CN110127489A - A kind of working handling apparatus of building construction - Google Patents
A kind of working handling apparatus of building construction Download PDFInfo
- Publication number
- CN110127489A CN110127489A CN201910410458.7A CN201910410458A CN110127489A CN 110127489 A CN110127489 A CN 110127489A CN 201910410458 A CN201910410458 A CN 201910410458A CN 110127489 A CN110127489 A CN 110127489A
- Authority
- CN
- China
- Prior art keywords
- lifting
- groups
- elevator chamber
- fixed
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/02—Cages, i.e. cars
- B66B11/0226—Constructional features, e.g. walls assembly, decorative panels, comfort equipment, thermal or sound insulation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B11/00—Main component parts of lifts in, or associated with, buildings or other structures
- B66B11/04—Driving gear ; Details thereof, e.g. seals
- B66B11/08—Driving gear ; Details thereof, e.g. seals with hoisting rope or cable operated by frictional engagement with a winding drum or sheave
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B9/00—Kinds or types of lifts in, or associated with, buildings or other structures
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- Mechanical Engineering (AREA)
- Automation & Control Theory (AREA)
- Types And Forms Of Lifts (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
The invention discloses a kind of working handling apparatus of building construction, including winding line wheel, lifting support, turntable, wind line wheel, handling steel wire, lift rail, elevator chamber, carrier, movable pulley, mobile station, first connecting rod and second connecting rod, the same side of the lifting support described in multiple groups passes through pin shaft and is rotatably connected to one group of fixed link, transfer ceiling hold is rotatably equipped with above lifting support described in one group of top, lift rail is respectively and fixedly provided on the one side of the transfer ceiling hold and lifting support away from fixed link, the internal elevator chamber with carrier is equipped with by mounting rack and lifting wheel lifting on the lift rail, the lifting wheel being rotatably installed on mounting rack is caught in the lifting groove on lift rail, have with elevator chamber and is fixed with coaming plate on the parallel another vertical side of elevator chamber of the one side of lifting wheel.The working handling apparatus of the building construction, has many advantages, such as reasonable in design, easy to use, can be used with popularity.
Description
Technical field
The invention belongs to construction equipment technical fields, and in particular to a kind of working handling apparatus of building construction.
Background technique
Handling apparatus is a kind of device for being used in building construction process carry out material handling, is carried out convenient for construction personnel
Construction, is mainly used in the fields such as building construction and road construction, with the continuous development of science and technology, handling apparatus is in structure and function
Can on be correspondingly improved.
But for existing handling apparatus during use there is also certain deficiency, safety is bad, cannot be good
When protecting to the object of handling, easily shake during handling, influence the stability of handling, while being hoisted to top
It is not easy to unload object.
Summary of the invention
The purpose of the present invention is to provide a kind of working handling apparatus of building construction, to solve in above-mentioned background technique
The problem of proposition.
To achieve the above object, the invention provides the following technical scheme: a kind of working handling apparatus of building construction, packet
Include winding line wheel, lifting support, turntable, winding line wheel, handling steel wire, lift rail, elevator chamber, carrier, movable pulley, movement
Platform, first connecting rod and second connecting rod, the lifting support is provided with multiple groups, and stacked on top passes sequentially through bolt and is fixedly connected,
And the same side of the lifting support described in multiple groups passes through pin shaft and is rotatably connected to one group of fixed link, goes up and down branch described in one group of top
It is rotatably equipped with transfer ceiling hold above frame, it is solid on the one side of the transfer ceiling hold and lifting support away from fixed link
Surely there is lift rail, lift rail is fixed on transfer ceiling hold and lifting support by connection sheet, and above and below lift rail described in multiple groups
Alignment is equipped with the internal elevator chamber with carrier, carrier by mounting rack and lifting wheel lifting on the lift rail
It is arranged inside elevator chamber by lifting assembly liftable, and is fixed with multiple groups resilient cushion in elevator chamber bottom face, in carrier
Bottom end quadrangle is equipped with movable pulley, and the lifting wheel being rotatably installed on mounting rack is caught in the lifting groove on lift rail, with lifting
It is fixed with coaming plate on another vertical side of elevator chamber that case has the one side of lifting wheel parallel, with the one side phase with coaming plate
Chamber door is hinged on other two adjacent vertical sides, chamber door is fixed on elevator chamber by snapping over.
Preferably, the lifting assembly includes two groups of mobile stations in mirror settings, mobile station synchronous backward described in two groups
Movement, the external opposite ends of the mobile station described in two groups are provided with slope, and two groups of vertical plane bottom ends of the hinged chamber door of elevator chamber are solid
Surely have horizontal railing, form the through slot stretched out for slope with the bottom face of elevator chamber, and mobile station top end face described in two groups and
Railing flushes.
Preferably, mobile station opposite side face center described in two groups is respectively and fixedly provided with one group of threaded sleeve, screw thread described in two groups
Casing opposite side is socketed with one group of threaded rod, and the opposite end of threaded rod described in two groups is fixedly connected with double end motor.
Preferably, first connecting rod and are additionally provided between mobile station described in two groups described in two groups on the outside of threaded sleeve
Two connecting rods, the first connecting rod and second connecting rod opposite side are hinged by pin shaft, first connecting rod and second connecting rod it is relatively outer
End respectively by pin shaft be rotatably connected to one group described in mobile station, when the stretching elevator chamber of the mobile station outer end slope described in two groups,
First connecting rod and second connecting rod are in horizontality.
Preferably, it is connected with handling steel wire in elevator chamber top quadrangle, handling steel wire is by transfer ceiling hold top
Fixed fixed pulley is wrapped in the winding line wheel of transfer ceiling hold top setting, winds line wheel by being fixed on transfer ceiling hold
The winding motor of top end face drives, and fixed pulley is rotatably installed in support bracket fastened top, and fixed bracket is fixedly welded on transfer
On the top end face of ceiling hold.
Preferably, locking casing is additionally provided between one group of the top lifting support and transfer ceiling hold of fixed link side
And hydraulic stem, the hydraulic stem is fixed on the top side of lifting support, and the telescopic end of hydraulic stem is arranged upward, in telescopic end
On be fixed with elongated insertion part, the locking casing of the bottom end opening opposite with elongated insertion part be fixed on transfer ceiling hold bottom end side.
Preferably, the bottom end height of the locking casing is higher than the bottom end height of transfer ceiling hold, receives completely in hydraulic stem
Elongated insertion part is detached from locking casing when contracting, and elongated insertion part top is lower than the tip height of the one group of lifting support in top.
Preferably, two groups of lifting wheels are provided on the elevator chamber side of same vertical direction, and on two groups of vertical directions
Lifting wheel spacing is less than the length of lift rail.
Technical effect and advantage of the invention: the working handling apparatus of the building construction loads loading by elevator chamber
The design of vehicle, chamber door and coaming plate are equipped on elevator chamber to protect carrier and object therein, loading
Vehicle can be detached from elevator chamber, convenient for carrying out the loading of object, while setting by lifting assembly to the carrier that can be moved
Meter can be by carrier bottom end movable pulley by outer end slope when double end motor is rotated and moved outside two groups of mobile stations of drive indirectly
It lifts, until flushing with railing, convenient for the release of carrier, first connecting rod and second connecting rod are in a horizontal position wheel easy to remove
During being moved by elevator chamber interior, while moved outside mobile station, slope is extend out to outside elevator chamber, can be convenient for load
Object vehicle passes in and out elevator chamber, and when not lifting, railing and mobile station can play clamping action to movable pulley, and then improve carrier
Stability in elevator chamber can be arrived by the design of rotatable transfer ceiling hold in the elevator chamber of carrying carrier
When shifting topmast rack position up to top, the position that rotation transfer ceiling hold carries out elevator chamber is adjusted, and releases handling convenient for carrier
Material, while the presence for locking casing and hydraulic stem can play position locking effect to transfer ceiling hold, in hoisting process
Guarantee the stability of transfer ceiling hold, elevator chamber is gone up and down on lift rail by lifting wheel, and is only hung by handling steel wire
Fortune is compared, and ensure that the stability of handling, the working handling apparatus of the building construction, has reasonable in design, user
Just the advantages that, can be used with popularity.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is that carrier of the invention is in the structural schematic diagram not being lifted in elevator chamber;
Fig. 3 is that carrier of the invention is in the structural schematic diagram being lifted in elevator chamber;
Fig. 4 is elevator chamber inside top figure of the invention;
Fig. 5 is lifting assembly structural schematic diagram of the invention.
In figure: 1 winding line wheel, 2 transfer ceiling holds, 3 turntables, 4 locking casings, 5 hydraulic stems, 6 fixed links, 7 lifting supports,
8 fixed pulleys, 9 fixed brackets, 10 lift rails, 11 handling steel wires, 12 transfer motors, 13 elevator chambers, 14 chamber doors, 15 resilient cushions, 16
Movable pulley, 17 mobile stations, 18 threaded sleeves, 19 threaded rods, 20 lifting assemblies, 21 double end motors, 22 carriers, 23 connection sheets,
24 mounting racks, 25 lifting wheels, 26 first connecting rods, 27 second connecting rods.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
The present invention provides the working handling apparatus of a kind of building construction as shown in Figs. 1-5, including winding line wheel 1,
Lifting support 7, turntable 3, winding line wheel 1, handling steel wire 11, lift rail 10, elevator chamber 13, carrier 22, movable pulley 16, movement
Platform 17, first connecting rod 26 and second connecting rod 27, the lifting support 7 is provided with multiple groups, and stacked on top passes sequentially through bolt and consolidates
Fixed connection, and the same side of the lifting support 7 described in multiple groups passes through pin shaft and is rotatably connected to one group of fixed link 6, one group of top
It is rotatably equipped with transfer ceiling hold 2 above the lifting support 7, deviates from fixed link in the transfer ceiling hold 2 and lifting support 7
Lift rail 10 is respectively and fixedly provided on 6 one side, lift rail 10 is fixed on transfer ceiling hold 2 and lifting support 7 by connection sheet 23
On, and 10 consistency from top to bottom of lift rail described in multiple groups, pass through mounting rack 24 and the lifting installation of lifting wheel 25 on the lift rail 10
There is the internal elevator chamber 13 with carrier 22, carrier 22 is arranged inside elevator chamber 13 by 20 liftable of lifting assembly,
And it is fixed with multiple groups resilient cushion 15 in 13 bottom face of elevator chamber, movable pulley 16, rotation peace are installed in 22 bottom end quadrangle of carrier
Lifting wheel 25 on mounting rack 24 is caught in the lifting groove on lift rail 10, has the side of lifting wheel 25 with elevator chamber 13
Face is fixed with coaming plate on another vertical side of parallel elevator chamber 13, the other two vertical sides adjacent with the one side with coaming plate
Chamber door 14 is hinged on face, chamber door 14 is fixed on elevator chamber 13 by snapping over.
Specifically, the lifting assembly 20 includes two groups of mobile stations 17 in mirror settings, mobile station 17 described in two groups is same
Counter motion is walked, the external opposite ends of the mobile station 17 described in two groups are provided with slope, and two groups of the hinged chamber door 14 of elevator chamber 13
Vertical plane bottom end is fixed with horizontal railing, forms the through slot stretched out for slope with the bottom face of elevator chamber 13, and described in two groups
17 top end face of mobile station is flushed with railing, and slope can not only lift movable pulley 16, is also convenient for moving when stretching out elevator chamber 13
The disengaging of wheel 16.
Specifically, 17 opposite side face center of mobile station described in two groups is respectively and fixedly provided with one group of threaded sleeve 18, described in two groups
18 opposite side of threaded sleeve is socketed with one group of threaded rod 19, and the opposite end of threaded rod 19 described in two groups is fixedly connected with double end
Motor 21.
Specifically, being additionally provided with first connecting rod between mobile station 17 described in two groups of 18 outside of threaded sleeve described in two groups
26 and second connecting rod 27, the first connecting rod 26 and 27 opposite side of second connecting rod are hinged by pin shaft, first connecting rod 26 and the
The external opposite ends of two connecting rods 27 pass through respectively pin shaft be rotatably connected to one group described in mobile station 17, outside the mobile station 17 described in two groups
When slope being held to stretch out elevator chamber 13, first connecting rod 26 and second connecting rod 27 are in horizontality.
Specifically, being connected with handling steel wire 11 in the 13 top quadrangle of elevator chamber, handling steel wire 11 is by transfer topmast
Fixed fixed pulley 8 is wrapped in the winding line wheel 1 of transfer 2 top of ceiling hold setting above frame 2, and winding line wheel 1 passes through fixation
In the winding motor driving of transfer 2 top end face of ceiling hold, and fixed pulley 8 is rotatably installed in the top of fixed bracket 9, fixed bracket
9 are fixedly welded on the top end face of transfer ceiling hold 2.
Specifically, being additionally provided with locking between one group of the top lifting support 7 and transfer ceiling hold 2 of 6 side of fixed link
Casing 4 and hydraulic stem 5, the hydraulic stem 5 is fixed on the top side of lifting support 7, and the telescopic end of hydraulic stem 5 is set upward
It sets, elongated insertion part is fixed on telescopic end, the locking casing 4 of the bottom end opening opposite with elongated insertion part is fixed on transfer ceiling hold 2
Bottom end side.
Specifically, the bottom end height of the locking casing 4 is higher than the bottom end height of transfer ceiling hold 2, it is complete in hydraulic stem 5
Elongated insertion part is detached from locking casing 4 when contraction, and elongated insertion part top is lower than the tip height of the one group of lifting support 7 in top, anti-rotation stop
It moves when ceiling hold 2 rotates and mutually collides.
Specifically, being provided with two groups of lifting wheels 25 on 13 side of elevator chamber of same vertical direction, and two groups of vertical directions
On 25 spacing of lifting wheel be less than lift rail 10 length, guarantee lifting wheel 25 be completely in transfer ceiling hold 2 on elevating lever
On 10, it is able to carry out rotation.
Specifically, the working handling apparatus of the building construction, when in use, the object for needing to lift is placed on carrier
In 22, the chamber door 14 of elevator chamber 13 is opened, drives threaded rod 19 to rotate by double end motor 21 and drives two groups of mobile stations 17 indirectly
Outer shifting, until the slope of 17 outer end of mobile station extends to outside elevator chamber 13, while first connecting rod 26 and second connecting rod 27 are in water
Carrier 22 is pushed into inside elevator chamber 13 by level state by slope, and subsequent double end motor 21 inverts, and two groups of mobile stations 17 are drawn
Closely, movable pulley 16 falls along slope, and mobile station 17 and railing clamp movable pulley 16, improves carrier 22 inside elevator chamber 13
Stability, close chamber door 14 simultaneously by snap lock, the winding rotation of line wheel 1 then driven by winding motor, utilizes handling
Steel wire 11 slings the elevator chamber 13 for being mounted with carrier 22, and hydraulic stem 5 is in elongation state, the lock of 5 telescopic end of hydraulic stem at this time
Determine head to be locked in inside locking casing 4, improve the stability of transfer ceiling hold 2, is risen at transfer ceiling hold 2 in elevator chamber 13,
And 13 bottom end of elevator chamber withdraws hydraulic stem 5, releases transfer ceiling hold 2 and one group of top lifting when being higher than transfer 2 bottom end of ceiling hold
The lock state of bracket 7, then by transfer 12 mobilization ceiling hold 2 of motor rotation, so that elevator chamber 13 turns to lifting
The other side of bracket 7 carries out the unloading of carrier 22, and in unloading, double end motor 21 rotates drives two groups of mobile stations 17 indirectly
Movable pulley 16 is lifted in outer shifting, can be released carrier 22 from elevator chamber 13 by movable pulley 16, building construction construction
Handling apparatus, has many advantages, such as reasonable in design, easy to use, can be used with popularity.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features,
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention
Within protection scope.
Claims (8)
1. a kind of working handling apparatus of building construction, including winding line wheel (1), lifting support (7), turntable (3), winding wire
Take turns (1), handling steel wire (11), lift rail (10), elevator chamber (13), carrier (22), movable pulley (16), mobile station (17), the
One connecting rod (26) and second connecting rod (27), it is characterised in that: the lifting support (7) is provided with multiple groups, and stacked on top is successively
It is bolted to connection, and the same side of the lifting support described in multiple groups (7) passes through pin shaft and is rotatably connected to one group and fixes
Bar (6) is rotatably equipped with transfer ceiling hold (2) above lifting support (7) described in one group of top, in the transfer ceiling hold (2)
It is respectively and fixedly provided with lift rail (10) on the one side of fixed link (6) with lifting support (7), lift rail (10) passes through connection sheet
(23) it is fixed on transfer ceiling hold (2) and lifting support (7), and lift rail described in multiple groups (10) consistency from top to bottom, in the liter
The internal elevator chamber (13) with carrier (22) is installed by mounting rack (24) and lifting wheel (25) lifting in drop rail (10),
Carrier (22) is arranged inside elevator chamber (13) by lifting assembly (20) liftable, and fixes in elevator chamber (13) bottom face
There are multiple groups resilient cushion (15), movable pulley (16) are installed in carrier (22) bottom end quadrangle, are rotatably installed on mounting rack (24)
Lifting wheel (25) be caught in the lifting groove on lift rail (10), with elevator chamber (13) have the one side of lifting wheel (25) it is parallel
Another vertical side of elevator chamber (13) on be fixed with coaming plate, on the other two vertical sides adjacent with the one side with coaming plate
It is hinged with chamber door (14), chamber door (14) is fixed on elevator chamber (13) by snapping over.
2. the working handling apparatus of a kind of building construction according to claim 1, it is characterised in that: the lifting assembly
It (20) include two groups of mobile stations (17) in mirror settings, (17) synchronous backward of mobile station described in two groups movement, described in two groups
The external opposite ends of mobile station (17) are provided with slope, and two groups of vertical plane bottom ends of the hinged chamber door (14) of elevator chamber (13) are fixed with
Horizontal railing forms the through slot stretched out for slope, and mobile station described in two groups (17) top with the bottom face of elevator chamber (13)
Face is flushed with railing.
3. the working handling apparatus of a kind of building construction according to claim 1, it is characterised in that: moved described in two groups
Platform (17) opposite side face center is respectively and fixedly provided with one group of threaded sleeve (18), and threaded sleeve described in two groups (18) opposite side covers
It is connected to one group of threaded rod (19), the opposite end of threaded rod described in two groups (19) is fixedly connected with double end motor (21).
4. the working handling apparatus of a kind of building construction according to claim 3, it is characterised in that: the spiral shell described in two groups
First connecting rod (26) and second connecting rod (27) are additionally provided between mobile station (17) described in two groups on the outside of line casing (18), it is described
First connecting rod (26) and second connecting rod (27) opposite side are hinged by pin shaft, the phase of first connecting rod (26) and second connecting rod (27)
Outer end is passed through respectively pin shaft be rotatably connected to one group described in mobile station (17), mobile station (17) outer end slope described in two groups is stretched
Out when elevator chamber (13), first connecting rod (26) and second connecting rod (27) are in horizontality.
5. the working handling apparatus of a kind of building construction according to claim 1, it is characterised in that: in the elevator chamber
(13) top quadrangle is connected with handling steel wire (11), and handling steel wire (11) is by fixed pulley fixed above transfer ceiling hold (2)
(8) it is wrapped in the winding line wheel (1) of transfer ceiling hold (2) top setting, winds line wheel (1) by being fixed on transfer ceiling hold
(2) the winding motor driving of top end face, and fixed pulley (8) is rotatably installed in the top of fixed bracket (9), fixed bracket (9) are solid
Surely it is welded on the top end face of transfer ceiling hold (2).
6. the working handling apparatus of a kind of building construction according to claim 1, it is characterised in that: in fixed link (6)
Locking casing (4) and hydraulic stem (5), institute are additionally provided between one group of the top lifting support (7) and transfer ceiling hold (2) of side
The top side that hydraulic stem (5) is fixed on lifting support (7) is stated, and the telescopic end of hydraulic stem (5) is arranged upward, on telescopic end
It is fixed with elongated insertion part, the locking casing (4) of the bottom end opening opposite with elongated insertion part is fixed on the bottom end one of transfer ceiling hold (2)
Side.
7. the working handling apparatus of a kind of building construction according to claim 6, it is characterised in that: the locking casing
(4) bottom end height is higher than the bottom end height of transfer ceiling hold (2), and when hydraulic stem (5) is shunk completely, elongated insertion part is detached from locking
Casing (4), and elongated insertion part top is lower than the tip height of the one group of lifting support (7) in top.
8. the working handling apparatus of a kind of building construction according to claim 1, it is characterised in that: same vertical direction
Elevator chamber (13) side on be provided with two groups of lifting wheels (25), and lifting wheel (25) spacing on two groups of vertical directions be less than rise
The length of rail (10) drops.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410458.7A CN110127489B (en) | 2019-05-17 | 2019-05-17 | Overhead hoist that house construction was used |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910410458.7A CN110127489B (en) | 2019-05-17 | 2019-05-17 | Overhead hoist that house construction was used |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110127489A true CN110127489A (en) | 2019-08-16 |
CN110127489B CN110127489B (en) | 2020-09-04 |
Family
ID=67574792
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910410458.7A Active CN110127489B (en) | 2019-05-17 | 2019-05-17 | Overhead hoist that house construction was used |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110127489B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110668291A (en) * | 2019-10-11 | 2020-01-10 | 江苏易明昌建设工程有限公司 | Hoisting device for house construction engineering |
CN111517229A (en) * | 2020-04-30 | 2020-08-11 | 乐清市城镇建设工程公司 | Overhead hoist that house construction was used |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150021122A1 (en) * | 2011-12-07 | 2015-01-22 | Mitsubishi Electric Corporation | Elevator apparatus |
CN106219360A (en) * | 2016-08-16 | 2016-12-14 | 史茹文 | A kind of baggage elevator of the inside and outside band transport vehicle that can form complete guide rail |
CN206298247U (en) * | 2016-12-20 | 2017-07-04 | 韦伯电梯有限公司 | The car structure of large-tonnage lorry loading elevator |
CN208119200U (en) * | 2018-03-23 | 2018-11-20 | 贵州理工学院 | A kind of express delivery loading liftable trolley |
CN208532111U (en) * | 2018-03-30 | 2019-02-22 | 苏州伊而雅精密部件有限公司 | A kind of automation elevating mechanism |
-
2019
- 2019-05-17 CN CN201910410458.7A patent/CN110127489B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20150021122A1 (en) * | 2011-12-07 | 2015-01-22 | Mitsubishi Electric Corporation | Elevator apparatus |
CN106219360A (en) * | 2016-08-16 | 2016-12-14 | 史茹文 | A kind of baggage elevator of the inside and outside band transport vehicle that can form complete guide rail |
CN206298247U (en) * | 2016-12-20 | 2017-07-04 | 韦伯电梯有限公司 | The car structure of large-tonnage lorry loading elevator |
CN208119200U (en) * | 2018-03-23 | 2018-11-20 | 贵州理工学院 | A kind of express delivery loading liftable trolley |
CN208532111U (en) * | 2018-03-30 | 2019-02-22 | 苏州伊而雅精密部件有限公司 | A kind of automation elevating mechanism |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110668291A (en) * | 2019-10-11 | 2020-01-10 | 江苏易明昌建设工程有限公司 | Hoisting device for house construction engineering |
CN111517229A (en) * | 2020-04-30 | 2020-08-11 | 乐清市城镇建设工程公司 | Overhead hoist that house construction was used |
Also Published As
Publication number | Publication date |
---|---|
CN110127489B (en) | 2020-09-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5018925A (en) | Lifting device for a platform for storage of motor vehicles | |
CN207053051U (en) | A kind of hanging wire unmanned plane reached the standard grade for livewire work machine | |
CN110127489A (en) | A kind of working handling apparatus of building construction | |
RU2007140411A (en) | METHOD AND DEVICE FOR STORAGE AND MOVEMENT OF CONTAINERS | |
CN106185534A (en) | The remodeling method of machine-roomless lift | |
CN114046033B (en) | Building outer wall suspends construction equipment in midair | |
CN113636449B (en) | Container portal crane with locking mechanism | |
CN218909654U (en) | Outdoor gantry crane with wind-proof device | |
CN116374812A (en) | Marine wind turbine generator system generator hoisting accessory | |
CN214543313U (en) | Crossing structure protection network integrated device | |
CN207053047U (en) | It is a kind of to be used for vehicular job platform offline on livewire work machine | |
CN107651625A (en) | A kind of power equipment installs lifting apparatus | |
CN214298962U (en) | Novel curtain wall detection large-size sample hoisting stabilizing device | |
CN112392269A (en) | Building platform for outdoor building and indoor decoration | |
CN218058156U (en) | Movable equipment gantry crane | |
CN112864946A (en) | Crossing structure protection network integrated device | |
CN219505880U (en) | Sinking type mobile contact net suitable for through loading and unloading line | |
CN112942792A (en) | Intelligent multi-use architecture hanging flower basket for construction | |
CN220165707U (en) | Lifting device for building construction | |
CN219906756U (en) | Safety moving device for high and large templates | |
CN219546477U (en) | Civil air defense door panel hoisting clamp | |
CN219469477U (en) | Profile conveying device | |
CN218478469U (en) | Truck tarpaulin traction covering device | |
CN211769901U (en) | Anti-swing wide crane | |
CN116788978B (en) | Electric pole hoisting device for electric power construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |