CN110109875A - The data connecting method and system of Engineering Change Management information system - Google Patents

The data connecting method and system of Engineering Change Management information system Download PDF

Info

Publication number
CN110109875A
CN110109875A CN201711447141.8A CN201711447141A CN110109875A CN 110109875 A CN110109875 A CN 110109875A CN 201711447141 A CN201711447141 A CN 201711447141A CN 110109875 A CN110109875 A CN 110109875A
Authority
CN
China
Prior art keywords
management information
information system
change
store path
change management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201711447141.8A
Other languages
Chinese (zh)
Inventor
刘遐
张一敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Foton Daimler Automobile Co Ltd
Original Assignee
Beijing Foton Daimler Automobile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Foton Daimler Automobile Co Ltd filed Critical Beijing Foton Daimler Automobile Co Ltd
Priority to CN201711447141.8A priority Critical patent/CN110109875A/en
Publication of CN110109875A publication Critical patent/CN110109875A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/13File access structures, e.g. distributed indices
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/14Details of searching files based on file metadata
    • G06F16/144Query formulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/10File systems; File servers
    • G06F16/14Details of searching files based on file metadata
    • G06F16/148File search processing

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Library & Information Science (AREA)
  • Mathematical Physics (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses the data connecting methods and system of a kind of Engineering Change Management information system, wherein method includes: the target store path for obtaining change in the work associated documents;Establish the incidence relation of the target button in target store path and Engineering Change Management information system;The target button is triggered, to inquire change in the work associated documents according to target store path.The target store path of the available associated documents of this method is simultaneously associated with the target button foundation in Engineering Change Management information system, so that inquiry change in the work information is become convenient and efficient, and can real-time update.

Description

The data connecting method and system of Engineering Change Management information system
Technical field
The present invention relates to Engineering Change Management technical field, in particular to a kind of data of Engineering Change Management information system Connection method and system.
Background technique
Inquiry data are frequently necessary in the work of change in the work, in specific works, the founder of data is different people, Such as: oneself, colleague, client etc..In this case, it necessarily will appear lookup less than associated documents, or storage in early days Situations such as file is out-of-date also will appear because file is stored under the multilayer catalogue of Dropbox searches time-consuming and laborious ask Topic.
Summary of the invention
The present invention is directed to solve at least to a certain extent it is above-mentioned in the related technology the technical issues of one of.
For this purpose, an aspect of of the present present invention purpose is to propose a kind of data connection side of Engineering Change Management information system Method.This method can conveniently and efficiently inquire change in the work information and can real-time update.
Another aspect of the present invention purpose is to propose a kind of Engineering Change Management information system.
To achieve the goals above, an aspect of of the present present invention embodiment discloses a kind of Engineering Change Management information system Data connecting method, comprising the following steps: obtain the target store path of change in the work associated documents;Establish the target storage The incidence relation of the target button in path and the Engineering Change Management information system;Described the target button is triggered, according to institute It states target store path and inquires the change in the work associated documents.
The data connecting method of the Engineering Change Management information system of the embodiment of the present invention, by the mesh for obtaining associated documents Mark store path is simultaneously associated with the target button foundation in Engineering Change Management information system, finds correlation when triggering the target button The target store path of connection, inquires change in the work associated documents.This method makes inquiry change in the work information become convenient and efficient, And it can real-time update.
In some instances, the data link method of the Engineering Change Management information system further include: to the work Cheng Biangeng associated documents are modified;By modified change in the work associated documents before target store path covering modification The change in the work associated documents.
In some instances, the change in the work associated documents are that user is preassigned.
In some instances, the target store path is Dropbox store path, or can be with Engineering Change Management information The PC hard disk of system connection.
The embodiment of another aspect of the present invention discloses a kind of Engineering Change Management information system, comprising: module is obtained, For obtaining the target store path of change in the work associated documents;Module is established, for establishing the target store path and institute State the incidence relation of the target button in Engineering Change Management information system;Module is checked, for triggering described the target button, with root The change in the work associated documents are inquired according to the target store path.
The Engineering Change Management information system of the embodiment of the present invention, by obtain associated documents target store path and and The target button establishes association in Engineering Change Management information system, and associated target storage road is found when triggering the target button Diameter inquires change in the work associated documents.The system makes inquiry change in the work information become convenient and efficient, and can real-time update.
Additional aspect and advantage of the invention will be set forth in part in the description, and will partially become from the following description Obviously, or practice through the invention is recognized.
Detailed description of the invention
Above-mentioned or additional aspect and advantage combination following accompanying drawings of the invention will be to will become bright in the description of embodiment It shows and is readily appreciated that, in which:
Fig. 1 is the process of the data connecting method of Engineering Change Management information system according to an embodiment of the invention Figure;With
Fig. 2 is the structural schematic diagram of Engineering Change Management information system according to an embodiment of the invention.
Specific embodiment
The embodiment of the present invention is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or the element with same or like engineering.Below with reference to attached The embodiment of figure description is exemplary, and for explaining only the invention, and is not considered as limiting the invention.
The data link method of Engineering Change Management information according to an embodiment of the present invention is described below in conjunction with attached drawing and is System.
Fig. 1 is the process of the data connecting method of Engineering Change Management information system according to an embodiment of the invention Figure.As shown in Figure 1, the data connecting method of the Engineering Change Management information system, comprising the following steps:
S1: the target store path of change in the work associated documents is obtained.
In specific example, change in the work associated documents are pre-assigned by the user, such as: it is some to check that frequency is higher File or created by other departments, inquiry is got up more troublesome event.
In specific example, target store path is Dropbox store path, convenient to update at any time, do not need to import again or Person finds this document path, convenient and efficient.Certainly, store path may be connecting with Engineering Change Management information system People's computer hard disc can be handled at any time, improve working efficiency.
S2: the incidence relation of the target button in target store path and Engineering Change Management information system is established.
In specific example, the target button in target store path and Engineering Change Management information system is associated.Example Such as: the target button A in target store path a and Engineering Change Management information system being associated, connection between the two is established.
S3: triggering the target button, to inquire change in the work associated documents according to target store path.
In specific example, triggering the target button includes clicking button, and such system can be found according to the button of triggering Associated target store path, and change in the work associated documents are inquired by it.Such as: click the engineering in above-mentioned S2 step The target button A in change management information system will find target store path a, and inquire the engineering being stored under a of path Change associated documents.
The data connecting method of the Engineering Change Management information system of the embodiment of the present invention, by the mesh for obtaining associated documents Mark store path is simultaneously associated with the target button foundation in Engineering Change Management information system, finds correlation when triggering the target button The target store path of connection, inquires change in the work associated documents.This method makes inquiry change in the work information become convenient and efficient, And it can real-time update.
Fig. 2 is the structural schematic diagram of Engineering Change Management information system according to an embodiment of the invention, such as Fig. 2 institute Show, which includes: to obtain module 101, establish module 102 and check module 103.
Specifically, the target store path that module 101 is used to obtain change in the work associated documents is obtained.
In specific example, change in the work associated documents are that user is preassigned;Target store path is Dropbox storage Path.
Module 102 is established to be associated with for establishing target store path with the target button in Engineering Change Management information system Relationship.
Module 103 is checked for triggering the target button, to inquire change in the work associated documents according to target store path.
In specific example, which further includes modified module, for modifying to change in the work associated documents, and will Change in the work associated documents of the modified change in the work associated documents before the covering modification of target store path.
It should be noted that the explanation of the aforementioned event data connection embodiment to Engineering Change Management information system It is also applied for the Engineering Change Management information system, details are not described herein again.
The Engineering Change Management information system of the embodiment of the present invention, by obtain associated documents target store path and and The target button establishes association in Engineering Change Management information system, and associated target storage road is found when triggering the target button Diameter inquires change in the work associated documents.The system makes inquiry change in the work information become convenient and efficient, and can real-time update.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is included at least one embodiment or example of the invention.In the present specification, schematic expression of the above terms are not It is that must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be It can be combined in any suitable manner in any one or more embodiment or examples.In addition, without conflicting with each other, this field Technical staff can carry out the feature of different embodiments or examples described in this specification and different embodiments or examples Combination and combination.
Although the embodiments of the present invention has been shown and described above, it is to be understood that above-described embodiment is example Property, it is not considered as limiting the invention, those skilled in the art within the scope of the invention can be to above-mentioned Embodiment is changed, modifies, replacement and variant.

Claims (8)

1. a kind of data link method of Engineering Change Management information system, which comprises the following steps:
Obtain the target store path of change in the work associated documents;
Establish the incidence relation of the target button in the target store path and the Engineering Change Management information system;
Described the target button is triggered, to inquire the change in the work associated documents according to the target store path.
2. the data link method of Engineering Change Management information system according to claim 1, which is characterized in that also wrap It includes:
It modifies to the change in the work associated documents;
The change in the work of the modified change in the work associated documents before target store path covering modification is related File.
3. the data link method of Engineering Change Management information system according to claim 1, which is characterized in that the work Cheng Biangeng associated documents are that user is preassigned.
4. the data link method of Engineering Change Management information system according to claim 1, which is characterized in that the mesh Mark store path is Dropbox store path, or the PC hard disk that can be connect with Engineering Change Management information system.
5. a kind of Engineering Change Management information system characterized by comprising
Module is obtained, for obtaining the target store path of change in the work associated documents;
Module is established, for establishing the pass of the target button in the target store path and the Engineering Change Management information system Connection relationship;
Check module, it is related to inquire the change in the work according to the target store path for triggering described the target button File.
6. Engineering Change Management information system according to claim 5, which is characterized in that further include: modified module is used for It modifies to the change in the work associated documents, and by modified change in the work associated documents in the target store path The change in the work associated documents before covering modification.
7. Engineering Change Management information system according to claim 5, which is characterized in that the change in the work associated documents It is that user is preassigned.
8. Engineering Change Management information system according to claim 5, which is characterized in that the target store path is net Disk storage path, or the PC hard disk that can be connect with Engineering Change Management information system.
CN201711447141.8A 2017-12-27 2017-12-27 The data connecting method and system of Engineering Change Management information system Withdrawn CN110109875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711447141.8A CN110109875A (en) 2017-12-27 2017-12-27 The data connecting method and system of Engineering Change Management information system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711447141.8A CN110109875A (en) 2017-12-27 2017-12-27 The data connecting method and system of Engineering Change Management information system

Publications (1)

Publication Number Publication Date
CN110109875A true CN110109875A (en) 2019-08-09

Family

ID=67483482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711447141.8A Withdrawn CN110109875A (en) 2017-12-27 2017-12-27 The data connecting method and system of Engineering Change Management information system

Country Status (1)

Country Link
CN (1) CN110109875A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112686554A (en) * 2020-12-31 2021-04-20 拉扎斯网络科技(上海)有限公司 Material management system and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1517909A (en) * 2003-01-15 2004-08-04 英业达股份有限公司 Integration method and system for altered engineering document
KR100856084B1 (en) * 2006-12-13 2008-09-02 한국과학기술정보연구원 System and method for association information total management by construction of association information database
CN101404027A (en) * 2008-10-30 2009-04-08 宇龙计算机通信科技(深圳)有限公司 File management method, system and equipment
US8126970B2 (en) * 2006-12-20 2012-02-28 Sap Ag Method and apparatus for engineering change management
CN102866888A (en) * 2012-09-07 2013-01-09 北京奇虎科技有限公司 Method and system for processing icons on user interface
CN103366259A (en) * 2013-07-30 2013-10-23 国家电网公司 Method for planning inspection project in hydroelectric production management system
CN104123129A (en) * 2013-04-28 2014-10-29 腾讯科技(深圳)有限公司 Method and device for quickly selecting file

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1517909A (en) * 2003-01-15 2004-08-04 英业达股份有限公司 Integration method and system for altered engineering document
KR100856084B1 (en) * 2006-12-13 2008-09-02 한국과학기술정보연구원 System and method for association information total management by construction of association information database
US8126970B2 (en) * 2006-12-20 2012-02-28 Sap Ag Method and apparatus for engineering change management
CN101404027A (en) * 2008-10-30 2009-04-08 宇龙计算机通信科技(深圳)有限公司 File management method, system and equipment
CN102866888A (en) * 2012-09-07 2013-01-09 北京奇虎科技有限公司 Method and system for processing icons on user interface
CN104123129A (en) * 2013-04-28 2014-10-29 腾讯科技(深圳)有限公司 Method and device for quickly selecting file
CN103366259A (en) * 2013-07-30 2013-10-23 国家电网公司 Method for planning inspection project in hydroelectric production management system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱婷: "汽车制造企业产品数据管理系统的设计与实现", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112686554A (en) * 2020-12-31 2021-04-20 拉扎斯网络科技(上海)有限公司 Material management system and method

Similar Documents

Publication Publication Date Title
EP1650681A3 (en) Data structure, database system, and method for data management and/or conversion
USD585907S1 (en) Computer network monitoring data consolidator for a computer screen-filter
CN103810275B (en) Method and apparatus for data interaction between non-relation and relevant database
EP1772803A3 (en) Method and system for performing distributed server change operations in a transaction-safe manner
EP1260916A3 (en) Method and system for collaborative ontology modeling
WO2005121945A3 (en) Method and system for creating, sustaining and using a transactional bill of materials (t-bom tm)
WO2007014341A3 (en) Patent mapping
WO2007021360A3 (en) Computer-implemented personal information manager method and system
US10210185B2 (en) GINA service orchestration
WO2008095072A3 (en) Methods and systems for site startup
RU2006102135A (en) STORAGE APPLICATION INTERFACE FOR GENERAL DATA PLATFORM
WO2003088087A3 (en) Media object management
WO2007019169A3 (en) Method and system for workflow management of electronic documents
JP2007531115A5 (en)
WO2004010631A3 (en) Automated configuration of packet routed network
EP3055808A1 (en) Event model for correlating system component states
WO2005045738A3 (en) Method and system for transacted file operations over a network
CN104391992B (en) For the data processing system of asset data
CN110109875A (en) The data connecting method and system of Engineering Change Management information system
AU2019257630A1 (en) Improved method and device for correlating multiple tables in a database environment
Plunkett et al. Women and domestic violence: Standards for counselling practice
JP2007503051A5 (en)
WO2006016350A3 (en) Enterprise resource planning based on separation of perception and data
CN110516081A (en) The display methods and device of tables of data mapping relations
US20060095921A9 (en) Object-oriented framework for document routing service in a content management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190809