CN110090549A - In a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing unit - Google Patents

In a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing unit Download PDF

Info

Publication number
CN110090549A
CN110090549A CN201910487503.9A CN201910487503A CN110090549A CN 110090549 A CN110090549 A CN 110090549A CN 201910487503 A CN201910487503 A CN 201910487503A CN 110090549 A CN110090549 A CN 110090549A
Authority
CN
China
Prior art keywords
plate
square chest
waste gas
gas
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910487503.9A
Other languages
Chinese (zh)
Other versions
CN110090549B (en
Inventor
魏福祥
员贤荣
房延峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Mishui Environmental Protection Group Co.,Ltd.
Original Assignee
Jiaxing Tianran Trading Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Tianran Trading Co Ltd filed Critical Jiaxing Tianran Trading Co Ltd
Priority to CN201910487503.9A priority Critical patent/CN110090549B/en
Publication of CN110090549A publication Critical patent/CN110090549A/en
Application granted granted Critical
Publication of CN110090549B publication Critical patent/CN110090549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/002Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols by condensation
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/46Removing components of defined structure
    • B01D53/72Organic compounds not provided for in groups B01D53/48 - B01D53/70, e.g. hydrocarbons
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D53/00Separation of gases or vapours; Recovering vapours of volatile solvents from gases; Chemical or biological purification of waste gases, e.g. engine exhaust gases, smoke, fumes, flue gases, aerosols
    • B01D53/34Chemical or biological purification of waste gases
    • B01D53/74General processes for purification of waste gases; Apparatus or devices specially adapted therefor
    • B01D53/81Solid phase processes
    • B01D53/82Solid phase processes with stationary reactants
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23GCREMATION FURNACES; CONSUMING WASTE PRODUCTS BY COMBUSTION
    • F23G7/00Incinerators or other apparatus for consuming industrial waste, e.g. chemicals
    • F23G7/06Incinerators or other apparatus for consuming industrial waste, e.g. chemicals of waste gases or noxious gases, e.g. exhaust gases
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D2258/00Sources of waste gases
    • B01D2258/02Other waste gases
    • B01D2258/0258Other waste gases from painting equipments or paint drying installations

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • Analytical Chemistry (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Health & Medical Sciences (AREA)
  • Biomedical Technology (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Treating Waste Gases (AREA)

Abstract

The invention discloses in a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing unit, its structure includes: horizontal square chest, electric cabinet, S bend pipe road, circular cone lamina tecti, observation window, spray chamber, combustion chamber, it is tightly attached on the top surface of combustion chamber the bottom surface of spray chamber, the present invention, which is realized, to be matched with horizontal square chest with S bend pipe road, exhaust gas acid-base property, which is detected, by PH test paper plate imports sliding slot path, then it carries out alkaline matter and neutralization reaction is realized to the sliding covering of formic acid gas, stabilize the activity of exhaust gas, pass through the cooling recycling organic gas of condenser pipe frame body again, then pretreated exhaust gas is imported into S bend pipe road and carries out later purification processing, the erection sliding for reaching binary channels classification acid-base neutralization promotes effect, it improves the cooling high efficiency that organic gas is precipitated and facilitates secondary use, also the company of Canal Nursing is ensured Logical effect improves preliminary analysis of the exhaust gas pretreatment to the protection of pipeline and to exhaust gas acid-base property, facilitates later purification.

Description

In a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing unit
Technical field
The present invention is to belong to lacquer spraying waste gas with degradation condensation cleaning processing unit in a kind of lacquer spraying waste gas formaldehyde of paint spray booth Process field.
Background technique
Paint spray booth is the japanning Processing Room to the furniture such as large-scale building materials and alloy frame, and enclosure space prevents outside air pollution It lets out, connection waste gas treatment equipment fast and easy directly purifies exhaust gas, reaches integrated work disposal effect, improves whole work Make performance and efficiency, but in terms of the tentatively pipeline of suction exhaust gas, it is slightly inadequate to the protection of exhaust gas chemical characteristic, at present The common disadvantage to be optimized of technology has:
Spray painting can distribute irritating smell often, this is that formaldehyde volatilizees in paint solution and is mingled in air, the water of formaldehyde Solution slant acidity, also more difficult to the processing of the gas after japanning, formaldehyde can slowly aoxidize formic acid in air, partially Acidity is corrosive, and has erosion effect to the pipeline of waste gas treatment equipment, causes the adherent corrosion of inner wall of the pipe, tube wall is caused to become Thin cracking, micro leakage lacquer spraying waste gas cause staff's gassing, and it is serious can occur carcinogenic hidden danger, it is extremely dangerous, Spray column is all more short of the exhaust-gas treatment of protection and connecting pin that pipeline is inscribed, only single to go purification useless from whole tower body Gas can take the nursing less than other connecting components into account.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide in a kind of lacquer spraying waste gas formaldehyde of paint spray booth and drop Condensation cleaning processing unit is solved, irritating smell can be distributed often to solve spray painting, this is that formaldehyde volatilizees in paint solution and mixes In air, the aqueous solution slant acidity of formaldehyde, also more difficult to the processing of the gas after japanning, formaldehyde in air can Slowly oxidation formic acid, slant acidity are corrosive, have erosion effect to the pipeline of waste gas treatment equipment, cause the attached of inner wall of the pipe Corrosion, lead to the thinning cracking of tube wall, micro leakage lacquer spraying waste gas causes staff's gassing, and serious can occur Carcinogenic hidden danger, extremely dangerous, the protection and the exhaust-gas treatment of connecting pin that pipeline is inscribed in spray column are all more short of, only it is single from The problem of whole tower body removes purification exhaust gas, can take the nursing less than other connecting components into account.
To achieve the goals above, the present invention is to realize by the following technical solutions: a kind of spray painting of paint spray booth is useless In gas formaldehyde and degradation condensation cleaning processing unit, structure include: horizontal square chest, electric cabinet, S bend pipe road, circular cone lamina tecti, The bottom surface of observation window, spray chamber, combustion chamber, the spray chamber is tightly attached on the top surface of combustion chamber, there are two the observation window is set And it is tightly attached to the front side of spray chamber vertically, the inner cavity and S bend pipe road that the top of the spray chamber passes through circular cone lamina tecti Nozzle is mutually communicated, and the front side of S bend pipe road bottom, the nozzle in the S bend pipe road lower right corner are installed on rear side of the electric cabinet It inserts embedded in the left side of horizontal square chest, the horizontal square chest is tightly attached to the right side of electric cabinet and in the same vertical plane, described Horizontal square chest is parallel to each other with observation window, and the circular cone lamina tecti, spray chamber, combustion chamber axle center are conllinear, and the horizontal square chest is set There are rotation snap-gauge, potentiometric sensor, PH test paper plate, wide diameter tube mouth, square chest shell, gas storage box, sliding slot path, condenser pipe frame body, The axis wheel of the rotation snap-gauge is flexibly connected with the shaft in potentiometric sensor middle section, and the rotation snap-gauge is equipped with two and difference The two sides up and down in potentiometric sensor middle section are installed in, the electrode slice of the potentiometric sensor right end is inserted embedded in PH test paper plate middle section Left side, the rotation snap-gauge, potentiometric sensor, PH test paper plate are installed in the inside of wide diameter tube mouth, and the wide diameter tube mouth is nested In the right side of square chest shell, the gas storage box is installed on the inside of square chest shell and is nested in the right end of condenser pipe frame body, institute It states wide diameter tube mouth to be mutually communicated by sliding slot path and condenser pipe frame body, the condenser pipe frame body is nested in respectively with wide diameter tube mouth The left and right ends in sliding slot path, the sliding slot path set there are two and are tightly attached to the two sides up and down of gas storage box, the electricity respectively Level sensor is electrically connected by conducting wire with electric cabinet, and the condenser pipe frame body is nested in the lower right corner in S bend pipe road, the square chest shell It is tightly attached to the right side of electric cabinet in the left side of body.
To optimize above-mentioned technical proposal, the measure further taken are as follows:
As a further improvement of the present invention, the sliding slot path is sliding by arc path, circular orbit, slide track bar, alkali plate Block composition, the circular orbit and slide track bar are integrally welded, and the alkali plate sliding block connects with circular orbit, slide track bar activity respectively It connects, the left and right sides that the circular orbit sets there are two and is nested in inside arc path respectively, the slide track bar is equipped with two It is a and be tightly attached to the two sides up and down inside arc path respectively.
As a further improvement of the present invention, the alkali plate sliding block is made of alkali bent plate, sliding block pedestal, the alkali bent plate Bottom surface is close together with the top surface with sliding block pedestal and in same level.
As a further improvement of the present invention, the condenser pipe frame body is by long arc pipe, annular shell, DC tube, grafting bottom Disk, confluence seat, corrugated hose composition, the annular shell are equipped with two and are nested in the left and right two of two long arc pipes respectively End, the long arc pipe are mutually communicated by annular shell with DC tube, and the right end of the DC tube is inserted embedded in the left side on grafting chassis Side, the inside on the grafting chassis is nested with the confluence outer surface of seat integral, and the confluence seat is nested in a left side for corrugated hose Side and axle center is conllinear.
As a further improvement of the present invention, the sliding block pedestal by vertical bar plate, moment of flexure springboard, bottom lining plate, cross recess, Solid bent plate block composition, the bottom lining plate set there are two and are respectively welded at the left and right sides of moment of flexure springboard, the vertical bar plate It intersects and is tightly attached on the bottom surface of cross recess inside groove respectively with bottom lining plate, the cross recess is integrated with solid bent plate block Structure.
As a further improvement of the present invention, the sliding block pedestal is the arc plate structure with cross recess, cross recess side Just it is engaged longitudinal slide rail and cross track ring activity, formation is spinning upside down covering sliding effect after moving left and right, reaching one A tubular sliding trace, the effect for making sliding block go neutralization reaction sufficiently to cover formic acid with alkaline matter are formed in channel.
As a further improvement of the present invention, the condenser pipe frame body is that the bend pipe for setting frame ring and the compound channel of straight tube are tied Structure, frame ring add the convenient interior potting of bend pipe to enter to carry out cooling degradation organic gas recycling at pipeline docking, and then straight tube just facilitates back When stream, recycles the interior organic gas that fills and store, reach the straight line recovering effect around processing.
Beneficial effect
In a kind of lacquer spraying waste gas formaldehyde of paint spray booth of the present invention and degradation condensation cleaning processing unit, after paint spray booth's use Lacquer spraying waste gas is pumped by horizontal square chest and gives S bend pipe road, and during which the formaldehyde gas of ingress of air becomes formic acid gas and pours in wide diameter Nozzle, at this moment formic acid gas contact PH test paper plate is in bluish violet slant acidity, detects opening rotation snap-gauge by potentiometric sensor Blocking lower section band acidic materials sliding slot path prevents formic acid gas from entering, and realizes that is detected the effect for judging Switching Two bit port Fruit makes formic acid gas enter band alkaline matter sliding slot path and carries out neutralization reaction, and in square chest shell, formic acid gas pours in arc Path is horizontally slipped by alkali plate sliding block in slide track bar, is then overturn further around upper circular orbit, is made alkali bent plate along sliding block pedestal Barrel-type track covers the formic acid neutralization reaction in alkaline particle and pipeline air into steam and organic gas, reaches circulating type The effect of covering is reacted, and vertical bar plate and moment of flexure springboard, the equal carrying magnetic of bottom lining plate overlay slide track bar and circular orbit, form electromagnetism The movement effects of sliding allow cross recess and solid bent plate block effectively to fasten slide track bar and circular orbit movement, at this moment have Machine gas arranges cooling extraction between long arc pipe and annular shell to condenser pipe frame body, the gas then extracted by arc path Gas storage box secondary recovery is poured into eventually by corrugated hose by the confluence seat that DC tube enters grafting chassis to utilize, and reaches circulation The direct current channel recovering effect made is condensed, and potentiometric sensor makes other non-corrosive by the real-time powered operation of electric cabinet Exhaust gas enters circular cone lamina tecti by S bend pipe road, purifies under the gradually processing of spray chamber and combustion chamber, and staff can be Observation window supervision work progress, the pipeline for allowing lacquer spraying waste gas to handle, which is guaranteed, differentiates the anticorrosion effect of processing with soda acid Fruit completes entire lacquer spraying waste gas treatment process.
There is accessible advantage after operation of the present invention:
It is matched with horizontal square chest with S bend pipe road, exhaust gas acid-base property is detected by PH test paper plate and imports sliding slot path, so Alkaline matter is carried out afterwards, neutralization reaction is realized to the sliding covering of formic acid gas, stabilize the activity of exhaust gas, then pass through condensation The cooling recycling organic gas of pipe support body, then imports S bend pipe road for pretreated exhaust gas and carries out later purification processing, reaches double The erection sliding of channel classification acid-base neutralization promotes effect, and the high efficiency for improving cooling precipitation organic gas facilitates secondary use, Also the connection effect for ensureing Canal Nursing improves preliminary analysis of the exhaust gas pretreatment to the protection of pipeline and to exhaust gas acid-base property, Facilitate later purification.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, the attached drawing in describing below to embodiment is made in detail It carefully introduces, allows other features, purposes and advantages of the invention will become more apparent with this:
Fig. 1 is the structural representation in a kind of lacquer spraying waste gas formaldehyde of paint spray booth of the present invention with degradation condensation cleaning processing unit Figure.
Fig. 2 is the horizontal detailed the schematic diagram of the section structure of square chest of the present invention.
Fig. 3 is the schematic cross-sectional view of the present invention horizontal square chest and sliding slot path working condition.
Fig. 4 is the schematic perspective view of alkali plate sliding block static condition of the present invention.
Fig. 5 is the schematic perspective view of present invention slider base turning state.
Fig. 6 is the volume rendering structural schematic diagram of condenser pipe frame body working condition of the present invention.
Description of symbols: horizontal square chest -1, electric cabinet -2, S bend pipe road -3, circular cone lamina tecti -4, observation window -5, spray Room -6, combustion chamber -7, rotation snap-gauge -11, potentiometric sensor -12, PH test paper plate -13, wide diameter tube mouth -14, square chest shell -15, Gas storage box -16, sliding slot path -17, condenser pipe frame body -18, arc path -171, circular orbit -172, slide track bar -173, alkali plate Sliding block -174, alkali bent plate -1741, sliding block pedestal -1742, vertical bar plate -17421, moment of flexure springboard -17422, bottom lining plate -17423, Cross recess -17424, solid bent plate block -17425, long arc pipe -181, annular shell -182, DC tube -183, grafting chassis - 184, converge seat -185, corrugated hose -186.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to Specific embodiment, the present invention is further explained.
Fig. 1-Fig. 6 is please referred to, the present invention provides in a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing Device, structure include: horizontal square chest 1, electric cabinet 2, S bend pipe road 3, circular cone lamina tecti 4, observation window 5, spray chamber 6, combustion chamber 7, the bottom surface of the spray chamber 6 is tightly attached on the top surface of combustion chamber 7, and the observation window 5 sets there are two and is tightly attached to vertically The top of the front side of spray chamber 6, the spray chamber 6 is mutually communicated by the nozzle of the inner cavity and S bend pipe road 3 of circular cone lamina tecti 4, The rear side of the electric cabinet 2 is installed on the front side of 3 bottom of S bend pipe road, and the nozzle in 3 lower right corner of S bend pipe road is inserted embedded in horizontal The left side of square chest 1, the horizontal square chest 1 are tightly attached to the right side of electric cabinet 2 and in the same vertical plane, the horizontal square chest 1 is parallel to each other with observation window 5, and the circular cone lamina tecti 4, spray chamber 6,7 axle center of combustion chamber are conllinear, and the horizontal square chest 1 is equipped with Rotate snap-gauge 11, potentiometric sensor 12, PH test paper plate 13, wide diameter tube mouth 14, square chest shell 15, gas storage box 16, sliding slot path 17, The axis wheel of condenser pipe frame body 18, the rotation snap-gauge 11 is flexibly connected with the shaft in 12 middle section of potentiometric sensor, the revotating card Plate 11 sets there are two and is installed in the two sides up and down in 12 middle section of potentiometric sensor, the electricity of 12 right end of potentiometric sensor respectively Pole piece is inserted embedded in the left side in 13 middle section of PH test paper plate, and the rotation snap-gauge 11, potentiometric sensor 12, PH test paper plate 13 are installed in The inside of wide diameter tube mouth 14, the wide diameter tube mouth 14 are nested in the right side of square chest shell 15, and the gas storage box 16 is installed on square chest The inside of shell 15 and the right end for being nested in condenser pipe frame body 18, the wide diameter tube mouth 14 pass through sliding slot path 17 and condenser pipe Frame body 18 is mutually communicated, and the condenser pipe frame body 18 is nested in the left and right ends in sliding slot path 17, institute with wide diameter tube mouth 14 respectively The two sides up and down that sliding slot path 17 sets there are two and is tightly attached to gas storage box 16 respectively are stated, the potentiometric sensor 12 passes through conducting wire It is electrically connected with electric cabinet 2, the condenser pipe frame body 18 is nested in the lower right corner in S bend pipe road 3, and the left side of the square chest shell 15 is tight It is affixed on the right side of electric cabinet 2, the condenser pipe frame body 18 is the bend pipe and the compound channel design of straight tube for setting frame ring, and frame ring adds curved Potting, which enters, in pipe is convenient carries out cooling degradation organic gas recycling at pipeline docking, when then straight tube just facilitates reflux, in circulation Organic gas storage is filled, the straight line recovering effect around processing is reached.
Referring to Fig. 3, the sliding slot path 17 is by arc path 171, circular orbit 172, slide track bar 173, alkali plate sliding block 174 composition, the circular orbit 172 and slide track bar 173 are integrally welded, the alkali plate sliding block 174 respectively with circular orbit 172, slide track bar 173 is flexibly connected, and the circular orbit 172 sets there are two and is nested in inside arc path 171 respectively The left and right sides, the slide track bar 173 set there are two and are tightly attached to the two sides up and down inside arc path 171 respectively, pass through arc Shape path 171 is the pipeline opening of left and right tangent bend, facilitates the delay of formic acid unreacting gas, prevents from being pumped into excessive formic acid gas swollen Swollen inland pipeline causes the slow interruption situation of waste gas purification, gradually protects pipeline the effect for being formed and separating buffering.
Referring to Fig. 4, the alkali plate sliding block 174 is made of alkali bent plate 1741, sliding block pedestal 1742, the alkali bent plate 1741 Bottom surface be close together with the top surface of sliding block pedestal 1742 and in same level, the sliding block pedestal 1742 is Arc plate structure with cross recess, cross recess facilitates occlusion longitudinal slide rail and cross track ring activity, after formation moves left and right Covering sliding effect is being spun upside down, one tubular sliding trace of formation in a channel is reached, is removing sliding block band alkaline matter Neutralization reaction sufficiently covers the effect of formic acid, and wrapping up formic acid gas by 1741 camber shape of alkali bent plate more prevents in reaction process The escape of gas forms package contact action.
Referring to Fig. 6, the condenser pipe frame body 18 is by long arc pipe 181, annular shell 182, DC tube 183, grafting chassis 184, converge seat 185, the composition of corrugated hose 186, and the annular shell 182 sets there are two and is nested in two long arc pipes respectively 181 left and right ends, the long arc pipe 181 pass through annular shell 182 and are mutually communicated with DC tube 183, the DC tube 183 Right end is inserted embedded in the left side on grafting chassis 184, and the inside on the grafting chassis 184 and the outer surface of confluence seat 185 are nested into one Body, the confluence seat 185 is nested in the left side of corrugated hose 186 and axle center is conllinear, is connected to confluence seat by DC tube 183 185 importing organic gas, which are inculcated, forms the path that a transverse direction directly transports recycling to corrugated hose 186, convenient to avoid condensing Circulation of the liquid in annular shell 182, condensed organic gas directly can pour in gas storage box 16 by DC tube 183 and return It receives, achievees the effect that the feedback recycling of single-pathway branch.
Referring to Fig. 5, the sliding block pedestal 1742 is by vertical bar plate 17421, moment of flexure springboard 17422, bottom lining plate 17423, ten Word groove 17424, solid bent plate block 17425 composition, the bottom lining plate 17423 set there are two and are respectively welded at moment of flexure springboard 17422 left and right sides, the vertical bar plate 17421 intersects respectively with bottom lining plate 17423 to be tightly attached in cross recess 17424 On the bottom surface of slot, the cross recess 17424 is structure as a whole with solid bent plate block 17425, passes through 17424 clinching of cross recess Vertical bar plate 17421 is bonded 173 lateral cross of slide track bar covering contact formic acid air containing alkaline matter and carries out neutralization reaction, then passes through Moment of flexure springboard 17422 is spun upside down with the cooperation of bottom lining plate 17,423 172 annular of circular orbit replaces sliding, has when pouring in gas One cylinder vivo environment sliding promotes the rate of neutralization reaction, improves the purified stability of formic acid.
Workflow: the lacquer spraying waste gas after paint spray booth's use is pumped by horizontal square chest 1 to S bend pipe road 3, and during which contact is empty The formaldehyde gas of gas becomes formic acid gas and pours in wide diameter tube mouth 14, and at this moment formic acid gas contact PH test paper plate 13 is in bluish violet meta-acid Property, detect that opening rotation snap-gauge 11 blocks lower section band acidic materials sliding slot path 17 and prevents formic acid gas by potentiometric sensor 12 Body enters, and realizes that is detected the effect for judging Switching Two bit port, formic acid gas is made to enter band alkaline matter sliding slot path 17 Neutralization reaction is carried out, in square chest shell 15, formic acid gas pours in arc path 171, by alkali plate sliding block 174 in slide track bar 173 horizontally slip, and then overturn further around upper circular orbit 172, make alkali bent plate 1741 along 1742 barrel-type track of sliding block pedestal The formic acid neutralization reaction in alkaline particle and pipeline air is covered into steam and organic gas, reaches circulating type reaction covering Effect, and vertical bar plate 17421 and moment of flexure springboard 17422, the equal carrying magnetic of bottom lining plate 17423 overlay slide track bar 173 and circular orbit 172, the movement effects of electromagnetism sliding are formed, cross recess 17424 and solid bent plate block 17425 is allow effectively to fasten slide track bar 173 with circular orbit 172 move, at this moment organic gas by 171 row of arc path to condenser pipe frame body 18 long arc pipe 181 with Cooling between annular shell 182 to extract, the gas then extracted enters the confluence seat 185 on grafting chassis 184 by DC tube 183 16 secondary recovery of gas storage box is poured into eventually by corrugated hose 186 to utilize, and is reached circulation and is condensed the direct current channel recovering effect made, And potentiometric sensor 12 allows other non-corrosive exhaust gas to enter circle by S bend pipe road 3 by the real-time powered operation of electric cabinet 2 Vertex of a cone cover board 4 purifies under gradually processing of the spray chamber 6 with combustion chamber 7, staff can observation window 5 supervise work into Degree, the pipeline for allowing lacquer spraying waste gas to handle, which is guaranteed, differentiates the anticorrosion ability of processing with soda acid, and it is useless to complete entire spray painting Gas disposal process.
The present invention is combined with each other by above-mentioned component, is reached and is matched with horizontal square chest 1 with S bend pipe road 3, passes through PH Test paper plate 13 detects exhaust gas acid-base property and imports sliding slot path 17, then carries out alkaline matter and covers realization to the sliding of formic acid gas Neutralization reaction stabilizes the activity of exhaust gas, then by the cooling recycling organic gas of condenser pipe frame body 18, after then pre-processing Exhaust gas import S bend pipe road 3 carry out later purification processing, reach binary channels classification acid-base neutralization erection sliding promote effect, It improves the cooling high efficiency that organic gas is precipitated and facilitates secondary use, also ensure the connection effect of Canal Nursing, it is pre- to improve exhaust gas The preliminary analysis to the protection of pipeline and to exhaust gas acid-base property is handled, later purification is facilitated, can be dissipated often with this to solve spray painting Send out smell irritating, this is that formaldehyde volatilizees in paint solution and is mingled in air, the aqueous solution slant acidity of formaldehyde, after japanning, Also more difficult to the processing of the gas, formaldehyde can slowly aoxidize formic acid in air, and slant acidity is corrosive, at exhaust gas The pipeline of reason equipment has erosion effect, causes the adherent corrosion of inner wall of the pipe, leads to the thinning cracking of tube wall, and micro leakage spray painting is useless Gas causes staff's gassing, and it is serious can occur carcinogenic hidden danger, extremely dangerous, spray column is inscribed pipeline anti- Shield and the exhaust-gas treatment of connecting pin are all more short of, only single to remove purification exhaust gas from whole tower body, can be taken into account less than other connections The problem of nursing of component.
Specific embodiment described herein is only to give an example to the present invention.The technical field of the invention Technical staff can make various modifications or additions to the described embodiments or be substituted in a similar manner, but Without departing from of the invention or beyond the scope of the appended claims.

Claims (7)

1. structure includes: horizontal square chest with degradation condensation cleaning processing unit in a kind of lacquer spraying waste gas formaldehyde of paint spray booth (1), electric cabinet (2), S bend pipe road (3), circular cone lamina tecti (4), observation window (5), spray chamber (6), combustion chamber (7), feature exists In:
The spray chamber (6) is installed on the top of combustion chamber (7), before the observation window (5) is tightly attached to spray chamber (6) vertically Side, the spray chamber (6) are mutually communicated by circular cone lamina tecti (4) with S bend pipe road (3), and the electric cabinet (2) is installed on S type The front side of pipeline (3) bottom, the S bend pipe road (3) are inserted embedded in the left side of horizontal square chest (1), and the horizontal square chest (1) is tightly attached to The right side of electric cabinet (2) and in the same vertical plane, the horizontal square chest (1) is parallel to each other with observation window (5), the circle Vertex of a cone cover board (4), spray chamber (6), combustion chamber (7) axle center are conllinear;
The horizontal square chest (1) be equipped with rotation snap-gauge (11), potentiometric sensor (12), PH test paper plate (13), wide diameter tube mouth (14), Square chest shell (15), gas storage box (16), sliding slot path (17), condenser pipe frame body (18);
The rotation snap-gauge (11) is flexibly connected with potentiometric sensor (12), and the potentiometric sensor (12), which is inserted, is embedded in PH test paper plate (13) left side, rotation snap-gauge (11), potentiometric sensor (12), PH test paper plate (13) are installed in wide diameter tube mouth (14) Inside, the wide diameter tube mouth (14) are nested in the right side of square chest shell (15), and the gas storage box (16) is installed on square chest shell (15) inside and the right side for being nested in condenser pipe frame body (18), the wide diameter tube mouth (14) by sliding slot path (17) with it is cold Solidifying pipe support body (18) are mutually communicated, and the sliding slot path (17) sets there are two and be tightly attached to respectively up and down the two of gas storage box (16) Side, the sliding slot path (17) insert embedded in wide diameter tube mouth (14) left side, the potentiometric sensor (12) by conducting wire with it is automatically controlled Case (2) electrical connection, the condenser pipe frame body (18) are nested in the lower right corner of S bend pipe road (3), and the square chest shell (15) is tightly attached to The right side of electric cabinet (2).
2. in a kind of lacquer spraying waste gas formaldehyde of paint spray booth according to claim 1 and degradation condensation cleaning processing unit, Be characterized in that: the sliding slot path (17) is by arc path (171), circular orbit (172), slide track bar (173), alkali plate sliding block (174) form, the circular orbit (172) and slide track bar (173) are integrally welded, the alkali plate sliding block (174) respectively with ring Shape track (172), slide track bar (173) are flexibly connected, the circular orbit (172), slide track bar (173), alkali plate sliding block (174) peace Inside loaded on arc path (171).
3. in a kind of lacquer spraying waste gas formaldehyde of paint spray booth according to claim 2 and degradation condensation cleaning processing unit, Be characterized in that: the alkali plate sliding block (174) is made of alkali bent plate (1741), sliding block pedestal (1742), the alkali bent plate (1741) It is close together with sliding block pedestal (1742) and in same level.
4. in a kind of lacquer spraying waste gas formaldehyde of paint spray booth according to claim 1 and degradation condensation cleaning processing unit, Be characterized in that: the condenser pipe frame body (18) is by long arc pipe (181), annular shell (182), DC tube (183), grafting chassis (184), converge seat (185), corrugated hose (186) composition, the long arc pipe (181) passes through annular shell (182) and DC tube (183) it is mutually communicated, the DC tube (183) is inserted embedded in the left side of grafting chassis (184), the grafting chassis (184) and remittance Flow seat (185) nesting integrally, the confluence seat (185) is conllinear with corrugated hose (186) axle center.
5. in a kind of lacquer spraying waste gas formaldehyde of paint spray booth according to claim 3 and degradation condensation cleaning processing unit, Be characterized in that: the sliding block pedestal (1742) is by vertical bar plate (17421), moment of flexure springboard (17422), bottom lining plate (17423), cross Groove (17424), solid bent plate block (17425) composition, the moment of flexure springboard (17422) and bottom lining plate (17423) are welded on one It rises, the vertical bar plate (17421) is installed in the inside of cross recess (17424), the cross recess with bottom lining plate (17423) (17424) it is structure as a whole with solid bent plate block (17425).
6. in a kind of lacquer spraying waste gas formaldehyde of paint spray booth according to claim 3 and 5 and degradation condensation cleaning processing unit, It is characterized by: the sliding block pedestal (1742) is the arc plate structure with cross recess.
7. according to claim 1 in a kind of lacquer spraying waste gas formaldehyde of paint spray booth described in 4 and degradation condensation cleaning processing unit, It is characterized by: the condenser pipe frame body (18) is the bend pipe and the compound channel design of straight tube for setting frame ring.
CN201910487503.9A 2019-06-05 2019-06-05 Paint spraying waste gas formaldehyde neutralization degradation condensation purification treatment device of paint spraying chamber Active CN110090549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910487503.9A CN110090549B (en) 2019-06-05 2019-06-05 Paint spraying waste gas formaldehyde neutralization degradation condensation purification treatment device of paint spraying chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910487503.9A CN110090549B (en) 2019-06-05 2019-06-05 Paint spraying waste gas formaldehyde neutralization degradation condensation purification treatment device of paint spraying chamber

Publications (2)

Publication Number Publication Date
CN110090549A true CN110090549A (en) 2019-08-06
CN110090549B CN110090549B (en) 2021-11-05

Family

ID=67450436

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910487503.9A Active CN110090549B (en) 2019-06-05 2019-06-05 Paint spraying waste gas formaldehyde neutralization degradation condensation purification treatment device of paint spraying chamber

Country Status (1)

Country Link
CN (1) CN110090549B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1258731A (en) * 1969-01-02 1971-12-30
CN201815227U (en) * 2010-06-18 2011-05-04 江海良 Waste gas recovering and treating device
CN207307599U (en) * 2017-10-20 2018-05-04 江西蓝天路之友环卫设备科技有限公司 A kind of refuse pyrolysis gasification furnace efficient impurity removal purifying column
CN108926956A (en) * 2018-06-20 2018-12-04 珠海市高栏联合新材料有限公司 A kind of cooling adsorbent equipment of benzoic acid production tail gas
CN208671044U (en) * 2018-08-07 2019-03-29 北京燕山玉龙石化工程有限公司 A kind of M-phthalic acid device waste gas collection device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1258731A (en) * 1969-01-02 1971-12-30
CN201815227U (en) * 2010-06-18 2011-05-04 江海良 Waste gas recovering and treating device
CN207307599U (en) * 2017-10-20 2018-05-04 江西蓝天路之友环卫设备科技有限公司 A kind of refuse pyrolysis gasification furnace efficient impurity removal purifying column
CN108926956A (en) * 2018-06-20 2018-12-04 珠海市高栏联合新材料有限公司 A kind of cooling adsorbent equipment of benzoic acid production tail gas
CN208671044U (en) * 2018-08-07 2019-03-29 北京燕山玉龙石化工程有限公司 A kind of M-phthalic acid device waste gas collection device

Also Published As

Publication number Publication date
CN110090549B (en) 2021-11-05

Similar Documents

Publication Publication Date Title
CN110090549A (en) In a kind of lacquer spraying waste gas formaldehyde of paint spray booth and degradation condensation cleaning processing unit
CN208018387U (en) A kind of desulfurizer with detection structure
CN209550095U (en) A kind of sealed copper line surface cleaning drying integral machine
CN207786134U (en) Novel pulse dust-extraction unit
CN210885879U (en) Contain high-efficient deacidification processing apparatus of acid ester class compound
CN214287535U (en) Pipeline air mist clash tail gas treatment tower
CN205145931U (en) High -efficient whirlwind formula exhaust gas purification device
CN202506485U (en) Fluid pipeline filter
CN209352980U (en) Acid dip pickle is used in a kind of automatically heavy nickel gold production
CN209093111U (en) Denitration dust collecting integral deduster
CN103055638A (en) High-effect cross flow washing pool
CN102304706A (en) Anticorrosion treatment device and treatment method for surface of long and narrow runner of aluminium alloy radiator
CN207165311U (en) A kind of Through ground wire surface liquid dries up reclaimer
CN205934027U (en) Online filter equipment of steel wire descaling bath
CN202036915U (en) Dust removal equipment
CN219073378U (en) Steel strand wires rust-resistant oil spraying equipment
CN211836464U (en) A traditional chinese medicine alcohol precipitation jar for traditional chinese medicine production
CN205972471U (en) Concentrated sulfuric acid storage tank
CN216473494U (en) High-efficient acid dip pickle of titanium alloy electroplating pretreatment
CN108383302A (en) A kind of energy saving water storage purifier of high ferro motor train unit train
CN202778210U (en) Automatic ammonia recovery device
CN218890247U (en) Skid-mounted sewage treatment device
CN208135110U (en) A kind of industrial sulfuric acid holding vessel with water removal function
CN209395375U (en) A kind of erosion protection system of large chemical equipment
CN207562413U (en) Screw slag removing solid-liquid separator

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20211014

Address after: Room 1503, building 8, Taihua Jinmao, Keji Second Road, Zhangba street, high tech Zone, Xi'an, Shaanxi 710075

Applicant after: Shaanxi Mishui Environmental Protection Group Co.,Ltd.

Address before: Room 217-5, 228 Qingnian Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Applicant before: Jiaxing Tianran Trading Co.,Ltd.

GR01 Patent grant
GR01 Patent grant