CN110143773A - Ardealite calcination system - Google Patents

Ardealite calcination system Download PDF

Info

Publication number
CN110143773A
CN110143773A CN201910460497.8A CN201910460497A CN110143773A CN 110143773 A CN110143773 A CN 110143773A CN 201910460497 A CN201910460497 A CN 201910460497A CN 110143773 A CN110143773 A CN 110143773A
Authority
CN
China
Prior art keywords
deduster
furnace
air
air hose
preheating furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910460497.8A
Other languages
Chinese (zh)
Inventor
赵嘉珩
赵建纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Original Assignee
ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd filed Critical ZHENGZHOU SUNDY BUILDING TECHNOLOGY Co Ltd
Priority to CN201910460497.8A priority Critical patent/CN110143773A/en
Publication of CN110143773A publication Critical patent/CN110143773A/en
Pending legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B11/00Calcium sulfate cements
    • C04B11/02Methods and apparatus for dehydrating gypsum
    • C04B11/028Devices therefor characterised by the type of calcining devices used therefor or by the type of hemihydrate obtained
    • C04B11/036Devices therefor characterised by the type of calcining devices used therefor or by the type of hemihydrate obtained for the dry process, e.g. dehydrating in a fluidised bed or in a rotary kiln, i.e. to obtain beta-hemihydrate
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B11/00Calcium sulfate cements
    • C04B11/26Calcium sulfate cements strating from chemical gypsum; starting from phosphogypsum or from waste, e.g. purification products of smoke

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Ceramic Engineering (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Furnace Details (AREA)

Abstract

A kind of ardealite calcination system belongs to ardealite calcining field, including calcining furnace, flame furnace, rear deduster to preheating furnace air hose, preceding deduster feed back pipe, preceding deduster, preheating furnace, preheating furnace air-exhausting duct, preceding deduster is to rear deduster air hose, rear deduster, reduction furnace, deduster reserves air hose afterwards, expansion chamber, expansion chamber to preceding deduster air hose, air-introduced machine;With the characteristics of compact-sized, layout is simple, energy high recycling rate.

Description

Ardealite calcination system
Technical field
The invention belongs to ardealites to calcine field, in particular to a kind of for being converted into building gypsum after calcining ardealite Calcination treating system.
Background technique
Ardealite is that one of phosphorous chemical industry enterprise production process industry byproduct can not due to containing Multiple components It directly applies in construction, needs to convert semi-hydrated gypsum by calcining for the main component dihydrate gypsum in ardealite, It can be used for construction;In the calcination process of ardealite, most original be using steamer, frying pan etc equipment into Row, low efficiency, the unstable quality of semi-hydrated gypsum powder produced, yield is small, can not adapt to large-scale industrial production;Wave Take the energy, will cause secondary pollution;With the progress of ardealite calcining technology, calciner also improves therewith, uses at present Be mostly that calcining furnace is calcined, since calcining furnace is also to be located ardealite respectively using individual feature kiln mostly Reason, energy utilization rate is low, and link is more, and occupied ground area is big, and the different layouts and connection type of ventilation shaft also determine The secondary use of hot wind and the influence to calcination efficiency.
Summary of the invention
For drawbacks described above existing for existing ardealite calciner, the present invention proposes a kind of ardealite being succinctly laid out Calcination system, it is characterised in that: including calcining furnace, flame furnace, rear deduster to preheating furnace air hose, preceding deduster feed back pipe is preceding Deduster, preheating furnace, preheating furnace air-exhausting duct, preceding deduster to rear deduster air hose, rear deduster, reduction furnace, rear deduster are pre- Stay air hose, expansion chamber, expansion chamber to preceding deduster air hose, air-introduced machine;The calcining furnace is mounted in calcining furnace installation pedestal, For Double-drum rotary formula detour calcining furnace;The flame furnace is mounted on inner cylinder opening one end of calcining furnace, and by bocca with forge The inner cylinder for burning furnace is corresponding;The flame furnace is coal powder injection furnace or combustion gas flame furnace;The rear deduster is to preheating furnace wind Pipe is mounted between rear deduster and preheating furnace, and one end is connect with the air outlet of rear deduster, the air inlet of the other end and preheating furnace Mouth connection;Before the preceding deduster feed back pipe is mounted between deduster and calcining furnace, one end goes out with preceding collector for duster hopper Material mouth connection, the other end connect with calcining furnace front end packet header and are connected to packet header inner cavity;The preceding deduster removes before being mounted on Be four cyclone dust collectors in dirt device mounting bracket, air inlet connect with expansion chamber to preceding deduster air hose, air outlet with preceding remove Dirt device is connected to rear deduster air hose, and the Material collecting box for harvesting discharge port of preceding deduster is connect with preceding deduster feed back pipe;The preheating Furnace is mounted in preheating furnace installation pedestal, positioned at the oblique upper of calcining furnace;The air inlet of the preheating furnace is arrived with rear deduster The connection of preheating furnace air hose, air outlet are connect with preheating furnace air-exhausting duct;The preheating furnace air-exhausting duct is mounted on the outlet air of preheating furnace At mouthful, the air outlet of one end and preheating furnace is connected, and the other end leads to atmosphere discharge;The preceding deduster is to rear deduster air hose Be mounted between preceding deduster and rear deduster, one end is connect with the air outlet of preceding deduster, the other end and rear deduster into Air port connection;The rear deduster is mounted in rear deduster mounting bracket, positioned at the oblique upper of calcining furnace, relative to preheating The position of furnace is located at the other side of calcining furnace;The air inlet and preceding deduster of the rear deduster connect to rear deduster air hose It connects, air outlet is connect with rear deduster to preheating furnace air hose;The reduction furnace is mounted in reduction furnace mounting bracket, positioned at forging Furnace side is burnt, and is located at rear deduster same side;The rear deduster reserves air hose and is mounted on rear deduster air outlet one end, It is connected to rear deduster air outlet;The rear deduster is reserved and is equipped with shut-off valve on air hose, can close and remove after opening Dirt device reserves the on-off of air hose;The expansion chamber is mounted on the packet header of calcining furnace front end, be thin wall cavity body, lower end with forge It burns the front end packet header connection of furnace and is connected to packet header inside, the upper end is connect with expansion chamber to preceding deduster air hose;Described is heavy Drop room is mounted between expansion chamber and preceding deduster to preceding deduster air hose, and one end is connect with top of settling chamber air outlet, another End is connect with the air inlet of preceding deduster;The air-introduced machine is mounted on preceding deduster to rear deduster air hose and rear deduster Onto preheating furnace air hose.
Further, the preceding deduster feed back pipe is thin metallic tubd.
Further, the air inlet of the preheating furnace is located at discharge port one end of preheating furnace.
Further, the preheating furnace is punching tube type preheating furnace.
Further, the distance of the preheating furnace to calcining furnace is no more than 10 meters.
Further, the preceding deduster to rear deduster air hose be thin metallic tubd.
Further, the rear deduster is more bag filters or water deduster.
Further, distance of the reduction furnace apart from calcining furnace is no more than 20 meters.
Further, the height of the expansion chamber is not less than 3 meters.
Further, device for reducing dust is provided in the expansion chamber, the device for reducing dust is taper or spiral shape Striker plate.
The directions such as front, rear, left and right above-mentioned are to face view direction.
Beneficial effect
The beneficial effects of the present invention are, can each ardealite calciner of rational deployment, accomplish compact-sized and meet phosphorus The requirement of gypsum calcining technique, rationally utilizes waste heat, simplifies hot wind currency structure.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention
1. calcining furnace, 2. flame furnaces, deduster is to preheating furnace air hose after 3., deduster feed back pipe before 4., and deduster before 5., 6. is pre- Hot stove, 7. preheating furnace air-exhausting ducts, 8. preceding dedusters to rear deduster air hose, deduster after 9., 10. reduction furnaces, deduster after 11. Reserved air hose, 12. expansion chambers, 13. expansion chambers to preceding deduster air hose.
Specific embodiment
Technical solution in order to further illustrate the present invention, now in conjunction with Detailed description of the invention a specific embodiment of the invention, such as Fig. 1, the Double-drum rotary formula plaster calcining furnace for selecting the industry general in this example install the calcining furnace 1 as calcining furnace 1 In calcining furnace installation pedestal;The combustion gas flame furnace for selecting the industry general in this example is as flame furnace 2, by the flame furnace 2 are mounted on inner cylinder opening one end of calcining furnace 1, and bocca is corresponding with the inner cylinder of calcining furnace 1;Steel Thin-Wall is selected in this example Pipe as rear deduster to preheating furnace air hose 3, by the rear deduster to preheating furnace air hose 3 be mounted on rear deduster 9 with it is pre- Between hot stove 6, the air outlet of one end and rear deduster 9 is welded to connect, and the air inlet of the other end and preheating furnace 6 is welded to connect, and One or more air-introduced machine is installed in the middle part of pipeline;Sheet metal edge rolling is selected to be fabricated to tubulose and weld seam crossing close in this example Envelope, as preceding deduster feed back pipe 4, before the preceding deduster feed back pipe 4 is mounted between deduster 5 and calcining furnace 1, one End is welded to connect with preceding collector for duster hopper discharge port, the other end and calcining furnace front end packet header be welded to connect and with the packet header inner cavity Connection;The preceding deduster 5 is mounted on by four cyclone dust collectors for selecting the industry general in this example as preceding deduster 5 In preceding deduster mounting bracket, air inlet is connect with expansion chamber to preceding deduster air hose 13, after air outlet is arrived with preceding deduster Deduster air hose 8 connects, and the Material collecting box for harvesting discharge port of preceding deduster 5 is connect with preceding deduster feed back pipe 3;The industry is selected in this example The preheating furnace 6 is mounted in preheating furnace installation pedestal, is located at as preheating furnace 6 by the rotary preheating furnace of general monotubular The oblique upper of calcining furnace 1, the outer edge of preheating furnace 6 are convenient for preheating furnace 6 to 1-2 meters of outline edge distance of calcining furnace in this way The charging to discharge to calcining furnace 1 reduces long distance delivery and intermediate conveying equipment, improves efficiency of heating- utilization apart from short;It will The air inlet of the preheating furnace 6 is connect with rear deduster to preheating furnace air hose 3, and air outlet is connect with preheating furnace air-exhausting duct 7;This The preheating furnace air-exhausting duct 7 is mounted on pre- by the thin-walled air-exhausting duct for selecting the industry general in example as preheating furnace air-exhausting duct 7 At the air outlet of hot stove 6, one end is connect with the air outlet of preheating furnace 6, and the other end leads to atmosphere discharge;Steel Thin-Wall is selected in this example Pipe is as preceding deduster to rear deduster air hose 8, deduster 5 before the preceding deduster to rear deduster air hose 8 is mounted on Between rear deduster 9, the air outlet of one end and preceding deduster 5 is welded to connect, and the air inlet of the other end and rear deduster 9 welds It connects, and one or more air-introduced machine is installed among this pipeline;The more bag filters for selecting the industry general in this example are made For rear deduster 9, the rear deduster 9 is mounted in rear deduster mounting bracket, positioned at the oblique upper of calcining furnace 1, phase It is located at the other side of calcining furnace 1 for the position of preheating furnace 6, that is, preheating furnace 6 and rear deduster 9 are located at calcining furnace 1 Two sides;The air inlet of the rear deduster 9 is welded to connect with preceding deduster to rear deduster air hose 8, rear deduster 9 Air outlet is connect with rear deduster to preheating furnace air hose 3;The rotary reduction furnace conduct of monotubular for selecting the industry general in this example The reduction furnace 10 is mounted in reduction furnace mounting bracket by reduction furnace 10, is located at 1 side of calcining furnace, and be located at rear dedusting 9 same side of device, the spacing apart from calcining furnace 1 are 10 meters;The thin-wall steel tube for selecting the industry general in this example is as rear deduster The rear deduster is reserved air outlet one end that air hose 11 is mounted on rear deduster 9, with rear deduster 9 by reserved air hose 11 Air outlet connection;And reserved in the rear deduster and shut-off valve is installed on air hose 11, deduster after capable of closing and opening The on-off of reserved air hose 11, the spare outlet air for rear deduster 9 are connect with other equipment such as reduction furnace 10;It is selected in this example The general structure type of the industry is welded into prismatic cavity body, 4 meters of height, section maximum gauge 1.8 using sheet metal bending Rice, as expansion chamber 12, the expansion chamber 12 is mounted on 1 front end packet header of calcining furnace, closed with the preceding packet header of calcining furnace 1 It is welded to connect, lower end connect with the front end packet header of calcining furnace 1 and is connected to packet header inside, the upper end and expansion chamber to preceding dedusting Device air hose 13 connects, and multiple inclinations and staggered striker plate are arranged to accelerate the rapid subsidence of ardealite dust in inner wall;This It selects thin-wall steel tube as expansion chamber to preceding deduster air hose 13 in example, the expansion chamber is installed to preceding deduster air hose 13 Between expansion chamber 12 and preceding deduster 5, one end and 12 top outlet inlet of expansion chamber are welded to connect, the other end and preceding deduster 5 Air inlet be welded to connect;This completes implementations of the invention.
In application, the flame that flame furnace 2 sprays and hot wind are blown into the inner cavity of calcining furnace 1 by air blower, after circulation, from The lower end of expansion chamber 12 enters 12 inner cavity of expansion chamber, since hot wind is accompanied by phosphogypsum powder, in expansion chamber 12, due to expansion chamber 12 height, phosphogypsum powder can settle back into calcining furnace, simultaneously because being provided with striker plate in expansion chamber 12, block phosphorus stone The rising of cream powder accelerates the sedimentation of phosphogypsum powder;Hot wind passes through expansion chamber to preceding deduster wind from the air outlet of expansion chamber 12 Before pipe 13 enters in deduster 5, the Dust Capacity that contains of hot wind at this time is just reduced, by (the preceding dedusting of four cyclone dust collectors Device 5) heavy-duty, the content of the phosphogypsum powder in hot wind is further quickly reduced, the phosphogypsum powder of deposition passes through preceding dedusting Device feed back pipe 4 re-enters into calcining furnace 1, and is transported to the external of calcining furnace 1 by the discharge port of calcining furnace 1 and supplies lower road work Sequence uses;Hot wind after preceding 5 dedusting of deduster by preceding deduster deduster 9 after deduster air hose 8 enters after, by In rear deduster 9 using more bag filters, the phosphogypsum powder in hot wind can be eliminated substantially, more pure hot wind from The air outlet of deduster 9 is admitted to preheating furnace 6 to preheating furnace air hose 3 by rear deduster afterwards, using the heat of hot wind, increases just The volatilization of the ardealite free water of beginning saves energy consumption when calcining, and then hot wind passes through in advance from the air outlet of preheating furnace 6 Hot stove air-exhausting duct 7 is discharged into atmosphere;It is connected to if desired, reserving air hose 11 using rear deduster with the equipment of hot wind is needed, energy The waste heat for enough making full use of calcining furnace 1 to generate;The air-introduced machine of installation in the duct increases the flow velocity and pressure of hot wind, is hot wind Power is provided by deduster, has pipeline apart from short, high-efficient, the features such as hot wind utilization rate is high.

Claims (9)

1. a kind of ardealite calcination system, it is characterised in that: including calcining furnace, flame furnace, rear deduster is preceding to preheating furnace air hose Deduster feed back pipe, preceding deduster, preheating furnace, preheating furnace air-exhausting duct, preceding deduster to rear deduster air hose, rear deduster, also Former furnace, rear deduster reserve air hose, expansion chamber, expansion chamber to preceding deduster air hose, air-introduced machine;The calcining furnace, which is mounted on, to be forged It burns in furnace installation pedestal, is Double-drum rotary formula detour calcining furnace;The flame furnace is mounted on inner cylinder opening one end of calcining furnace, And it is bocca is corresponding with the inner cylinder of calcining furnace;The flame furnace is coal powder injection furnace or combustion gas flame furnace;It is described rear to remove Dirt device is mounted between rear deduster and preheating furnace to preheating furnace air hose, and one end is connect with the air outlet of rear deduster, the other end It is connect with the air inlet of preheating furnace;Before the preceding deduster feed back pipe is mounted between deduster and calcining furnace, one end is with before The connection of collector for duster hopper discharge port, the other end connect with calcining furnace front end packet header and are connected to packet header inner cavity;It is described preceding to remove It is four cyclone dust collectors before dirt device is mounted in deduster mounting bracket, air inlet and expansion chamber connect to preceding deduster air hose It connects, air outlet is connect with preceding deduster to rear deduster air hose, the Material collecting box for harvesting discharge port of preceding deduster and preceding deduster feed back pipe Connection;The preheating furnace is mounted in preheating furnace installation pedestal, positioned at the oblique upper of calcining furnace;The air inlet of the preheating furnace Mouth is connect with rear deduster to preheating furnace air hose, and air outlet is connect with preheating furnace air-exhausting duct;The preheating furnace air-exhausting duct installation At the air outlet of preheating furnace, the air outlet of one end and preheating furnace is connected, and the other end leads to atmosphere discharge;The preceding deduster It is mounted between preceding deduster and rear deduster to rear deduster air hose, one end is connect with the air outlet of preceding deduster, the other end It is connect with the air inlet of rear deduster;The rear deduster is mounted in rear deduster mounting bracket, positioned at the oblique of calcining furnace Top is located at the other side of calcining furnace relative to the position of preheating furnace;The air inlet of the rear deduster is arrived with preceding deduster Deduster air hose connects afterwards, and air outlet is connect with rear deduster to preheating furnace air hose;The reduction furnace is mounted on reduction furnace peace It fills on bracket, is located at calcining furnace side, and be located at rear deduster same side;The rear deduster is reserved after air hose is mounted on and is removed Dirt device air outlet one end, is connected to rear deduster air outlet;The rear deduster is reserved and is equipped with shut-off valve on air hose, can Deduster reserves the on-off of air hose after closing and opening;The expansion chamber is mounted on the packet header of calcining furnace front end, is that thin-walled is empty Cavity, lower end are connected to the connection of the front end packet header of calcining furnace and with packet header inside, the upper end and expansion chamber to preceding deduster wind Pipe connection;The expansion chamber is mounted between expansion chamber and preceding deduster to preceding deduster air hose, one end and top of settling chamber Air outlet connection, the other end are connect with the air inlet of preceding deduster;The air-introduced machine is mounted on preceding deduster to rear deduster On air hose and on rear deduster to preheating furnace air hose.
2. a kind of ardealite calcination system according to claim 1, it is characterised in that: preceding deduster feed back pipe is Thin metallic tubd.
3. a kind of ardealite calcination system according to claim 1, it is characterised in that: the preheating furnace into Air port is located at discharge port one end of preheating furnace.
4. a kind of ardealite calcination system according to claim 1, it is characterised in that: the preheating furnace is to wear Heart tube type preheating furnace.
5. a kind of ardealite calcination system according to claim 1, it is characterised in that: the preheating furnace is to forging The distance for burning furnace is no more than 10 meters.
6. a kind of ardealite calcination system according to claim 1, it is characterised in that: the preceding deduster arrives Deduster air hose is thin metallic tubd afterwards.
7. a kind of ardealite calcination system according to claim 1, it is characterised in that: the rear deduster is More bag filters.
8. a kind of ardealite calcination system according to claim 1, it is characterised in that: the reduction furnace distance The distance of calcining furnace is no more than 20 meters.
9. a kind of ardealite calcination system according to claim 1, it is characterised in that: the height of the expansion chamber Degree is not less than 3 meters.
CN201910460497.8A 2019-05-30 2019-05-30 Ardealite calcination system Pending CN110143773A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910460497.8A CN110143773A (en) 2019-05-30 2019-05-30 Ardealite calcination system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910460497.8A CN110143773A (en) 2019-05-30 2019-05-30 Ardealite calcination system

Publications (1)

Publication Number Publication Date
CN110143773A true CN110143773A (en) 2019-08-20

Family

ID=67593667

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910460497.8A Pending CN110143773A (en) 2019-05-30 2019-05-30 Ardealite calcination system

Country Status (1)

Country Link
CN (1) CN110143773A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110836605A (en) * 2019-11-21 2020-02-25 江苏新达石英有限公司 Calcining device for quartz sand purification and using method thereof
CN111548036A (en) * 2020-05-18 2020-08-18 郑州三迪建筑科技有限公司 Method for utilizing waste heat generated by calcining phosphogypsum

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274615A (en) * 2013-06-03 2013-09-04 郑州市鼎力干燥设备有限公司 Desulfurization gypsum drying and calcining equipment, and production process
CN206001926U (en) * 2016-08-31 2017-03-08 山西太钢工程技术有限公司 A kind of device of utilization applied to pelletizing rotary kiln tail flue gas waste heat
CN106904853A (en) * 2017-05-11 2017-06-30 郑州三迪建筑科技有限公司 Industry by-product gypsum calcining furnace
CN107902932A (en) * 2017-11-21 2018-04-13 郑州三迪建筑科技有限公司 A kind of ardealite calciner plant
CN108489290A (en) * 2018-05-21 2018-09-04 北京航天石化技术装备工程有限公司 A kind of high-temperature flue gas residual neat recovering system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103274615A (en) * 2013-06-03 2013-09-04 郑州市鼎力干燥设备有限公司 Desulfurization gypsum drying and calcining equipment, and production process
CN206001926U (en) * 2016-08-31 2017-03-08 山西太钢工程技术有限公司 A kind of device of utilization applied to pelletizing rotary kiln tail flue gas waste heat
CN106904853A (en) * 2017-05-11 2017-06-30 郑州三迪建筑科技有限公司 Industry by-product gypsum calcining furnace
CN107902932A (en) * 2017-11-21 2018-04-13 郑州三迪建筑科技有限公司 A kind of ardealite calciner plant
CN108489290A (en) * 2018-05-21 2018-09-04 北京航天石化技术装备工程有限公司 A kind of high-temperature flue gas residual neat recovering system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
赵云龙 等: "《石膏应用技术问答》", 30 September 2016, 中国建材工业出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110836605A (en) * 2019-11-21 2020-02-25 江苏新达石英有限公司 Calcining device for quartz sand purification and using method thereof
CN111548036A (en) * 2020-05-18 2020-08-18 郑州三迪建筑科技有限公司 Method for utilizing waste heat generated by calcining phosphogypsum

Similar Documents

Publication Publication Date Title
CN110092599A (en) Ardealite calcination system
CN110143773A (en) Ardealite calcination system
CN105698524B (en) Heat accumulating type multistage heating rotary kiln device
JP2013512176A (en) Powder lime baking method and apparatus
CN109761519A (en) Intelligent calcination system and application method for building gypsum
CN101870561B (en) Large automatic shaft lime kiln
CN108569853A (en) A kind of industry by-product gypsum dewatering system and technique
CN107879595A (en) A kind of deflector type device for preheating glass batch
CN101509724B (en) Smelting blast deflecting wall for vertical pellet furnace and drying bed
CN107421332A (en) Vertical gradient continuous sintering machine
CN103787391A (en) Novel dry method equipment for producing coal ash aluminum oxide clinker
CN202216538U (en) Cement clinker burning system
CN103884198A (en) Device and method for dust collection and discharge of sintering flue gas
CN207775323U (en) A kind of Novel electric furnace zinc powder production line
CN209180920U (en) A kind of new-type fluidized bed smoke furnace
CN203639349U (en) Environmental-friendly energy-saving program control automatic lime kiln
CN209802104U (en) vertical sinter cooling kiln with uniform ventilation device
CN106610229A (en) Rotary kiln vertical preheater
CN208199838U (en) A kind of layering material pulling device of clinker brick
CN104741254A (en) Dust-containing scorched particle winnowing and separating device and method thereof
CN205856324U (en) gypsum steam calcining furnace
CN206469669U (en) A kind of segmented rotary kiln
CN207922174U (en) A kind of built-in exhaust gas and dust separator of waste heat boiler
CN109443015A (en) A kind of kiln integral structure and the process system using the kiln integral structure
CN201397033Y (en) Smelting pellet furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190820