CN110106772A - A kind of highway clod wash U-shaped composite beam bridge and its construction method - Google Patents

A kind of highway clod wash U-shaped composite beam bridge and its construction method Download PDF

Info

Publication number
CN110106772A
CN110106772A CN201910302113.XA CN201910302113A CN110106772A CN 110106772 A CN110106772 A CN 110106772A CN 201910302113 A CN201910302113 A CN 201910302113A CN 110106772 A CN110106772 A CN 110106772A
Authority
CN
China
Prior art keywords
steel plate
shaped
beam bridge
highway
shaped steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910302113.XA
Other languages
Chinese (zh)
Other versions
CN110106772B (en
Inventor
刘荣
唐晨
司朋举
衣凡
何梓铭
田帅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201910302113.XA priority Critical patent/CN110106772B/en
Publication of CN110106772A publication Critical patent/CN110106772A/en
Application granted granted Critical
Publication of CN110106772B publication Critical patent/CN110106772B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/30Metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The invention discloses a kind of highway clod wash U-shaped composite beam bridge and its construction method, in structure by several U-shaped steel plate splicings be bridge main body steel construction;It is concreting area on U-shaped steel plate, bitumen layer is laid on concrete, door frame is arranged in end of the bridge, and guardrail and lamppost is arranged in bridge two sides.Compared with prior art, U-shaped steel plate cold bending of the present invention is formed without welding, and avoids the occurrence of problems of welded quality and welding residual stress;Shop splice steel girder segment is transported to scene, then casting concrete Cheng Qiao.Steel girder segment replaces construction formwork, and Optimizing construction technique improves construction quality and shortens construction period.Clod wash U-shaped combination beam anti-bending bearing capacity is 3 times of same across footpath hollow slab girder, and can reduce concrete cracking disease, enhances bridge durability.

Description

A kind of highway clod wash U-shaped composite beam bridge and its construction method
Technical field
The present invention relates to a kind of bridge structures, the especially structure of U-shaped composite beam bridge, lamppost and guardrail and its production side Method belongs to bridge structure technical field.
Background technique
Traditional hollow slab girder concrete amount is big, and concrete segment is from great, for the area lifting fortune having inconvenient traffic Defeated inconvenience, and concrete plate beam is easy to damage during transport, lifting.The past concrete hollow slab girder during service, Overload overweight vehicle, which increases, and long-term temperature effect and shrinkage and creep are easy makes plate-girder cracking disease occur, jeopardizes bridge master The durability of body and safety.In addition, concrete cracks quantity is more, distribution is wide, detection, reparation and reinforcement technique difficulty are big, after Phase maintenance cost is big, influences the economic performance of bridge total life cycle.
Traditional hollow slab bridge guardrail mostly uses timber structure and steel construction, and the durability of timber structure is poor, is easy to damage by worms With weathering corrosion phenomenon;Spray painting outside spray painting steel construction is easy to fall off because of pedestrian or vehicle friction, and the naked leakage of reinforcing bar is in sky In gas, easily corrode.This kind of guardrail influences safety and the comfort of driving, and the maintenance in later period is inconvenient, maintenance cost It is high.For conventional hollow plate-girder more than great, the cracking disease and the problems such as guardrail durability is poor, a kind of combination of clod wash U-shaped is proposed Beam bridge solves.
Summary of the invention
The technical problem to be solved in the invention is in view of the above shortcomings of the prior art, and to provide a kind of highway clod wash U Shape composite beam bridge and its construction method.
In order to solve the above technical problems, the technical solution adopted by the present invention is that:
A kind of highway clod wash U-shaped composite beam bridge, several U-shaped steel plates including transverse direction and longitudinal direction splicing, the section of U-shaped steel plate are U Shape, the open surfaces of U-shaped steel plate are stamped armoured concrete slab, and the surrounding side of the armoured concrete slab has reserved steel bar, Reserved steel bar be it is hook-shaped, be engaged between two neighboring armoured concrete slab by reserved steel bar;It is adjacent before and after beam bridge direction It is lateral wet seam between two armoured concrete slabs, is longitudinal wet joint between two adjacent armoured concrete slabs of left and right, Concrete is poured in the wet seam of the transverse direction and longitudinal wet joint, the armored concrete plate surface is equipped with bitumen layer.
Scheme as a further preference, U-shaped edges of plate position are welded with nail connector, weldering nail connector In the wet seam of U-shaped steel plate concrete.
Scheme as a further preference is equipped between two longitudinally disposed U-shaped steel plates for being connected and fixed Junction steel plate, the side and bottom of U-shaped steel plate are provided with junction steel plate.
Scheme as a further preference is provided with through reinforcing bar between two reserved steel bars being engaged.
Scheme as a further preference, the wet seam of transverse direction post water-stop glue band.
Scheme as a further preference, the beam bridge two sides are disposed with guardrail and street lamp.
Scheme as a further preference, the U-shaped steel plate edge of the beam bridge two sides are provided with built-in fitting, built-in fitting it is upper Portion is welded with fence upright and street lamp, and the guardrail is mounted on fence upright.
A kind of construction method of highway clod wash U-shaped composite beam bridge, comprising the following steps:
Step 1: supporting structure is erected with Temporary Piers and Bailey beam;
Step 2: be prefabricated in the factory U-shaped steel plate while, be segmented pouring reinforcement concrete plate at bridging scene, and it is pre- in side Stay reinforcing bar and built-in fitting;
Step 3: weldering nail connector is welded on U-shaped steel plate in factory, and U-shaped steel plate is transported to scene, exactitude position is set up;
Step 4: junction steel plate is fixed by bolts to two U-shaped steel plate docking locations, forms steel girder segment;
Step 5: armoured concrete slab is placed on U-shaped steel plate by piecemeal, armoured concrete slab and U-shaped steel plate junction with And water-stop glue band is placed in two U-shaped steel plate junctions;
Step 6: vertical or horizontal reinforcing bar, longitudinal wet joint and cross are worn in the reserved steel bar lap-joint of two pieces of armoured concrete slabs It is filled up to wet seam with concrete, forms concrete slab;
Step 7: after laterally wet seam and longitudinal wet joint reach design strength, in floorings asphalt surface layer;
Step 8: reaching design strength to asphalt surface course, and bucket arch lamppost and fence upright are welded with built-in fitting respectively;
Step 9: guardrail is pierced on fence upright.
Compared with prior art, a kind of highway clod wash U-shaped composite beam bridge of the invention and its construction method, can make full use of The compressive property of the stronger tensile property of steel and concrete.U-shaped steel plate cold bending is formed without welding, and avoids the occurrence of welding quality Problem and welding residual stress.Compared to concrete hollow slab girder, the present invention can reduce concrete cracking disease;Compared to clean steel Beam, the present invention significantly improve the fatigue behaviour of steel plate.The anti-bending bearing capacity of clod wash U-shaped combination beam is same across footpath Hollow Slab Beam Bridge 3 times, due to U-shaped steel plate combination neutral axis of the beam below concrete slab and close to concrete slab, concrete is in full compression shape State does not generate concrete in tension cracking disease;Girder steel is in tensile region, is not likely to produce the fatigue damage of girder steel.Steel in guardrail Muscle is wrapped up with bamboo wood, and reinforcing bar is avoided to be directly exposed to air, and slows down the corrosion of reinforcing bar, and bamboo wood for ease of maintenaince replaces It changes, economic performance is good.Using clod wash U-shaped steel plate alternate template, Optimizing construction technique shortens the construction period, saves construction cost; Using concrete precast block, it is segmented the characteristics of installing, creep and shrinkage effects can be reduced.
Detailed description of the invention
Fig. 1 is the elevation of beam bridge;
Fig. 2 is the view in transverse section of beam bridge;
Fig. 3 is the connection schematic diagram of two U-shaped steel plates;
Fig. 4 is internal structure chart of the invention;
Fig. 5 is the sectional view of U-shaped steel plate;
Fig. 6 is built-in fitting schematic diagram;
Fig. 7 is schematic diagram at the top of fence upright;
Fig. 8 is bucket arch lamppost schematical top view;
Fig. 9 is guardrail schematic diagram;
Figure 10 is armoured concrete slab distribution map;
Wherein, 1-U shape steel plate, 2- weldering nail connector, 3- longitudinal wet joint, 4- junction steel plate, 5- fence upright, 6- built-in fitting, At the top of the 7- fence upright of falling pagoda, 8- bucket arch lamppost, 9- guardrail, laterally wet seam, 11- armoured concrete slab, 12- are reserved by 10- Reinforcing bar, 13- bitumen layer.
Specific embodiment
The optimal technical scheme that the invention will now be described in detail with reference to the accompanying drawings.
Embodiment 1
As shown, a kind of clod wash U-shaped composite beam bridge of the invention, learns according to analysis, the clod wash U-shaped composite beam bridge across Diameter is in 10m to 20m range, and the rolled steel dosage compared to same across footpath hollow slab girder reduces about 30%-50%, and lifting quality reduces about 50%-70%;With weldering nail connector connection, enhancing steel reinforced concrete between the longitudinal wet joint 3 and lateral wet seam 10 and U-shaped steel plate 1 The switching performance at interface.The anti-bending bearing capacity of U-shaped steel plate combination beam bridge is 3 times of same across footpath hollow slab girder;
For the bucket arch lamppost 8 using oxidation steel plate, top structure is sets of brackets on top of the columns structure;Reinforcing bar is placed inside the horizontal bar 9, outside is adopted With bamboo wood, bamboo is cut into isometric, diametrically splitted, obtained semicircle bamboo chip using rope made of hemp package well in advance horizontal bar steel On muscle, common stress prevents pedestrian and vehicle from falling;The fence upright uses reinforced concrete structure, uses at the top of column Pagoda-shaped 7.
Weldering nail connector 2 is provided in longitudinal wet joint 3 and laterally wet seam 10, the weldering nail connector 2 is welded on U-shaped On steel plate 1.
Along vertical bridge to end it is lamppost 8 in bitumen layer 13, is sets of brackets on top of the columns structure at the top of the lamppost 8;In the bitumen layer 13 It is railing along direction across bridge both ends, falls pagoda-shaped 7 at the top of the fence upright 5, be bamboo wood outside horizontal bar 9, inside is reinforcing bar.
Prefabricated armoured concrete slab 11 is placed on U rib at longitudinal wet joint 3 and laterally wet seam 10;The reinforcing bar 11 reserved steel bar 12 of concrete slab and built-in fitting 6;Vertical or horizontal reinforcing bar is worn by 12 lap-joint of reserved steel bar, two be engaged It is provided between a reserved steel bar 12 through reinforcing bar, plays dowel action.
A kind of highway clod wash U-shaped composite beam bridge and preparation method thereof, comprising:
A. abutment is built;
B. welding steel structure cage fills mortar flag stone;
C. setting support: construction channel is used as bracket substructure using Temporary Piers and Bailey beam, other using scaffolding steel pipe; Precompressed (self weight and the 110% of construction loads) is carried out to bracket and eliminates settlement of foundation and bracket inelastic deformation;It is vertical to measure bracket Flexible deformation, when formwork erection, should be included in the influence of bracket vertical elastic deformation and dead load flexible deformation;Place basin type rubber branch Seat sets up U-shaped steel plate 1;
D. U-shaped steel plate 1 is lifted, exactitude position is set up;
E. connect junction steel plate 4 and U-shaped steel plate 1 with high-strength bolt, the connection including U-shaped steel plate 1 side and bottom;
F. corrosion, the dirt for removing girder steel top flange and connector, keep surface cleaning;
G. the positioning of armoured concrete slab 11 is placed on U rib, and wears vertical or horizontal reinforcing bar in 12 lap-joint of reserved steel bar, Water-stop glue band is placed in armoured concrete slab 11 and 1 junction of U-shaped steel plate and two 1 junctions of U-shaped steel plate, in longitudinal wet joint 3 and laterally at wet seam 10 pour C50 concrete;
H. covering geotextiles conserve 28d;Form removal, striking are surface-treated;Expansion joint is set, pours end of the bridge and takes Plate;
I. bitumen layer 13 is poured, after bitumen layer 13 reaches design strength, column channel steel and built-in fitting 6 are welded, guardrail 9 is installed With lamppost 8;
J. fence upright 5, guardrail 9,8 antirust paint coating of lamppost;
K. at bridge.
It is specifically divided into following steps:
The positioning of U-shaped steel plate 1 is set up: setting up main bridge combination beam rack construction channel using Temporary Piers and Bailey beam as bracket lower part Structure, other use scaffolding steel pipe;Precompressed is carried out to bracket and eliminates settlement of foundation and bracket inelastic deformation;It is perpendicular to measure bracket To the influence for being included in support vertical elastic deformation and dead load flexible deformation when deforming formwork erection.U-shaped steel plate 1 is lifted, and is carried out Contraposition is set up.
It is bolted: being connect junction steel plate 4 with U-shaped steel plate 1 with high strength friction bolt, including 1 side of U-shaped steel plate With the connection of bottom surface.
It pours: armoured concrete slab 11 is placed on U rib, and wear vertical or horizontal steel in 12 lap-joint of reserved steel bar Muscle places water-stop glue band in armoured concrete slab 11 and 1 junction of U-shaped steel plate and two 1 junctions of U-shaped steel plate, then exists Casting concrete at longitudinal wet joint 3 and laterally wet seam 10, what it is due to selection is self-compaction light high strength concrete, without vibration It smashes, demoulding after maintenance 28 days.
Welding: fence upright 5 and lamppost 8 are welded on built-in fitting 6, and welding uses fillet weld.
Guardrail is set up: reinforcing bar being passed through the hole that fence upright 5 is reserved above, and is fixed, bamboo is made to isometric, edge Diameter is cast aside, and is obtained semicircular bamboo chip, is carried out water-proofing treatment, and two panels bamboo chip is stranded to prick being beforehand with using the rope made of hemp On good horizontal bar reinforcing bar.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects It is described in detail, it should be understood that being not limited to this hair the foregoing is merely a specific embodiment of the invention Bright, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should be included in the present invention Protection scope within.

Claims (8)

1. a kind of highway clod wash U-shaped composite beam bridge, it is characterised in that: several U-shaped steel plates (1) including transverse direction and longitudinal direction splicing, U The section of shape steel plate (1) is U-shaped, and the open surfaces of U-shaped steel plate (1) are stamped armoured concrete slab (11), the armored concrete The surrounding side of plate (11) has reserved steel bar (12), and reserved steel bar (12) is hook-shaped, two neighboring armoured concrete slab (11) Between be engaged by reserved steel bar (12);It is laterally wet between two adjacent armoured concrete slabs (11) before and after beam bridge direction Seam (10) is longitudinal wet joint (3), wet 10 He of seam of transverse direction between two adjacent armoured concrete slabs (11) of left and right Concrete is poured in longitudinal wet joint (3), armoured concrete slab (11) surface is equipped with bitumen layer.
2. a kind of highway clod wash U-shaped composite beam bridge according to claim 1, it is characterised in that: the U-shaped steel plate (1) Marginal position is welded with nail connector (2), and weldering nail connector (2) is located in the wet seam of U-shaped steel plate (1) concrete (3).
3. a kind of highway clod wash U-shaped composite beam bridge according to claim 1, it is characterised in that: in two longitudinally disposed U Junction steel plate (4) for being connected and fixed is installed, the side and bottom of U-shaped steel plate (1) are provided with company between shape steel plate (1) Connect steel plate (4).
4. a kind of highway clod wash U-shaped composite beam bridge according to claim 1, it is characterised in that: two reserved steel being engaged Muscle is provided between (12) through reinforcing bar.
5. a kind of highway clod wash U-shaped composite beam bridge according to claim 1, it is characterised in that: the wet seam of transverse direction (10) water-stop glue band is posted.
6. a kind of highway clod wash U-shaped composite beam bridge according to claim 1, it is characterised in that: the beam bridge two sides arrangement There are guardrail and street lamp.
7. a kind of highway clod wash U-shaped composite beam bridge according to claim 6, it is characterised in that: the U-shaped of the beam bridge two sides Steel plate (1) edge is provided with built-in fitting (6), and the top of built-in fitting (6) is welded with fence upright (5) and street lamp, the guardrail peace On fence upright (5).
8. a kind of construction method of highway clod wash U-shaped composite beam bridge according to any one of claims 1-7, feature It is, comprising the following steps:
Step 1: supporting structure is erected with Temporary Piers and Bailey beam;
Step 2: be prefabricated in the factory U-shaped steel plate (1) while, bridging scene be segmented pouring reinforcement concrete plate (11), and Side reserved steel bar (12) and built-in fitting (6);
Step 3: weldering nail connector (2) is welded on U-shaped steel plate (1) in factory, and U-shaped steel plate is transported to scene, exactitude position It sets up;
Step 4: junction steel plate (4) is fixed by bolts to two U-shaped steel plate (1) docking locations, forms steel girder segment;
Step 5: armoured concrete slab (11) is placed on U-shaped steel plate (1) by piecemeal, in armoured concrete slab (11) and U-shaped steel Water-stop glue band is placed in plate (1) junction and two U-shaped steel plate (1) junctions;
Step 6: vertical or horizontal reinforcing bar, longitudinal wet are worn in reserved steel bar (12) lap-joint of two pieces of armoured concrete slabs (11) Seam (3) and lateral wet seam (10) are filled up with concrete, form concrete slab;
Step 7: after laterally wet seam (10) and longitudinal wet joint (3) reach design strength, in floorings asphalt face Layer;
Step 8: reaching design strength to asphalt surface course, and bucket arch lamppost (8) and fence upright (5) are welded with built-in fitting (6) respectively It connects;
Step 9: guardrail (9) is pierced on fence upright (5).
CN201910302113.XA 2019-04-16 2019-04-16 Road cold-bending U-shaped combined beam bridge and construction method thereof Active CN110106772B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910302113.XA CN110106772B (en) 2019-04-16 2019-04-16 Road cold-bending U-shaped combined beam bridge and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910302113.XA CN110106772B (en) 2019-04-16 2019-04-16 Road cold-bending U-shaped combined beam bridge and construction method thereof

Publications (2)

Publication Number Publication Date
CN110106772A true CN110106772A (en) 2019-08-09
CN110106772B CN110106772B (en) 2021-06-04

Family

ID=67483840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910302113.XA Active CN110106772B (en) 2019-04-16 2019-04-16 Road cold-bending U-shaped combined beam bridge and construction method thereof

Country Status (1)

Country Link
CN (1) CN110106772B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111366349A (en) * 2020-03-09 2020-07-03 河海大学 Large-span suspension bridge power test device with dynamically adjustable mass
CN114563200A (en) * 2022-01-26 2022-05-31 河海大学 Assembled large-span cable-stayed bridge power test system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665876B1 (en) * 2006-03-31 2007-01-09 우경건설 주식회사 The prestressed opening trapezoid waveform still girder construction method of having installed concrete caisson in the upper flange
CN202595623U (en) * 2012-05-15 2012-12-12 江苏赛特钢结构有限公司 Combined beam plate structure based on U-shaped channel steel
CN104594194A (en) * 2015-02-04 2015-05-06 河南省交通规划勘察设计院有限责任公司 Composite bridge deck applied to long-span bridges and city bridges
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106758813A (en) * 2016-12-30 2017-05-31 东南大学 For the UHPC wells formula rib floorings and its construction method of steel reinforced concrete composite beam bridge
CN107905083A (en) * 2017-12-22 2018-04-13 长安大学 A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection
CN208455463U (en) * 2017-10-17 2019-02-01 青海省高等级公路建设管理局 A kind of wet seam anti-corrosion component of steel-concrete composite beam
CN109440642A (en) * 2018-11-30 2019-03-08 中铁第四勘察设计院集团有限公司 Steel reinforced concrete composite beam bridge panel assembly seam construction based on early strong high performance concrete

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100665876B1 (en) * 2006-03-31 2007-01-09 우경건설 주식회사 The prestressed opening trapezoid waveform still girder construction method of having installed concrete caisson in the upper flange
CN202595623U (en) * 2012-05-15 2012-12-12 江苏赛特钢结构有限公司 Combined beam plate structure based on U-shaped channel steel
CN104594194A (en) * 2015-02-04 2015-05-06 河南省交通规划勘察设计院有限责任公司 Composite bridge deck applied to long-span bridges and city bridges
CN105926440A (en) * 2016-05-09 2016-09-07 湖南城市学院 Steel-concrete combined continuous beam bridge deck as well as manufacturing method and application thereof
CN106758813A (en) * 2016-12-30 2017-05-31 东南大学 For the UHPC wells formula rib floorings and its construction method of steel reinforced concrete composite beam bridge
CN208455463U (en) * 2017-10-17 2019-02-01 青海省高等级公路建设管理局 A kind of wet seam anti-corrosion component of steel-concrete composite beam
CN107905083A (en) * 2017-12-22 2018-04-13 长安大学 A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection
CN109440642A (en) * 2018-11-30 2019-03-08 中铁第四勘察设计院集团有限公司 Steel reinforced concrete composite beam bridge panel assembly seam construction based on early strong high performance concrete

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111366349A (en) * 2020-03-09 2020-07-03 河海大学 Large-span suspension bridge power test device with dynamically adjustable mass
CN111366349B (en) * 2020-03-09 2021-06-01 河海大学 Large-span suspension bridge power test device with dynamically adjustable mass
CN114563200A (en) * 2022-01-26 2022-05-31 河海大学 Assembled large-span cable-stayed bridge power test system
CN114563200B (en) * 2022-01-26 2022-12-20 河海大学 Assembled large-span cable-stayed bridge power test system

Also Published As

Publication number Publication date
CN110106772B (en) 2021-06-04

Similar Documents

Publication Publication Date Title
CN108677685B (en) Ultra-high-performance concrete-part steel beam combined bent cap and construction method thereof
CN211848855U (en) Novel swift formula modularization decking seam structure
CN108867310A (en) The short rib T beam bridge of pretensioning prestressed concrete and its construction method
CN106245511A (en) A kind of two-fold shape combined beam structure and construction method thereof
CN110747754B (en) Shear-resisting reinforcing method for oblique section of wide hollow slab
CN103711067A (en) Transversely assembled corrugated steel web combined box girder with small number of supports and construction method thereof
CN109811633A (en) A kind of corrugated steel and Combined concrete double curvature arched bridge and preparation method thereof
CN114892552B (en) Box girder type bridge reconstruction construction method
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
CN110106772A (en) A kind of highway clod wash U-shaped composite beam bridge and its construction method
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
KR100842062B1 (en) The steel composite rahmen bridge construction technique for which preflexion steel girder was used
CN211200026U (en) Simply support steel-concrete composite beam decking continuous structure
CN209114299U (en) A kind of Single-box multi-chamber box beam bridge
CN109853377B (en) Bridge deck continuous connection structure adopting ultra-high performance concrete and construction method thereof
CN216338993U (en) Longitudinal joint for steel-UHPC (ultra high performance concrete) assembled pi-shaped combination beam
CN105696453B (en) A kind of steel-concrete combination beam
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method
CN113512932B (en) Prestressed steel beam connected prefabricated small box girder type hidden cover beam and construction method thereof
CN210658013U (en) Hanging basket structure for construction of wet joints of prefabricated erected small box girder cross-line bridge
CN113802450A (en) Steel concrete composite beam structure and construction method
CN109972512B (en) Cast-in-place construction method of profiled steel sheet-concrete combined bridge deck slab
CN203795293U (en) Transverse-assembly corrugated steel web combination box beam with few supports
CN210031380U (en) Prefabricated sidewalk plate and sidewalk structure
CN205576717U (en) External prestress 's back continuous bridge of letter is earlier adopted to construction time

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant