hole (11);Corridor wall groove (6) are arranged on the outside of the arc middle position of the arc piping lane wall two (2), arc
The both side ends of piping lane wall two (2) are arranged symmetrically piping lane body connection rib (5), and it is pre- that piping lane body connects middle position setting on rib (5)
Stay bolt hole (11);Pass through prepared screw-bolt hole (11) for arc piping lane wall one (1) and arc piping lane wall using high-strength bolt (10)
Two (2) are correspondingly connected with;The end piping lane wall (3) and arc piping lane wall two (2) is arranged in the left and right sides of piping lane body, end
Portion's piping lane wall (3) is set to the end of the left and right sides of entire underground pipe gallery, and the length of end piping lane wall (3) is curved pipe
The half of corridor wall two (2) is attached end piping lane wall (3) with arc piping lane wall two (2) using high-strength bolt (10);It is described
Arc concrete casing (4) shape be quarter circular arc, arc concrete casing (4) both ends be arranged cage connection rib (7),
Cage connection rib (7) size is the half of corridor wall groove (6), the cage connection on two adjacent arc concrete casings (4)
The cross sectional shape of the same corridor wall groove (6) of cross sectional shape after rib (7) docking is identical;It is inserted into after cage connection rib (7) docking
Prefabricated corridor wall groove (6) on arc piping lane wall one (1) and arc piping lane wall two (2), it is outer on arc concrete casing (4)
Shell connects rib (7) other side arrangement U-bolt hole (13), U-bolt hole (13) position on adjacent arc concrete casing (4)
Corresponding, 4 arc concrete casings (4) are connected by U-bolt (9).
2. the round no node underground pipe gallery of a kind of assembled waterproof dual-layer according to claim 1, it is characterised in that:
Arc piping lane wall two (2) is set to the center of first and second arc piping lane wall one (1), interlaced with each other, always edge
Piping lane direction is attached, and arc piping lane wall one (1) is 1 more than two (2) number of arc piping lane wall above whole piping lane.
3. the round no node underground pipe gallery of a kind of assembled waterproof dual-layer according to claim 1, it is characterised in that:
Prefabricated corridor wall groove (6) depth of groove is equal to cage connection on the arc piping lane wall one (1) and arc piping lane wall two (2)
The height of rib (7) adds the thickness of a water proof rubber bed course (8).
4. the round no node underground pipe gallery of a kind of assembled waterproof dual-layer according to claim 1, it is characterised in that:
It is carried out at the waterproof of gap between the adjacent arc concrete casing (4) arranged along piping lane direction with buildings waterproof adhesive tape (12)
Reason.
5. the round no node underground pipe gallery of a kind of assembled waterproof dual-layer according to claim 1, it is characterised in that:
Water proof rubber bed course (8) are placed in the corridor wall groove (6).
6. the round no node underground pipe gallery of a kind of assembled waterproof dual-layer according to claim 1, it is characterised in that:
Water proof rubber bed course (8) area of section is identical with corridor wall groove (6) area of section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910517776.3A CN110144966A (en) | 2019-06-14 | 2019-06-14 | A kind of round no node underground pipe gallery of assembled waterproof dual-layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910517776.3A CN110144966A (en) | 2019-06-14 | 2019-06-14 | A kind of round no node underground pipe gallery of assembled waterproof dual-layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110144966A true CN110144966A (en) | 2019-08-20 |
Family
ID=67591534
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910517776.3A Withdrawn CN110144966A (en) | 2019-06-14 | 2019-06-14 | A kind of round no node underground pipe gallery of assembled waterproof dual-layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110144966A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005737A (en) * | 2019-12-28 | 2020-04-14 | 上海建旗建筑工程设计有限公司 | Tunnel type prestressed pipe curtain structure and construction method |
-
2019
- 2019-06-14 CN CN201910517776.3A patent/CN110144966A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111005737A (en) * | 2019-12-28 | 2020-04-14 | 上海建旗建筑工程设计有限公司 | Tunnel type prestressed pipe curtain structure and construction method |
CN111005737B (en) * | 2019-12-28 | 2021-07-23 | 上海建旗建筑工程设计有限公司 | Tunnel type prestressed pipe curtain structure and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017071113A1 (en) | Cement-soil mixing pile protected underground pipe gallery | |
CN110144963A (en) | Variable storehouse assembled underground pipe gallery | |
CN105507346A (en) | Prefabricated underground pipe gallery | |
CN211037044U (en) | City utility tunnel | |
CN110144966A (en) | A kind of round no node underground pipe gallery of assembled waterproof dual-layer | |
WO2017071111A1 (en) | Underground pipe gallery protection structure | |
CN114150702A (en) | Double-pipe suspension tunnel pipe body joint device and construction method | |
CN109629602A (en) | A kind of assembled underground pipe gallery with T-section point of changeable layout | |
CN205894103U (en) | Prefabricated parabola type utility tunnel | |
CN110541432A (en) | Slip casting formula utility tunnel of prefabricated round shell | |
CN210712928U (en) | Assembled double-bin underground comprehensive pipe gallery node | |
CN111236315A (en) | Oval-shaped utility tunnel in variable storehouse of assembled | |
CN205617425U (en) | Prefabricated structure of assembling of utility tunnel | |
CN111519658A (en) | Novel assembled underground pipe gallery | |
CN212294740U (en) | Oval-shaped utility tunnel in variable storehouse of assembled | |
CN210507525U (en) | Strengthen waterproof type assembled many storehouses utility tunnel | |
CN109469099A (en) | Assembled underground pipe gallery | |
CN208996077U (en) | A kind of double cabin piping lane import and export mixes in underground | |
CN110056006B (en) | Assembled underground pipe gallery | |
CN212983870U (en) | Circular working pit supporting member | |
CN209816915U (en) | Double-circular shield construction comprehensive pipe gallery | |
CN210712933U (en) | Assembled concrete utility tunnel is connected to cell-type | |
CN210797632U (en) | Assembled waterproof double-layer circular node-free underground comprehensive pipe gallery | |
CN211057848U (en) | Circular utility tunnel extensible structure of individual layer | |
CN210238570U (en) | Assembled underground pipe gallery structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190820 |