CN110144787A - A kind of super construction technology for gluing ultra-thin stress absorbing layer - Google Patents
A kind of super construction technology for gluing ultra-thin stress absorbing layer Download PDFInfo
- Publication number
- CN110144787A CN110144787A CN201910403830.1A CN201910403830A CN110144787A CN 110144787 A CN110144787 A CN 110144787A CN 201910403830 A CN201910403830 A CN 201910403830A CN 110144787 A CN110144787 A CN 110144787A
- Authority
- CN
- China
- Prior art keywords
- absorbing layer
- stress absorbing
- expansion joint
- basal plane
- cement concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C11/00—Details of pavings
- E01C11/24—Methods or arrangements for preventing slipperiness or protecting against influences of the weather
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/10—Coherent pavings made in situ made of road-metal and binders of road-metal and cement or like binders
- E01C7/14—Concrete paving
- E01C7/147—Repairing concrete pavings, e.g. joining cracked road sections by dowels, applying a new concrete covering
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Road Paving Structures (AREA)
Abstract
The invention discloses a kind of super construction technologies for gluing ultra-thin stress absorbing layer, include the following steps: that Disease Processing early period --- slotting to existing cement concrete basal plane expansion joint --- is formally constructed by the later period.Stress absorbing layer of the invention has very strong viscosity, the bonding that it can be consolidated with cement concrete basal plane.Since the strong multiple emulsion of black room temperature speed is on the basis of modified emulsifying asphalt; so will form certain thickness asphalt membrane on road surface; it can be effectively prevented underwater infiltration; inhibit the generation of edema evil; and the quartz sand of pitch and different structure will form the structure sheaf for inhibiting crack reflection together; the generation for effectively preventing crack, adequately protects the asphalt uplayer to pave.The present invention improves the ascending ability of anti-low-temperature cracking and delayed reflex crack by the interlaminar bonding ability and shear at high temperature intensity that improve, plays good inter-laminar stress absorption and cementitiousness, the quality of engineering is effectively guaranteed.
Description
Technical field
The invention belongs to the preparation and application fields of stress absorbing layer, and in particular to a kind of super to glue ultra-thin stress absorbing layer
Construction technology.
Background technique
This engineering technology is more, the overlay heat on water-setting concrete road for being directed to Cement Concrete Pavement Reconstruction application
Asphalt surface course makes full use of the intensity of cement concrete, not only low cost, and easy construction is smaller with traffic pollution to environment.
The technology that traditional stress absorbing layer uses is largely Synchronous pavement surface dressing, passes through synchronous macadam seal paver
Rubble and adhesives are synchronized and are sprinkled upon on cement concrete pavement, bed course is served as by this technology, in cement concrete and drip
Blueness overlays interlayer and forms a kind of stress absorbing layer, has the characteristics that resistance deformability is low with stiffness modulus by force, deformation passes through
Buffer layer passes to overlay, plays the characteristics of reducing crack peak value, to play the characteristics of inhibiting crack reflection.
Novel stress absorbing layer is to be mixed by black room temperature pitch multiple emulsion with high stiffness additive package, by dilute
Slurry chip sealer paves on water-setting concrete road surface, which can resist cement concrete surface expansion joint bring
Stress, to delay the crack reflection of the bituminous concrete bituminous sheaths overlayed.
Summary of the invention
Goal of the invention: in order to solve the deficiencies in the prior art, super ultra-thin stress absorbing layer is glued the present invention provides a kind of
Construction technology.
It is directed between asphalt concrete pavement layer and status Cement Concrete Pavement Slab, forms a kind of stress absorbing layer,
Play stress absorption, isolation, waterproof, water shutoff and prevents crack reflection.The core of product is black room temperature speed Qiang Fuhe
Lotion mixes addition strength mix with high stiffness and forms, formed it is a kind of super glue it is ultra-thin.Viscosity and waterproof performance with super strength, simultaneously
Also there is the stress absorbing layer of high-intensitive tensile ductility.
Technical solution: a kind of super construction technology for gluing ultra-thin stress absorbing layer includes the following steps: at disease early period
Managing --- slotting to existing cement concrete basal plane expansion joint ---, the later period formally constructs;Wherein:
Slot to existing cement concrete basal plane expansion joint: the depth of fluting is 2mm, then will hold stretching for slot successfully
Contracting seam carries out cementation of fissures processing, until base joint grouting glue demulsification after-contraction molding, anti-cracking cloth is posted on the expansion joint filled, in anticracking
Water shutoff item is carried out on cloth.
As optimization: Disease Processing early period: including to cement concrete basal plane fracture unit: for being greater than
The expansion joint of 5mm can directly can apply the expansion joint less than 5mm directly with the direct cementation of fissures of aqueous base joint grouting glue with hairbrush
Brush carries out leveling to basal plane out-of-flatness, low-lying place, the levelling material of different models is selected according to levelling thickness.
As optimization: the later period formally constructs: cleaning cement pavement is clean to surface, and distribution vehicle sprays cement pavement
Sticking layer oil, micro- table paver vehicle pave on stress absorbing layer to Portland Cement Concrete Surface Course, carry out before paving to the match ratio of mixture
Calibration, determines correct match ratio.
The utility model has the advantages that stress absorbing layer of the invention has very strong viscosity, it can be steady with cement concrete basal plane
Solid bonding.Since the strong multiple emulsion of black room temperature speed is on the basis of modified emulsifying asphalt, so will form on road surface
Certain thickness asphalt membrane, it can be effectively prevented underwater infiltration, inhibit the generation of edema evil, and pitch and different structure
Quartz sand will form the structure sheaf of one of inhibition crack reflection, effectively prevent the generation in crack, adequately protect the drip to pave
Green upper layer.It can also be studied by interlayer mechanical analysis, tensile stress and shearing force Experimental comparison, provide for project and reliably apply
Work basis, the interlaminar bonding ability and shear at high temperature intensity of raising, improves the rising energy in anti-low-temperature cracking and delayed reflex crack
Power plays good inter-laminar stress absorption and cementitiousness, effective to guarantee using newest design scheme and construction technology
The quality of engineering.
Detailed description of the invention
Fig. 1 is flow diagram of the invention.
Specific embodiment
The technical scheme in the embodiments of the invention will be clearly and completely described below, so that the technology of this field
Personnel can better understand advantages and features of the invention, to make apparent boundary to protection scope of the present invention
It is fixed.Embodiment described in the invention is only a part of the embodiment of the present invention, instead of all the embodiments, based on the present invention
In embodiment, those of ordinary skill in the art's every other implementation obtained without making creative work
Example, shall fall within the protection scope of the present invention.
Embodiment
As shown in Figure 1, a kind of super construction technology for gluing ultra-thin stress absorbing layer, includes the following steps: at disease early period
Managing --- slotting to existing cement concrete basal plane expansion joint ---, the later period formally constructs;Wherein:
Disease Processing early period: including to cement concrete basal plane fracture unit: the expansion joint for being greater than 5mm
The expansion joint less than 5mm can directly can be brushed with hairbrush, directly with the direct cementation of fissures of aqueous base joint grouting glue to basal plane injustice
Whole, low-lying place carries out leveling, and the levelling material of different models is selected according to levelling thickness;
Slot to existing cement concrete basal plane expansion joint: the depth of fluting is 2mm, then will hold stretching for slot successfully
Contracting seam carries out cementation of fissures processing, until base joint grouting glue demulsification after-contraction molding, anti-cracking cloth is posted on the expansion joint filled, in anticracking
Water shutoff item is carried out on cloth;
The later period formally constructs: cleaning cement pavement is clean to surface, and distribution vehicle sprays cement pavement sticking layer oil, micro-
Table paver vehicle paves on stress absorbing layer to Portland Cement Concrete Surface Course, demarcates before paving to the match ratio of mixture, determines
Correct match ratio.
Specific embodiment 1
The white of certain cities and counties changes black stress absorbing layer, and former cement and concrete pavement road surface is overlaying 4 centimeters of heated bitumen above
Then concrete road surface, the stress absorbing layer that Backing layer paves are stretched cement by the Disease Processing to cement basal plane early period
Contracting seam is slotted, the cementation of fissures, pastes anti-cracking cloth, does water shutoff item, is finally paved to the stress absorbing layer on the road surface.Since this tests
Road belongs to national highway, and vehicle flowrate is relatively large, so the quality requirement for the stress absorbing layer is very high, other in this area are white
Change black pavement spread is all thicker heated bitumen surface layer (add in one layer of paving in grain formula surface layer), therefore quality of materials comparison can
Know its effect.
Specific embodiment 2
The white of certain cities and counties changes black stress absorbing layer, and former road surface is cement concrete pavement, is overlaying 4 centimeters of heat drip above
Green concrete road surface, the stress absorbing layer that Backing layer paves, by the Disease Processing to cement basal plane early period, then to cement
Expansion joint is slotted, the cementation of fissures, pastes anti-cracking cloth, does water shutoff item, is finally paved to the stress absorbing layer on the road surface.Wherein there is one section
For the cement concrete pavement of bridge floor, and compared with the stress absorbing layer of the design of different specification around.
Specific embodiment 3
The white of certain cities and counties changes black stress absorbing layer, and former road surface is cement concrete pavement, is overlaying 4 centimeters of heat drip above
Green concrete road surface, the stress absorbing layer that Backing layer paves, by the Disease Processing to cement basal plane early period, then to cement
Expansion joint is slotted, the cementation of fissures, pastes anti-cracking cloth, does water shutoff item, is finally paved to the stress absorbing layer on the road surface.The test section is
One slope, difference of height is larger, to the more demanding of stress absorbing layer.
Stress absorbing layer in the present invention includes the Disease Processing of early period and the processing of anti-cracking cloth water shutoff item, formal to the later period
Pave stress absorbing layer, including Disease Processing whether in place, anti-cracking cloth water shutoff item whether according to the ratio strict control, the later period paves is
No no agglomeration, whether Mixture Ratio correct, and whether the thickness to pave up to standard etc..
The strong multiple emulsion composition principle of black room temperature speed is as follows: the strong multiple emulsion of black room temperature speed is using polymer water and milk
SBS aqueous emulsion, increasing stick toughening aqueous emulsion are added in the base of modified emulsifying asphalt and can make pitch for the modified mode of liquid
Chain rupture recombinates to form a kind of stable chemical network novel sticky splicing at normal temperature with macromolecule.
High stiffness additive package in the present invention is a kind of novel room temperature asphalt concrete additive agent, by a variety of polymerizations
The composition such as object rubber powder, curing agent, activator, the bituminous concrete comprehensive performance of the material can significantly improve, and room temperature is applied
Work, not by seasonal effect.
The present invention is paved in construction by micro-surface area paver vehicle, and the strong multiple emulsion of black room temperature speed is mixed with high stiffness
Additive directly stirs in paver vehicle, is modified to bituminous concrete, in high stiffness additive package and room temperature pitch
Water chemically reacts, and forms microfibre toughening crystallization hyrate, can control the curing time of mixture, directly passes through paver vehicle
It paves on cement concrete basal plane.
Stress absorbing layer of the invention has very strong viscosity, the bonding that it can be consolidated with cement concrete basal plane.
Since the strong multiple emulsion of black room temperature speed is on the basis of modified emulsifying asphalt, so will form on road surface certain thickness
Asphalt membrane, it can be effectively prevented underwater infiltration, inhibit the generation of edema evil, and the quartz sand of pitch and different structure can shape
At the structure sheaf for inhibiting crack reflection together, the generation in crack is effectively prevented, the asphalt uplayer to pave is adequately protected.?
It can be studied by interlayer mechanical analysis, tensile stress and shearing force Experimental comparison, provide reliable construction basis for project, improve
Interlaminar bonding ability and shear at high temperature intensity, improve the ascending ability of anti-low-temperature cracking and delayed reflex crack, play very
Good inter-laminar stress absorbs and using newest design scheme and construction technology the matter of engineering is effectively guaranteed in cementitiousness
Amount.
Claims (3)
1. a kind of super construction technology for gluing ultra-thin stress absorbing layer, characterized by the following steps: at early period disease
Managing --- slotting to existing cement concrete basal plane expansion joint ---, the later period formally constructs;Wherein:
Slot to existing cement concrete basal plane expansion joint: the depth of fluting is 2mm, then will hold the expansion joint of slot successfully
Cementation of fissures processing is carried out, until base joint grouting glue demulsification after-contraction molding, anti-cracking cloth is posted on the expansion joint filled, on anti-cracking cloth
Carry out water shutoff item.
2. the super construction technology for gluing ultra-thin stress absorbing layer according to claim 1, it is characterised in that: disease early period
Harm reason: including to cement concrete basal plane fracture unit: for greater than 5mm expansion joint can directly with aqueous base joint grouting glue it is straight
The cementation of fissures is connect, the expansion joint less than 5mm can directly be brushed with hairbrush, levelling place is carried out to basal plane out-of-flatness, low-lying place
Reason, the levelling material of different models is selected according to levelling thickness.
3. the super construction technology for gluing ultra-thin stress absorbing layer according to claim 1, it is characterised in that: the later period is just
Formula construction: cleaning cement pavement is clean to surface, stress absorption that distribution vehicle sprays cement pavement sticking layer oil, micro- table paver vehicle paves
On layer to Portland Cement Concrete Surface Course, the match ratio of mixture is demarcated before paving, determines correct match ratio.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910403830.1A CN110144787A (en) | 2019-05-15 | 2019-05-15 | A kind of super construction technology for gluing ultra-thin stress absorbing layer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910403830.1A CN110144787A (en) | 2019-05-15 | 2019-05-15 | A kind of super construction technology for gluing ultra-thin stress absorbing layer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110144787A true CN110144787A (en) | 2019-08-20 |
Family
ID=67595499
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910403830.1A Pending CN110144787A (en) | 2019-05-15 | 2019-05-15 | A kind of super construction technology for gluing ultra-thin stress absorbing layer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110144787A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709132A (en) * | 2020-12-31 | 2021-04-27 | 南通福伦利新材料有限公司 | Preparation and spraying method of normal-temperature asphalt stress absorption film for heavy corrosion prevention of steel bridge deck/steel base surface |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101643636A (en) * | 2008-08-04 | 2010-02-10 | 李志刚 | Water-base joint grouting glue for normal temperature road |
CN102296507A (en) * | 2011-06-08 | 2011-12-28 | 中冶建工集团有限公司 | Treatment method of subgrade cracks |
CN202787014U (en) * | 2012-08-25 | 2013-03-13 | 江苏中设工程咨询集团有限公司 | Asphalt pavement structure formed by modifying cement pavement |
CN203559319U (en) * | 2013-03-20 | 2014-04-23 | 深圳市市政设计研究院有限公司 | Novel anti-crack adhesive structure |
CN104294732A (en) * | 2014-10-20 | 2015-01-21 | 广东华盟路桥工程有限公司 | High-elasto-viscosity stress absorbing layer and top facing construction process thereof |
CN104650803A (en) * | 2014-12-30 | 2015-05-27 | 南通福伦利新材料有限公司 | Preparation method for novel asphalt cold-mixing cold-paving adhesive |
CN204530366U (en) * | 2015-03-26 | 2015-08-05 | 广东电白建设集团有限公司 | Novel anticracking asphalt roads structure |
CN104831598A (en) * | 2015-04-21 | 2015-08-12 | 成军 | Construction method for reconstruction of old cement pavement into asphalt concrete pavement |
CN205711601U (en) * | 2016-03-18 | 2016-11-23 | 广州昇美材料科技有限公司 | A kind of super viscous wearing course paving structure of cement pavement enhancement mode |
CN207685618U (en) * | 2017-12-13 | 2018-08-03 | 淄博市规划设计研究院 | A kind of Old cement concrete transform asphalt pavement structure as |
CN108821676A (en) * | 2018-05-28 | 2018-11-16 | 南通福伦利新材料有限公司 | A kind of high preparation method for gluing flexible room temperature construction stress absorbed layer mixture |
-
2019
- 2019-05-15 CN CN201910403830.1A patent/CN110144787A/en active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101643636A (en) * | 2008-08-04 | 2010-02-10 | 李志刚 | Water-base joint grouting glue for normal temperature road |
CN102296507A (en) * | 2011-06-08 | 2011-12-28 | 中冶建工集团有限公司 | Treatment method of subgrade cracks |
CN202787014U (en) * | 2012-08-25 | 2013-03-13 | 江苏中设工程咨询集团有限公司 | Asphalt pavement structure formed by modifying cement pavement |
CN203559319U (en) * | 2013-03-20 | 2014-04-23 | 深圳市市政设计研究院有限公司 | Novel anti-crack adhesive structure |
CN104294732A (en) * | 2014-10-20 | 2015-01-21 | 广东华盟路桥工程有限公司 | High-elasto-viscosity stress absorbing layer and top facing construction process thereof |
CN104650803A (en) * | 2014-12-30 | 2015-05-27 | 南通福伦利新材料有限公司 | Preparation method for novel asphalt cold-mixing cold-paving adhesive |
CN204530366U (en) * | 2015-03-26 | 2015-08-05 | 广东电白建设集团有限公司 | Novel anticracking asphalt roads structure |
CN104831598A (en) * | 2015-04-21 | 2015-08-12 | 成军 | Construction method for reconstruction of old cement pavement into asphalt concrete pavement |
CN205711601U (en) * | 2016-03-18 | 2016-11-23 | 广州昇美材料科技有限公司 | A kind of super viscous wearing course paving structure of cement pavement enhancement mode |
CN207685618U (en) * | 2017-12-13 | 2018-08-03 | 淄博市规划设计研究院 | A kind of Old cement concrete transform asphalt pavement structure as |
CN108821676A (en) * | 2018-05-28 | 2018-11-16 | 南通福伦利新材料有限公司 | A kind of high preparation method for gluing flexible room temperature construction stress absorbed layer mixture |
Non-Patent Citations (1)
Title |
---|
汪东升等: "胶粉改性沥青加铺应力吸收层技术的研究与应用", 《天津建设科技》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112709132A (en) * | 2020-12-31 | 2021-04-27 | 南通福伦利新材料有限公司 | Preparation and spraying method of normal-temperature asphalt stress absorption film for heavy corrosion prevention of steel bridge deck/steel base surface |
CN112709132B (en) * | 2020-12-31 | 2023-02-28 | 南通福伦利新材料有限公司 | Preparation and spraying method of normal-temperature asphalt stress absorption film for heavy corrosion prevention of steel bridge deck/steel base surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104402339B (en) | The constructional method of pervious concrete | |
CN103114526B (en) | Steel bridge deck pavement cold mixing maintenance material and manufacturing method thereof | |
CN106149500B (en) | A kind of construction method of cement emulsified asphalt mortar penetration type half-flexible pavement | |
CN106012743B (en) | Semi-rigid type base anti-crack road surface structure and construction method suitable for high temperature difference area | |
CN206736657U (en) | A kind of cracking resistance rubber asphalt composite seal coat | |
CN103966941B (en) | A kind of can repair the constructional method that regulating course is increased at expansion joint fast | |
CN108003639A (en) | Bituminous paving oozes the maintenance construction method of solid wearing course | |
CN104762861A (en) | Semi-flexible pavement based on cold-recycling base of bituminous pavement and construction method of semi-flexible pavement | |
CN207685618U (en) | A kind of Old cement concrete transform asphalt pavement structure as | |
CN109797624A (en) | A kind of road modified geopolymer Sub-sealing Course material semi-flexible and its construction method | |
CN106800400B (en) | A kind of preparation method and applications of road repair mortar dry powder | |
CN110714389A (en) | Ultrathin high-performance composite semi-flexible surface layer pavement structure and construction method thereof | |
JP2010216175A (en) | Rc floor slab structure and repair method for increasing thickness of rc floor slab | |
CN110144787A (en) | A kind of super construction technology for gluing ultra-thin stress absorbing layer | |
CN1821491A (en) | Wag-resisting concrete bridge surface paving method | |
CN104927759B (en) | A kind of interface adhesive material and black overlay structure and its construction technology of changing in vain based on the material | |
RU2433096C2 (en) | Mixture of substances used particularly as additive for concrete mixture | |
CN108821676A (en) | A kind of high preparation method for gluing flexible room temperature construction stress absorbed layer mixture | |
CN104844100A (en) | Pre-mixed dry material for cold-in-place recycling, cold-in-place recycling mixture and preparation therefor | |
CN107288003A (en) | A kind of road surface or preventive maintenance of deck structure and its construction method | |
CN110330605A (en) | Self-compacting type concrete thermoset pitch mixture and construction method for tunnel deformation joint | |
Hlail | Toward semi flexible pavement application for Iraqi highway and airport pavements: Review its feasibility | |
CN102515636A (en) | Penetrated cement concrete material and preparation method and use thereof | |
CN205501762U (en) | Cement road surface surpasses glues wearing and tearing layer structure of mating formation | |
CN105541194A (en) | Fog seal material and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190820 |