CN110127538A - Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system - Google Patents

Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system Download PDF

Info

Publication number
CN110127538A
CN110127538A CN201910406967.2A CN201910406967A CN110127538A CN 110127538 A CN110127538 A CN 110127538A CN 201910406967 A CN201910406967 A CN 201910406967A CN 110127538 A CN110127538 A CN 110127538A
Authority
CN
China
Prior art keywords
otic placode
tower crane
support frame
crane
plate type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910406967.2A
Other languages
Chinese (zh)
Inventor
张红伟
李小波
陈吉申
李圣兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201910406967.2A priority Critical patent/CN110127538A/en
Publication of CN110127538A publication Critical patent/CN110127538A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/24Mobile wall cranes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system, including the support frame being installed on the outside of super high-rise building, it is provided with tower crane above support frame and reinforces section, support frame and tower crane reinforce setting between section, and there are two grated plate type swing arms, the lower end of grated plate type swing arm and support frame are hinged, it is hinged that the upper end of grated plate type swing arm and tower crane reinforce section, support frame, tower crane reinforces section and parallelogram sturcutre is collectively formed with two grated plate type swing arms, cylinder barrel of the support frame along the hinged hydraulic cylinder in side of grated plate type swing arm swaying direction, the piston rod of hydraulic cylinder tilts upward extension and hinged tower crane reinforces section.Pass through the flexible of control hydraulic cylinder, to drive the swing of grated plate type swing arm, and then drive that tower crane reinforces section and tower crane mounted thereto moves left and right, while tower crane is able to maintain that verticality is constant always during moving left and right, and realizes the mobile problem of outer attachment tower crane overhead horizontal.

Description

Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system
Technical field
The present invention relates to from climbing tower-crane technical field, climbed certainly it particularly relates to adhere to outside a kind of super high-rise building Lift-type tower crane high-altitude integral translation system.
Background technique
It is general to adhere to tower crane from outside climbing type using in the setting of Core Walls Structure exterior wall in construction of super highrise building, but due to super High-rise Core Walls Structure interface dimensions generally will do it interior receipts several times with the increase of height, former when the time receiving in Core Walls Structure interface There is tower crane attachment not just to be available, even if increasing the support arm lengths of attachment, if tower crane continuation continues to erect in original position It directly climbs, will lead to the hypertelorism of tower body and Core Walls Structure, bring great potential safety hazard.
For the problems in the relevant technologies, currently no effective solution has been proposed.
Summary of the invention
For above-mentioned technical problem in the related technology, the present invention proposes that a kind of super high-rise building adheres to outside from climbing type tower High-altitude integral translation system is hung, tower crane horizontal direction can be driven mobile, the integral translation of tower crane high-altitude is realized, solve Super High The problem of causing tower crane to need secondary dismounting is received in core wall structure section.
To realize the above-mentioned technical purpose, the technical scheme of the present invention is realized as follows:
Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system, including is installed on the outside of super high-rise building Support frame, tower crane is provided with above support frame as described above and reinforces section, support frame as described above and the tower crane are reinforced being arranged between section There are two grated plate type swing arm, the lower end of the grated plate type swing arm and support frame as described above are hinged, the upper end of the grated plate type swing arm and The tower crane reinforces section hingedly, and support frame as described above, tower crane reinforcement section are collectively formed parallel with two grated plate type swing arms Quadrilateral structure, support frame as described above along the hinged hydraulic cylinder in side of the grated plate type swing arm swaying direction cylinder barrel, it is described hydraulic The piston rod of cylinder tilts upward extension and the hinged tower crane reinforces section.
Further, the grated plate type swing arm includes intersect the vertical supporting arm and lateral connection arm of setting, described The quantity of vertical supporting arm is at least two, and the quantity of the lateral connection arm is at least one, the vertical supporting arm it is upper End is provided with the first otic placode, and the lower end of the vertical supporting arm is provided with the second otic placode.
Further, the bottom that the tower crane reinforces section is provided with swing arm engaging lug corresponding with first otic placode Plate, first otic placode are connected with the swing arm connection otic placode by pin.
Further, rectangle frame is provided at the top of support frame as described above, the rectangle frame includes at least two H-shaped sections side Beam and two rectangular section side bars, H-shaped section side bar and the grated plate type swing arm correspond, the rectangular section side bar Support frame as described above is fixedly connected with by clamping screw.
Further, the rectangular section side bar is connected with the C-shaped fastener being matched therewith, the C-shaped fastener with it is described Rectangular section side bar is connected by locking bolt, be installed on the C-shaped fastener it is several respectively with the vertical supporting arm one One corresponding connection support arm.
Further, the top of the connection support arm is provided with support otic placode corresponding with second otic placode, institute It states support otic placode to be connected with second otic placode by pin, the bottom of the support arm is fixedly connected with the C-shaped fastener.
Further, otic placode is provided on the cylinder barrel and piston rod of the hydraulic cylinder, the tower crane reinforces the bottom of section It is provided with hydraulic cylinder connection otic placode corresponding with the otic placode, is provided at the top of support frame as described above corresponding with the otic placode Hydraulic cylinder install otic placode, the hydraulic cylinder connection otic placode and the hydraulic cylinder installation otic placode respectively pass through with the corresponding otic placode Pin is connected.
Beneficial effects of the present invention: by the flexible of control hydraulic cylinder, to drive the swing of grated plate type swing arm, and then band Dynamic tower crane reinforces moving left and right for section and tower crane mounted thereto, at the same tower crane be able to maintain during moving left and right it is vertical Straight degree is constant always, realizes the mobile problem of outer attachment tower crane overhead horizontal, solves super high-rise building because of core wall structure Increase with height and received in section, but tower crane can only vertically climb, and is gradually deviated from Core Walls Structure outer surface and can not effectively adhere to In the core wall structure the problem of.
Detailed description of the invention
It in order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, below will be to institute in embodiment Attached drawing to be used is needed to be briefly described, it should be apparent that, the accompanying drawings in the following description is only some implementations of the invention Example, for those of ordinary skill in the art, without creative efforts, can also obtain according to these attached drawings Obtain other attached drawings.
Fig. 1 is to adhere to outside the super high-rise building described according to embodiments of the present invention from climbing tower-crane high-altitude integral translation system Front view of the system before translation;
Fig. 2 is to adhere to exist from climbing tower-crane high-altitude integral translation system outside the super high-rise building described according to embodiments of the present invention Axonometric drawing before translation;
Fig. 3 is to adhere to put down from climbing tower-crane high-altitude integral translation system outside the super high-rise building described according to embodiments of the present invention Front view after shifting;
Fig. 4 is to adhere to put down from climbing tower-crane high-altitude integral translation system outside the super high-rise building described according to embodiments of the present invention Axonometric drawing after shifting;
Fig. 5 is the schematic diagram of the grated plate type swing arm described according to embodiments of the present invention;
Fig. 6 is the schematic diagram of the connection support arm described according to embodiments of the present invention;
Fig. 7 is the schematic diagram of the rectangle frame described according to embodiments of the present invention;
Fig. 8 is the schematic diagram of the support frame described according to embodiments of the present invention;
Fig. 9 is the schematic diagram that the tower crane described according to embodiments of the present invention reinforces section;
Figure 10 is to adhere to outside the super high-rise building described according to embodiments of the present invention from climbing tower-crane high-altitude integral translation system Schematic diagram one when in use;
Figure 11 is to adhere to outside the super high-rise building described according to embodiments of the present invention from climbing tower-crane high-altitude integral translation system Schematic diagram two when in use.
In figure:
1, grated plate type swing arm;101, vertical supporting arm;101a, the first otic placode;102, cross-brace arm;102a, the second otic placode;2, Connect support arm;201, otic placode is supported;202, C-shaped fastener;3, rectangle frame;4, support frame;401, hydraulic cylinder installs otic placode;5, liquid Cylinder pressure;6, tower crane reinforces section;601, swing arm connection otic placode;602, hydraulic cylinder connection otic placode;7, clamping screw;8, bolt is locked.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art's every other embodiment obtained belong to what the present invention protected Range.
As shown in figs. 1-11, adhere to outside a kind of super high-rise building according to embodiments of the present invention from climbing tower-crane height Empty integral translation system, including the support frame 4 being installed on the outside of super high-rise building, the top of support frame as described above 4 is provided with tower crane Reinforce section 6, there are two grated plate type swing arm 1, the grated plate type swing arms 1 for setting between support frame as described above 4 and tower crane reinforcement section 6 Lower end and support frame as described above 4 it is hinged, it is hinged that the upper end of the grated plate type swing arm 1 and the tower crane reinforce section 6, support frames as described above 4, the tower crane reinforces section 6 and parallelogram sturcutre is collectively formed in two grated plate type swing arms 1, and support frame as described above 4 is along institute The cylinder barrel of the hinged hydraulic cylinder 5 in side of 1 swaying direction of grated plate type swing arm is stated, the piston rod of the hydraulic cylinder 5 tilts upward extension And the hinged tower crane reinforces section 6.
In one particular embodiment of the present invention, vertical supporting of the grated plate type swing arm 1 including the setting that intersects Arm 101 and lateral connection arm 102, the quantity of the vertical supporting arm 101 are at least two, the number of the lateral connection arm 102 Amount is at least one, and the upper end of the vertical supporting arm 101 is provided with the first otic placode 101a, under the vertical supporting arm 101 End is provided with the second otic placode 102b.
In one particular embodiment of the present invention, the bottom that the tower crane reinforces section 6 is provided with and first otic placode The corresponding swing arm connection otic placode 601 of 101a, the first otic placode 101a are connected with the swing arm connection otic placode 601 by pin It connects.
In one particular embodiment of the present invention, the top of support frame as described above 4 is provided with rectangle frame 3, the rectangle frame 3 Including at least two H-shaped section side bars 301 and two rectangular section side bars 302, H-shaped section side bar 301 and the screen Formula swing arm 1 corresponds, and the rectangular section side bar 302 is fixedly connected with support frame as described above 4 by clamping screw 7.
In one particular embodiment of the present invention, the rectangular section side bar 302 is connected with the C-shaped card being matched therewith Part 202, the C-shaped fastener 202 are connected with the rectangular section side bar 302 by locking bolt 8, on the C-shaped fastener 202 It is installed with and several connect support arm 2 correspondingly with the vertical supporting arm 101 respectively.
In one particular embodiment of the present invention, the top of the connection support arm 2 is provided with and second otic placode The corresponding support otic placode 201 of 102b, the support otic placode 201 is connected with the second otic placode 102b by pin, described The bottom of support arm 2 is fixedly connected with the C-shaped fastener 202.
In one particular embodiment of the present invention, it is provided with otic placode on the cylinder barrel and piston rod of the hydraulic cylinder 5, institute The bottom for stating tower crane reinforcement section 6 is provided with hydraulic cylinder connection otic placode 602 corresponding with the otic placode, the top of support frame as described above 4 Portion is provided with hydraulic cylinder installation otic placode 401 corresponding with the otic placode, the hydraulic cylinder connection otic placode 602 and the hydraulic cylinder Installation otic placode 401 is respectively connected with the corresponding otic placode by pin.
In order to facilitate above-mentioned technical proposal of the invention is understood, below by way of specifically used mode to above-mentioned skill of the invention Art scheme is described in detail.
Adhering to outside super high-rise building of the present invention from climbing tower-crane high-altitude integral translation system includes: grated plate type pendulum Arm 1, connection support arm 2, rectangle frame 3, support frame 4, hydraulic cylinder 5, tower crane reinforce section 6, clamping screw 7, lock bolt 8.Screen The swing arm connection otic placode 601 that the first otic placode 101a and tower crane of 1 upper end of formula swing arm reinforce 6 bottoms of section is connected to one by pin It rises, the support otic placode 201 on the second otic placode 101b and connection support arm 2 of 1 lower end of grated plate type swing arm is connected to one by pin It rises, the C-shaped fastener 202 of connection 2 bottom of support arm is stuck on the rectangular section side bar 302 of rectangle frame 3, and by locking bolt 8 Connection C-shaped fastener 202 is locked with rectangular section side bar 302, two H-shaped section side bars 301 of rectangle frame 3 pass through clamping screw 7 are fixed on support frame 4, and the otic placode on 5 piston rod of hydraulic cylinder reinforces the hydraulic cylinder engaging lug of 6 bottoms of section by pin and tower crane Plate 602 connects, and the otic placode on 5 cylinder barrel of hydraulic cylinder is installed otic placode 401 by the hydraulic cylinder on pin and 4 tail portion crossbeam of support frame and connected It connects.
Grated plate type swing arm 1 is welded by vertical supporting arm 101 and lateral connection arm 102, the quantity of vertical supporting arm 101 At least two, the quantity of lateral connection arm 102 is at least one, and the first otic placode 101a is arranged in the upper end of vertical supporting arm 101, The second otic placode 102b is arranged in the lower end of vertical supporting arm 101.
Two 1 sizes of grated plate type swing arm are identical, tower crane reinforce section 6 bottoms swing arm connection otic placode 601 spacing with The spacing of support otic placode 201 on two connection support arms 2 is equal, therefore section 6 and branch are reinforced in two grated plate type swing arms 1, tower crane Support 4 together constitutes parallelogram sturcutre, and (certain 1 quantity of grated plate type swing arm can also be more than two, to constitute multiple Parallelogram sturcutre), since two connection support arms 2 are connected on support frame 4 by rectangle frame 3, when two screens When formula swing arm 1 swings, the tower crane for driving tower crane to reinforce section 6 and be attached to is moved left and right, and moving process kind tower crane Verticality can remain constant.
When tower crane need to be translated towards super high-rise building direction, hydraulic cylinder 5 is shunk, and tower crane is pulled to reinforce section 6, two grated plate types 1 synchronous hunting of swing arm, tower crane is reinforced facing super high-rise building direction while section 6 is mobile straight down on one side and is translated, to ensure that Verticality can remain constant in tower crane translation motion.
In conclusion by means of above-mentioned technical proposal of the invention, by the flexible of control hydraulic cylinder, to drive screen The swing of formula swing arm, and then drive that tower crane reinforces section and tower crane mounted thereto moves left and right, while tower crane is moved in left and right It is able to maintain that verticality is constant always in dynamic process, realizes the mobile problem of outer attachment tower crane overhead horizontal, solve super Skyscraper is received in section due to core wall structure increases with height, but tower crane can only vertically climb, and is gradually deviated from Core Walls Structure Outer surface and the problem of can not effectively be attached to core wall structure.
The above is merely preferred embodiments of the present invention, be not intended to limit the invention, it is all in spirit of the invention and Within principle, any modification, equivalent replacement, improvement and so on be should all be included in the protection scope of the present invention.

Claims (7)

1. adhering to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system, including it is installed in outside super high-rise building The support frame (4) of side is provided with tower crane above support frame as described above (4) and reinforces section (6), which is characterized in that support frame as described above (4) Reinforce between section (6) setting there are two grated plate type swing arm (1) the tower crane, the lower end of the grated plate type swing arm (1) with it is described Hingedly, the upper end of the grated plate type swing arm (1) and the tower crane reinforce section (6) hingedly to support frame (4), support frame as described above (4), institute It states tower crane reinforcement section (6) and parallelogram sturcutre, support frame as described above (4) edge is collectively formed in two grated plate type swing arms (1) The cylinder barrel of the hinged hydraulic cylinder in side (5) of grated plate type swing arm (1) swaying direction, the piston rod inclination of the hydraulic cylinder (5) It upwardly extends and the hinged tower crane reinforces section (6).
2. adhering to outside super high-rise building according to claim 1 from climbing tower-crane high-altitude integral translation system, feature It is, the grated plate type swing arm (1) includes intersect the vertical supporting arm (101) and lateral connection arm (102) of setting, described The quantity of vertical supporting arm (101) is at least two, and the quantity of the lateral connection arm (102) is at least one, described vertical The upper end of support arm (101) is provided with the first otic placode (101a), and the lower end of the vertical supporting arm (101) is provided with the second otic placode (102b).
3. adhering to outside super high-rise building according to claim 2 from climbing tower-crane high-altitude integral translation system, feature It is, the bottom that the tower crane reinforces section (6) is provided with swing arm connection otic placode corresponding with the first otic placode (101a) (601), first otic placode (101a) is connected with the swing arm connection otic placode (601) by pin.
4. adhering to outside super high-rise building according to claim 2 from climbing tower-crane high-altitude integral translation system, feature It is, is provided at the top of support frame as described above (4) rectangle frame (3), the rectangle frame (3) includes at least two H-shaped section side bars (301) rectangular section He Lianggen side bar (302), H-shaped section side bar (301) and the grated plate type swing arm (1) correspond, The rectangular section side bar (302) is fixedly connected with support frame as described above (4) by clamping screw (7).
5. adhering to outside super high-rise building according to claim 4 from climbing tower-crane high-altitude integral translation system, feature It is, the rectangular section side bar (302) is connected with the C-shaped fastener (202) being matched therewith, the C-shaped fastener (202) and institute State rectangular section side bar (302) and be connected by locking bolt (8), be installed on the C-shaped fastener (202) it is several respectively with institute It states vertical supporting arm (101) and connects support arm (2) correspondingly.
6. adhering to outside super high-rise building according to claim 5 from climbing tower-crane high-altitude integral translation system, feature It is, the top of connection support arm (2) is provided with support otic placode (201) corresponding with the second otic placode (102b), The support otic placode (201) is connected with second otic placode (102b) by pin, and the bottom of the support arm (2) is fixed to be connected Connect the C-shaped fastener (202).
7. adhering to outside super high-rise building according to claim 1 from climbing tower-crane high-altitude integral translation system, feature It is, otic placode is provided on the cylinder barrel and piston rod of the hydraulic cylinder (5), and the bottom that the tower crane reinforces section (6) is provided with Hydraulic cylinder connection otic placode (602) corresponding with the otic placode is provided at the top of support frame as described above (4) opposite with the otic placode Hydraulic cylinder installation otic placode (401) answered, the hydraulic cylinder connection otic placode (602) and the hydraulic cylinder install otic placode (401) respectively with The corresponding otic placode is connected by pin.
CN201910406967.2A 2019-05-16 2019-05-16 Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system Pending CN110127538A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910406967.2A CN110127538A (en) 2019-05-16 2019-05-16 Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910406967.2A CN110127538A (en) 2019-05-16 2019-05-16 Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system

Publications (1)

Publication Number Publication Date
CN110127538A true CN110127538A (en) 2019-08-16

Family

ID=67574576

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910406967.2A Pending CN110127538A (en) 2019-05-16 2019-05-16 Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system

Country Status (1)

Country Link
CN (1) CN110127538A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111747317A (en) * 2020-05-22 2020-10-09 中建三局集团有限公司 Self-elevating tower crane heightening and angle transformation conversion section and use method thereof
CN113479791A (en) * 2021-06-25 2021-10-08 中国建筑第八工程局有限公司 Position adjusting device of climbing tower crane and construction method thereof

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7704466L (en) * 1976-04-23 1977-10-24 Rauma Repola Oy DEVICE FOR CHANGING AXLE WEIGHT FOR LIFT CROWNING COMBINATION VEHICLES
SU935453A1 (en) * 1979-08-17 1982-06-15 Ленинградский Механический Завод Управления Капитального Ремонта Self-erecting tower crane
US5053746A (en) * 1990-05-07 1991-10-01 Taneo Panfilo C Vehicular communication device
CN1986373A (en) * 2006-12-14 2007-06-27 中冶南方工程技术有限公司 Short-stroke hydraulic down-ender
US20100101086A1 (en) * 2006-07-12 2010-04-29 Eole Overseas Company Limited Device and process for rapid disassembly of a rotor and a nacelle from the mast of a windmill, as well as a windmill that is equipped with such a device
CN201770426U (en) * 2010-08-04 2011-03-23 贵州詹阳动力重工有限公司 Cab lifting device of crawler-type hydraulic steel grabbing machine
CN102976215A (en) * 2012-11-16 2013-03-20 上海市机械施工有限公司 External suspension type crane overhead integral shift device and shift method thereof
CN203741438U (en) * 2014-01-02 2014-07-30 昆明理工大学 Nickel plate alignment clamping device
CN104370220A (en) * 2014-10-18 2015-02-25 青岛中天斯壮科技有限公司 Self-climbing maintenance robot for wind power generation tower
CN105109940A (en) * 2015-08-18 2015-12-02 无锡乐华自动化科技有限公司 High-bearing-capacity lifting mechanism driven by air cylinder and provided with swing arms
CN106219419A (en) * 2016-09-19 2016-12-14 中国建筑第八工程局有限公司 High-rise building large-scale swing arm tower crane is converted to plug-in construction method by interior climbing in situ
CN206599392U (en) * 2017-03-31 2017-10-31 青建集团股份公司 A kind of prestressing force tower crane attachment
CN206617097U (en) * 2017-03-15 2017-11-07 上海兰石重工机械有限公司 Drive horizontal movement system in top
CN210366726U (en) * 2019-05-16 2020-04-21 中铁建设集团有限公司 Super high-rise building outer attached self-climbing tower crane high-altitude integral translation system

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SE7704466L (en) * 1976-04-23 1977-10-24 Rauma Repola Oy DEVICE FOR CHANGING AXLE WEIGHT FOR LIFT CROWNING COMBINATION VEHICLES
SU935453A1 (en) * 1979-08-17 1982-06-15 Ленинградский Механический Завод Управления Капитального Ремонта Self-erecting tower crane
US5053746A (en) * 1990-05-07 1991-10-01 Taneo Panfilo C Vehicular communication device
US20100101086A1 (en) * 2006-07-12 2010-04-29 Eole Overseas Company Limited Device and process for rapid disassembly of a rotor and a nacelle from the mast of a windmill, as well as a windmill that is equipped with such a device
CN1986373A (en) * 2006-12-14 2007-06-27 中冶南方工程技术有限公司 Short-stroke hydraulic down-ender
CN201770426U (en) * 2010-08-04 2011-03-23 贵州詹阳动力重工有限公司 Cab lifting device of crawler-type hydraulic steel grabbing machine
CN102976215A (en) * 2012-11-16 2013-03-20 上海市机械施工有限公司 External suspension type crane overhead integral shift device and shift method thereof
CN203741438U (en) * 2014-01-02 2014-07-30 昆明理工大学 Nickel plate alignment clamping device
CN104370220A (en) * 2014-10-18 2015-02-25 青岛中天斯壮科技有限公司 Self-climbing maintenance robot for wind power generation tower
CN105109940A (en) * 2015-08-18 2015-12-02 无锡乐华自动化科技有限公司 High-bearing-capacity lifting mechanism driven by air cylinder and provided with swing arms
CN106219419A (en) * 2016-09-19 2016-12-14 中国建筑第八工程局有限公司 High-rise building large-scale swing arm tower crane is converted to plug-in construction method by interior climbing in situ
CN206617097U (en) * 2017-03-15 2017-11-07 上海兰石重工机械有限公司 Drive horizontal movement system in top
CN206599392U (en) * 2017-03-31 2017-10-31 青建集团股份公司 A kind of prestressing force tower crane attachment
CN210366726U (en) * 2019-05-16 2020-04-21 中铁建设集团有限公司 Super high-rise building outer attached self-climbing tower crane high-altitude integral translation system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111747317A (en) * 2020-05-22 2020-10-09 中建三局集团有限公司 Self-elevating tower crane heightening and angle transformation conversion section and use method thereof
CN113479791A (en) * 2021-06-25 2021-10-08 中国建筑第八工程局有限公司 Position adjusting device of climbing tower crane and construction method thereof

Similar Documents

Publication Publication Date Title
CN208650862U (en) A kind of anti-collapse suspension device of constructing tunnel
CN110127538A (en) Adhere to outside a kind of super high-rise building from climbing tower-crane high-altitude integral translation system
CN107313360A (en) Overhead cable formula is without support bearing replacement operating platform
CN1293342C (en) Steam generator and assembly method
CN209369308U (en) A kind of climbing frame wall-attached supporting seat
CN105649322B (en) A kind of integral jacking platform hanger skid beam system
CN205316526U (en) Outer quick -witted support frame of fixed air conditioner suspends in midair
CN209194364U (en) A kind of Continuous Beam-arch Bridge sunpender bridge floor tensioning equipment
CN108678362B (en) Fixed installation method for construction elevator and wall
CN210366726U (en) Super high-rise building outer attached self-climbing tower crane high-altitude integral translation system
CN107032241B (en) One kind plus drag-line tower crane climbing frame apparatus and its application method
CN105520681A (en) Pitching-type folding-arm window cleaning machine
CN213143884U (en) Walking platform of material sowing machine
CN214462401U (en) Double-layer protection frame with novel structure
CN114856048A (en) Rib-free hanging type mounting structure of ultra-large-span full-glass curtain wall
CN208501499U (en) A kind of bent cap bracket installation jacking system
CN111706060A (en) Steel wire rope inclined-pulling type hanging basket device
CN113756558A (en) High-rise assembled steel structure system externally hung hanging basket installation structure and construction method thereof
CN209226364U (en) A kind of elevator shaft regulating device
CN208088150U (en) Cantilever type movable type bridge repairing stage apparatus
CN215439396U (en) Tower crane attachment device for pier
CN213572943U (en) High-altitude operation hanging basket with high-suspension support
CN110080121A (en) A kind of Hanging Basket up-link and construction method
CN109972845A (en) Method for mounting steel roof truss
CN215484552U (en) Construction hanging basket structure of roof frame structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination