CN110097345A - A kind of job Shop Management System system and method - Google Patents

A kind of job Shop Management System system and method Download PDF

Info

Publication number
CN110097345A
CN110097345A CN201910389184.8A CN201910389184A CN110097345A CN 110097345 A CN110097345 A CN 110097345A CN 201910389184 A CN201910389184 A CN 201910389184A CN 110097345 A CN110097345 A CN 110097345A
Authority
CN
China
Prior art keywords
agent node
production
task
node
block platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910389184.8A
Other languages
Chinese (zh)
Inventor
李世杰
余荣
张浩川
张丽莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong University of Technology
Original Assignee
Guangdong University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong University of Technology filed Critical Guangdong University of Technology
Priority to CN201910389184.8A priority Critical patent/CN110097345A/en
Publication of CN110097345A publication Critical patent/CN110097345A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/06Buying, selling or leasing transactions
    • G06Q30/08Auctions
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/04Manufacturing
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Operations Research (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Quality & Reliability (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Manufacturing & Machinery (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Educational Administration (AREA)
  • Game Theory and Decision Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of job Shop Management System and method, system includes: task agent node, for decomposing production task, sends bid request according to production task after decomposition;Block platform chain, for receiving bid request;Process agent node, for obtaining bid request by block platform chain, judge whether to send bid response to block platform chain, so that target processing agent node obtains production plan and starts to produce after task agent node determines target processing agent node and production plan;Process agent node, for passing through block platform chain monitor production process.The application realizes workshop management function using multiple agent nodes, can dispose multiple cheap nodes instead of high-performance large capacity equipment, the quantity for increasing node can be realized system extension, reduce production cost;It is connect by block platform chain with each node, using the protection and monitoring that can not distort and can be traced characteristic, realize to data of block chain, improves the safety of data.

Description

A kind of job Shop Management System system and method
Technical field
This application involves workshop management technical fields, more specifically to a kind of job Shop Management System and method.
Background technique
Modern Workshop Production passes through multiple technological innovation, has had certain breakthrough, has realized Workshop Production Full-automation, but the particulars of either workshop save or workshop management system, still using centralization, concentrate The equipment that formula system needs to dispose high-performance large capacity, and increasing portfolio is faced, improve the performance of centralized single machine It need to be by way of replacing hardware come improving performance, cost can be higher and higher, and standalone hardware is there are the performance bottleneck of oneself, into One step limits the extension of data center's scale.In addition, workshop management system is by Internet of Things mostly by each server at present It is attached, data are easy to be tampered, and safety is lower.
Summary of the invention
The application's is designed to provide a kind of job Shop Management System and method, reduces production cost, improves The safety of the scalability and data of system.
To achieve the above object, this application provides a kind of job Shop Management Systems, comprising:
Task agent node, for being decomposed after receiving production task to the production task, and according to raw after decomposition Production task sends corresponding bid request;
Block platform chain, the bid request sent for receiving the task agent node;
Agent node is processed, for obtaining the bid request by the block platform chain, and judges whether to send and throw Mark response is to block platform chain, so that target target processing agent node and corresponding production during the task agent node is determining After plan, the target processing agent node obtains the production plan by the block platform chain and starts to produce;
Process agent node, for passing through the block platform chain monitor production process.
Optionally, the task agent node, is also used to:
The on-stream time of each processing agent node is determined according to preset rules;The preset rules include that production is appointed Priority of being engaged in and/or production task complete the time limit.
Optionally, the task agent node, is also used to:
After receiving the production task, judge whether that can complete the production appoints according to the condition of production of current system Business, and judging result and judgment basis are sent to the block platform chain.
Optionally, the block platform chain, is also used to:
Receive the judging result and the judgment basis that the task agent node is sent;
The judgment basis is verified using historical data, it is such as inconsistent, then it is sent to the task agent node Rejudge instruction.
Optionally, further includes:
Memory node records the judgment basis and institute if consistent with the historical data for the judgment basis State judging result.
Optionally, the processing agent node, is also used to:
After receiving the bid request, the bid response is sent to the block platform chain according to itself working ability It is recorded;Wherein, the bid response includes process time, processing price;
The task agent node is also used to after receiving the bid response by the block platform chain, according to It is expected that process time and expected processing cost select optimal processing agent node to be determined as the target processing agent node, and will The target processing agent node and the fabrication plan are recorded into the block platform chain.
Optionally, the process agent node, is also used to:
Before the production plan starts, detecting relevant all processing agent nodes in the production plan is It is no to there are problems that equipment fault;It if so, fault message is then uploaded to the block platform chain, and is the production task weight It is new to determine production plan.
Optionally, the process agent node, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node Point is then held consultation by the block platform chain and the remaining processing agent node, the production of the first node is appointed Business is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain.
Optionally, further includes:
Resource Broker node, for managing all kinds of physical resources;
Manpower agent node, for managing human resources;
In product agent node, for tracking and managing in product;
Cooperation agent node cooperates for being responsible for itself with extraneous.
To achieve the above object, this application provides a kind of Workshop Production Management methods, are applied to block platform chain, packet It includes:
Receive the bid request that task agent node is sent;Wherein, the bid request is that the task agent node connects The request that the production task is decomposed after receiving production task, and is sent according to production task after decomposition;
Bid request is issued to processing agent node, and is rung receiving the bid that the processing agent node is sent Should after be forwarded to the task agent node;
Obtain the middle target target processing agent node and right that the task agent node is determined according to the bid response The production plan answered;
The production plan is sent to the target processing agent node, to open using target processing agent node Begin to produce, and utilizes process agent node monitor production process.
By above scheme it is found that a kind of job Shop Management System provided by the present application, comprising: task agent node, For being decomposed after receiving production task to the production task, and corresponding bid is sent according to production task after decomposition and is asked It asks;Block platform chain, the bid request sent for receiving the task agent node;Agent node is processed, for leading to It crosses the block platform chain and obtains the bid request, and judge whether to send bid response to block platform chain, so that described After target target processes agent node and corresponding production plan during task agent node is determining, the target processes agent node The production plan is obtained by the block platform chain and starts to produce;Process agent node, for passing through the block chain Platform monitor production process.From the foregoing, it will be observed that job Shop Management System provided by the present application is real respectively using multiple agent nodes Existing corresponding workshop management function, the equipment that high-performance large capacity can be replaced by disposing multiple cheap nodes, if The performance of workshop management system need to be improved, can be realized, be avoided to system hardware more by increasing corresponding agent node Change process;If need to be extended to the data scale of system, it is only necessary to which the quantity for increasing agent node is significantly reduced and is produced into This, improves the scalability of system;Further, the application is connect by block platform chain with each agent node, is utilized Characteristic can not be distorted and be can be traced to block chain, realize protection and monitoring to production process data, solve data easily quilt The shortcomings that distorting improves the safety of data.
Disclosed herein as well is a kind of Workshop Production Management methods, are equally able to achieve above-mentioned technical effect.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited Application.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of job Shop Management System disclosed in the embodiment of the present application;
Fig. 2 is the structural schematic diagram of another kind job Shop Management System disclosed in the embodiment of the present application;
Fig. 3 is a kind of structural schematic diagram of specific job Shop Management System disclosed in the embodiment of the present application;
Fig. 4 is a kind of flow chart of Workshop Production Management method disclosed in the embodiment of the present application;
Fig. 5 is a kind of flow chart of specific Workshop Production Management method disclosed in the embodiment of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall in the protection scope of this application.
The particulars of modern Workshop Production either workshop save or workshop management system, still using collection Chinese style, the equipment that integrated system needs to dispose high-performance large capacity, and increasing portfolio is faced, it is single to improve centralization The performance of machine need to be by way of replacing hardware come improving performance, and cost can be higher and higher, and there are the property of oneself for standalone hardware Energy bottleneck, further limits the extension of data center's scale.In addition, current workshop management system is will by Internet of Things mostly Each server is attached, and data are easy to be tampered, and safety is lower.
The embodiment of the present application discloses a kind of job Shop Management System, reduces production cost, and improve system can The safety of scalability and data.
Fig. 1 is a kind of job Shop Management System disclosed in the embodiment of the present application, as shown in Figure 1, system includes:
Task agent node 11, for being decomposed after receiving production task to the production task, and according to decomposition after Production task sends corresponding bid request;
In the present embodiment, task agent node 11 is after receiving production task, the life that will can further receive Production Task-decomposing is multiple subtasks, and generates corresponding bid request based on subtask.
Block platform chain 12, the bid request sent for receiving the task agent node 11;
In the present embodiment, after task agent node 11 generates bid request according to production task, bid request is sent to In block platform chain 12, so that block platform chain 12 can record bid request.
It specifically, further include multiple management nodes and supervision node in the block platform chain 12 of the present embodiment, by above-mentioned Two class node administrations simultaneously supervise the normal production run in manufacture process, and the Transaction Information of production task is via block chain Node is verified, and can ensure the safety of transaction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts Production;
Further, bid request is forwarded to the processing agency's section for being responsible for every Physical Processing using block platform chain 12 Point 13 determines that itself current working ability decides whether to send and submits a tender after processing agent node 13 receives bid request Response;If can be competent at bid requests corresponding production task, sends bid response to block platform chain 12 and recorded. Wherein, bid response may include the information such as process time and processing cost needed for completing corresponding production task.
It is understood that task agent node 11 is forwarded to after block platform chain 12 receives bid response, to appoint Business agent node 11 can determine optimal processing agent node according to bid response from all processing agent nodes 13 of bid, will Optimal processing agent node is determined as processing agent node eventually for the target for completing production task.Specifically, optimal processing The time that agent node can be reported according to the expection process time of production task and expected processing cost and processing agent node It is determined with price.After determining target processing agent node, task agent node 11 formulates corresponding production plan, and will Production plan and target processing agent node are sent to block platform chain 12 and are recorded.Further, target processing agency section Point can start to produce by the production plan that block platform chain 12 issues.
Process agent node 14, for passing through 12 monitor production process of block platform chain.
In the present embodiment, process agent node 14 carries out real-time monitoring for passing through block platform chain in process of production, Once it was found that actual production process with it is expected that production plan have relatively large deviation, then by block platform chain 12 control production stop Only, the guarantee to production process is realized.
By above scheme it is found that a kind of job Shop Management System provided by the present application, comprising: task agent node, For being decomposed after receiving production task to the production task, and corresponding bid is sent according to production task after decomposition and is asked It asks;Block platform chain, the bid request sent for receiving the task agent node;Agent node is processed, for leading to It crosses the block platform chain and obtains the bid request, and judge whether to send bid response to block platform chain, so that described After target target processes agent node and corresponding production plan during task agent node is determining, the target processes agent node The production plan is obtained by the block platform chain and starts to produce;Process agent node, for passing through the block chain Platform monitor production process.From the foregoing, it will be observed that job Shop Management System provided by the present application is real respectively using multiple agent nodes Existing corresponding workshop management function, the equipment that high-performance large capacity can be replaced by disposing multiple cheap nodes, if The performance of workshop management system need to be improved, can be realized, be avoided to system hardware more by increasing corresponding agent node Change process;If need to be extended to the data scale of system, it is only necessary to which the quantity for increasing agent node is significantly reduced and is produced into This, improves the scalability of system;Further, the application is connect by block platform chain with each agent node, is utilized Characteristic can not be distorted and be can be traced to block chain, realize protection and monitoring to production process data, solve data easily quilt The shortcomings that distorting improves the safety of data.
The embodiment of the present application discloses another job Shop Management System, relative to a upper embodiment, the present embodiment pair Technical solution has made further instruction and optimization.It is specific:
Fig. 2 is another job Shop Management System provided by the embodiments of the present application, as shown in Fig. 2, the system includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;If the judging result For the production task can be completed, then the production task is decomposed, and is sent accordingly according to production task after decomposition Bid request;
In the present embodiment, task agent node 11 first has to the production according to current system after receiving production task Situation is to determine whether production task can be completed, if it is not, then returning to corresponding refusal feedback information;If it is, receiving Production task simultaneously carries out Task-decomposing.Specifically, the condition of production of current system include the production capacity of system, working ability with And current production task.Judging result and judgment basis are further sent to block platform chain 12, judgment basis is for sentencing The condition of production data of the current system to break when can complete production task.
Block platform chain 12, for receive the task agent node 11 is sent and judging result and the judgement according to According to;The judgment basis is verified using historical data, if inconsistent, is sent again to the task agent node 11 Decision instruction;If consistent, the bid request is received;
In the present embodiment, the judging result and judgment basis of the transmission of task agent node 11 are received in block platform chain 12 Afterwards, verifying judgment basis it is whether consistent with historical data, if it is inconsistent, indicate data distorted, need again into Row judgement, rejudges instruction to task agent node 11 is corresponding;If consistent, receive task agent node 11 according to point The bid request that production task is sent after solution.
Agent node 13 is processed, for obtaining the bid request by the block platform chain, and judges whether to send Bid response is to block platform chain 12, so that target target processing agent node and correspondence during the task agent node 11 is determining Production plan after, target processing agent node obtains the production plan by the block platform chain 12 and starts to give birth to It produces;
In the present embodiment, when task agent node 11 determines production plan, determine that each processing is acted on behalf of according to preset rules The on-stream time of node;Wherein, preset rules may include that production task priority and/or production task complete the time limit, thus Can it is higher to priority, may overdue production task or bottleneck subtask give priority in arranging for.
Specifically, task agent node 11 is first for there are the determinations of first subtask in the subtask of sequencing to open Between working hour, and by result notice to the processing agent node for undertaking first subtask, which calculates delivery time and fortune After the defeated time, by time announcement to next processing agent node, once analogizes and be sent to whole processing generations that production plan is related to Manage node.
Process agent node 14, for passing through the block platform chain monitor production process;
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with The judging result.
Further, the present embodiment further includes memory node 15, is connected with block chain, for the judgement in production process As a result and data are recorded.
The embodiment of the present application discloses another job Shop Management System, relative to a upper embodiment, the present embodiment pair Technical solution has made further instruction and optimization.Specifically, job Shop Management System provided in this embodiment includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;To the production task into Row decomposes, and sends corresponding bid request according to production task after decomposition;
Block platform chain 12, for receiving the bid request and the judgement that the task agent node 11 is sent As a result with the judgment basis;The judgment basis is verified using historical data, it is such as inconsistent, then to the task generation The reason transmission of node 11 rejudges instruction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts Production;
Process agent node 14, for before the production plan starts, detecting relevant institute in the production plan There is the processing agent node 13 with the presence or absence of equipment fault problem;If so, fault message is then uploaded to the block chain Platform 12, and production plan is redefined for the production task;
Process agent node 14, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node 13 Point is then held consultation by the block platform chain 12 and the remaining processing agent node 13, by the life of the first node Production task is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain 12;
In the present embodiment, process agent node 14 is before production plan starts, detection production plan relevant processing generation It manages and whether there is equipment fault problem in node 13, if it does not exist, i.e., characterization can start production process;If it exists, then by failure Information is recorded into block platform chain 12, and needs to determine production plan again for current production task.
Further, in process of production, if detecting in processing agent node 13 there are the biggish first node of load, Specific judgment basis can be to judge whether load is greater than preset threshold.If detecting first node, pass through block platform chain 12 It holds consultation with the smaller processing agent node 13 of remaining load, determines second node, thus by the part producing of first node Task is handed over to second node and continues to produce.Meanwhile negotiation result being sent in block platform chain 12 and is recorded.
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with The judging result.
The embodiment of the present application discloses a kind of specific job Shop Management System, relative to a upper embodiment, this implementation Example has made further instruction and optimization to technical solution.It is specific:
Fig. 3 is a kind of specific job Shop Management System provided by the embodiments of the present application, as shown in figure 3, system includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;To the production task into Row decomposes, and sends corresponding bid request according to production task after decomposition;
Block platform chain 12, for receiving the bid request and the judgement that the task agent node 11 is sent As a result with the judgment basis;The judgment basis is verified using historical data, it is such as inconsistent, then to the task generation The reason transmission of node 11 rejudges instruction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts Production;
Process agent node 14, for before the production plan starts, detecting relevant institute in the production plan There is the processing agent node 13 with the presence or absence of equipment fault problem;If so, fault message is then uploaded to the block chain Platform 12, and production plan is redefined for the production task;
Process agent node 14, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node 13 Point is then held consultation by the block platform chain 12 and the remaining processing agent node 13, by the life of the first node Production task is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain 12;
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with The judging result.
Resource Broker node 16, for managing all kinds of physical resources;
Manpower agent node 17, for managing human resources;
In product agent node 18, for tracking and managing in product;
Cooperation agent node 19 cooperates for being responsible for itself with extraneous.
A kind of Workshop Production Management method provided by the embodiments of the present application is introduced below, a kind of vehicle described below Between production management method can be cross-referenced with a kind of above-described job Shop Management System.
Fig. 4 is a kind of flow chart of Workshop Production Management method provided by the embodiments of the present application, is applied to block platform chain, As shown in figure 4, method includes:
S101: the bid request that task agent node is sent is received;Wherein, the bid request is the task agent section Point decomposes the production task after receiving production task, and the request sent according to production task after decomposition;
S102: bid request is issued to processing agent node, and is receiving what the processing agent node was sent The task agent node is forwarded to after bid response;
S103: the task agent node is obtained according to the middle target target that the bid response determines and processes agent node And corresponding production plan;
S104: being sent to the target for the production plan and process agent node, to utilize target processing agency Node starts to produce, and utilizes process agent node monitor production process.
Specific steps about above-mentioned steps S101 to S104 can refer to corresponding contents disclosed in previous embodiment, This is no longer repeated.
A kind of Workshop Production Management method provided by the present application is applied to block platform chain, comprising: receives task agent section The bid request that point is sent;Wherein, bid request is that the task agent node receives after production task to the production Task is decomposed, and the request sent according to production task after decomposition;Bid request is issued to processing agent node, And the task agent node is forwarded to after receiving the bid response that the processing agent node is sent;Obtain the task generation It manages node and agent node and corresponding production plan is processed according to the middle target target that the bid response determines;By the production Plan is sent to the target processing agent node, to start to produce using target processing agent node, and utilizes process Agent node monitor production process.The application realizes corresponding workshop management function, Ke Yitong using multiple agent nodes respectively Cross dispose multiple cheap nodes can if the performance of workshop management system need to be improved instead of the equipment of high-performance large capacity To realize by increasing corresponding agent node, the replacement process to system hardware is avoided;If need to be to the data scale of system It is extended, it is only necessary to which the quantity for increasing agent node significantly reduces production cost, improves the scalability of system;Into One step, the application is connect by block platform chain with each agent node, can not distort and can be traced spy using block chain Property, the protection and monitoring to production process data are realized, solves the disadvantage that data are easily tampered, improves the safety of data Property.
Referring to Fig. 5, Fig. 5 is a kind of flow chart of specific Workshop Production Management method provided by the embodiments of the present application, such as Shown in Fig. 5, after receiving the order of production task, according to current machining capabilities, the current life of production capacity and workshop Can production plan judgement complete new order, and judging result and judgment basis (i.e. data 1) are uploaded to block platform chain.
Further, block platform chain can be compared using historical data with data 1, check whether data are consistent, such as Fruit is inconsistent, and block platform chain will retract data and be verified again;If data are consistent, it is deposited into memory node.At this point, If judging result obtains current inter-vehicular and is unsatisfactory for working condition, i.e., do not allow to carry out operation, then prompt cancels an order or according to working as Before the priority of production task and existing task that receives resequence, to determine whether that current order can be received.
If judging result obtain workshop allow carry out operation, using task agent node to the production task in order into Row decomposes, and based on production subtask after decomposing to some or all specific processing agent node bid, asks to receive bid The processing agent node asked decides whether that the one or more to production subtask is submitted a tender according to itself working ability.If certainly It is fixed to submit a tender, then process time and processing price are reported by block platform chain, records bid response using block platform chain at this time Information.
Further, after task agent node receives bid response by block platform chain, as far as possible according to processing cost Small, total time requirement as short as possible determines acceptance of the bid processing agent node, and determines optimal processing route, by acceptance of the bid processing agency Node and optimal processing route (i.e. data 2) are sent to block platform chain, and block platform chain will verify data 2, check It is whether consistent with the historical data of system.Data check process is similar with the checking procedure of data 1 herein, no longer goes to live in the household of one's in-laws on getting married herein It states.
After getting data 2, production plan is formulated according to the basic condition of data 2 and acceptance of the bid processing agent node, And the problem of being detected whether before production plan starts using process agent node with the presence of processing agent node equipment fault, It avoids impacting production process due to equipment fault.If detecting equipment fault, production plan is reformulated, and will be new Production information be uploaded to block platform chain.If equipment operates normally, equally the testing result of processing agent node (is counted According to 3) being uploaded, and verify it is errorless after be stored in memory node.
Further, production plan (i.e. data 4) is uploaded to block platform chain, once reality is detected in process of production Border process and production plan have relatively large deviation, then control production process stopping, and out of service anti-of storing data 4 and workshop Present data.After workshop smoothly completes scheduled production plan, also needs that data will be completed to be uploaded to block platform chain and go forward side by side Row storage, completes production task.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For system disclosed in embodiment Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration ?.It should be pointed out that for those skilled in the art, under the premise of not departing from the application principle, also Can to the application, some improvement and modification can also be carried out, these improvement and modification also fall into the protection scope of the claim of this application It is interior.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged Except there is also other identical elements in the process, method, article or apparatus that includes the element.

Claims (10)

1. a kind of job Shop Management System characterized by comprising
Task agent node is appointed for decomposing after receiving production task to the production task, and according to production after decomposition Business sends corresponding bid request;
Block platform chain, the bid request sent for receiving the task agent node;
Agent node is processed, for obtaining the bid request by the block platform chain, and judges whether to send to submit a tender and ring It should be to block platform chain, so that target target processing agent node and corresponding production plan during the task agent node is determining Afterwards, the target processing agent node obtains the production plan by the block platform chain and starts to produce;
Process agent node, for passing through the block platform chain monitor production process.
2. job Shop Management System according to claim 1, which is characterized in that the task agent node is also used to:
The on-stream time of each processing agent node is determined according to preset rules;The preset rules include that production task is excellent First grade and/or production task complete the time limit.
3. job Shop Management System according to claim 1, which is characterized in that the task agent node is also used to:
After receiving the production task, judged whether that the production task can be completed according to the condition of production of current system, And judging result and judgment basis are sent to the block platform chain.
4. job Shop Management System according to claim 3, which is characterized in that the block platform chain is also used to:
Receive the judging result and the judgment basis that the task agent node is sent;
The judgment basis is verified using historical data, it is such as inconsistent, then it is sent again to the task agent node Decision instruction.
5. job Shop Management System according to claim 4, which is characterized in that further include:
Memory node records the judgment basis and described sentences if consistent with the historical data for the judgment basis Disconnected result.
6. job Shop Management System according to claim 1, which is characterized in that the processing agent node is also used to:
After receiving the bid request, the bid response to the block platform chain is sent according to itself working ability and is carried out Record;Wherein, the bid response includes process time, processing price;
The task agent node is also used to after receiving the bid response by the block platform chain, according to expection Process time and expected processing cost select optimal processing agent node to be determined as the target processing agent node, and will be described Target processing agent node and the fabrication plan are recorded into the block platform chain.
7. job Shop Management System according to claim 1, which is characterized in that the process agent node is also used to:
Before the production plan starts, detect whether relevant all processing agent nodes in the production plan are deposited In equipment fault problem;If so, fault message is then uploaded to the block platform chain, and again true for the production task Determine production plan.
8. job Shop Management System according to claim 1, which is characterized in that the process agent node is also used to:
In process of production, if detecting the first node in the processing agent node there are load greater than preset threshold, It is held consultation by the block platform chain and the remaining processing agent node, the production task of the first node is transferred It is produced to the second node for negotiating determining, and negotiation result is sent in the block platform chain.
9. job Shop Management System according to any one of claims 1 to 8, which is characterized in that further include:
Resource Broker node, for managing all kinds of physical resources;
Manpower agent node, for managing human resources;
In product agent node, for tracking and managing in product;
Cooperation agent node cooperates for being responsible for itself with extraneous.
10. a kind of Workshop Production Management method, which is characterized in that be applied to block platform chain, comprising:
Receive the bid request that task agent node is sent;Wherein, the bid request is that the task agent node receives life The request that the production task is decomposed after production task, and is sent according to production task after decomposition;
Bid request is issued to processing agent node, and after receiving the bid response that the processing agent node is sent It is forwarded to the task agent node;
Obtain the middle target target processing agent node and corresponding that the task agent node is determined according to the bid response Production plan;
The production plan is sent to the target processing agent node, to start to give birth to using target processing agent node It produces, and utilizes process agent node monitor production process.
CN201910389184.8A 2019-05-10 2019-05-10 A kind of job Shop Management System system and method Pending CN110097345A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910389184.8A CN110097345A (en) 2019-05-10 2019-05-10 A kind of job Shop Management System system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910389184.8A CN110097345A (en) 2019-05-10 2019-05-10 A kind of job Shop Management System system and method

Publications (1)

Publication Number Publication Date
CN110097345A true CN110097345A (en) 2019-08-06

Family

ID=67447699

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910389184.8A Pending CN110097345A (en) 2019-05-10 2019-05-10 A kind of job Shop Management System system and method

Country Status (1)

Country Link
CN (1) CN110097345A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111767582A (en) * 2020-06-30 2020-10-13 平安国际智慧城市科技股份有限公司 Block chain-based electronic bidding method, device, equipment and storage medium
CN111767582B (en) * 2020-06-30 2024-06-04 深圳赛安特技术服务有限公司 Electronic bidding method, device, equipment and storage medium based on block chain

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101373530A (en) * 2007-08-20 2009-02-25 马占祯 Transaction electric platform for calling for tender and bidding of project
CN108765058A (en) * 2018-04-28 2018-11-06 中国科学院信息工程研究所 A kind of safe Synergistic method of manufacture link multiple entity based on block chain
CN108876587A (en) * 2018-01-03 2018-11-23 上海指旺信息科技有限公司 Supply chain financial platform and method based on block chain

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101373530A (en) * 2007-08-20 2009-02-25 马占祯 Transaction electric platform for calling for tender and bidding of project
CN108876587A (en) * 2018-01-03 2018-11-23 上海指旺信息科技有限公司 Supply chain financial platform and method based on block chain
CN108765058A (en) * 2018-04-28 2018-11-06 中国科学院信息工程研究所 A kind of safe Synergistic method of manufacture link multiple entity based on block chain

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
常志会: "基于多代理的车间作业计划研究", 《科学技术与工程》 *
韦文斌等: "基于多代理的车间调度系统结构和调度流程的研究", 《航空精密制造技术》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111767582A (en) * 2020-06-30 2020-10-13 平安国际智慧城市科技股份有限公司 Block chain-based electronic bidding method, device, equipment and storage medium
CN111767582B (en) * 2020-06-30 2024-06-04 深圳赛安特技术服务有限公司 Electronic bidding method, device, equipment and storage medium based on block chain

Similar Documents

Publication Publication Date Title
CN108280760A (en) A kind of financial risks on-line monitoring method and apparatus
CN107707377B (en) A kind of method and system for analyzing network node availability
CN113255811B (en) BIM-based beam bridge multi-source heterogeneous data fusion decision system
KR20180108446A (en) System and method for management of ict infra
KR20180025757A (en) Smart factory flatform for processing mass data of continuous process in a real time
CN105719056A (en) Small and medium-sized enterprise event management process
CN109345076A (en) A kind of whole process engineering consulting project risk management method
CN107395379A (en) A kind of cluster cruising inspection system and method
CN108398932A (en) Automatic driving vehicle detecting system and method
CN106897779A (en) A kind of processing method of data center's operational system event
CN108694522A (en) A kind of data analysing method and device
CN101830256A (en) Method and system for realizing balanced production of whole-automobile general assembly shop
CN108537243A (en) A kind of violation alarm method and device
CN110097345A (en) A kind of job Shop Management System system and method
CN116955304B (en) Track traffic resource sharing and calling system based on cloud platform
KR20180026596A (en) Distributed Parallel Processing System for Processing Data Of Continuous Process In Rea Time
CN103188085B (en) Intelligent maintenance method and system based on Enterprise information integration technology
CA3165779A1 (en) Recovery maturity index (rmi) - based control of disaster recovery
CN108173711A (en) Enterprises system data exchange monitoring method
CN104484277B (en) Process data dynamic analysis device and its application method based on control point
Prístavka et al. Evaluation of quality costs in the production organization
CN113537527A (en) Intelligent operation and maintenance management system and method based on Internet of things
CN108197127A (en) material approval information management method and system
KR102032680B1 (en) Distributed Parallel Processing System for Processing Data Of Continuous Process In Real Time
CN112801314A (en) Intelligent service method and system for coal mine enterprises

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190806

RJ01 Rejection of invention patent application after publication