CN110112765A - A kind of home intelligent peak load shifting control system and super capacitance cell group - Google Patents

A kind of home intelligent peak load shifting control system and super capacitance cell group Download PDF

Info

Publication number
CN110112765A
CN110112765A CN201910511541.3A CN201910511541A CN110112765A CN 110112765 A CN110112765 A CN 110112765A CN 201910511541 A CN201910511541 A CN 201910511541A CN 110112765 A CN110112765 A CN 110112765A
Authority
CN
China
Prior art keywords
cell group
capacitance cell
super capacitance
timing
peak
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910511541.3A
Other languages
Chinese (zh)
Inventor
吴裕宙
方绍怀
梁永昌
任龙霞
骆华
卢璇君
李韵诗
谭海强
赵睿
钱惠强
陈裕祥
尹玉芬
吴觉敏
谭伟聪
李伟强
刘沛
黎沛坚
余沛谦
袁文伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangdong Power Grid Co Ltd
Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd
Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Power Grid Co Ltd, Dongguan Power Supply Bureau of Guangdong Power Grid Co Ltd, Zhanjiang Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangdong Power Grid Co Ltd
Priority to CN201910511541.3A priority Critical patent/CN110112765A/en
Publication of CN110112765A publication Critical patent/CN110112765A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/345Parallel operation in networks using both storage and other dc sources, e.g. providing buffering using capacitors as storage or buffering devices
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E70/00Other energy conversion or management systems reducing GHG emissions
    • Y02E70/30Systems combining energy storage with energy generation of non-fossil origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention discloses a kind of home intelligent peak load shifting control system and super capacitance cell groups, including controller, it avoids the peak hour timing governor, timing converter, quick charge module, super capacitance cell group, circuit adjusts converter, Wi-Fi module and solar generating system, the Wi-Fi module is connected with controller, the solar generating system is connected by timing converter with quick charge module, it charges in low power consumption using mains-supplied and for super capacitance cell group, alternating current is disconnected when peak of power consumption, and utilizing super capacitance cell group is domestic consumer's power supply, realize peak load shifting, electric power resource can be made to be configured well in this way, and it can be insufficient from the power supply for largely solving the peak of power consumption stage, reduce shortage of electric power problem, the cost of household electricity can be further reduced simultaneously, Conscientiously the effect that electricity consumption material benefit is brought to domestic consumer, it is carefree to realize household electricity.

Description

A kind of home intelligent peak load shifting control system and super capacitance cell group
Technical field
The present invention relates to peak load shifting technical fields, and in particular to a kind of home intelligent peak load shifting control system and super Capacitor batteries group.
Background technique
With rapid development economic at this stage, the living standard of urban and rural residents is also greatly improved, various The household electrical appliance of various kinds are widely used in huge numbers of families, and electric power is comfortably and convenient constantly soaring to urban and rural residents' bring. In recent years, family life electricity consumption increases year by year, very high specific gravity is occupied in social total electricity consumption, with three industries and city The villeggiatura people are to the growing of power demand, it is easy to cause power supply shortage, by using peak load shifting, reduce peak Power load has ensured power grid in the safe operation of peak time, and peak load part can be transferred to low ebb by peak load shifting Period makes the network load of cyclic fluctuation become more balanced, is conducive to the utilization rate for improving power supply equipment, reduces hair The construction of power supply unit is put into, and optimizes electric power resource configuration, additionally it is possible to be improved the efficiency and benefit of power supply entirety, be saved The energy finally reduces electric cost, to electricity consumption enterprise, has great meaning to socio-economic development.
During peak of power consumption, in order to guarantee the safe and stable operation of power grid, although by peak load shifting to urban and rural residents Material benefit is brought, the electricity charge are saved, it is most important that it can also solve the problems, such as shortage of electric power, but in the serious nervous feelings of electricity consumption Under condition (such as summer of south sweltering heat), power supply still can be caused insufficient, cause a certain region locally to power off, to influence The normal production and living of people, it is thus possible to will cause certain economic asset loss, along with thermal power generation is to the wave of the energy Take, there are also haze weathers caused by exhaust gas discharge, can all influence power supply effect when peak load shifting to a certain extent.
In existing peak load shifting system, there are some defects, such as cannot pass through mobile terminal (mobile phone, plate electricity Brain etc.) remotely controlled, it manipulates and inconvenient for use, the power supply of simultaneity factor generallys use alternating current, and power supply mode is relatively simple, And general peak load shifting system can carry out electric power storage using battery, but general battery can generate very greatly when in use Heat, keep the temperature of battery higher, there is certain risk, while the charge-discharge performance of battery can be reduced.
Summary of the invention
The purpose of the present invention is to provide a kind of home intelligent peak load shifting control system and super capacitance cell group, with It charges using mains-supplied when electric low ebb and for super capacitance cell group, when peak of power consumption disconnects alternating current, and utilizes super capacitor Battery pack is domestic consumer's power supply, realizes peak load shifting, electric power resource can be made to be configured well in this way, to solve existing skill Since the power supply in peak of power consumption stage is insufficient in art, shortage of electric power problem is reduced.
To achieve this purpose, the present invention adopts the following technical scheme:
A kind of home intelligent peak load shifting control system, including it is controller, timing governor of avoiding the peak hour, timing converter, fast Fast charging module, super capacitance cell group, circuit adjust converter, Wi-Fi module and solar generating system, the Wi-Fi mould Block is connected with controller, and the solar generating system is connected by timing converter with quick charge module;
The timing governor of avoiding the peak hour, timing converter and super capacitance cell group are connected and are controlled with controller Device control driving, the input terminal of the timing governor of avoiding the peak hour are connected with line, and the timing governor of avoiding the peak hour is provided with Two output ends, one of output end connection are connected with timing converter, and another output then adjusts converter with circuit It is connected, the timing converter, quick charge module, super capacitance cell group and circuit adjust converter and be sequentially connected.
As a kind of home intelligent peak load shifting control system preferred embodiment of the invention, the timing governor of avoiding the peak hour, According to the peak load shifting time, the connection of alternating current and timing converter is connected in low power consumption, at the peak of power consumption stage For cutting off the connection of alternating current and timing converter.
As a kind of home intelligent peak load shifting control system preferred embodiment of the invention, the timing governor of avoiding the peak hour, According to the peak load shifting time, charged using alternating current to super capacitance cell group in low power consumption, it is sharp at the peak of power consumption stage Domestic consumer is powered with super capacitance cell group.
As a kind of home intelligent peak load shifting control system preferred embodiment of the invention, the circuit adjusts converter, For the converting direct-current power into alternating-current power of super capacitance cell group in home intelligent peak load shifting control system for domestic consumer It uses.
As a kind of home intelligent peak load shifting control system preferred embodiment of the invention, the timing converter is used to The electric current of solar generating system and alternating current is converted to unified electric current, for the use of quick charge module.
The use of the new type additionally provides a kind of super capacitance cell group, including installation shell, setting in the mounting shell body There are battery installation passage and two baffling cavitys, baffling cavity described in two is located at the left and right two of battery installation passage Side, the battery installation passage is in rectangular channel shape, and the electricity of rectangular configuration is provided on the inner wall of the battery installation passage Pond installation through-hole, the battery installation passage are communicated by battery installation through-hole with the baffling cavity of two sides, the battery installation Through-hole, inner wall on be provided with battery mounting base, be fixed with capacitor batteries between the corresponding battery mounting base in two sides;
The front end of the left side baffling cavity is provided with air inlet, and the front end of the battery installation passage is provided with outlet air Mouthful, ventilation opening is provided between the most inner side and battery installation passage of the right side baffling cavity.
As a kind of super capacitance cell group preferred embodiment of the invention, barrier is provided in the middle part of the baffling cavity Four baffling cavitys, according to flow of air sequence, are divided into the first baffling sky so that two baffling cavitys are divided into four parts by plate Chamber, the second baffling cavity, third baffling cavity and the 4th baffling cavity.
As a kind of super capacitance cell group preferred embodiment of the invention, the outside of the installation shell is provided with inlet and outlet Conversion equipment, the inlet and outlet conversion equipment include the rotation axis between air inlet and air outlet, the rotation axis connection There is changeover panel, setting is fixed with intake stack in the venthole described in one of them there are two venthole on the changeover panel.
As a kind of super capacitance cell group preferred embodiment of the invention, venthole described in two is about rotation axis pair Claim, while venthole described in two is corresponding with air inlet and air outlet respectively.
As a kind of super capacitance cell group preferred embodiment of the invention, it is provided with outside the venthole cyclic annular flexible Slot, the ring-type telescopic chute face install shell, and liftable is provided with sealing ring in the ring-type telescopic chute, the sealing ring It is provided with adjustable spring between bottom and cyclic annular telescopic chute, is provided with electromagnetism ring at the top of the sealing ring.
Embodiments of the present invention have the advantages that
It (1), will when being in the low power consumption stage when using home intelligent peak load shifting control system of the invention City is electrically accessed household electricity route, powers for domestic consumer, while being super capacitor using the electric energy for flowing into household electricity route Battery pack charging cuts off the connection between alternating current and household electricity route, simultaneously switches off alternating current when being in the peak of power consumption stage Route between quick charge module stops charging, also, circuit conversion adjuster can control super capacitance cell group at this time It is connected with household electricity route, is domestic consumer's power supply using super capacitance cell group, achievees the effect that peak load shifting, in this way meeting Configure electric power resource well, and can be insufficient from the power supply for largely solving the peak of power consumption stage, Shortage of electric power problem is reduced, while can further reduce the cost of household electricity, brings electricity consumption real to domestic consumer conscientiously The effect of favour, it is carefree to realize household electricity;
(2) the home intelligent peak load shifting control system in the present invention is by setting solar generating system, using quickly filling Electric module is the charging of super capacitance cell group, thus the charging to super capacitance cell group in above-mentioned peak load shifting control system Cheng Jinhang supplement can avoid influencing household electricity since super capacitance cell group electric energy is insufficient, can be simultaneously reached energy-efficient Effect, and by setting Wi-Fi module, user can remotely be controlled by mobile terminals such as mobile phone, computers, manipulate and make With more convenient;
(3) super capacitance cell group provided in the present invention, by internal tortuous mounting structure, when air-flow flows through, The heat on capacitor batteries can be taken away, the temperature of battery is reduced, eliminates its risk, the charge and discharge for promoting battery is electrical Can, and due to the flow trace of air-flow complications, the residence time of air-flow can be increased, air-flow and capacitor batteries is made to have abundance Time contact, heat are able to be sufficiently transmitted in air-flow, so that more heats, lifting device can be taken away by making the process of air-flow Cooling effect.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention without any creative labor, may be used also for those of ordinary skill in the art To obtain other attached drawings according to these attached drawings.
Structure depicted in this specification, ratio, size etc., only to cooperate the revealed content of specification, for Those skilled in the art understands and reads, and is not intended to limit the invention enforceable qualifications, therefore does not have technical Essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size are not influencing the function of the invention that can be generated Under effect and the purpose that can reach, should all still it fall in the range of disclosed technology contents obtain and can cover.
Fig. 1 is the schematic diagram of home intelligent peak load shifting control system in embodiment of the present invention;
Fig. 2 is the overall structure diagram of super capacitance cell group in embodiment of the present invention;
Fig. 3 is the structural schematic diagram that shell is installed in embodiment of the present invention;
Fig. 4 is the structural schematic diagram that conversion equipment is imported and exported in embodiment of the present invention;
Fig. 5 is the enlarged structure schematic diagram of A in embodiment of the present invention Fig. 4.
In figure:
1- controller;2- avoids the peak hour timing governor;3- timing converter;4- quick charge module;5- super capacitance cell Group;6- circuit adjusts converter;7-Wi-Fi module;8- solar generating system;9- installs shell;10- battery installation passage;12- Battery installation through-hole;13- battery mounting base;14- capacitor batteries;15- air inlet;16- air outlet;17- ventilation opening;18- barrier Plate;19- the first baffling cavity;20- the second baffling cavity;21- third baffling cavity;The 4th baffling cavity of 22-;23- inlet and outlet Conversion equipment;24- rotation axis;25- changeover panel;26- venthole;27- intake stack;28- ring-type telescopic chute;29- sealing ring; 30- adjustable spring;31- electromagnetism ring.
Specific embodiment
In order to make the invention's purpose, features and advantages of the invention more obvious and easy to understand, below in conjunction with the present invention Attached drawing in embodiment, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that disclosed below Embodiment be only a part of the embodiment of the present invention, and not all embodiment.Based on the embodiments of the present invention, this field Those of ordinary skill's all other embodiment obtained without making creative work, belongs to protection of the present invention Range.
In the description of the present invention, it is to be understood that, term " on ", "lower", "top", "bottom", "inner", "outside" etc. indicate Orientation or positional relationship be based on the orientation or positional relationship shown in the drawings, be merely for convenience of description the present invention and simplification retouch It states, rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, Therefore it is not considered as limiting the invention.It should be noted that when a component is considered as " connection " another component, It can be directly to another component or may be simultaneously present the component being centrally located.
To further illustrate the technical scheme of the present invention below with reference to the accompanying drawings and specific embodiments.
As shown in Figure 1, the present invention provides a kind of home intelligent peak load shifting control system, including controller 1, avoid the peak hour it is fixed When adjuster 2, timing converter 3, quick charge module 4, super capacitance cell group 5, circuit adjust converter 6, Wi-Fi module 7 and solar generating system 8, the Wi-Fi module 7 be connected with controller 1, the solar generating system 8 pass through timing converter 3 It is connected with quick charge module 4.
In the present invention, the timing governor 2 of avoiding the peak hour, timing converter 3 and super capacitance cell group 5 with control Device 1, which is connected and is controlled by controller 1, to be driven, and the input terminal for avoiding the peak hour timing governor 2 is connected with line, described to avoid the peak hour There are two output end, one of output end connections to be connected with timing converter 3 for the setting of timing governor 2, another output It then adjusts converter 6 with circuit to be connected, the timing converter 3, quick charge module 4, super capacitance cell group 5 and circuit Converter 6 is adjusted to be sequentially connected.
In the present invention, avoid the peak hour timing governor 2 according to the peak load shifting time, be used to connect in low power consumption alternating current with The connection of timing converter 3 cuts off the connection of alternating current Yu timing converter 3 at the peak of power consumption stage, while it is fixed to avoid the peak hour When adjuster 2 according to the peak load shifting time, in low power consumption using alternating current to super capacitance cell group 5 charge, in electricity consumption height Domestic consumer is powered using super capacitance cell group 5 when the peak stage, it is for direct current that the circuit, which adjusts converter 6, Electric (DC) is transformed into alternating current (AC) (household electricity is generally 220v50HZ sine or square wave), that is, is used to home intelligent The converting direct-current power into alternating-current power of battery 10 is used for domestic consumer in peak load shifting system, and the timing converter 3 is used to The electric current of solar generating system 8 and alternating current is converted to unified electric current, for the use of quick charge module 4.
When using the home intelligent peak load shifting control system in the present invention, firstly, domestic consumer is according to where oneself The peak load shifting timetable in region or the rule of household electricity, by avoiding the peak hour, the adjusting of timing governor 2 is avoided the peak hour the time, according to adjusting City is electrically accessed household electricity route when being sometime in the low power consumption stage by the good time of avoiding the peak hour, and is supplied for domestic consumer Electricity, while the route that the meeting of timing converter 3 turn on automatically is avoided the peak hour between timing governor 2 and quick charge module 4, utilize inflow The electric energy of household electricity route is the charging of super capacitance cell group 5;When being sometime in the peak of power consumption stage, according to adjusting Good time timing converter 2 of avoiding the peak hour can automatically cut off the connection avoided the peak hour between timing governor connector 2 and household electricity route, The route avoided the peak hour between timing governor 2 and quick charge module 4 is simultaneously switched off, charging, also, circuit conversion tune at this time are stopped Section device 6 can control super capacitance cell group 5 and be connected with household electricity route, be domestic consumer's confession using super capacitance cell group 5 Electricity.
It in the present invention, is that super capacitance cell group 5 is filled using quick charge module 4 by the way that solar generating system 8 is arranged Electricity can avoid to supplement the charging process of super capacitance cell group 5 in above-mentioned peak load shifting control system due to super 5 electric energy of grade capacitor batteries group is insufficient and influences household electricity, can be simultaneously reached energy-efficient effect.And pass through setting Wi-Fi Module 7, user can remotely be controlled by mobile terminals such as mobile phone, computers, be manipulated and more convenient to use.
As shown in Figures 2 to 5, the present invention also provides a kind of super capacitance cell group, including installation shell 9, the peaces Battery installation passage 10 and two baffling cavitys are provided in dress shell 9, baffling cavity described in two is located at battery peace The left and right sides in channel 10 is filled, the battery installation passage 10 is in rectangular channel shape, and the inner wall of the battery installation passage 10 On be provided with the battery installation through-hole 12 of rectangular configuration, the battery installation passage 10 passes through battery installation through-hole 12 and two sides Baffling cavity communicates, and battery mounting base 13, the corresponding battery installation in two sides are provided on the inner wall of the battery installation through-hole 12 Capacitor batteries 14 are fixed between seat 13.
As shown in figure 3, in the present invention, the front end of the left side baffling cavity is provided with air inlet 15, the battery peace The front end in dress channel 10 is provided with air outlet 16, is arranged between the most inner side and battery installation passage 10 of the right side baffling cavity There is ventilation opening 17, be provided with baffler 18 in the middle part of the baffling cavity, so that two baffling cavitys are divided into four parts, presses According to flow of air sequence, four baffling cavitys are divided into the first baffling cavity 19, the second baffling cavity 20,21 and of third baffling cavity 4th baffling cavity 22.
In the present invention, after air-flow enters from air inlet 16, it can enter in the first baffling cavity 19, pass through battery later Installation through-hole 12 enters the channel being made of capacitor batteries 14, takes away the heat on the capacitor batteries 14 for constituting above-mentioned channel, then Battery installation passage 10 is crossed by above-mentioned channel, and is entered in the second baffling cavity 20, then entered by battery installation through-hole 12 The heat on the capacitor batteries 14 for constituting above-mentioned channel is taken away, then is crossed by above-mentioned channel in the channel being made of capacitor batteries 14 Battery installation passage 10, and enter in third baffling cavity 21, then entered by battery installation through-hole 12 by 14 structure of capacitor batteries At channel, take away the heat on the capacitor batteries 14 for constituting above-mentioned channel, then battery installation passage 10 is crossed by above-mentioned channel, And enter in the 4th baffling cavity 22, entered again by ventilation opening 17 in the battery installation passage 10 at middle part later, takes away setting and exist Heat in battery installation passage 10 on capacitor batteries 14 is finally discharged by air outlet 16.
In the above description, air-flow firstly flows through the channel being made of multiple capacitor batteries 14, and air-flow can take away capacitor at this time Heat on 14 inner surface of battery, then again passes through battery installation passage 10, can be taken away on 14 outer surface of capacitor batteries at this time Heat, so by above-mentioned setting, it can be with the cooling effect of lifting device.
Also, in above description, the flow trace of air-flow is more tortuous, can increase the residence time of air-flow, make air-flow There is the sufficient time to contact with capacitor batteries 14, heat is able to be transferred in air-flow, so that making the process of air-flow can take away more More heats, the cooling effect of lifting device.
In the above description, battery installation through-hole 12 is in rectangle, and four sides are provided with battery mounting base 13, thus pacifying After loading onto capacitor batteries 14, four capacitor batteries 14 can constitute closed channel, and in above-mentioned closed channel, shape will not shadow The transmission effect of heat when air-flow is passed through by channel interior is rung, but when air-flow passes through above-mentioned closed channel by battery installation passage 10 When, if closed channel is horizontally set in battery installation passage 10, air-flow can vertically with a wherein face contact for closed channel, Other three face is then difficult to contact, thus keep the transmission effect of heat bad, and in the present invention, closed channel is obliquely installed, and is made It assumes diamond in shape, thus air-flow when flowing through can two face contacts, promote heat transfer effect.
In the above description, although air-flow pass through two faces, but still there are two face not with air flow contacts, so the present invention exists The outside of the installation shell 9 is provided with inlet and outlet conversion equipment 23, by importing and exporting conversion equipment 23, thus it is possible to vary air-flow stream Dynamic direction, air-flow are entered by air outlet 16, successively pass through battery installation passage 10, the 4th baffling cavity 22, third baffling cavity 21, the second baffling cavity 20 and the first baffling cavity 19, then be discharged by air inlet 15, so that air-flow can be with above-mentioned closed channel Other two face contact, takes away heat thereon, so constantly changes the flow direction of air-flow, can as much as possible take away peace Fill the heat inside shell 9.
Meanwhile it is minimum that the temperature when having just enter into of the air-flow in installation shell 9 is blasted in the present invention, and with air-flow and capacitor The continuous contact of battery 14, air-flow constantly can absorb heat and heat up, so that air-flow and the temperature of capacitor batteries 14 is made to become smaller, into And make for cooling effect to be deteriorated, to be located at 14 good cooling effect of capacitor batteries of air-flow flow trace front end, it is located at air-flow stream 14 cooling effect of capacitor batteries of dynamic trailing end is poor, is not affected by gas even on the capacitor batteries 14 of air-flow flow trace front end Stream influences, and the present invention upsets the engagement sequence of air-flow Yu capacitor batteries 14, make to own by the flow direction of constantly change air-flow Capacitor batteries 14 can touch low-temperature airflow, thus make capacitor batteries 14 quickly, uniform decrease in temperature, the cooling of lifting device Effect.
As shown in Fig. 3, Fig. 4 and Fig. 5, in the present invention, the inlet and outlet conversion equipment 23 includes being located at 14 He of air inlet Rotation axis 24 between air outlet 15, the rotation axis 24 are connected with changeover panel 25, and there are two logical for setting on the changeover panel 25 Stomata 26 is fixed with intake stack 27 in the venthole 26 described in one of them, and venthole 26 described in two is about rotation axis 24 is symmetrical, while venthole 26 described in two is corresponding with air inlet 14 and air outlet 15 respectively, sets outside the venthole 26 It is equipped with cyclic annular telescopic chute 28, ring-type 28 face of telescopic chute installs shell 9, and liftable is provided in the ring-type telescopic chute 28 Sealing ring 29 is provided with adjustable spring 30 between the bottom of the sealing ring 29 and cyclic annular telescopic chute 28, the sealing ring 29 Top is provided with electromagnetism ring 31.
In the inlet and outlet conversion equipment 23 of invention, rotation axis 24 is connected with motor, which can be fixed on installation shell 9 On, motor driven rotation axis 24, and then changeover panel 25 is controlled, realize the adjusting of two 26 positions of venthole, while air inlet 14 Magnetic plate is provided with at 15 port of air outlet.When stating inlet and outlet conversion equipment 23 in use, two ventholes 26 are distinguished Face then air inlet 14 and air outlet 15, electromagnetism ring 31 are powered and have magnetism, two sealing rings 29 respectively with air inlet 14 and Magnetic sheet on air outlet 15 is in close contact, and constitutes closed structure, the air-flow in intake stack 27 is by air inlet 14 and air outlet One enters inside installation shell 9 in 15, then by another discharge, and after a period of time, control changeover panel 25 rotates 180 °, changes Air current flow direction then controls changeover panel 25 and rotates backward 180 ° after a period of time, becomes air current flow direction again and comes, prevents Only intake stack 27 knots.
The above, the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although referring to before Stating embodiment, invention is explained in detail, those skilled in the art should understand that: it still can be to preceding Technical solution documented by each embodiment is stated to modify or equivalent replacement of some of the technical features;And these It modifies or replaces, the spirit and scope for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of home intelligent peak load shifting control system, which is characterized in that including controller (1), timing governor of avoiding the peak hour (2), timing converter (3), quick charge module (4), super capacitance cell group (5), circuit adjust converter (6), Wi-Fi mould Block (7) and solar generating system (8), the Wi-Fi module (7) are connected with controller (1), and the solar generating system (8) is logical Timing converter (3) is crossed to be connected with quick charge module (4);
The timing governor of avoiding the peak hour (2), timing converter (3) and super capacitance cell group (5) are connected with controller (1) And it is controlled and is driven by controller (1);The input terminal of the timing governor of avoiding the peak hour (2) is connected with line, and described avoid the peak hour is determined When adjuster (2) be arranged there are two output end, one of output end is connected with timing converter (3), and another output is then Converter (6) are adjusted with circuit to be connected;The timing converter (3), quick charge module (4), super capacitance cell group (5) with And circuit adjusts converter (6) and is sequentially connected.
2. a kind of home intelligent peak load shifting control system according to claim 1, which is characterized in that the timing of avoiding the peak hour Adjuster (2) is used to connect the connection of alternating current Yu timing converter (3) in low power consumption according to the peak load shifting time, with It is used to cut off the connection of alternating current Yu timing converter (3) when electric peak phase.
3. a kind of home intelligent peak load shifting control system according to claim 1, which is characterized in that the timing of avoiding the peak hour Adjuster (2) charges to super capacitance cell group (5) using alternating current in low power consumption, according to the peak load shifting time in electricity consumption Domestic consumer is powered using super capacitance cell group (5) when peak phase.
4. a kind of home intelligent peak load shifting control system according to claim 1, which is characterized in that the circuit is adjusted Converter (6) is used to the direct current of super capacitance cell group (5) in home intelligent peak load shifting control system to be converted into exchanging Electricity is used for domestic consumer.
5. a kind of home intelligent peak load shifting control system according to claim 1, which is characterized in that the timing conversion Device (3) is used to the electric current of solar generating system (8) and alternating current being converted to unified electric current, so that quick charge module (4) makes With.
6. a kind of super capacitance cell group, which is characterized in that including installing shell (9), be provided with electricity in the installation shell (9) Pond installation passage (10) and two baffling cavitys, baffling cavity described in two are located at the left and right of battery installation passage (10) Two sides, the battery installation passage (10) is in rectangular channel shape, and is provided with square on the inner wall of the battery installation passage (10) The battery installation through-hole (12) of shape structure, the battery installation passage (10) pass through the baffling of battery installation through-hole (12) and two sides Cavity communicates;It is provided with battery mounting base (13) on the inner wall of the battery installation through-hole (12), the corresponding battery in inner wall two sides Capacitor batteries (14) are fixed between mounting base (13);
The front end of the left side baffling cavity is provided with air inlet (15), and the front end of the battery installation passage (10) is provided with out Air port (16) is provided with ventilation opening (17) between the most inner side and battery installation passage (10) of the right side baffling cavity.
7. a kind of super capacitance cell group according to claim 6, which is characterized in that the middle part of each baffling cavity is equal A baffler (18) are provided with, so that two baffling cavitys are divided into four parts, according to flow of air sequence, by four baffling skies Chamber is divided into the first baffling cavity (19), the second baffling cavity (20), third baffling cavity (21) and the 4th baffling cavity (22).
8. a kind of super capacitance cell group according to claim 6, which is characterized in that the outside of installation shell (9) Inlet and outlet conversion equipment (23) are provided with, the inlet and outlet conversion equipment (23) includes being located at air inlet (14) and air outlet (15) Between rotation axis (24), the rotation axis (24) is connected with changeover panel (25), and there are two logical for setting on the changeover panel (25) Stomata (26) is fixed with intake stack (27) in venthole (26) described in one of them.
9. a kind of super capacitance cell group according to claim 8, which is characterized in that venthole (26) described in two closes Symmetrically in rotation axis (24), while venthole (26) described in two is corresponding with air inlet (14) and air outlet (15) respectively.
10. a kind of super capacitance cell group according to claim 8, which is characterized in that set outside the venthole (26) It is equipped with cyclic annular telescopic chute (28), ring-type telescopic chute (28) face installation shell (9), can be risen in the ring-type telescopic chute (28) Drop is provided with sealing ring (29), is provided with adjustable spring between the bottom of the sealing ring (29) and cyclic annular telescopic chute (28) (30), electromagnetism ring (31) are provided at the top of the sealing ring (29).
CN201910511541.3A 2019-06-13 2019-06-13 A kind of home intelligent peak load shifting control system and super capacitance cell group Pending CN110112765A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910511541.3A CN110112765A (en) 2019-06-13 2019-06-13 A kind of home intelligent peak load shifting control system and super capacitance cell group

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910511541.3A CN110112765A (en) 2019-06-13 2019-06-13 A kind of home intelligent peak load shifting control system and super capacitance cell group

Publications (1)

Publication Number Publication Date
CN110112765A true CN110112765A (en) 2019-08-09

Family

ID=67494984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910511541.3A Pending CN110112765A (en) 2019-06-13 2019-06-13 A kind of home intelligent peak load shifting control system and super capacitance cell group

Country Status (1)

Country Link
CN (1) CN110112765A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023137940A1 (en) * 2022-01-19 2023-07-27 厦门普为光电科技有限公司 Illuminating apparatus having off-peak power consumption management mechanism, and method for illuminating apparatus

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1985382A (en) * 2004-05-18 2007-06-20 双向电池公司 Multi-cell battery assembly
US20110189522A1 (en) * 2010-02-01 2011-08-04 Kim Tae-Yong Battery pack
CN103718374A (en) * 2011-04-15 2014-04-09 约翰逊控制技术有限责任公司 Battery system having an external thermal management system
US20150030890A1 (en) * 2013-07-29 2015-01-29 Denso Corporation Battery pack
CN106898846A (en) * 2015-12-18 2017-06-27 中国科学院大连化学物理研究所 A kind of air flow channel integrated metal/air cell group
CN206302162U (en) * 2016-12-06 2017-07-04 华东交通大学 A kind of home intelligent is used electricity in off-peak hours system
CN107302119A (en) * 2017-06-12 2017-10-27 浙江磁石科技有限公司 A kind of electric automobile battery box air-cooling apparatus and method
CN206619912U (en) * 2017-04-21 2017-11-07 遵义职业技术学院 A kind of novel energy saver of using electricity in off-peak hours
WO2018019182A1 (en) * 2016-07-28 2018-02-01 恒丰工程(香港)有限公司 Side-flow plate and shell-type heat exchanging plate and multi-flow detachable plate and shell-type heat exchanger
US20180316073A1 (en) * 2017-04-28 2018-11-01 Robert Bosch Gmbh Battery having a plurality of battery cells
CN209748206U (en) * 2019-06-13 2019-12-06 广东电网有限责任公司 Household intelligent super-capacitor battery pack for peak staggering

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1985382A (en) * 2004-05-18 2007-06-20 双向电池公司 Multi-cell battery assembly
US20110189522A1 (en) * 2010-02-01 2011-08-04 Kim Tae-Yong Battery pack
CN103718374A (en) * 2011-04-15 2014-04-09 约翰逊控制技术有限责任公司 Battery system having an external thermal management system
US20150030890A1 (en) * 2013-07-29 2015-01-29 Denso Corporation Battery pack
CN106898846A (en) * 2015-12-18 2017-06-27 中国科学院大连化学物理研究所 A kind of air flow channel integrated metal/air cell group
WO2018019182A1 (en) * 2016-07-28 2018-02-01 恒丰工程(香港)有限公司 Side-flow plate and shell-type heat exchanging plate and multi-flow detachable plate and shell-type heat exchanger
CN206302162U (en) * 2016-12-06 2017-07-04 华东交通大学 A kind of home intelligent is used electricity in off-peak hours system
CN206619912U (en) * 2017-04-21 2017-11-07 遵义职业技术学院 A kind of novel energy saver of using electricity in off-peak hours
US20180316073A1 (en) * 2017-04-28 2018-11-01 Robert Bosch Gmbh Battery having a plurality of battery cells
CN107302119A (en) * 2017-06-12 2017-10-27 浙江磁石科技有限公司 A kind of electric automobile battery box air-cooling apparatus and method
CN209748206U (en) * 2019-06-13 2019-12-06 广东电网有限责任公司 Household intelligent super-capacitor battery pack for peak staggering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2023137940A1 (en) * 2022-01-19 2023-07-27 厦门普为光电科技有限公司 Illuminating apparatus having off-peak power consumption management mechanism, and method for illuminating apparatus

Similar Documents

Publication Publication Date Title
CN109004691B (en) Day-ahead optimal scheduling method for alternating current-direct current hybrid system containing power electronic transformer
CN108832646B (en) A kind of management system and its method suitable for dynamically reconfigurable battery energy storage system
CN102315645B (en) Energy router for distributed power generation
CN104916860B (en) A kind of pile group tandem arrangement based on outer air flow chamber SOFC
CN206628840U (en) A kind of intelligent power distribution equipment and system
CN102545255A (en) Photovoltaic and micro gas turbine mixed micro grid coordinated operation control method
CN106385024A (en) Modular electric energy router device and implementation method thereof
CN103178533A (en) Controlling method and controller for variable participation frequency of temperature control load
WO2022006706A1 (en) Integrated control device and new energy vehicle
CN102135760A (en) Neural network energy coordinated controller for microgrid
CN107645178B (en) Virtual synchronous machine control system and method based on power electronic transformer
CN105978010A (en) Photovoltaic air-conditioning power supply control system and control method based on peak and valley price
CN107482659A (en) Exchange mixed energy storage system control method for coordinating under micro-capacitance sensor off-network state
CN103236713B (en) Micro-grid network, method for controlling same and bidirectional converter for micro-grid
CN104852381B (en) Portable shelter monitoring system and battery energy storage system charge/discharge control method
CN110212563B (en) Energy storage parallel operation system
CN110112765A (en) A kind of home intelligent peak load shifting control system and super capacitance cell group
CN204407890U (en) A kind of regenerative resource cool and thermal power micro-grid system
CN110707747A (en) Household photovoltaic micro-grid energy management system containing coal-to-electricity equipment
CN206759139U (en) A kind of charging pile and charging station
CN108599255A (en) A kind of micro-grid coordination control method considering electric-gas interconnection
CN209748206U (en) Household intelligent super-capacitor battery pack for peak staggering
CN209516641U (en) A kind of energy storage stacking system of Based on Distributed energy storage demand
CN116683534A (en) Collaborative planning method and device for power distribution network considering multi-type flexible resources
CN106786744A (en) A kind of circuit topology of the single-point type electric power energy collector of integrated distributed plant-grid connection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination