CN110097345A - A kind of job Shop Management System system and method - Google Patents
A kind of job Shop Management System system and method Download PDFInfo
- Publication number
- CN110097345A CN110097345A CN201910389184.8A CN201910389184A CN110097345A CN 110097345 A CN110097345 A CN 110097345A CN 201910389184 A CN201910389184 A CN 201910389184A CN 110097345 A CN110097345 A CN 110097345A
- Authority
- CN
- China
- Prior art keywords
- agent node
- production
- task
- node
- block platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 65
- 238000004519 manufacturing process Methods 0.000 claims abstract description 199
- 238000012545 processing Methods 0.000 claims abstract description 89
- 230000008569 process Effects 0.000 claims abstract description 52
- 230000004044 response Effects 0.000 claims abstract description 28
- 238000000354 decomposition reaction Methods 0.000 claims abstract description 13
- 238000007726 management method Methods 0.000 claims description 51
- 238000012544 monitoring process Methods 0.000 abstract description 5
- 230000005540 biological transmission Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 230000006870 function Effects 0.000 description 3
- 238000005457 optimization Methods 0.000 description 3
- 230000008859 change Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000012512 characterization method Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000003116 impacting effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000012163 sequencing technique Methods 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0633—Workflow analysis
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q30/00—Commerce
- G06Q30/06—Buying, selling or leasing transactions
- G06Q30/08—Auctions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/04—Manufacturing
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Economics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Operations Research (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Manufacturing & Machinery (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
This application discloses a kind of job Shop Management System and method, system includes: task agent node, for decomposing production task, sends bid request according to production task after decomposition;Block platform chain, for receiving bid request;Process agent node, for obtaining bid request by block platform chain, judge whether to send bid response to block platform chain, so that target processing agent node obtains production plan and starts to produce after task agent node determines target processing agent node and production plan;Process agent node, for passing through block platform chain monitor production process.The application realizes workshop management function using multiple agent nodes, can dispose multiple cheap nodes instead of high-performance large capacity equipment, the quantity for increasing node can be realized system extension, reduce production cost;It is connect by block platform chain with each node, using the protection and monitoring that can not distort and can be traced characteristic, realize to data of block chain, improves the safety of data.
Description
Technical field
This application involves workshop management technical fields, more specifically to a kind of job Shop Management System and method.
Background technique
Modern Workshop Production passes through multiple technological innovation, has had certain breakthrough, has realized Workshop Production
Full-automation, but the particulars of either workshop save or workshop management system, still using centralization, concentrate
The equipment that formula system needs to dispose high-performance large capacity, and increasing portfolio is faced, improve the performance of centralized single machine
It need to be by way of replacing hardware come improving performance, cost can be higher and higher, and standalone hardware is there are the performance bottleneck of oneself, into
One step limits the extension of data center's scale.In addition, workshop management system is by Internet of Things mostly by each server at present
It is attached, data are easy to be tampered, and safety is lower.
Summary of the invention
The application's is designed to provide a kind of job Shop Management System and method, reduces production cost, improves
The safety of the scalability and data of system.
To achieve the above object, this application provides a kind of job Shop Management Systems, comprising:
Task agent node, for being decomposed after receiving production task to the production task, and according to raw after decomposition
Production task sends corresponding bid request;
Block platform chain, the bid request sent for receiving the task agent node;
Agent node is processed, for obtaining the bid request by the block platform chain, and judges whether to send and throw
Mark response is to block platform chain, so that target target processing agent node and corresponding production during the task agent node is determining
After plan, the target processing agent node obtains the production plan by the block platform chain and starts to produce;
Process agent node, for passing through the block platform chain monitor production process.
Optionally, the task agent node, is also used to:
The on-stream time of each processing agent node is determined according to preset rules;The preset rules include that production is appointed
Priority of being engaged in and/or production task complete the time limit.
Optionally, the task agent node, is also used to:
After receiving the production task, judge whether that can complete the production appoints according to the condition of production of current system
Business, and judging result and judgment basis are sent to the block platform chain.
Optionally, the block platform chain, is also used to:
Receive the judging result and the judgment basis that the task agent node is sent;
The judgment basis is verified using historical data, it is such as inconsistent, then it is sent to the task agent node
Rejudge instruction.
Optionally, further includes:
Memory node records the judgment basis and institute if consistent with the historical data for the judgment basis
State judging result.
Optionally, the processing agent node, is also used to:
After receiving the bid request, the bid response is sent to the block platform chain according to itself working ability
It is recorded;Wherein, the bid response includes process time, processing price;
The task agent node is also used to after receiving the bid response by the block platform chain, according to
It is expected that process time and expected processing cost select optimal processing agent node to be determined as the target processing agent node, and will
The target processing agent node and the fabrication plan are recorded into the block platform chain.
Optionally, the process agent node, is also used to:
Before the production plan starts, detecting relevant all processing agent nodes in the production plan is
It is no to there are problems that equipment fault;It if so, fault message is then uploaded to the block platform chain, and is the production task weight
It is new to determine production plan.
Optionally, the process agent node, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node
Point is then held consultation by the block platform chain and the remaining processing agent node, the production of the first node is appointed
Business is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain.
Optionally, further includes:
Resource Broker node, for managing all kinds of physical resources;
Manpower agent node, for managing human resources;
In product agent node, for tracking and managing in product;
Cooperation agent node cooperates for being responsible for itself with extraneous.
To achieve the above object, this application provides a kind of Workshop Production Management methods, are applied to block platform chain, packet
It includes:
Receive the bid request that task agent node is sent;Wherein, the bid request is that the task agent node connects
The request that the production task is decomposed after receiving production task, and is sent according to production task after decomposition;
Bid request is issued to processing agent node, and is rung receiving the bid that the processing agent node is sent
Should after be forwarded to the task agent node;
Obtain the middle target target processing agent node and right that the task agent node is determined according to the bid response
The production plan answered;
The production plan is sent to the target processing agent node, to open using target processing agent node
Begin to produce, and utilizes process agent node monitor production process.
By above scheme it is found that a kind of job Shop Management System provided by the present application, comprising: task agent node,
For being decomposed after receiving production task to the production task, and corresponding bid is sent according to production task after decomposition and is asked
It asks;Block platform chain, the bid request sent for receiving the task agent node;Agent node is processed, for leading to
It crosses the block platform chain and obtains the bid request, and judge whether to send bid response to block platform chain, so that described
After target target processes agent node and corresponding production plan during task agent node is determining, the target processes agent node
The production plan is obtained by the block platform chain and starts to produce;Process agent node, for passing through the block chain
Platform monitor production process.From the foregoing, it will be observed that job Shop Management System provided by the present application is real respectively using multiple agent nodes
Existing corresponding workshop management function, the equipment that high-performance large capacity can be replaced by disposing multiple cheap nodes, if
The performance of workshop management system need to be improved, can be realized, be avoided to system hardware more by increasing corresponding agent node
Change process;If need to be extended to the data scale of system, it is only necessary to which the quantity for increasing agent node is significantly reduced and is produced into
This, improves the scalability of system;Further, the application is connect by block platform chain with each agent node, is utilized
Characteristic can not be distorted and be can be traced to block chain, realize protection and monitoring to production process data, solve data easily quilt
The shortcomings that distorting improves the safety of data.
Disclosed herein as well is a kind of Workshop Production Management methods, are equally able to achieve above-mentioned technical effect.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited
Application.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below
There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this
Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with
It obtains other drawings based on these drawings.
Fig. 1 is a kind of structural schematic diagram of job Shop Management System disclosed in the embodiment of the present application;
Fig. 2 is the structural schematic diagram of another kind job Shop Management System disclosed in the embodiment of the present application;
Fig. 3 is a kind of structural schematic diagram of specific job Shop Management System disclosed in the embodiment of the present application;
Fig. 4 is a kind of flow chart of Workshop Production Management method disclosed in the embodiment of the present application;
Fig. 5 is a kind of flow chart of specific Workshop Production Management method disclosed in the embodiment of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on
Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall in the protection scope of this application.
The particulars of modern Workshop Production either workshop save or workshop management system, still using collection
Chinese style, the equipment that integrated system needs to dispose high-performance large capacity, and increasing portfolio is faced, it is single to improve centralization
The performance of machine need to be by way of replacing hardware come improving performance, and cost can be higher and higher, and there are the property of oneself for standalone hardware
Energy bottleneck, further limits the extension of data center's scale.In addition, current workshop management system is will by Internet of Things mostly
Each server is attached, and data are easy to be tampered, and safety is lower.
The embodiment of the present application discloses a kind of job Shop Management System, reduces production cost, and improve system can
The safety of scalability and data.
Fig. 1 is a kind of job Shop Management System disclosed in the embodiment of the present application, as shown in Figure 1, system includes:
Task agent node 11, for being decomposed after receiving production task to the production task, and according to decomposition after
Production task sends corresponding bid request;
In the present embodiment, task agent node 11 is after receiving production task, the life that will can further receive
Production Task-decomposing is multiple subtasks, and generates corresponding bid request based on subtask.
Block platform chain 12, the bid request sent for receiving the task agent node 11;
In the present embodiment, after task agent node 11 generates bid request according to production task, bid request is sent to
In block platform chain 12, so that block platform chain 12 can record bid request.
It specifically, further include multiple management nodes and supervision node in the block platform chain 12 of the present embodiment, by above-mentioned
Two class node administrations simultaneously supervise the normal production run in manufacture process, and the Transaction Information of production task is via block chain
Node is verified, and can ensure the safety of transaction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out
Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right
After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts
Production;
Further, bid request is forwarded to the processing agency's section for being responsible for every Physical Processing using block platform chain 12
Point 13 determines that itself current working ability decides whether to send and submits a tender after processing agent node 13 receives bid request
Response;If can be competent at bid requests corresponding production task, sends bid response to block platform chain 12 and recorded.
Wherein, bid response may include the information such as process time and processing cost needed for completing corresponding production task.
It is understood that task agent node 11 is forwarded to after block platform chain 12 receives bid response, to appoint
Business agent node 11 can determine optimal processing agent node according to bid response from all processing agent nodes 13 of bid, will
Optimal processing agent node is determined as processing agent node eventually for the target for completing production task.Specifically, optimal processing
The time that agent node can be reported according to the expection process time of production task and expected processing cost and processing agent node
It is determined with price.After determining target processing agent node, task agent node 11 formulates corresponding production plan, and will
Production plan and target processing agent node are sent to block platform chain 12 and are recorded.Further, target processing agency section
Point can start to produce by the production plan that block platform chain 12 issues.
Process agent node 14, for passing through 12 monitor production process of block platform chain.
In the present embodiment, process agent node 14 carries out real-time monitoring for passing through block platform chain in process of production,
Once it was found that actual production process with it is expected that production plan have relatively large deviation, then by block platform chain 12 control production stop
Only, the guarantee to production process is realized.
By above scheme it is found that a kind of job Shop Management System provided by the present application, comprising: task agent node,
For being decomposed after receiving production task to the production task, and corresponding bid is sent according to production task after decomposition and is asked
It asks;Block platform chain, the bid request sent for receiving the task agent node;Agent node is processed, for leading to
It crosses the block platform chain and obtains the bid request, and judge whether to send bid response to block platform chain, so that described
After target target processes agent node and corresponding production plan during task agent node is determining, the target processes agent node
The production plan is obtained by the block platform chain and starts to produce;Process agent node, for passing through the block chain
Platform monitor production process.From the foregoing, it will be observed that job Shop Management System provided by the present application is real respectively using multiple agent nodes
Existing corresponding workshop management function, the equipment that high-performance large capacity can be replaced by disposing multiple cheap nodes, if
The performance of workshop management system need to be improved, can be realized, be avoided to system hardware more by increasing corresponding agent node
Change process;If need to be extended to the data scale of system, it is only necessary to which the quantity for increasing agent node is significantly reduced and is produced into
This, improves the scalability of system;Further, the application is connect by block platform chain with each agent node, is utilized
Characteristic can not be distorted and be can be traced to block chain, realize protection and monitoring to production process data, solve data easily quilt
The shortcomings that distorting improves the safety of data.
The embodiment of the present application discloses another job Shop Management System, relative to a upper embodiment, the present embodiment pair
Technical solution has made further instruction and optimization.It is specific:
Fig. 2 is another job Shop Management System provided by the embodiments of the present application, as shown in Fig. 2, the system includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task
The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;If the judging result
For the production task can be completed, then the production task is decomposed, and is sent accordingly according to production task after decomposition
Bid request;
In the present embodiment, task agent node 11 first has to the production according to current system after receiving production task
Situation is to determine whether production task can be completed, if it is not, then returning to corresponding refusal feedback information;If it is, receiving
Production task simultaneously carries out Task-decomposing.Specifically, the condition of production of current system include the production capacity of system, working ability with
And current production task.Judging result and judgment basis are further sent to block platform chain 12, judgment basis is for sentencing
The condition of production data of the current system to break when can complete production task.
Block platform chain 12, for receive the task agent node 11 is sent and judging result and the judgement according to
According to;The judgment basis is verified using historical data, if inconsistent, is sent again to the task agent node 11
Decision instruction;If consistent, the bid request is received;
In the present embodiment, the judging result and judgment basis of the transmission of task agent node 11 are received in block platform chain 12
Afterwards, verifying judgment basis it is whether consistent with historical data, if it is inconsistent, indicate data distorted, need again into
Row judgement, rejudges instruction to task agent node 11 is corresponding;If consistent, receive task agent node 11 according to point
The bid request that production task is sent after solution.
Agent node 13 is processed, for obtaining the bid request by the block platform chain, and judges whether to send
Bid response is to block platform chain 12, so that target target processing agent node and correspondence during the task agent node 11 is determining
Production plan after, target processing agent node obtains the production plan by the block platform chain 12 and starts to give birth to
It produces;
In the present embodiment, when task agent node 11 determines production plan, determine that each processing is acted on behalf of according to preset rules
The on-stream time of node;Wherein, preset rules may include that production task priority and/or production task complete the time limit, thus
Can it is higher to priority, may overdue production task or bottleneck subtask give priority in arranging for.
Specifically, task agent node 11 is first for there are the determinations of first subtask in the subtask of sequencing to open
Between working hour, and by result notice to the processing agent node for undertaking first subtask, which calculates delivery time and fortune
After the defeated time, by time announcement to next processing agent node, once analogizes and be sent to whole processing generations that production plan is related to
Manage node.
Process agent node 14, for passing through the block platform chain monitor production process;
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with
The judging result.
Further, the present embodiment further includes memory node 15, is connected with block chain, for the judgement in production process
As a result and data are recorded.
The embodiment of the present application discloses another job Shop Management System, relative to a upper embodiment, the present embodiment pair
Technical solution has made further instruction and optimization.Specifically, job Shop Management System provided in this embodiment includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task
The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;To the production task into
Row decomposes, and sends corresponding bid request according to production task after decomposition;
Block platform chain 12, for receiving the bid request and the judgement that the task agent node 11 is sent
As a result with the judgment basis;The judgment basis is verified using historical data, it is such as inconsistent, then to the task generation
The reason transmission of node 11 rejudges instruction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out
Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right
After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts
Production;
Process agent node 14, for before the production plan starts, detecting relevant institute in the production plan
There is the processing agent node 13 with the presence or absence of equipment fault problem;If so, fault message is then uploaded to the block chain
Platform 12, and production plan is redefined for the production task;
Process agent node 14, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node 13
Point is then held consultation by the block platform chain 12 and the remaining processing agent node 13, by the life of the first node
Production task is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain 12;
In the present embodiment, process agent node 14 is before production plan starts, detection production plan relevant processing generation
It manages and whether there is equipment fault problem in node 13, if it does not exist, i.e., characterization can start production process;If it exists, then by failure
Information is recorded into block platform chain 12, and needs to determine production plan again for current production task.
Further, in process of production, if detecting in processing agent node 13 there are the biggish first node of load,
Specific judgment basis can be to judge whether load is greater than preset threshold.If detecting first node, pass through block platform chain 12
It holds consultation with the smaller processing agent node 13 of remaining load, determines second node, thus by the part producing of first node
Task is handed over to second node and continues to produce.Meanwhile negotiation result being sent in block platform chain 12 and is recorded.
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with
The judging result.
The embodiment of the present application discloses a kind of specific job Shop Management System, relative to a upper embodiment, this implementation
Example has made further instruction and optimization to technical solution.It is specific:
Fig. 3 is a kind of specific job Shop Management System provided by the embodiments of the present application, as shown in figure 3, system includes:
Task agent node 11 judges whether energy according to the condition of production of current system after receiving production task
The production task is enough completed, and judging result and judgment basis are sent to block platform chain 12;To the production task into
Row decomposes, and sends corresponding bid request according to production task after decomposition;
Block platform chain 12, for receiving the bid request and the judgement that the task agent node 11 is sent
As a result with the judgment basis;The judgment basis is verified using historical data, it is such as inconsistent, then to the task generation
The reason transmission of node 11 rejudges instruction.
Agent node 13 is processed, for obtaining the bid request by the block platform chain 12, and judges whether to send out
Send bid response to block platform chain 12 so that the task agent node 11 determine in target target processing agent node and right
After the production plan answered, the target processing agent node obtains the production plan by the block platform chain 12 and starts
Production;
Process agent node 14, for before the production plan starts, detecting relevant institute in the production plan
There is the processing agent node 13 with the presence or absence of equipment fault problem;If so, fault message is then uploaded to the block chain
Platform 12, and production plan is redefined for the production task;
Process agent node 14, is also used to:
In process of production, if detecting, there are the first segments that load is greater than preset threshold in the processing agent node 13
Point is then held consultation by the block platform chain 12 and the remaining processing agent node 13, by the life of the first node
Production task is handed over to the determining second node of negotiation and is produced, and negotiation result is sent in the block platform chain 12;
Memory node 15, if for the judgment basis it is consistent with the historical data, record the judgment basis with
The judging result.
Resource Broker node 16, for managing all kinds of physical resources;
Manpower agent node 17, for managing human resources;
In product agent node 18, for tracking and managing in product;
Cooperation agent node 19 cooperates for being responsible for itself with extraneous.
A kind of Workshop Production Management method provided by the embodiments of the present application is introduced below, a kind of vehicle described below
Between production management method can be cross-referenced with a kind of above-described job Shop Management System.
Fig. 4 is a kind of flow chart of Workshop Production Management method provided by the embodiments of the present application, is applied to block platform chain,
As shown in figure 4, method includes:
S101: the bid request that task agent node is sent is received;Wherein, the bid request is the task agent section
Point decomposes the production task after receiving production task, and the request sent according to production task after decomposition;
S102: bid request is issued to processing agent node, and is receiving what the processing agent node was sent
The task agent node is forwarded to after bid response;
S103: the task agent node is obtained according to the middle target target that the bid response determines and processes agent node
And corresponding production plan;
S104: being sent to the target for the production plan and process agent node, to utilize target processing agency
Node starts to produce, and utilizes process agent node monitor production process.
Specific steps about above-mentioned steps S101 to S104 can refer to corresponding contents disclosed in previous embodiment,
This is no longer repeated.
A kind of Workshop Production Management method provided by the present application is applied to block platform chain, comprising: receives task agent section
The bid request that point is sent;Wherein, bid request is that the task agent node receives after production task to the production
Task is decomposed, and the request sent according to production task after decomposition;Bid request is issued to processing agent node,
And the task agent node is forwarded to after receiving the bid response that the processing agent node is sent;Obtain the task generation
It manages node and agent node and corresponding production plan is processed according to the middle target target that the bid response determines;By the production
Plan is sent to the target processing agent node, to start to produce using target processing agent node, and utilizes process
Agent node monitor production process.The application realizes corresponding workshop management function, Ke Yitong using multiple agent nodes respectively
Cross dispose multiple cheap nodes can if the performance of workshop management system need to be improved instead of the equipment of high-performance large capacity
To realize by increasing corresponding agent node, the replacement process to system hardware is avoided;If need to be to the data scale of system
It is extended, it is only necessary to which the quantity for increasing agent node significantly reduces production cost, improves the scalability of system;Into
One step, the application is connect by block platform chain with each agent node, can not distort and can be traced spy using block chain
Property, the protection and monitoring to production process data are realized, solves the disadvantage that data are easily tampered, improves the safety of data
Property.
Referring to Fig. 5, Fig. 5 is a kind of flow chart of specific Workshop Production Management method provided by the embodiments of the present application, such as
Shown in Fig. 5, after receiving the order of production task, according to current machining capabilities, the current life of production capacity and workshop
Can production plan judgement complete new order, and judging result and judgment basis (i.e. data 1) are uploaded to block platform chain.
Further, block platform chain can be compared using historical data with data 1, check whether data are consistent, such as
Fruit is inconsistent, and block platform chain will retract data and be verified again;If data are consistent, it is deposited into memory node.At this point,
If judging result obtains current inter-vehicular and is unsatisfactory for working condition, i.e., do not allow to carry out operation, then prompt cancels an order or according to working as
Before the priority of production task and existing task that receives resequence, to determine whether that current order can be received.
If judging result obtain workshop allow carry out operation, using task agent node to the production task in order into
Row decomposes, and based on production subtask after decomposing to some or all specific processing agent node bid, asks to receive bid
The processing agent node asked decides whether that the one or more to production subtask is submitted a tender according to itself working ability.If certainly
It is fixed to submit a tender, then process time and processing price are reported by block platform chain, records bid response using block platform chain at this time
Information.
Further, after task agent node receives bid response by block platform chain, as far as possible according to processing cost
Small, total time requirement as short as possible determines acceptance of the bid processing agent node, and determines optimal processing route, by acceptance of the bid processing agency
Node and optimal processing route (i.e. data 2) are sent to block platform chain, and block platform chain will verify data 2, check
It is whether consistent with the historical data of system.Data check process is similar with the checking procedure of data 1 herein, no longer goes to live in the household of one's in-laws on getting married herein
It states.
After getting data 2, production plan is formulated according to the basic condition of data 2 and acceptance of the bid processing agent node,
And the problem of being detected whether before production plan starts using process agent node with the presence of processing agent node equipment fault,
It avoids impacting production process due to equipment fault.If detecting equipment fault, production plan is reformulated, and will be new
Production information be uploaded to block platform chain.If equipment operates normally, equally the testing result of processing agent node (is counted
According to 3) being uploaded, and verify it is errorless after be stored in memory node.
Further, production plan (i.e. data 4) is uploaded to block platform chain, once reality is detected in process of production
Border process and production plan have relatively large deviation, then control production process stopping, and out of service anti-of storing data 4 and workshop
Present data.After workshop smoothly completes scheduled production plan, also needs that data will be completed to be uploaded to block platform chain and go forward side by side
Row storage, completes production task.
Each embodiment is described in a progressive manner in specification, the highlights of each of the examples are with other realities
The difference of example is applied, the same or similar parts in each embodiment may refer to each other.For system disclosed in embodiment
Speech, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part illustration
?.It should be pointed out that for those skilled in the art, under the premise of not departing from the application principle, also
Can to the application, some improvement and modification can also be carried out, these improvement and modification also fall into the protection scope of the claim of this application
It is interior.
It should also be noted that, in the present specification, relational terms such as first and second and the like be used merely to by
One entity or operation are distinguished with another entity or operation, without necessarily requiring or implying these entities or operation
Between there are any actual relationship or orders.Moreover, the terms "include", "comprise" or its any other variant meaning
Covering non-exclusive inclusion, so that the process, method, article or equipment for including a series of elements not only includes that
A little elements, but also including other elements that are not explicitly listed, or further include for this process, method, article or
The intrinsic element of equipment.In the absence of more restrictions, the element limited by sentence "including a ...", is not arranged
Except there is also other identical elements in the process, method, article or apparatus that includes the element.
Claims (10)
1. a kind of job Shop Management System characterized by comprising
Task agent node is appointed for decomposing after receiving production task to the production task, and according to production after decomposition
Business sends corresponding bid request;
Block platform chain, the bid request sent for receiving the task agent node;
Agent node is processed, for obtaining the bid request by the block platform chain, and judges whether to send to submit a tender and ring
It should be to block platform chain, so that target target processing agent node and corresponding production plan during the task agent node is determining
Afterwards, the target processing agent node obtains the production plan by the block platform chain and starts to produce;
Process agent node, for passing through the block platform chain monitor production process.
2. job Shop Management System according to claim 1, which is characterized in that the task agent node is also used to:
The on-stream time of each processing agent node is determined according to preset rules;The preset rules include that production task is excellent
First grade and/or production task complete the time limit.
3. job Shop Management System according to claim 1, which is characterized in that the task agent node is also used to:
After receiving the production task, judged whether that the production task can be completed according to the condition of production of current system,
And judging result and judgment basis are sent to the block platform chain.
4. job Shop Management System according to claim 3, which is characterized in that the block platform chain is also used to:
Receive the judging result and the judgment basis that the task agent node is sent;
The judgment basis is verified using historical data, it is such as inconsistent, then it is sent again to the task agent node
Decision instruction.
5. job Shop Management System according to claim 4, which is characterized in that further include:
Memory node records the judgment basis and described sentences if consistent with the historical data for the judgment basis
Disconnected result.
6. job Shop Management System according to claim 1, which is characterized in that the processing agent node is also used to:
After receiving the bid request, the bid response to the block platform chain is sent according to itself working ability and is carried out
Record;Wherein, the bid response includes process time, processing price;
The task agent node is also used to after receiving the bid response by the block platform chain, according to expection
Process time and expected processing cost select optimal processing agent node to be determined as the target processing agent node, and will be described
Target processing agent node and the fabrication plan are recorded into the block platform chain.
7. job Shop Management System according to claim 1, which is characterized in that the process agent node is also used to:
Before the production plan starts, detect whether relevant all processing agent nodes in the production plan are deposited
In equipment fault problem;If so, fault message is then uploaded to the block platform chain, and again true for the production task
Determine production plan.
8. job Shop Management System according to claim 1, which is characterized in that the process agent node is also used to:
In process of production, if detecting the first node in the processing agent node there are load greater than preset threshold,
It is held consultation by the block platform chain and the remaining processing agent node, the production task of the first node is transferred
It is produced to the second node for negotiating determining, and negotiation result is sent in the block platform chain.
9. job Shop Management System according to any one of claims 1 to 8, which is characterized in that further include:
Resource Broker node, for managing all kinds of physical resources;
Manpower agent node, for managing human resources;
In product agent node, for tracking and managing in product;
Cooperation agent node cooperates for being responsible for itself with extraneous.
10. a kind of Workshop Production Management method, which is characterized in that be applied to block platform chain, comprising:
Receive the bid request that task agent node is sent;Wherein, the bid request is that the task agent node receives life
The request that the production task is decomposed after production task, and is sent according to production task after decomposition;
Bid request is issued to processing agent node, and after receiving the bid response that the processing agent node is sent
It is forwarded to the task agent node;
Obtain the middle target target processing agent node and corresponding that the task agent node is determined according to the bid response
Production plan;
The production plan is sent to the target processing agent node, to start to give birth to using target processing agent node
It produces, and utilizes process agent node monitor production process.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910389184.8A CN110097345A (en) | 2019-05-10 | 2019-05-10 | A kind of job Shop Management System system and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910389184.8A CN110097345A (en) | 2019-05-10 | 2019-05-10 | A kind of job Shop Management System system and method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110097345A true CN110097345A (en) | 2019-08-06 |
Family
ID=67447699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910389184.8A Pending CN110097345A (en) | 2019-05-10 | 2019-05-10 | A kind of job Shop Management System system and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110097345A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111767582A (en) * | 2020-06-30 | 2020-10-13 | 平安国际智慧城市科技股份有限公司 | Block chain-based electronic bidding method, device, equipment and storage medium |
CN111767582B (en) * | 2020-06-30 | 2024-06-04 | 深圳赛安特技术服务有限公司 | Electronic bidding method, device, equipment and storage medium based on block chain |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373530A (en) * | 2007-08-20 | 2009-02-25 | 马占祯 | Transaction electric platform for calling for tender and bidding of project |
CN108765058A (en) * | 2018-04-28 | 2018-11-06 | 中国科学院信息工程研究所 | A kind of safe Synergistic method of manufacture link multiple entity based on block chain |
CN108876587A (en) * | 2018-01-03 | 2018-11-23 | 上海指旺信息科技有限公司 | Supply chain financial platform and method based on block chain |
-
2019
- 2019-05-10 CN CN201910389184.8A patent/CN110097345A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101373530A (en) * | 2007-08-20 | 2009-02-25 | 马占祯 | Transaction electric platform for calling for tender and bidding of project |
CN108876587A (en) * | 2018-01-03 | 2018-11-23 | 上海指旺信息科技有限公司 | Supply chain financial platform and method based on block chain |
CN108765058A (en) * | 2018-04-28 | 2018-11-06 | 中国科学院信息工程研究所 | A kind of safe Synergistic method of manufacture link multiple entity based on block chain |
Non-Patent Citations (2)
Title |
---|
常志会: "基于多代理的车间作业计划研究", 《科学技术与工程》 * |
韦文斌等: "基于多代理的车间调度系统结构和调度流程的研究", 《航空精密制造技术》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111767582A (en) * | 2020-06-30 | 2020-10-13 | 平安国际智慧城市科技股份有限公司 | Block chain-based electronic bidding method, device, equipment and storage medium |
CN111767582B (en) * | 2020-06-30 | 2024-06-04 | 深圳赛安特技术服务有限公司 | Electronic bidding method, device, equipment and storage medium based on block chain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108280760A (en) | A kind of financial risks on-line monitoring method and apparatus | |
CN107707377B (en) | A kind of method and system for analyzing network node availability | |
CN113255811B (en) | BIM-based beam bridge multi-source heterogeneous data fusion decision system | |
KR20180108446A (en) | System and method for management of ict infra | |
KR20180025757A (en) | Smart factory flatform for processing mass data of continuous process in a real time | |
CN105719056A (en) | Small and medium-sized enterprise event management process | |
CN109345076A (en) | A kind of whole process engineering consulting project risk management method | |
CN107395379A (en) | A kind of cluster cruising inspection system and method | |
CN108398932A (en) | Automatic driving vehicle detecting system and method | |
CN106897779A (en) | A kind of processing method of data center's operational system event | |
CN108694522A (en) | A kind of data analysing method and device | |
CN101830256A (en) | Method and system for realizing balanced production of whole-automobile general assembly shop | |
CN108537243A (en) | A kind of violation alarm method and device | |
CN110097345A (en) | A kind of job Shop Management System system and method | |
CN116955304B (en) | Track traffic resource sharing and calling system based on cloud platform | |
KR20180026596A (en) | Distributed Parallel Processing System for Processing Data Of Continuous Process In Rea Time | |
CN103188085B (en) | Intelligent maintenance method and system based on Enterprise information integration technology | |
CA3165779A1 (en) | Recovery maturity index (rmi) - based control of disaster recovery | |
CN108173711A (en) | Enterprises system data exchange monitoring method | |
CN104484277B (en) | Process data dynamic analysis device and its application method based on control point | |
Prístavka et al. | Evaluation of quality costs in the production organization | |
CN113537527A (en) | Intelligent operation and maintenance management system and method based on Internet of things | |
CN108197127A (en) | material approval information management method and system | |
KR102032680B1 (en) | Distributed Parallel Processing System for Processing Data Of Continuous Process In Real Time | |
CN112801314A (en) | Intelligent service method and system for coal mine enterprises |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190806 |
|
RJ01 | Rejection of invention patent application after publication |