CN110113760A - A kind of site scheme determines method and device - Google Patents
A kind of site scheme determines method and device Download PDFInfo
- Publication number
- CN110113760A CN110113760A CN201910354838.3A CN201910354838A CN110113760A CN 110113760 A CN110113760 A CN 110113760A CN 201910354838 A CN201910354838 A CN 201910354838A CN 110113760 A CN110113760 A CN 110113760A
- Authority
- CN
- China
- Prior art keywords
- site
- demand
- resource
- network
- determining
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/18—Network planning tools
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/22—Traffic simulation tools or models
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W16/00—Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
- H04W16/24—Cell structures
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/04—Arrangements for maintaining operational condition
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/10—Scheduling measurement reports ; Arrangements for measurement reports
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Databases & Information Systems (AREA)
- Theoretical Computer Science (AREA)
- Remote Sensing (AREA)
- Data Mining & Analysis (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
Abstract
The embodiment of the present invention provides a kind of site scheme and determines that method and device, method include: to import site resource, and carry out Distribution GIS to site resource and show, site resource includes at least storage site, shaft tower resource;Determine that network demand, network demand include the first kind network demand that operator provides and/or the second class network demand determining according to network optimization data;According to network demand, determine that mode is chosen in corresponding site, wherein the corresponding automatic selection mode of first kind network demand or human assistance choose mode, and the second class network demand corresponds to human assistance and chooses mode;Mode and site resource and network demand are chosen according to site, determines target site.In the embodiment of the present invention, the site resource of plurality of classes is imported, keeps the determination of target site more comprehensive, it is ensured that the landing of target site;According to different network demands, mode is chosen using different target sites, improves the determination efficiency of target site.
Description
Technical field
The present embodiments relate to field of communication technology, in particular to a kind of site scheme determines method and device.
Background technique
The method of conventional wireless network planning is coverage condition and capacity feelings to wireless network using network operation data
Condition is analyzed, and obtains the existing covering blind spot of network and hot spot, and determine construction site, the side of existing determining site with this
Formula are as follows: (1) network is emulated by emulation tool, excavate the coverage hole of network, and use automatic cloth station function, output
Programme.(2) network operation data are analyzed using software tool, excavates the coverage hole of network, but specifically lands scheme
Still it needs using the map tools such as Mapinfo (a kind of desktop GIS software), Google, by manually working out planning
Scheme.
The method of existing determining site has the disadvantage in that the work parameter evidence of (1) emulation tool heavy dependence site information
Accuracy, planning quality not can guarantee in practice, can not be flexibly with each when in addition emulation tool generates sensor distributing
Class resource causes the schemes synthesis generated and landing property poor.
(2) majority of network planning software function concentrates in the analysis to disparate networks data, by assessing network quality,
It is automatic to excavate network problem region, but specific landing scheme still needs to manually in GIS-Geographic Information System (Geographic
Information System, GIS) it completes on map, efficiency is lower.
Summary of the invention
The embodiment of the present invention provides a kind of site scheme and determines method and device, solves the method landing of existing determining site
Property it is poor, complete the lower problem of efficiency.
First method according to an embodiment of the present invention provides a kind of site scheme and determines method, which comprises
Site resource is imported, and Distribution GIS is carried out to the site resource and shows that the site resource is at least
Including storage site, shaft tower resource;
Determine network demand, the network demand includes the first kind network demand that operator provides and/or according to network optimization
The second class network demand that data determine;
According to the network demand, determine that mode is chosen in corresponding site, wherein when the network demand is first kind net
It is that automatic selection mode or human assistance choose mode that mode is chosen in the site when network demand, when the network demand is second
It is that human assistance chooses mode that mode is chosen in the site when class network demand;
Mode and the site resource and the network demand are chosen according to the site, determines target site.
Optionally, the site resource further includes following one or more:
Building library, electric power access point, transmission access point, pipeline are divided in urban and rural planning site, deposit site, difficult site, room
Routing.
Optionally, described that site resource progress GIS is shown, including following one or more:
The storage site carries out GIS in dots and shows;
The shaft tower resource is carried out GIS in the form of point, line or face and shown;
The urban and rural planning site is carried out GIS in the form of point, line or face and shown;
The deposit site carries out GIS in dots and shows;
The difficulty site carries out GIS in dots and shows;
The room divides building library to carry out GIS in dots to show;
The electric power access point carries out GIS in dots and shows;
The transmission access point carries out GIS in dots and shows;
The pipeline carries out GIS in the form of a line and shows.
Optionally, after the resource of the importing site, the method also includes:
Accuracy verification is carried out to all kinds of resources in the site resource;
According to the bearer capability information of the storage site, availability analysis, the carrying are carried out to the storage site
Ability information includes following one or more: the tower mast of storage site, battery capacity, dispatch from foreign news agency introduce capacity, remaining seat in the plane number.
Optionally, the first kind network demand is the demand site that operator provides;
The second class network demand is the weak area of coverage determined according to network optimization data;
Wherein the network optimization data include at least one of the following: that measurement report MR data, drive test data, Internet enterprises are got over
It crosses operator's OTT data, complain data.
Optionally, when the network demand is demand site, after the importing network demand, the method is also wrapped
It includes:
Accuracy verification is carried out to the demand site;
When the network demand is the weak area of coverage, the weak area of coverage is included at least one of the following:
Region of the MR data-signal less than the first threshold value;
Region of the drive test data signal less than the second threshold value;
The OTT data-signal is less than the region of third threshold value;
The corresponding region of the complaint data.
Optionally, described that mode, Yi Jisuo are chosen according to the site when the network demand is the demand site
Site resource and the network demand are stated, determines target site, comprising:
The projecting parameter of the demand site is set, and the projecting parameter includes at least offset distance and nearest stop spacing;
The determining existing website location nearest with the demand site distance on the different directions of the demand site respectively, obtains
To multiple existing website locations;
Establish the delaunay triangulation network between the demand site and the multiple existing website location;
Thiessen polygon region is determined in the delaunay triangulation network;
According to the projecting parameter, one or more is determined from the available site resource in the Thiessen polygon region
A first alternative site;
First object site is determined in the one or more of first alternative sites according to pre-set priority, wherein storage
The highest priority of site;
Wherein, when the first object site is storage site, determine that the first object site is the site that reuses;When
When the first object site is non-storage site, determine that the first object site is newly-built site;When can not at one or
When determining first object site in multiple first alternative sites, the demand site is determined as the first object station
Location, and determine that the first object site is newly-built site.
Optionally, described that mode, Yi Jisuo are chosen according to the site when the network demand is the weak area of coverage
Site resource and the network demand are stated, determines target site, comprising:
Reference point is determined in the weak area of coverage;
Determine that the first reference zone, first reference zone cover the weak area of coverage;
According to first reference zone and pre-determined distance, the second reference zone is determined;
The available site resource of one or more in first reference zone is determined as the second alternative site;
It is instructed according to input, one or more second Target Stations is determined from one or more second alternative sites
Location.
Optionally, mode and the site resource and the network demand are chosen according to the site described, determined
After target site, the method also includes:
Record is invested according to the history in project management system PMS, determines newly-built scene library and the scene library that reuses, wherein institute
Stating newly-built scene library includes the corresponding investment estimate of a variety of newly-built scenes, and the scene library that reuses includes that a variety of scenes that reuse are corresponding
Investment estimate;
When first object site is newly-built site, the first scene of the first object site is determined, and according to described
First scene determines corresponding investment estimate in the newly-built scene library;
When first object site is to reuse site, the second scene of the first object site is determined, and according to described
Second scene determines corresponding investment estimate in the scene library that reuses;
According to the investment estimate, the total investment of the first object site is determined.
Optionally, mode and the site resource and the network demand are chosen according to the site described, determined
After target site, the method also includes:
The site type of second target site is set, and the site type includes: macro station type, micro- station type, room
Classifying type;
When the site type of second target site is the macro station type, record is invested by the history in PMS
Determine the investment estimate of second target site;
When the site type of second target site is micro- station type, record is invested by history list station and is determined
The investment estimate of second target site;
When the site type of second target site is the room classifying type, manufactured by area coverage and unit plane
Valence determines the investment estimate of second target site;
According to the investment estimate, the total investment of second target site is determined.
Second aspect according to an embodiment of the present invention, provides a kind of site scheme determining device, and the site scheme determines
Device includes:
Import modul for importing site resource, and carries out Distribution GIS to the site resource and shows, institute
Site resource is stated including at least storage site, shaft tower resource;
First determining module, for determining that network demand, the network demand include the first kind network that operator provides
Demand and/or the second class network demand determined according to network optimization data;
Second determining module, for determining that mode is chosen in corresponding site, wherein when the net according to the network demand
Mode is chosen in the site to network demand when being first kind network demand is that automatic selection mode or human assistance choose mode, works as institute
Stating site when network demand is the second class network demand and choosing mode is that human assistance chooses mode;
Third determining module, for choosing mode and the site resource and the network demand according to the site,
Determine target site.
Optionally, the site resource further includes following one or more:
Building library, electric power access point, transmission access point, pipeline are divided in urban and rural planning site, deposit site, difficult site, room
Routing.
Optionally, the import modul is further used for: the storage site carries out GIS in dots and shows;
The import modul is further used for: the shaft tower resource is carried out GIS in the form of point, line or face and shown;
The import modul is further used for: the urban and rural planning site is carried out GIS in the form of point, line or face and shown;
The import modul is further used for: the deposit site carries out GIS in dots and shows;
The import modul is further used for: the difficulty site carries out GIS in dots and shows;
The import modul is further used for: the room divides building library to carry out GIS in dots to show;
The import modul is further used for: the electric power access point carries out GIS in dots and shows;
The import modul is further used for: the transmission access point carries out GIS in dots and shows;
The import modul is further used for: the pipeline carries out GIS in the form of a line and shows.
Optionally, the site scheme determining device further include:
First correction verification module, for carrying out accuracy verification to all kinds of resources in the site resource;
Analysis module carries out availability to the storage site for the bearer capability information according to the storage site
Analysis, the bearer capability information includes following one or more: the tower mast of storage site, battery capacity, dispatch from foreign news agency, which introduce, to be held
Amount, remaining seat in the plane number.
Optionally, the first kind network demand is the demand site that operator provides;
The second class network demand is the weak area of coverage determined according to network optimization data;
Wherein the network optimization data include at least one of the following: that measurement report MR data, drive test data, Internet enterprises are got over
It crosses operator's OTT data, complain data.
Optionally, when the network demand is demand site, the site scheme determining device further include:
Second correction verification module, for carrying out accuracy verification to the demand site;
When the network demand is the weak area of coverage, the weak area of coverage is included at least one of the following:
Region of the MR data-signal less than the first threshold value;
Region of the drive test data signal less than the second threshold value;
The OTT data-signal is less than the region of third threshold value;
The corresponding region of the complaint data.
Optionally, when the network demand is the demand site, the third determining module includes:
Setting unit, for the projecting parameter of the demand site to be arranged, the projecting parameter includes at least offset distance
With nearest stop spacing;
First determination unit, for the determining and demand site distance on the different directions of the demand site respectively
Nearest existing website location obtains multiple existing website locations;
Unit is established, the delaunay triangulation network for establishing between the demand site and the multiple existing website location;
Second determination unit, for determining Thiessen polygon region in the delaunay triangulation network;
Third determination unit, for the available site according to the projecting parameter, out of described Thiessen polygon region
The first alternative site of one or more is determined in resource;
4th determination unit, for determining first in the one or more of first alternative sites according to pre-set priority
Target site, the wherein highest priority of storage site;
4th determination unit is also used to determine first mesh when the first object site is storage site
Labeling station location is the site that reuses;When the first object site is non-storage site, determine that the first object site is newly-built
Site;It is when that can not determine first object site in one or more first alternative sites, the demand site is true
It is set to the first object site, and determines that the first object site is newly-built site.
Optionally, when the network demand is the weak area of coverage, the third determining module includes:
5th determination unit, for determining reference point in the weak area of coverage;
6th determination unit, for determining the first reference zone, first ginseng according to the reference point and pre-determined distance
Examine the weak area of coverage described in region overlay;
7th determination unit, for determining the second reference zone according to first reference zone and pre-determined distance;
8th determination unit, for the available site resource of one or more in second reference zone to be determined as
Second alternative site;
9th determination unit determines one from one or more second alternative sites for instructing according to input
Or multiple second targets site.
Optionally, the site scheme determining device further include:
4th determining module, for investing record according to the history in project management system PMS, determine newly-built scene library and
Reuse scene library, wherein the newly-built scene library includes the corresponding investment estimate of a variety of newly-built scenes, the scene library packet that reuses
Containing the corresponding investment estimate of a variety of scenes that reuse;
5th determining module, for when first object site is newly-built site, determining the of the first object site
One scene, and corresponding investment estimate is determined in the newly-built scene library according to first scene;
5th determining module is also used to determine the first object station when first object site is to reuse site
Second scene of location, and corresponding investment estimate is determined in the scene library that reuses according to second scene;
5th determining module is also used to determine that the investment of the first object site is total according to the investment estimate
Volume.
Optionally, the site scheme determining device further include:
Setup module, for the site type of second target site to be arranged, the site type includes: macro station class
Type, micro- station type, room classifying type;
6th determining module, for passing through PMS when the site type of second target site is the macro station type
In history investment record determine second target site investment estimate;
6th determining module is also used to when the site type of second target site is micro- station type,
It is invested by history list station and records the investment estimate for determining second target site;
6th determining module is also used to when the site type of second target site is the room classifying type,
The investment estimate of second target site is determined by area coverage and unit area building cost;
6th determining module is also used to determine that the investment of second target site is total according to the investment estimate
Volume.
In the embodiment of the present invention, the site resource of plurality of classes is imported, keeps the determination of target site more comprehensive, it is ensured that
The landing of target site;According to different network demands, mode is chosen using different target sites, improves target site
Determine efficiency.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, needed in being described below to the embodiment of the present invention
Attached drawing to be used is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention,
For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings
Other attached drawings.
Fig. 1 is the flow diagram that site scheme provided in an embodiment of the present invention determines method;
Fig. 2 is site resource provided in an embodiment of the present invention and display mode correspondence diagram;
Fig. 3 is one of application scenarios schematic diagram provided in an embodiment of the present invention;
Fig. 4 is the two of application scenarios schematic diagram provided in an embodiment of the present invention;
Fig. 5 is the three of application scenarios schematic diagram provided in an embodiment of the present invention;
Fig. 6 is the four of application scenarios schematic diagram provided in an embodiment of the present invention;
Fig. 7 is the five of application scenarios schematic diagram provided in an embodiment of the present invention;
Fig. 8 is the structural schematic diagram of scheme determining device in site provided in an embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are some of the embodiments of the present invention, instead of all the embodiments.Based on this hair
Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts
Example, shall fall within the protection scope of the present invention.
Referring to Fig. 1, the embodiment of the present invention provides a kind of site scheme and determines method, and specific step is as follows for this method:
Step 101: importing site resource, and GIS is carried out to site resource and is shown;
In embodiments of the present invention, site resource includes all kinds of resources, improves what site determined by the resource of multiple types
It is comprehensive.Wherein, which includes at least: storage site, shaft tower resource (such as the social shaft tower such as light pole, electric power bar
Resource).
Optionally, which further includes following one or more: urban and rural planning site, deposit site, difficult station
Building library, electric power access point, transmission access point, pipeline are divided in location, room.
After importing site resource, it can be counted according to site resource of the resource metrics to importing, which refers to
Mark can be divided according to dimensions such as scene, type, telecommunications enterprises, carry out comprehension management to site resource.
Referring to fig. 2, GIS is carried out in different ways for different site resources to show.Shape of the storage site to put
Formula carries out GIS and shows;Shaft tower resource is carried out GIS in the form of point, line or face and shown;Urban and rural planning site is with point, line or face
Form carries out GIS and shows;Deposit site carries out GIS in dots and shows;Difficult site carries out GIS in dots and shows;
Room divides building library to carry out GIS in dots to show;Electric power access point carries out GIS in dots and shows;Transmit access point with
The form of point carries out GIS and shows;Pipeline carries out GIS in the form of a line and shows.
It is understood that since different classes of site resource quantity is huge, if all being imported in the form of point
It has been shown that, will lead to the congestion of system.Therefore, some types resource is shown in the form of line or face, alleviates system
Pressure.
It should be noted that the corresponding relationship between different classes of site resource and GIS display mode can be and prestore
Corresponding relationship, the corresponding relationship between different classes of site resource and GIS display mode is also possible to by being manually arranged
Corresponding relationship, the embodiment of the present invention is not specifically limited in this embodiment.
Further, after importing site resource, accuracy verification is carried out to all kinds of resources in the site resource.Tool
Body, automatic identification is carried out by site resource of the system to importing, determines administrative region mistake, water-based site of leaving a question open, and
User is allowed to be modified in GIS map to the relevant field of the site of mistake.
Availability analysis is carried out to the storage site in the resource of site, specifically, is believed according to the bearing capacity of storage site
Breath carries out availability analysis, which includes following one or more: the tower mast of storage site, battery capacity,
Dispatch from foreign news agency introduces capacity, remaining seat in the plane number.By the availability analysis to storage site, the determination for succeeding target site provides base
Plinth.
Step 102: determining network demand;
In embodiments of the present invention, network demand include operator provide first kind network demand and/or according to network optimization
The second class network demand that data determine, wherein first kind network demand is the demand site that operator provides;Second class network
Demand is the weak area of coverage determined according to network optimization data, which includes at least one of the following: measurement report
(Measurement Report, MR) data, drive test data, Internet enterprises cross operator (Over The Top, OTT) number
According to, complain data.
After determining network demand, it can be counted according to a point telecommunications enterprise, point demand acquisition modes etc., to network
Demand carries out comprehension management.
When network demand is the demand site that operator provides, after importing the demand site, need to the demand station
Location carries out accuracy verification, which may include the excessively close demand in site, repeat demand, administrative area mistake, water system mistake
Deng the embodiment of the present invention is not specifically limited checking procedure.
It is understood that the demand site is shown in GIS map, and after importing demand site in accuracy
Allow manually to revise the demand site in checking procedure.
When network demand is the weak area of coverage, guide enters network optimization data and analyzes, and determines the weak area of coverage.Specifically
Ground, the weak area of coverage include at least one of the following: region of the MR data-signal less than the first threshold value;Drive test data signal is less than
The region of two threshold values;OTT data-signal is less than the region of third threshold value;Complain the corresponding region of data.
For MR data, drive test data, the OTT data in network optimization data, corresponding data signal strength door is respectively set
Limit value indicates that the network of the data-signal corresponding region is poor, belongs to weak cover when the data-signal detected is less than threshold value
Cover region.It is understood that the corresponding data signal strength threshold value of each data-signal may be the same or different, i.e.,
The numerical value of one threshold value, the second threshold value and third threshold value may be the same or different.
It can since the network that it can directly embody corresponding region is poor for the complaint data in network optimization data
The corresponding region of data will be complained to be determined as the weak area of coverage.
It is understood that the weak area of coverage is shown in GIS map after determining the weak area of coverage.
Step 103: according to network demand, determining that mode is chosen in corresponding site;
In embodiments of the present invention, it is automatic selection side that when network demand is first kind network demand, mode is chosen in site
Formula or human assistance choose mode, and it is human assistance selection side that when network demand is the second class network demand, mode is chosen in site
Formula;
Specifically, the demand site provided for operator, selects target site by choosing mode automatically automatically, or
It assists selecting target site by way of human assistance selection;For the weak area of coverage obtained by network optimization data, by artificial auxiliary
Help selection mode to assist selecting target site, compared with the prior art in fully rely on artificial selection, improve site determine
Efficiency.
Step 104: mode and site resource and network demand being chosen according to site, determine target site;
In embodiments of the present invention, for different classes of network demand, target site is determined using different processes.
When network demand is demand site, target site is determined using automatic selection mode, the determination target site
Specific step is as follows:
(1) projecting parameter of demand site is set;
In embodiments of the present invention, projecting parameter includes at least offset distance and nearest stop spacing;
Further, as shown in table 1, it generates projecting parameter setting table and carries out projecting parameter setting, needle for operator
Different zones can be set with different projecting parameter.
Table 1
It is understood that above-mentioned table 1 is a kind of example of projecting parameter setting table, the embodiment of the present invention is to planning
The concrete form of parameter setting table is without limitation.
(2) determining and demand site obtains more apart from nearest existing website location on the different directions of demand site respectively
A existing website location;
Referring to Fig. 3, demand site a is shown in GIS map, on the basis of a of the demand site, to all directions around into
Row investigation, picks out existing website location b~g that distance requirement site a is nearest in all directions.With continued reference to Fig. 3, given in figure
The scene of 6 existing website location b~g is selected, existing website location b~g is located at 6 different directions of demand site a.
(3) the delaunay triangulation network between demand site and multiple existing website locations is established;
Referring to fig. 4, the delaunay triangulation network between demand site a and existing website location b~g, the delaunay triangulation network are established
The characteristics of be each triangle circumscribed circle do not include face in other any points.
(4) Thiessen polygon region is determined in the delaunay triangulation network;
Referring to Fig. 5, the circumscribed circle center of circle of each triangle in the delaunay triangulation network is connected, Thiessen polygon region 51 is obtained.
According to the site resource imported in a step 101, the one or more that is capable of determining that in the Thiessen polygon region 51
Site resource, Fig. 5 shows tool in Thiessen polygon region 51, and there are three the scenes of site resource x1, x2 and x3
(5) according to projecting parameter, one or more the are determined from the available site resource in Thiessen polygon region
One alternative site;
(6) first object site is determined in one or more first alternative sites according to pre-set priority, wherein storage
The highest priority of site;
In embodiments of the present invention, it first passes through the projecting parameter set and selects and meet offset distance and nearest stop spacing
Then first alternative site determines first object site in one or more first alternative sites according to pre-set priority,
The highest priority of middle storage site, the pre-set priority can be the storage site > deposit site > shaft tower town and country resource > rule
Draw site.The embodiment of the present invention sorts without limitation to the specific of pre-set priority.
Referring to Fig. 6, the scene that site resource x2 is determined as to first object site is shown in figure.
Wherein, when first object site is storage site, determine that first object site is the site that reuses, corresponding rule
The scheme of drawing is the scheme that reuses;When first object site is non-storage site, such as: first object site is shaft tower resource, storage
Standby site etc. determines that first object site is newly-built site, and corresponding programme is newly-built project;When can not at one or
When determining first object site in multiple first alternative sites, demand site is determined as first object site, and determine first
Target site is newly-built site, and corresponding programme is newly-built project.
It should be noted that establishing mode and can also determine the priority of target site for different programmes,
Such as: mode is established using shared for reusing scheme, for newly-built project using building together or singly establishing mode, wherein building together
Expression is established jointly by multiple operators, is singly built expression and is independently established by an operator.It is corresponded to according to different schemes of establishing
Different costs of investment comprehensively considers and chooses target site.
When network demand is the weak area of coverage, target site is determined using human assistance mode, the determination target site
Specific step is as follows:
Optionally, before starting process, scheme creation first is carried out to the weak area of coverage, and carry out scheme name.
(1) reference point is determined in the weak area of coverage;
In embodiments of the present invention, the weak area of coverage can be shown by GIS map, and is labeled wherein.
Referring to Fig. 7, determine that reference point 72, the reference point 72 can be system automatically in the weak area of coverage in the weak area of coverage 71
It is determined in 71, is also possible to manually select in the weak area of coverage 71;Preferably, it is selected in the weak area of coverage 71 by artificial mode
Determine reference point 72, one mitigates system processing pressure.
The position of reference point 72 is chosen at the middle part of the weak area of coverage 71, when the area of the weak area of coverage 71 is not very big
When, a reference point 72 can be only chosen in the weak area of coverage 71;It, can be only weak when the area of the weak area of coverage 71 is very big
Multiple reference points 72 are chosen in the area of coverage 71, the embodiment of the present invention does not do specific location of the reference point 72 in the weak area of coverage 71
It limits.
(2) determine that the first reference zone, the first reference zone cover the weak area of coverage;
In embodiments of the present invention, it is automatic according to the weak area of coverage 71 to can be system for the first reference zone (not shown)
Determining region, the first reference zone are also possible to the region manually delimited in GIS map.Preferably, first reference area
Domain is the region manually delimited, and since the weak area of coverage 71 is usually irregular figure, will increase system pressure by system automatically generated
Power can will determine the first reference zone of regular shape when by manually delimiting, such as: it is round, oval or rule
Polygon, the embodiment of the present invention are not specifically limited the shape of the first reference zone.
It should be noted that the range of the first reference zone wants that the weak area of coverage 71 can be covered, it is subsequent from first to ensure
It is chosen for the entire weak area of coverage 71 the target site chosen in reference zone.
(3) according to first reference zone and pre-determined distance, the second reference zone is determined;
In embodiments of the present invention, after determining the first reference zone, expand outward on the basis of the first reference zone
Pre-determined distance obtains the second reference zone (not shown), such as: the first reference zone is a border circular areas, and pre-determined distance is
1000 meters, then the second reference zone is border circular areas, and center location be mutually all it is identical as the first reference zone center location, half
Diameter is 1000 meters bigger than the radius of the first reference zone.
(4) the available site resource of one or more in the second reference zone is determined as the second alternative site;
With continued reference to Fig. 7, according to the site resource imported in a step 101, it is capable of determining that positioned at second reference area
One or more site resources in domain.
Optionally, the site resource shown for carrying out GIS in the form of line or face, such as: shaft tower resource, it can be at this
The resource points are selected as shaft tower resource by establishing resource point on line segment or face.
Specifically, Fig. 7 shows the scene that 6 site resources are determined in the second reference zone, including storage
Site A, storage site B, storage site C, storage site D, shaft tower resource 1, shaft tower resource 2.
Further, analyzed according to previously availability to storage site, to the storage site in the first reference zone into
Row availability mark, such as: storage site A, B, C are available site in Fig. 7, and storage site D is not available site.It can be with
Understand, scene shown in Fig. 7 is only a kind of example, also may include other kinds of site money in the second reference zone
Source, such as: building library etc. is divided in urban and rural planning site, room.
Further, the distance between each site resource and reference point 72 in reference area are marked out.
It is possible to further according in the site resource that imports in a step 101 electric power access point, transmission access point,
The sites such as pipeline resource draws transmission and the routing of electric power cabling.
In this way, assist operators carry out artificial selection target site by above-mentioned site resource information and mark.
(4) it is instructed according to input, one or more second target sites is determined from one or more second alternative sites.
In embodiments of the present invention, input instruction is the instruction of artificial operation input.Specifically, operator is according to display
Site resource information and auxiliary mark, by the operation for pulling or clicking, one is selected from the second reference zone
Or multiple second targets site.
For the scene shown in Fig. 7, chooses and be located in the weak area of coverage 71, and available site resource, then the selected
Two target sites include: storage site B, shaft tower resource 1, shaft tower resource 2.
Further, be arranged the second target site site type, the site type include: macro station type, micro- station type,
Room classifying type.
According to the second target site manually chosen, scheme pond is generated, program pond can be shown in table form, such as table
Shown in 2:
Site serial number | Resource type | Resource name | Site type |
1 | Storage site | Storage site B | Macro station type |
2 | Shaft tower resource | Shaft tower resource 1 | Micro- station type |
3 | Shaft tower resource | Shaft tower resource 2 | Micro- station type |
Table 2
It is understood that above-mentioned table 2 is a kind of example in scheme pond, specific shape of the embodiment of the present invention to scheme pond
Formula is without limitation.
Optionally, it after determining target site according to site resource and network demand, further fills in and target site
Corresponding geographical location information, such as: province, districts and cities, longitude and latitude etc., the embodiment of the present invention is not specifically limited in this embodiment.
It should be noted that for the case where network demand is the demand site that operator provides, it can also be using artificial
Auxiliary selection mode determines target site, and the detailed process of the determination target site is referred to the above-mentioned target to the weak area of coverage
Choose process in site.
It is understood that since demand site is usually shown in dots in GIS map, compared to weak
Process is chosen in the target site of the area of coverage, during carrying out the selection of target site to demand site, can save determining ginseng
The step of examination point, and when determining the first reference zone, and determining the second reference zone according to pre-determined distance, it can pass through
Lesser numerical value is selected to meet the demand of demand site.
Further, after determining target site according to site resource and network demand, target site is invested
Estimation.Wherein, process is determined for different target sites, different investment Estimation Methods can be used.
Specifically, when selecting first object site by choosing mode automatically, to the investment estimate of first object site
Include:
(1) first object site is newly-built site, and corresponding programme is newly-built project, will as unit of districts and cities
In project management system (power production management system, PMS) construction scheme over the years and investment according to
Scene dimension is concluded, is classified, and obtains the sequence and accounting of each construction mode under each scene, obtains accounting under different scenes
Highest construction mode generates newly-built scene library, and first object site is based on scene and is matched in newly-built scene library, directly
Generate construction scheme and investment estimate.
(2) first object site is the site that reuses, and corresponding programme is the scheme that reuses, will as unit of districts and cities
Secret sharing over the years and investment are concluded, are classified according to scene, product type and reforming content in PMS, obtain each product class
The sequence of each reforming content and accounting under type form the scheme base that reuses (such as the group of steel tower and computer room of preferred accounting highest mode
Close result), sharing site is based on availability and product type matches the scheme base that reuses, and directly generates modification scheme and investment is estimated
It calculates.
In this way, determining the total investment of first object site based on the investment estimate to first object site.
When selecting the second target site by way of human assistance selection, to the investment estimate packet of the second target site
It includes:
The site type of (1) second target site is macro station type, is recorded by the history investment in PMS and determines the second mesh
The investment estimate of labeling station location, detailed process are referred to the above-mentioned investment estimate process to first object site.
The site type of (2) second target sites is micro- station type, is invested by history list station and records determining second target
The investment estimate of site.
The site type of (3) second target sites is room classifying type, determines the by area coverage and unit area building cost
The investment estimate of two target sites.
Optionally, the investment estimate of the second target site is added in the table of corresponding scheme pond.
In this way, determining the total investment of the second target site based on the investment estimate to the second target site.
Complete to the investment estimate of target site after, target site is counted, including to target site scale,
Investment, shared rate, resource utilization etc. are counted.
In the embodiment of the present invention, the site resource of plurality of classes is imported, keeps the determination of target site more comprehensive, it is ensured that
The landing of target site;According to different network demands, mode is chosen using different target sites, improves target site
Determine efficiency.
Referring to Fig. 8, the embodiment of the present invention provides a kind of site scheme determining device 800, the site scheme determining device
800 include:
Import modul 801 for importing site resource, and carries out Distribution GIS to the site resource and shows,
The site resource includes at least storage site, shaft tower resource;
First determining module 802, for determining that network demand, the network demand include the first kind net that operator provides
Network demand and/or the second class network demand determined according to network optimization data;
Second determining module 803, for determining that mode is chosen in corresponding site, wherein working as institute according to the network demand
Stating site when network demand is first kind network demand and choosing mode is that automatic selection mode or human assistance choose mode,
It is that human assistance chooses mode that when the network demand is the second class network demand, mode is chosen in the site;
Third determining module 804 is needed for choosing mode and the site resource and the network according to the site
It asks, determines target site.
Optionally, the site resource further includes following one or more:
Building library, electric power access point, transmission access point, pipeline are divided in urban and rural planning site, deposit site, difficult site, room
Routing.
Optionally, the import modul 801 is further used for: the storage site carries out GIS in dots and shows;
The import modul 801 is further used for: the shaft tower resource is carried out GIS in the form of point, line or face and shown;
The import modul 801 is further used for: it is aobvious that the urban and rural planning site carries out GIS in the form of point, line or face
Show;
The import modul 801 is further used for: the deposit site carries out GIS in dots and shows;
The import modul 801 is further used for: the difficulty site carries out GIS in dots and shows;
The import modul 801 is further used for: the room divides building library to carry out GIS in dots to show;
The import modul 801 is further used for: the electric power access point carries out GIS in dots and shows;
The import modul 801 is further used for: the transmission access point carries out GIS in dots and shows;
The import modul 801 is further used for: the pipeline carries out GIS in the form of a line and shows.
Optionally, the site scheme determining device 800 further include:
First correction verification module 805, for carrying out accuracy verification to all kinds of resources in the site resource;
Analysis module 806 can be used the storage site for the bearer capability information according to the storage site
Property analysis, the bearer capability information includes following one or more: the tower mast of storage site, battery capacity, dispatch from foreign news agency introduce
Capacity, remaining seat in the plane number.
Optionally, the first kind network demand is the demand site that operator provides;
The second class network demand is the weak area of coverage determined according to network optimization data;
Wherein the network optimization data include at least one of the following: that measurement report MR data, drive test data, Internet enterprises are got over
It crosses operator's OTT data, complain data.
Optionally, when the network demand is demand site, the site scheme determining device 800 further include:
Second correction verification module 807, for carrying out accuracy verification to the demand site;
When the network demand is the weak area of coverage, the weak area of coverage is included at least one of the following:
Region of the MR data-signal less than the first threshold value;
Region of the drive test data signal less than the second threshold value;
The OTT data-signal is less than the region of third threshold value;
The corresponding region of the complaint data.
Optionally, when the network demand is the demand site, the third determining module 804 includes:
Setting unit 8040, for the projecting parameter of the demand site to be arranged, the projecting parameter includes at least offset
Distance and nearest stop spacing;
First determination unit 8041, for the determining and demand site on the different directions of the demand site respectively
The nearest existing website location of distance obtains multiple existing website locations;
Unit 8042 is established, the delaunay triangle for establishing between the demand site and the multiple existing website location
Net;
Second determination unit 8043, for determining Thiessen polygon region in the delaunay triangulation network;
Third determination unit 8044, for according to the projecting parameter, from available in the Thiessen polygon region
The first alternative site of one or more is determined in the resource of site;
4th determination unit 8045, for being determined in the one or more of first alternative sites according to pre-set priority
First object site, the wherein highest priority of storage site;
4th determination unit 8045 is also used to determine described the when the first object site is storage site
One target site is the site that reuses;When the first object site is non-storage site, determine that the first object site is
Newly-built site;When that can not determine first object site in one or more first alternative sites, by the demand station
Location is determined as the first object site, and determines that the first object site is newly-built site.
Optionally, when the network demand is the weak area of coverage, the third determining module 804 includes:
5th determination unit 8046, for determining reference point in the weak area of coverage;
6th determination unit 8047, for according to the reference point and pre-determined distance, determining the first reference zone, described the
One reference zone covers the weak area of coverage;
7th determination unit 8048, for determining the second reference zone according to first reference zone and pre-determined distance;
8th determination unit 8049, for the available site resource of one or more in first reference zone is true
It is set to the second alternative site;
9th determination unit 8050 is determined from one or more second alternative sites for being instructed according to input
One or more second target sites.
Optionally, the site scheme determining device 800 further include:
4th determining module 808 determines newly-built scene for investing record according to the history in project management system PMS
Library and the scene library that reuses, wherein the newly-built scene library includes the corresponding investment estimate of a variety of newly-built scenes, the scene that reuses
Library includes the corresponding investment estimate of a variety of scenes that reuse;
5th determining module 809, for determining the first object site when first object site is newly-built site
First scene, and corresponding investment estimate is determined in the newly-built scene library according to first scene;
5th determining module 809 is also used to determine the first object when first object site is to reuse site
Second scene of site, and corresponding investment estimate is determined in the scene library that reuses according to second scene;
5th determining module 809 is also used to determine the investment of the first object site according to the investment estimate
Total value.
Optionally, the site scheme determining device 800 further include:
Setup module 810, for the site type of second target site to be arranged, the site type includes: macro station
Type, micro- station type, room classifying type;
6th determining module 811, for passing through when the site type of second target site is the macro station type
History investment in PMS records the investment estimate for determining second target site;
6th determining module 811 is also used to when the site type of second target site be micro- station type
When, it is invested by history list station and records the investment estimate for determining second target site;
6th determining module 811 is also used to when the site type of second target site be the room classifying type
When, the investment estimate of second target site is determined by area coverage and unit area building cost;
6th determining module 811, is also used to determine the investment of second target site according to the investment estimate
Total value.
In the embodiment of the present invention, the site resource of plurality of classes is imported, keeps the determination of target site more comprehensive, it is ensured that
The landing of target site;According to different network demands, mode is chosen using different target sites, improves target site
Determine efficiency.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific
Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art
Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much
Form belongs within protection of the invention.
Claims (20)
1. a kind of site scheme determines method, which is characterized in that the described method includes:
Site resource is imported, and Distribution GIS is carried out to the site resource and shows that the site resource includes at least
Storage site, shaft tower resource;
Determine network demand, the network demand includes the first kind network demand that operator provides and/or according to network optimization data
The second determining class network demand;
According to the network demand, determine that mode is chosen in corresponding site, wherein when the network demand needs for first kind network
It is that automatic selection mode or human assistance choose mode that mode is chosen in the site when asking, when the network demand is the second class net
It is that human assistance chooses mode that mode is chosen in the site when network demand;
Mode and the site resource and the network demand are chosen according to the site, determines target site.
2. the method according to claim 1, wherein the site resource further includes following one or more:
Building library, electric power access point, transmission access point, pipeline are divided in urban and rural planning site, deposit site, difficult site, room.
3. according to the method described in claim 2, it is characterized in that, it is described to the site resource carry out GIS show, including with
The next item down is multinomial:
The storage site carries out GIS in dots and shows;
The shaft tower resource is carried out GIS in the form of point, line or face and shown;
The urban and rural planning site is carried out GIS in the form of point, line or face and shown;
The deposit site carries out GIS in dots and shows;
The difficulty site carries out GIS in dots and shows;
The room divides building library to carry out GIS in dots to show;
The electric power access point carries out GIS in dots and shows;
The transmission access point carries out GIS in dots and shows;
The pipeline carries out GIS in the form of a line and shows.
4. the method according to claim 1, wherein the method is also wrapped after the resource of the importing site
It includes:
Accuracy verification is carried out to all kinds of resources in the site resource;
According to the bearer capability information of the storage site, availability analysis, the bearing capacity are carried out to the storage site
Information includes following one or more: the tower mast of storage site, battery capacity, dispatch from foreign news agency introduce capacity, remaining seat in the plane number.
5. according to the method described in claim 4, it is characterized in that,
The first kind network demand is the demand site that operator provides;
The second class network demand is the weak area of coverage determined according to network optimization data;
Wherein the network optimization data include at least one of the following: that measurement report MR data, drive test data, Internet enterprises cross fortune
It seeks quotient OTT data, complain data.
6. according to the method described in claim 5, it is characterized in that,
When the network demand is demand site, after the importing network demand, the method also includes:
Accuracy verification is carried out to the demand site;
Alternatively,
When the network demand is the weak area of coverage, the weak area of coverage is included at least one of the following:
Region of the MR data-signal less than the first threshold value;
Region of the drive test data signal less than the second threshold value;
The OTT data-signal is less than the region of third threshold value;
The corresponding region of the complaint data.
7. described according to the method described in claim 5, it is characterized in that, when the network demand is the demand site
Mode and the site resource and the network demand are chosen according to the site, determines target site, comprising:
The projecting parameter of the demand site is set, and the projecting parameter includes at least offset distance and nearest stop spacing;
The determining existing website location nearest with the demand site distance on the different directions of the demand site respectively, obtains more
A existing website location;
Establish the delaunay triangulation network between the demand site and the multiple existing website location;
Thiessen polygon region is determined in the delaunay triangulation network;
According to the projecting parameter, one or more the are determined from the available site resource in the Thiessen polygon region
One alternative site;
First object site is determined in the one or more of first alternative sites according to pre-set priority, wherein storage site
Highest priority;
Wherein, when the first object site is storage site, determine that the first object site is the site that reuses;When described
When first object site is non-storage site, determine that the first object site is newly-built site;When can not be in one or more
When determining first object site in the first alternative site, the demand site is determined as the first object site, and
Determine that the first object site is newly-built site.
8. described according to the method described in claim 5, it is characterized in that, when the network demand is the weak area of coverage
Mode and the site resource and the network demand are chosen according to the site, determines target site, comprising:
Reference point is determined in the weak area of coverage;
Determine that the first reference zone, first reference zone cover the weak area of coverage;
According to first reference zone and pre-determined distance, the second reference zone is determined;
The available site resource of one or more in second reference zone is determined as the second alternative site;According to input
Instruction determines one or more second target sites from one or more second alternative sites.
9. the method according to the description of claim 7 is characterized in that described according to site selection mode and described
Site resource and the network demand, after determining target site, the method also includes:
Record is invested according to the history in project management system PMS, determines newly-built scene library and the scene library that reuses, wherein described new
Building scene library includes the corresponding investment estimate of a variety of newly-built scenes, and the scene library that reuses includes the corresponding throwing of a variety of scenes that reuse
Money estimation;
When first object site is newly-built site, the first scene of the first object site is determined, and according to described first
Scene determines corresponding investment estimate in the newly-built scene library;
When first object site is to reuse site, the second scene of the first object site is determined, and according to described second
Scene determines corresponding investment estimate in the scene library that reuses;
According to the investment estimate, the total investment of the first object site is determined.
10. according to the method described in claim 8, it is characterized in that, described according to site selection mode and described
Site resource and the network demand, after determining target site, the method also includes:
The site type of second target site is set, and the site type includes: macro station type, micro- station type, room classification
Type;
When the site type of second target site is the macro station type, determined by the history investment record in PMS
The investment estimate of second target site;
When the site type of second target site is micro- station type, recorded by the investment of history list station described in determining
The investment estimate of second target site;
It is true by area coverage and unit area building cost when the site type of second target site is the room classifying type
The investment estimate of fixed second target site;
According to the investment estimate, the total investment of second target site is determined.
11. a kind of site scheme determining device, which is characterized in that the site scheme determining device includes:
Import modul for importing site resource, and carries out Distribution GIS to the site resource and shows, the station
Location resource includes at least storage site, shaft tower resource;
First determining module, for determining that network demand, the network demand include the first kind network demand that operator provides
And/or the second class network demand determined according to network optimization data;
Second determining module, for determining that mode is chosen in corresponding site according to the network demand, wherein when the network needs
It is that automatic selection mode or human assistance choose mode that mode is chosen in the site when asking as first kind network demand, when the net
Mode is chosen in the site to network demand when being the second class network demand is that human assistance chooses mode;
Third determining module is determined for choosing mode and the site resource and the network demand according to the site
Target site.
12. scheme determining device in site according to claim 11, which is characterized in that the site resource further includes following
One or more:
Building library, electric power access point, transmission access point, pipeline are divided in urban and rural planning site, deposit site, difficult site, room.
13. scheme determining device in site according to claim 12, which is characterized in that
The import modul is further used for: the storage site carries out GIS in dots and shows;
The import modul is further used for: the shaft tower resource is carried out GIS in the form of point, line or face and shown;
The import modul is further used for: the urban and rural planning site is carried out GIS in the form of point, line or face and shown;
The import modul is further used for: the deposit site carries out GIS in dots and shows;
The import modul is further used for: the difficulty site carries out GIS in dots and shows;
The import modul is further used for: the room divides building library to carry out GIS in dots to show;
The import modul is further used for: the electric power access point carries out GIS in dots and shows;
The import modul is further used for: the transmission access point carries out GIS in dots and shows;
The import modul is further used for: the pipeline carries out GIS in the form of a line and shows.
14. scheme determining device in site according to claim 11, which is characterized in that the site scheme determining device is also
Include:
First correction verification module, for carrying out accuracy verification to all kinds of resources in the site resource;
Analysis module carries out availability analysis to the storage site for the bearer capability information according to the storage site,
The bearer capability information includes following one or more: the tower mast of storage site, battery capacity, dispatch from foreign news agency introduce capacity, remain
Remaining seat in the plane number.
15. scheme determining device in site according to claim 14, which is characterized in that
The first kind network demand is the demand site that operator provides;
The second class network demand is the weak area of coverage determined according to network optimization data;
Wherein the network optimization data include at least one of the following: that measurement report MR data, drive test data, Internet enterprises cross fortune
It seeks quotient OTT data, complain data.
16. scheme determining device in site according to claim 15, which is characterized in that
When the network demand is demand site, the site scheme determining device further include:
Second correction verification module, for carrying out accuracy verification to the demand site;
When the network demand is the weak area of coverage, the weak area of coverage is included at least one of the following:
Region of the MR data-signal less than the first threshold value;
Region of the drive test data signal less than the second threshold value;
The OTT data-signal is less than the region of third threshold value;
The corresponding region of the complaint data.
17. scheme determining device in site according to claim 15, which is characterized in that when the network demand is the need
When asking site, the third determining module includes:
Setting unit, for the projecting parameter of the demand site to be arranged, the projecting parameter is including at least offset distance and most
Nearly stop spacing;
First determination unit, for the determining and described demand site distance to be nearest on the different directions of the demand site respectively
Existing website location, obtain multiple existing website locations;
Unit is established, the delaunay triangulation network for establishing between the demand site and the multiple existing website location;
Second determination unit, for determining Thiessen polygon region in the delaunay triangulation network;
Third determination unit is used for according to the projecting parameter, from the available site resource in the Thiessen polygon region
Middle determining one or more first alternative sites;
4th determination unit, for determining first object in the one or more of first alternative sites according to pre-set priority
Site, the wherein highest priority of storage site;
4th determination unit is also used to determine the first object station when the first object site is storage site
Location is the site that reuses;When the first object site is non-storage site, determine that the first object site is newly-built site;
When that can not determine first object site in one or more first alternative sites, the demand site is determined as institute
First object site is stated, and determines that the first object site is newly-built site.
18. scheme determining device in site according to claim 15, which is characterized in that when the network demand is described weak
When the area of coverage, the third determining module includes:
5th determination unit, for determining reference point in the weak area of coverage;
6th determination unit, for determining that the first reference zone, first reference zone cover the weak area of coverage;
7th determination unit, for determining the second reference zone according to first reference zone and pre-determined distance;
8th determination unit, for the available site resource of one or more in second reference zone to be determined as second
Alternative site;
9th determination unit determines one or more from one or more second alternative sites for instructing according to input
A second target site.
19. scheme determining device in site according to claim 17, which is characterized in that the site scheme determining device is also
Include:
4th determining module, for investing record according to the history in project management system PMS, determining newly-built scene library and reusing
Scene library, wherein the newly-built scene library includes the corresponding investment estimate of a variety of newly-built scenes, the scene library that reuses includes more
Plant the corresponding investment estimate of scene that reuses;
5th determining module, for determining first of the first object site when first object site is newly-built site
Scape, and corresponding investment estimate is determined in the newly-built scene library according to first scene;
5th determining module is also used to determine the first object site when first object site is to reuse site
Second scene, and corresponding investment estimate is determined in the scene library that reuses according to second scene;
5th determining module is also used to determine the total investment of the first object site according to the investment estimate.
20. scheme determining device in site according to claim 18, which is characterized in that the site scheme determining device is also
Include:
Setup module, for being arranged the site type of second target site, the site type includes: macro station type, micro-
It stands type, room classifying type;
6th determining module, for when the site type of second target site be the macro station type when, by PMS
History investment records the investment estimate for determining second target site;
6th determining module is also used to pass through when the site type of second target site is micro- station type
The investment of history list station records the investment estimate for determining second target site;
6th determining module is also used to pass through when the site type of second target site is the room classifying type
Area coverage and unit area building cost determine the investment estimate of second target site;
6th determining module, is also used to determine the total investment of second target site according to the investment estimate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910354838.3A CN110113760B (en) | 2019-04-29 | 2019-04-29 | Method and device for determining station address scheme |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910354838.3A CN110113760B (en) | 2019-04-29 | 2019-04-29 | Method and device for determining station address scheme |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110113760A true CN110113760A (en) | 2019-08-09 |
CN110113760B CN110113760B (en) | 2022-04-12 |
Family
ID=67487393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910354838.3A Active CN110113760B (en) | 2019-04-29 | 2019-04-29 | Method and device for determining station address scheme |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110113760B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2572529A1 (en) * | 2010-05-19 | 2013-03-27 | Alcatel Lucent | Methods of determining coverage areas |
US20140051451A1 (en) * | 2011-10-25 | 2014-02-20 | Bryan Goldberg | Resource Installation Management in a Wireless Network |
CN105338537A (en) * | 2015-11-16 | 2016-02-17 | 广州杰赛科技股份有限公司 | Method for sharing and analyzing station address of newly-increased base station and terminal |
CN108462965A (en) * | 2018-01-05 | 2018-08-28 | 中兴网鲲信息科技(上海)有限公司 | Share planing method in a kind of steel tower demand site |
CN109429234A (en) * | 2017-08-23 | 2019-03-05 | 中兴通讯股份有限公司 | A kind of dispositions method and device of base station |
-
2019
- 2019-04-29 CN CN201910354838.3A patent/CN110113760B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2572529A1 (en) * | 2010-05-19 | 2013-03-27 | Alcatel Lucent | Methods of determining coverage areas |
US20140051451A1 (en) * | 2011-10-25 | 2014-02-20 | Bryan Goldberg | Resource Installation Management in a Wireless Network |
CN105338537A (en) * | 2015-11-16 | 2016-02-17 | 广州杰赛科技股份有限公司 | Method for sharing and analyzing station address of newly-increased base station and terminal |
CN109429234A (en) * | 2017-08-23 | 2019-03-05 | 中兴通讯股份有限公司 | A kind of dispositions method and device of base station |
CN108462965A (en) * | 2018-01-05 | 2018-08-28 | 中兴网鲲信息科技(上海)有限公司 | Share planing method in a kind of steel tower demand site |
Non-Patent Citations (3)
Title |
---|
谭云婷等: "基于空间相邻分析的基站数据模型与算法研究", 《移动通信》 * |
谭洪利: "移动通信目标网站址规划", 《电信工程技术与标准化》 * |
陈刚等: "铁塔公司通信基站专项规划思路探讨", 《电信工程技术与标准化》 * |
Also Published As
Publication number | Publication date |
---|---|
CN110113760B (en) | 2022-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108260075A (en) | A kind of addressing method and device of base station deployment position | |
CN105682105B (en) | A kind of method and apparatus for planning website evaluation | |
CN105898762A (en) | Base station optimization and deployment method and device | |
CN100583168C (en) | Channel patrol checking management system | |
CN110298553A (en) | A kind of National land space planing method, system and equipment based on GIS | |
CN107516282A (en) | Three look into the Land Change Survey information management system of unification | |
CN107705042A (en) | The method for inspecting and device of power equipment | |
US9860757B2 (en) | Wireless access point installation analyzer and reporting | |
CN104980950A (en) | Network optimization server, mobile device of realizing network optimization and system of realizing network optimization | |
CN104410978A (en) | Method and device of evaluating site planning | |
CN109151890A (en) | A kind of mobile terminal locating method and device | |
CN103796227B (en) | Carry out the method and system of wireless signal covering analyzing | |
CN104715127B (en) | One kind complains hot spot region recognition methods and system | |
CN107846688A (en) | A kind of wireless network site planning method and device based on multi-operator | |
CN109768886A (en) | Network planning evaluation method and device | |
CN105813092B (en) | A kind of building network coverage optimization method and device based on ticket | |
CN107547154A (en) | A kind of method and device for establishing video traffic prediction model | |
CN108462965A (en) | Share planing method in a kind of steel tower demand site | |
CN106899985A (en) | The appraisal procedure and device of a kind of network coverage | |
CN103037424A (en) | Evaluation method and device of the 3rd generation telecommunication (3G) network coverage | |
CN109699035A (en) | A kind of subway network scene cell recognition method and device | |
CN114641015A (en) | Network evaluation method and device, electronic equipment and storage medium | |
CN108696888A (en) | A kind of method and device of determining overlapping coverage cell | |
CN108259097A (en) | The method and device of amendment radio transmission model based on MR data | |
CN108416514A (en) | Adjacent section planning method and device based on GIS-Geographic Information System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Room 101, floors 1-3, building 14, North District, yard 9, dongran North Street, Haidian District, Beijing 100029 Applicant after: CHINA TOWER Co.,Ltd. Address before: 100142 19th floor, 73 Fucheng Road, Haidian District, Beijing Applicant before: CHINA TOWER Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |