CN110144824A - Beret slice single side formwork method - Google Patents

Beret slice single side formwork method Download PDF

Info

Publication number
CN110144824A
CN110144824A CN201910391348.0A CN201910391348A CN110144824A CN 110144824 A CN110144824 A CN 110144824A CN 201910391348 A CN201910391348 A CN 201910391348A CN 110144824 A CN110144824 A CN 110144824A
Authority
CN
China
Prior art keywords
beret slice
construction
type groove
steel
single side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910391348.0A
Other languages
Chinese (zh)
Inventor
何锐
史策
吴洪波
田国平
梁宝辉
唐海峰
赵乾
唐晓明
赵庆明
张永
王玲
颜丙鑫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Original Assignee
China Railway 22nd Bureau Group Co Ltd
Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 22nd Bureau Group Co Ltd, Harbin Railway Construction Group Co Ltd of China Railway 22nd Bureau Group Co Ltd filed Critical China Railway 22nd Bureau Group Co Ltd
Priority to CN201910391348.0A priority Critical patent/CN110144824A/en
Publication of CN110144824A publication Critical patent/CN110144824A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Beret slice single side formwork method is related to wearing the culvert of engineering tunnel, U-type groove side wall construction technology under municipal administration.Tunnel is contained, after U-type groove foundation pit supporting project (cast-in-situ bored pile) construction, and side wall uses beret slice single side formwork technique, step: one, crown beam is constructed: in crown beam construction, the hole of accurate screw-thread steel is reserved at interval.Two, U-type groove pit earthwork excavates.Three, U-type groove construction of bottom plates: pre-buried fining twisted steel and Two bors d's oeuveres channel steel are needed when mounting base reinforcing bar, pours underplate concrete.Four, beret slice single side formwork is constructed: installing beret slice using lifting machine, beret slice bottom is placed in above Two bors d's oeuveres channel steel;Installation template, flitch;It reinforces.It, which is solved down, wears the culvert of engineering tunnel, the construction of U-type groove side wall using unilateral construction method, that there are construction technical requirements is high, larger for tall and big wall limitation, the larger, Support Method that occupies horizontal space is to site requirements height, the problem that working rack template consumption is big, cost is high, long in time limit.

Description

Beret slice single side formwork method
Technical field
The present invention relates to architectural construction technology methods, and in particular to the culvert of engineering tunnel, U-type groove side wall construction work are worn under municipal administration Skill.
Background technique
In Subway Bridge construction process, tunnel contain and the concrete-pile of U-type groove side wall and foundation pit supporting project close to, Cause not staying as required on the outside of side wall and set external wall construction work surface, causes to be applied according to traditional two-sided formwork way Work.And the circulation material of traditional two-sided formwork investment is more, effect is poor, and the construction site area of occupancy is big, and construction cost is high, It is not able to satisfy construction quality and schedule requirement.Single side bracing method: surveying setting-out → ground excavation → cushion construction → reinforcement installation And after acceptance(check) → installation template → single side bracing lifts in place → installation single side bracing → installation reinforcement steel pipe → installation pressure Beam channel steel → installation built-in fitting system → adjusting bracket verticality → installs operating platform → fastening inspection → examination conjunction again Lattice after-pouring concrete;Using above-mentioned unilateral construction method, construction technology has the following disadvantages: construction technical requirement is high, Larger for tall and big wall limitation, occupancy horizontal space is larger, and Support Method disappears to site requirements height, working rack template Consumption is big, and cost is high, long in time limit.
Summary of the invention
The present invention provides one kind, it solves Subway Bridge two sides U-type groove and concrete-pile construction using unilateral construction method Larger for tall and big wall limitation there are construction technical requirement height, occupancy horizontal space is larger, and Support Method is to site requirements Height, working rack template consumption is big, and cost is high, problem long in time limit.
To solve the above problems, the present invention adopts the following technical scheme: beret slice single side formwork method, under municipal administration with wearing engineering Road is contained, the construction of U-type groove side wall, using beret slice single side formwork technique, comprises the concrete steps that after bored pile construction:
(1) crown beam is constructed: in crown beam construction, the hole of accurate screw-thread steel is reserved at interval, for installing accurate screw-thread steel;
(2) U-type groove pit earthwork excavates: earth excavation, U-type groove bed course pour, concrete drill hole stake gunite concrete, as U Type groove outer wall template;
(3) U-type groove construction of bottom plates: pre-buried fining twisted steel and U-type groove side wall main reinforcement is needed to weld and in advance when mounting base reinforcing bar Two bors d's oeuveres channel steel is buried, bottom plate installation is then carried out and underplate concrete pours;
(4) beret slice single side formwork is constructed: installing beret slice using lifting machine, beret slice is placed in double close to wall side bottom It spells above channel steel;Lumps of wood cushion block is set by shortcut middle line side bottom, beret slice top is reinforced through finish rolling screw thread to drawing and crown beam Connection, beret slice lower part reinforce and are connect by the pre-buried fining twisted steel with U-type groove bottom.
400-800mm is divided between accurate screw-thread steel reserving hole.Reserved bore dia 35-45mm.Accurate screw-thread steel uses Φ 32 fining twisted steels.Beret slice arranges that spacing is 400-600mm.
The present invention is characterized by:
1, traditional bracket is replaced with beret slice, working face is small, and it is small not to be occupied horizontal space by the sex-limited of space;
2, using Two bors d's oeuveres channel steel support in beret slice in the following, beret slice stable structure, Two bors d's oeuveres channel steel can limit beret slice longitudinal direction Displacement;
3, beret slice top is connect with the accurate screw-thread steel reserving hole in concrete drill hole stake top portion, beret slice lower part and U-type groove The pre-buried fining twisted steel at bottom connects, and prevents beret slice lateral displacement;
4, beret slice stable structure, low to site requirements, working bracket consumption is small, low cost, short time limit.
Beret slice of the present invention is existing device, and beret slice can be used for highway bridge, and assembled portal jib crane is led Beam, Bridge Erector, hanging basket etc..Bailey truss combined gantry crane, using assembly type steel bridge on highway component assembly portal frame, and Its span and stem height are adjustable, to adapt to different work-yards, be now widely used for highway, railway, municipal administration, building, The Contraction in Site such as the construction projects such as water conservancy, bridge construction precasting yard lifting movement prefabricated components, bridge pier side fortune dress crossbeam.
Conventional beret slice is welded by upper and lower chord member, vertical bar and brace, and there is male and female connector in the end of top-bottom chord, There is pestle frame connecting pin bores on connector.The chord member of beret slice is composed of two No. 10 channel steels (back-to-back), on lower boom, weldering There is steel plate of the muti-piece with circular hole, has the bolt hole for connecting with reinforcement chord member and the double-deck truss in upper and lower chord member, in top boom Interior four bolts hole there are also for connecting support frame, two in-between holes are to connect for double or multiple rows of truss with internode 's.Two holes by both ends are across internode connections.Multiple rows of beret slice makees beam or column in use, must be reinforced with support frame The joint portion of lower two section beret slices.
Detailed description of the invention
Fig. 1 is overall structure of the present invention;
Fig. 2 is the K direction view of Fig. 1;
Fig. 3 is partial enlarged view at the I of Fig. 2;
Fig. 4 is the schematic diagram of construction technology (two) step bored pile construction of the present invention;
Fig. 5 is the schematic diagram of construction technology (three) step crown beam construction of the present invention;
Fig. 6 is the schematic diagram of construction technology (four) step earth excavation of the present invention;
Fig. 7 is the schematic diagram of construction technology (five) step cushion construction of the present invention;
Fig. 8 is the schematic diagram of construction technology (five) step gunite concrete of the present invention;
Fig. 9 is the schematic diagram of construction technology (six) step baseplate reinforcing bar installation of the present invention;
Figure 10 is the schematic diagram of construction technology (seven) step installation section of the present invention beret slice;
Figure 11 is the schematic diagram of construction technology (eight) step installation side wall template of the present invention;
Figure 12 is the schematic diagram of construction technology (nine) step installation flitch of the present invention.
Symbol description in figure: U-type groove body 1, concrete drill hole stake 2, beret slice 3, original ground absolute altitude 4, drilled pile main reinforcement 5, Crown beam 6, accurate screw-thread steel 7, accurate screw-thread steel reserving hole 8, bed course 9, shotcrete layer 10, Two bors d's oeuveres channel steel 11, finish rolling spiral shell Line steel 12, lumps of wood cushion block 13, steel form 14, flitch 15, construction joint 16.
Specific embodiment
The present invention is described in detail with optimal embodiment below.
Embodiment one
Beret slice single side formwork method wears the culvert of engineering tunnel, the construction of U-type groove side wall under municipal administration, after bored pile construction, Using beret slice single side formwork technique, comprise the concrete steps that:
(1) surveying setting-out: survey crew measures setting-out to works according to site control point;
(2) bored pile construction: being drilled using churning driven, until designed elevation, hangs steel reinforcement cage to designed elevation in hole And acceptance(check) after-pouring concrete, complete concrete drill hole stake;
(3) crown beam is constructed: in crown beam construction, the hole of accurate screw-thread steel is reserved at interval, for installing accurate screw-thread steel;Essence 400-800mm is divided between quasi- screw-thread steel reserving hole.Reserved bore dia 35-45mm.Accurate screw-thread steel uses 32 finish rolling screw thread of Φ Steel.Beret slice arranges that spacing is 400-600mm;
(4) U-type groove pit earthwork excavates: earth excavation, U-type groove bed course pour, concrete drill hole stake gunite concrete, as U Type groove outer wall template;
(5) U-type groove construction of bottom plates: pre-buried fining twisted steel and U-type groove side wall main reinforcement is needed to weld and in advance when mounting base reinforcing bar Two bors d's oeuveres channel steel is buried, bottom plate installation is then carried out and underplate concrete pours;
(6) beret slice single side formwork is constructed: installing beret slice using lifting machine, beret slice is placed in double close to wall side bottom It spells above channel steel;Lumps of wood cushion block is set by shortcut middle line side bottom, beret slice top is reinforced through finish rolling screw thread to drawing and crown beam Connection, beret slice lower part reinforce and are connect by the pre-buried fining twisted steel with U-type groove bottom;
(7) install side wall template: side wall template uses combined steel formwork, using lifting machine handling template and is installed on Bei Lei On the inside of piece;
(8) flitch is installed: flitch is installed between combined steel formwork and beret slice;
(9) remaining beret slice and locking fining twisted steel are installed: remaining beret slice all being installed using lifting machine, locking Fining twisted steel.
(10) school mould: survey crew carries out template correction using total station;
(11) casting concrete;
(12) form removal and beret slice and locking screw thread steel complete construction.
Embodiment two
As shown in Figure 1-3, beret slice single side formwork method, there is 100mm thickness C20 gunite concrete between drilled pile and U-type groove structure As outboard template;Panel uses the 9015 of plate thickness 3mm to combine, and steel, mould are secondary stupefied for 100*100mm flitch, and stupefied master is 450* 3000*1450mm beret slice, master are stupefied, secondary stupefied, as shown in the figure to pulling plug model and step pitch.Pile foundation concrete is C30, U-type groove Structural concrete is C40, and concreting mode is pumping.
Detailed construction processing step is:
(1) surveying setting-out: survey crew measures setting-out to works according to site control point;
(2) bored pile construction (as shown in Figure 4): being drilled using churning driven, until designed elevation and acceptance(check) are laggard Row borehole cleaning hangs steel reinforcement cage in hole to designed elevation and acceptance(check) after-pouring concrete, completes concrete drill hole stake 2;
(3) crown beam construction (as shown in Figure 5): installing crown beam in concrete drill hole stake 2, need to be reserved every 525mm when installing crown beam 40mm hole, to install accurate screw-thread steel, accurate screw-thread steel is using the fixed bracket of 32 fining twisted steel of Φ;
(4) it earth excavation (as shown in Figure 6): according to works point position control earth excavation, digs to people at designed elevation 200mm After the clear soil to designed elevation and acceptance(check) of work, U-type groove is formed;
(5) cushion construction and gunite concrete (as shown in Figure 7,8): U-type groove bottom surface pours 100mm bed course, concrete drill hole stake 2 side gunite concrete 75mm are thick;
(6) pre-buried 32 fining twisted steel (fining twisted steel baseplate reinforcing bar installation (as shown in Figure 9): is needed when mounting base reinforcing bar It is pre-buried according to live beret slice size), the above side wall of chamfering pours together erects 800mm high, and when bottom slab concreting concrete is pre-buried double 20b channel steel 11 and 32 fining twisted steel of Φ are spelled, embedded bar and drilled pile main reinforcement 5 are welded;Then carry out bottom plate installation template and Bottom surface pours underplate concrete;
(7) installation section beret slice (as shown in Figure 10): using lifting machine elder generation installation section beret slice 3 as falsework, Job platform and inspection are provided for the worker of installation template;Beret slice divides into setting lumps of wood cushion block 13, and beret slice top passes through essence Quasi- screw-thread steel is connect with the accurate screw-thread steel reserving hole 8 in concrete drill hole stake top portion, and beret slice lower part is pre-buried with U-type groove bottom The connection of 32 fining twisted steel of Φ;
(8) install side wall template (as shown in figure 11): using 9015 combined steel formworks, (template should shift to an earlier date bulk spelling to side wall template Connect), using lifting machine handling template and it is installed on the inside of beret slice;
(9) 100mmX100mm flitch (as shown in figure 12) is installed: flitch, flitch is installed between combined steel formwork and beret slice Between be spaced setting, steel form is micro- when the purpose is to reduce gap between steel form and beret slice and shrink casting concrete Deformation;
(10) remaining beret slice and locking fining twisted steel are installed: remaining beret slice all being installed using lifting machine, crown beam After the accurate screw-thread steel and passed examination of place's installation 32 fining twisted steel of Φ;Lock 32 fining twisted steel of Φ: beret slice bottom with After Φ 32 fining twisted steel in top carries out locking and acceptance(check);
(11) school mould: survey crew carries out template correction using total station, reports supervising engineer after self-test is qualified;
(12) casting concrete: concrete uses and pumps, manually vibrates, placement layer by layer (300mm-500mm);
(13) form removal and beret slice and locking screw thread steel: branch is first torn open after following, and is first propped up and is torn open afterwards.The advantage is that: not only Solving the problems, such as that construction site is narrow also needs the transport channel that is unearthed, and reduces construction cost, while ensure that U-type groove knot The safety and presentation quality of structure.

Claims (5)

1. beret slice single side formwork method, which is characterized in that wear the culvert of engineering tunnel, the construction of U-type groove side wall under municipal administration, filled in drilling After infusing pile driving construction, using beret slice single side formwork technique, comprise the concrete steps that:
(1) crown beam is constructed: in crown beam construction, the hole of accurate screw-thread steel is reserved at interval, for installing accurate screw-thread steel;
(2) U-type groove pit earthwork excavates: earth excavation, U-type groove bed course pour, concrete drill hole stake gunite concrete, as U Type groove outer wall template;
(3) U-type groove construction of bottom plates: pre-buried fining twisted steel and U-type groove side wall main reinforcement is needed to weld and in advance when mounting base reinforcing bar Two bors d's oeuveres channel steel is buried, bottom plate installation is then carried out and underplate concrete pours;
(4) beret slice single side formwork is constructed: installing beret slice using lifting machine, beret slice is placed in double close to wall side bottom It spells above channel steel;Lumps of wood cushion block is set by shortcut middle line side bottom, beret slice top is reinforced through finish rolling screw thread to drawing and crown beam Connection, beret slice lower part reinforce and are connect by the pre-buried fining twisted steel with U-type groove bottom.
2. beret slice single side formwork method as described in claim 1, which is characterized in that in step (1), accurate screw-thread steel preformed hole 400-800mm is divided between hole.
3. beret slice single side formwork method as described in claim 1, which is characterized in that in step (1), reserve bore dia 35- 45mm。
4. beret slice single side formwork method as described in claim 1, which is characterized in that in step (1), accurate screw-thread steel uses Φ 32 fining twisted steels.
5. beret slice single side formwork method as described in claim 1, which is characterized in that in step (1), beret slice arrangement spacing is 400-600mm。
CN201910391348.0A 2019-05-12 2019-05-12 Beret slice single side formwork method Pending CN110144824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910391348.0A CN110144824A (en) 2019-05-12 2019-05-12 Beret slice single side formwork method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910391348.0A CN110144824A (en) 2019-05-12 2019-05-12 Beret slice single side formwork method

Publications (1)

Publication Number Publication Date
CN110144824A true CN110144824A (en) 2019-08-20

Family

ID=67595253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910391348.0A Pending CN110144824A (en) 2019-05-12 2019-05-12 Beret slice single side formwork method

Country Status (1)

Country Link
CN (1) CN110144824A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467369A (en) * 2021-06-11 2022-12-13 中铁二十二局集团第一工程有限公司 Unilateral template combination system of consolidating

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761092A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Construction method of movable side wall of large overall template of large-span deep foundation pit
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106930271A (en) * 2017-04-17 2017-07-07 西北综合勘察设计研究院 It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN107587716A (en) * 2017-09-07 2018-01-16 福建建中建设科技股份有限公司 A kind of unilateral support shuttering truss and its assembly method
CN207160585U (en) * 2017-08-04 2018-03-30 中铁建工集团有限公司 Superelevation outer wall of basement Bailey bracket single side formwork architecture
CN207419519U (en) * 2017-11-15 2018-05-29 江苏省岩土工程公司 A kind of campshed supporting is with helping the structural system that arm-type barricade is combined
CN208009469U (en) * 2017-09-07 2018-10-26 福建建中建设科技股份有限公司 A kind of lateral wall is without perforation Encased truss

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761092A (en) * 2009-12-30 2010-06-30 中铁十二局集团第二工程有限公司 Construction method of movable side wall of large overall template of large-span deep foundation pit
CN105220874A (en) * 2015-09-11 2016-01-06 杭州江润科技有限公司 The construction method of basement superelevation exterior wall self-supporting single side formwork system
CN106930271A (en) * 2017-04-17 2017-07-07 西北综合勘察设计研究院 It is a kind of to excavate the continuous side wall supporting and retaining system protective construction in underground and its construction method without fertile groove
CN107119695A (en) * 2017-06-27 2017-09-01 中国建筑第二工程局有限公司 A kind of operation support body and construction method for cancelling outer wall of basement backfill
CN207160585U (en) * 2017-08-04 2018-03-30 中铁建工集团有限公司 Superelevation outer wall of basement Bailey bracket single side formwork architecture
CN107587716A (en) * 2017-09-07 2018-01-16 福建建中建设科技股份有限公司 A kind of unilateral support shuttering truss and its assembly method
CN208009469U (en) * 2017-09-07 2018-10-26 福建建中建设科技股份有限公司 A kind of lateral wall is without perforation Encased truss
CN207419519U (en) * 2017-11-15 2018-05-29 江苏省岩土工程公司 A kind of campshed supporting is with helping the structural system that arm-type barricade is combined

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
郁雷: "贝雷架单面超高将变墙体中的应用", 《门窗》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115467369A (en) * 2021-06-11 2022-12-13 中铁二十二局集团第一工程有限公司 Unilateral template combination system of consolidating

Similar Documents

Publication Publication Date Title
CN106907161B (en) A kind of tunnel slope caunches special construction method
CN104612162B (en) A kind of Deep Foundation Pit of Metro Stations excavation construction method
CN102720140B (en) Large-span prestress concrete continuous beam deepwater pier construction process
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN205742213U (en) Foundation pit supporting construction
CN109914456A (en) A kind of bridge and subway tunnel adjoin newly-built or with design and construction method when building
CN201991017U (en) Subway large-span station body structure based on arch cover method construction forming
CN102828518A (en) Manual hole digging support pile prestress anchor cable anchoring structure and construction method of anchoring structure
CN103938634B (en) A kind of deep foundation pit supporting structure and construction method
CN107795749A (en) A kind of precast spliced pipe fitting jacking system and its construction method
CN103306289A (en) Foundation pit piled anchor dado concrete anchor cable top beam structure and construction method thereof
CN113062354A (en) Assembly method for prefabricated subway station of open-cut pile support system
CN110439590A (en) Method for tunnel construction
CN109488347A (en) A kind of excavation construction method for special formation chamber
CN111455977A (en) Underground continuous wall construction method
CN104164881A (en) Piling wall overlapping cantilever foundation pit support construction method and structure
CN115717536A (en) Inclined shaft forward-hole-entering and top-raising construction method for large-section tunnel in weak water-rich stratum
CN115821985A (en) Integrated construction method for auxiliary structure of subway open cut station
CN206888994U (en) A kind of inclined shaft two serves as a contrast and pilot tunnel caunches device
CN105386779A (en) Arch column method for building large-scale underground structure in shallow buried rock stratums
CN110144824A (en) Beret slice single side formwork method
CN209523759U (en) A kind of super shallow-buried tunnel structure
CN109024670B (en) Underground comprehensive pipe gallery protection and reinforcement system penetrating through buried high-voltage cable and reinforcement method
CN113898007B (en) Semi-inverse construction method for long-span corridor structure along street
Hulme et al. SINGAPORE MASS RAPID TRANSIT SYSTEM: CONSTRUCTION.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination