CN110089442A - A kind of dismountable concrete leakage dropping-board - Google Patents

A kind of dismountable concrete leakage dropping-board Download PDF

Info

Publication number
CN110089442A
CN110089442A CN201910475639.8A CN201910475639A CN110089442A CN 110089442 A CN110089442 A CN 110089442A CN 201910475639 A CN201910475639 A CN 201910475639A CN 110089442 A CN110089442 A CN 110089442A
Authority
CN
China
Prior art keywords
concrete
bearing capacity
hole
component
shaped bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910475639.8A
Other languages
Chinese (zh)
Inventor
王凤军
王金龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heilongjiang Muchuan Assembly Building Co Ltd
Original Assignee
Heilongjiang Muchuan Assembly Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Muchuan Assembly Building Co Ltd filed Critical Heilongjiang Muchuan Assembly Building Co Ltd
Priority to CN201910475639.8A priority Critical patent/CN110089442A/en
Publication of CN110089442A publication Critical patent/CN110089442A/en
Pending legal-status Critical Current

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K1/00Housing animals; Equipment therefor
    • A01K1/015Floor coverings, e.g. bedding-down sheets ; Stable floors
    • A01K1/0151Grids; Gratings; Slatted floors
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01KANIMAL HUSBANDRY; AVICULTURE; APICULTURE; PISCICULTURE; FISHING; REARING OR BREEDING ANIMALS, NOT OTHERWISE PROVIDED FOR; NEW BREEDS OF ANIMALS
    • A01K31/00Housing birds
    • A01K31/04Dropping-boards; Devices for removing excrement

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Zoology (AREA)
  • Animal Husbandry (AREA)
  • Biodiversity & Conservation Biology (AREA)
  • Birds (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of dismountable concrete leakage dropping-boards, it is characterised in that: is made of concrete bed component 1, concrete bar shaped bearing capacity component 2, end attaching nut 3, intermediate connection steel bolt 4, sealed gum cap 5, the funneling leakage excrement hole 6 of combination;Concrete bed component 1 is arranged in parallel in immediately below several 2 both ends of concrete bar shaped bearing capacity component;Concrete bed component 1 is made of combination groove 7, combination boss 8, end connecting screw 12, vertical connecting hole 13, the chain boss 14 in end, the chain groove 15 in end, bar frame 16;Concrete bar shaped bearing capacity component 2 is made of funneling leakage excrement hole 20, end connection T-shaped hole 21, end connection T-shaped hole casing 22, upper reinforcing bar 23, lower reinforcing bar 24, vertical reinforcing bar 25, horizontal reinforcement 26, intermediate lands 27, intermediate connection jack 28, intermediate connection jack casing 29, Upper rectangular facing concrete 200, lower part isosceles trapezoid bottom concrete 201;Easy to disassemble and disinfection.

Description

A kind of dismountable concrete leakage dropping-board
Technical field
The present invention relates to a kind of dismountable concrete leakage dropping-boards, belong to livestock and poultry farm high concentration wastewater treatment and liquid dung Resource technology field.
Background technique
Concrete leakage dropping-board (being commonly called as cement leakage dropping-board) is the indispensable concrete component equipment of China's animal husbandry, Its width 1000mm~1200mm, with a thickness of 100mm~120mm, length is mostly 3000mm.Produce coagulation large-sized in this way Native leakage dropping-board, quality it is difficult to ensure that, there are also entrucking, unload, transport and all there are problems, there are also site operation installations to need Large-scale lifting appliance cooperation, installation speed is slow, and at high cost, breakage rate is high;There are also concrete crevice boards after installation, Wu Fajin Row dismounting is not easy to carry out concrete crevice board replacement or the disinfection treatment to virus.African swine fever in 2018 is to China Pig-breeding industry strike it is huge, in addition to control in transit virus control other than, it is often more important that livestock-raising is given up Interior regular progress chemical ablation virus, but since traditional concrete leakage dropping-board is whole, it is not easy to it dismounts, it can not be to leakage excrement The virus of the lower part of plate carries out chemical mode killing.In order to overcome technological deficiency existing for traditional concrete entirety leakage dropping-board, It can not especially dismount again and can not the huge technological deficiency killed of the bottom virus to leakage dropping-board.The present invention provides one The dismountable concrete leakage dropping-board of kind, the environmental protection for meeting the processing of livestock and poultry cultivation liquid dung need and to viral killing needs, prevent The propagation of African swine fever, while guaranteeing this dismountable concrete leakage dropping-board and building same service life, aquaculture cost is reduced, is mentioned Height cultivation quality and economic benefit.
Summary of the invention
It is an object of the invention to: overcome the integrally formed concrete leakage dropping-board of tradition of above-mentioned livestock and poultry cultivation, design, Serious technical defect existing for the links such as production, transport, in-site installation, not can be removably mounted especially, can not be to leakage dropping-board lower part Virus carries out the fatal technological deficiency of chemical mode killing, provides a kind of dismountable concrete leakage dropping-board, easy to produce, fortune Defeated, reduction surface pores, installation, dismounting, elimination virus, make concrete leakage dropping-board and building same service life, reduce aquaculture cost, Cultivation quality is improved, is the renewal product of conventional concrete leakage dropping-board.
The technical scheme of the present invention is realized as follows: a kind of dismountable concrete leakage dropping-board, it is characterised in that: by mixing Solidifying soil substructure member 1, concrete bar shaped bearing capacity component 2, several end attaching nuts 3, intermediate connection steel bolt 4, several sealings Capsule 5, several funneling leakage excrement holes 6 of combination are constituted;
The concrete bed component 1 is arranged in parallel in several described 2 liangs of component of concrete bar shaped bearing capacity and rectifies Lower section, the concrete bar shaped bearing capacity component 2 are stuck in the combination groove 7 of the concrete bed component 1, and described Concrete bed component 1 upper surface and the concrete bar shaped bearing capacity component 2 upper surface in the same plane;
The concrete bed component 1 is by several combination grooves 7 being uniformly arranged, several combination boss being uniformly arranged 8, half combination groove 9, several end connecting screws 12, the two vertical connecting holes 13 in combination groove 7, end at both ends The chain boss 14 in portion, the chain groove 15 in end, bar frame 16 are constituted;The combination groove 7 by the groove of falling isosceles trapezoid 11, Top rectangular groove 18 is constituted;The combination boss 8 is made of top rectangular boss 17, isosceles trapezoid boss 10;Several institutes The end connecting screw 12 stated is located at the center of the combination groove 7, and pre-plugged is good, and height is convex lower than combining The upper surface of platform 8;The bar frame 16 is made of two horizontal reinforcements 160, several reinforcing steel bar frames 161;It is mixed positioned at described The half combination groove 9 at 1 both ends of solidifying soil substructure member, is made of half of combination groove 7, complete by composition one at docking Combine groove 7;The chain boss 14 in the end carried out with the chain groove 15 in the end it is chain so that two neighboring described Concrete bed component 1 have overall stability and position accuracy;
The concrete bar shaped bearing capacity component 2 is by two centrally located 20, two difference in funneling leakage excrement hole Half funneling leakage excrement hole, 61, two ends, 21, two ends of connection T-shaped hole positioned at two sides connect T-shaped hole casing 22, two Vertical 25, two horizontal reinforcements 26 of reinforcing bar of the lower reinforcing bar 24, two of upper reinforcing bar 23, two, intermediate lands 27, two intermediate connections are inserted 28, two, hole is intermediate to connect jack casing 29, superposed rectangle facing concrete 200, the isosceles trapezoid bottom positioned at lower part Layer concrete 201 is constituted;The intermediate lands 27 are located at the two sides of the concrete bar shaped bearing capacity component 2, and are located at Middle;The intermediate connection jack 28 is located at the center of 27 side of intermediate lands, and perpendicular to the side of intermediate lands 27 Face, the outside of the intermediate connection jack 28 are intermediate connection jack casing 29;Funneling leakage excrement hole 20 described in two, Two end connection T-shaped holes 21 are located on same center line.
The end attaching nut 3 is located at two ends connection T-shaped hole of the concrete bar shaped bearing capacity component 2 In 21, and it is connected with end connecting screw 12 by screw thread;
The intermediate connection steel bolt 4 is on 2 intermediate lands 27 of concrete bar shaped bearing capacity component described in two In centre connection jack 28, the two neighboring concrete bar shaped bearing capacity component 2 is connected as an entirety, it is whole to increase its Body rigidity.
The sealed gum cap 5 is located at two ends connection T-shaped hole 21 of the concrete bar shaped bearing capacity component 2 It is interior, and in the surface of the end attaching nut 3;5 upper surface of sealed gum cap and the concrete bar shaped The upper surface of bearing capacity component 2 carries out tight closure in the same plane, to end connection T-shaped hole 21.
The funneling leakage excrement hole 6 of the combination is by half leakage positioned at 2 two sides of concrete bar shaped bearing capacity component Bucket type leaks excrement hole 61, constitutes when the two neighboring concrete bar shaped bearing capacity component 2 combines.
It is the bar frame 16, the upper reinforcing bar 23, the lower reinforcing bar 24, the vertical reinforcing bar 25, described Horizontal reinforcement 26, the intermediate connection steel bolt 4, the end connection T-shaped hole casing 22, the intermediate connection jack sleeve Pipe 29 is both needed to remove floating rust in advance, requires to carry out hot galvanizing processing according still further to hot dip galvanizing process.
The vertical connecting hole 13 of described two, the chain boss 14 in the end, the end equal position of chain groove 15 In on same center line;The vertical connecting hole 13 be through-hole structure, convenient for concrete prefabricated dropping pit phase below Connection.
Detailed description of the invention:
Fig. 1 is a kind of stereoscopic schematic diagram of dismountable concrete leakage dropping-board of the present invention;
Fig. 2 is a kind of schematic top plan view of dismountable concrete leakage dropping-board of the present invention;
Fig. 3 is a kind of elevational schematic view of dismountable concrete leakage dropping-board of the present invention;
Fig. 4 is a kind of three-dimensional signal of concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Figure;
Fig. 5 is a kind of vertical view signal of concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Figure;
Fig. 6 looks up signal for a kind of concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Figure;
Fig. 7 is a kind of E-E diagrammatic cross-section of the concrete bed component 1 of dismountable concrete leakage dropping-board of the present invention;
Solid when Fig. 8 is a kind of two concrete bed components 1 docking of dismountable concrete leakage dropping-board of the present invention Schematic diagram;
Fig. 9 is a kind of reinforcing bar configuration of concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Stereoscopic schematic diagram;
Figure 10 is a kind of the vertical of bar frame 16 of the concrete bed component 1 of dismountable concrete leakage dropping-board of the present invention Body schematic diagram;
Figure 11 is a kind of A-A section of the concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Schematic diagram;
Figure 12 is a kind of B-B section of the concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Schematic diagram;
Figure 13 is a kind of C-C section of the concrete bar shaped bearing capacity component 2 of dismountable concrete leakage dropping-board of the present invention Schematic diagram;
Figure 14 is a kind of end connecting screw 12 of dismountable concrete leakage dropping-board of the present invention and end attaching nut 3 Combine schematic top plan view;
Figure 15 is a kind of schematic top plan view of the sealed gum cap 5 of dismountable concrete leakage dropping-board of the present invention;
Figure 16 is a kind of F-F diagrammatic cross-section of the sealed gum cap 5 of dismountable concrete leakage dropping-board of the present invention;
Figure 17 is a kind of D-D diagrammatic cross-section of dismountable concrete leakage dropping-board of the present invention.
In figure: 1 is concrete bed component
10 be isosceles trapezoid boss
11 be the groove of falling isosceles trapezoid
12 be end connecting screw
13 be vertical connecting hole
14 be the chain boss in end
15 be the chain groove in end
16 be bar frame
160 be horizontal reinforcement
161 be reinforcing steel bar frame
17 be top rectangular boss
18 be top rectangular groove
2 be concrete bar shaped bearing capacity component
20 be funneling leakage excrement hole
21 connect T-shaped hole for end
22 connect T-shaped hole casing for end
23 be upper reinforcing bar
24 be lower reinforcing bar
25 be vertical reinforcing bar
26 be horizontal reinforcement
27 be intermediate lands
28 be intermediate connection jack
29 be intermediate connection jack casing
200 be rectangle facing concrete
201 be isosceles trapezoid bottom concrete
3 be end attaching nut
4 be intermediate connection steel bolt
5 be sealed gum cap
6 be the funneling leakage excrement hole of combination
61 be half funneling leakage excrement hole
7 be combination groove
8 be combination boss
9 be half combination groove
Specific embodiment
The invention is realized in this way 1~Figure 17 is described further with reference to the accompanying drawing: a kind of dismountable concrete Leakage dropping-board, it is characterised in that: by concrete bed component 1, concrete bar shaped bearing capacity component 2, several end attaching nuts 3, Centre connection steel bolt 4, several sealed gum caps 5, several funneling leakage excrement holes 6 of combination are constituted;
The concrete bed component 1 is arranged in parallel in several described 2 liangs of component of concrete bar shaped bearing capacity and rectifies Lower section, the concrete bar shaped bearing capacity component 2 are stuck in the combination groove 7 of the concrete bed component 1, and described Concrete bed component 1 upper surface and the concrete bar shaped bearing capacity component 2 upper surface in the same plane;
The concrete bed component 1 is by several combination grooves 7 being uniformly arranged, several combination boss being uniformly arranged 8, half combination groove 9, several end connecting screws 12, the two vertical connecting holes 13 in combination groove 7, end at both ends The chain boss 14 in portion, the chain groove 15 in end, bar frame 16 are constituted;The combination groove 7 by the groove of falling isosceles trapezoid 11, Top rectangular groove 18 is constituted;The combination boss 8 is made of top rectangular boss 17, isosceles trapezoid boss 10;Several institutes The end connecting screw 12 stated is located at the center of the combination groove 7, and pre-plugged is good, and height is convex lower than combining The upper surface of platform 8;The bar frame 16 is made of two horizontal reinforcements 160, several reinforcing steel bar frames 161;It is mixed positioned at described The half combination groove 9 at 1 both ends of solidifying soil substructure member, is made of half of combination groove 7, complete by composition one at docking Combine groove 7;The chain boss 14 in the end carried out with the chain groove 15 in the end it is chain so that two neighboring described Concrete bed component 1 have overall stability and position accuracy;
The concrete bar shaped bearing capacity component 2 is by two centrally located 20, two difference in funneling leakage excrement hole Half funneling leakage excrement hole, 61, two ends, 21, two ends of connection T-shaped hole positioned at two sides connect T-shaped hole casing 22, two Vertical 25, two horizontal reinforcements 26 of reinforcing bar of the lower reinforcing bar 24, two of upper reinforcing bar 23, two, intermediate lands 27, two intermediate connections are inserted 28, two, hole is intermediate to connect jack casing 29, superposed rectangle facing concrete 200, the isosceles trapezoid bottom positioned at lower part Layer concrete 201 is constituted;The intermediate lands 27 are located at the two sides of the concrete bar shaped bearing capacity component 2, and are located at Middle;The intermediate connection jack 28 is located at the center of 27 side of intermediate lands, and perpendicular to the side of intermediate lands 27 Face, the outside of the intermediate connection jack 28 are intermediate connection jack casing 29;Funneling leakage excrement hole 20 described in two, Two end connection T-shaped holes 21 are located on same center line.
The end attaching nut 3 is located at two ends connection T-shaped hole of the concrete bar shaped bearing capacity component 2 In 21, and it is connected with end connecting screw 12 by screw thread;
The intermediate connection steel bolt 4 is on 2 intermediate lands 27 of concrete bar shaped bearing capacity component described in two In centre connection jack 28, the two neighboring concrete bar shaped bearing capacity component 2 is connected as an entirety, has increased it just Property.
The sealed gum cap 5 is located at two ends connection T-shaped hole 21 of the concrete bar shaped bearing capacity component 2 It is interior, and in the surface of the end attaching nut 3;5 upper surface of sealed gum cap and the concrete bar shaped The upper surface of bearing capacity component 2 carries out tight closure in the same plane, to end connection T-shaped hole 21.
The funneling leakage excrement hole 6 of the combination is by half leakage positioned at 2 two sides of concrete bar shaped bearing capacity component Bucket type leaks excrement hole 61, constitutes when the two neighboring concrete bar shaped bearing capacity component 2 combines.
It is the bar frame 16, the upper reinforcing bar 23, the lower reinforcing bar 24, the vertical reinforcing bar 25, described Horizontal reinforcement 26, the intermediate connection steel bolt 4, the end connection T-shaped hole casing 22, the intermediate connection jack sleeve Pipe 29 is both needed to remove floating rust in advance, requires to carry out hot galvanizing processing according still further to hot dip galvanizing process.
The vertical connecting hole 13 of described two, the chain boss 14 in the end, the end equal position of chain groove 15 In on same center line;The vertical connecting hole 13 be through-hole structure, convenient for concrete prefabricated dropping pit phase below Connection.
Assembled in situ construction of the invention is implemented:
1) installation site of leakage dropping-board is cleared up, unwrapping wire, water detection it is flat;
2) concrete bed component 1, the chain boss 14 in end and chain 15 mutual linking of groove in end are placed, and keeps high Degree is consistent;
3) connector is inserted into vertical connecting hole 13, by (or the field fabrication of concrete bed component 1 and prefabricated dropping pit Dropping pit) it is connected with each other;
4) concrete bar shaped bearing capacity component 2 is piled up, keeps each concrete bar shaped bearing capacity component 2 in the same level In face;
5) end attaching nut 3 is smeared using anti-corrosion grease and connect bolt 12 with end, then end attaching nut 3 is screwed in On end connecting screw 12, the height of bolt 12 and nut 3 will be lower than concrete bar shaped bearing capacity component 2;
6) using the sundries and dust in high pressure gas cleaning end connection T-shaped hole 21;
7) finally sealed gum cap 3 is pressed into end connection T-shaped hole 21, sealed gum cap outer should be coated with sealant, to this Hole is sealed, and the sealed gum cap 3 after indentation should be with concrete bar shaped bearing capacity component 2 in the same plane.
The beneficial effect comprise that:
1) a kind of dismountable concrete leakage dropping-board, by traditional whole production concrete leakage dropping-board production breakdown at concrete The novel production process of substructure member 1, concrete bar shaped bearing capacity 2 two independent components of component, ensure that production, transport, The flexibility of construction site Assembly And Disassembly reduces production cost, improves product quality, improves construction assembly efficiency.
2) a kind of dismountable concrete leakage dropping-board changes traditional entirety convenient for the dismounting and replacement to leakage dropping-board Concrete leakage dropping-board can not inactivate the virus of leakage dropping-board lower part using chemical method;Effectively change livestock-raising house This dead angle of the leakage dropping-board of inner virus chemical ablation can prevent the virus such as African swine fever completely and occur or spread.
3) in a kind of production process of dismountable concrete leakage dropping-board, mix, mold molding, product stripping, under The production processes such as line transport, steam curing, product stacking, product packaging are relatively easy, easy to accomplish, and cost reduces, raw Efficiency is produced to improve, transport is easy, and it is easy for construction, it is low in cost.
4) integrally formed using dry concrete in the production process of the integrally formed concrete leakage dropping-board of tradition, together The concrete mix of sample intensity vibrates integrally formed leakage dropping-board using dry concrete, it may appear that four problems:
First is that intensity, which is lower than, pours seperated molding concrete leakage dropping-board of vibrating;
Second is that bottom surface and side that integrally formed leakage dropping-board is contacted with mold will appear a large amount of diameter not etc., it is deep Shallow different stomata;
Third is that will appear ixoderm in demoulding, need manually to carry out secondary repairing treatment, product appearance quality is bad;
Fourth is that, since mold is a globality, die quality is too heavy when the integrally formed crevice board of dry concrete, then In addition the quality of the concrete mix in mold, the vibration of shaking platform must use heavy-duty motor, and high-frequency is vibrated, by This generates huge noise, pollutes to ambient enviroment and the waste of electric power;
And a kind of dismountable concrete leakage dropping-board of the present invention, vibration moulding new process is poured using fission molding, product With removable property;Pouring property concrete vibrating fission moulding process, compared with vibrating integral forming technique with dry concrete, It has the advantage that
First is that the concrete mix of same intensity, is higher than using the concrete leakage dropping-board intensity of pouring property concrete formation Molding 20% or more the concrete leakage dropping-board intensity of dry concrete;
Second is that hardly there is stomata in bottom surface and side that dismountable leakage dropping-board component is contacted with mold;
Third is that being not in ixoderm phenomenon in demoulding;
Fourth is that die quality is small using seperated small mould, the concrete mix in mold is also few, using pouring coagulation Earth forming, molding noise substantially reduce, and meet the requirement of environmental protection, while reducing the requirement to electric power.
5) technical indicators such as mechanical property, structural behavior of a kind of dismountable concrete leakage dropping-board of the invention are above Traditional dry concrete body vibration forms leakage dropping-board product.The present invention is traditional body vibration formation of concrete leakage dropping-board Update substitution production technology and product, there is pole vast market prospect.

Claims (3)

1. a kind of dismountable concrete leakage dropping-board, it is characterised in that: carried by concrete bed component (1), concrete bar shaped Power component (2), several end attaching nuts (3), intermediate connection steel bolt (4), several sealed gum caps (5), several combinations are funneling Excrement hole (6) are leaked to constitute;
The concrete bed component (1) is arranged in parallel in several concrete bar shaped bearing capacity components (2) two and rectifies Lower section, the concrete bar shaped bearing capacity component (2) are stuck in the combination groove (7) of the concrete bed component (1), And the upper surface of the upper surface of the concrete bed component (1) and the concrete bar shaped bearing capacity component (2) is same In one plane;
The concrete bed component (1) is by several combination grooves (7) being uniformly arranged, several combination boss being uniformly arranged (8), the half of both ends combines groove (9), vertically connects positioned at the several end connecting screws (12) combined in groove (7), two Connect hole (13), the chain boss in end (14), the chain groove in end (15), bar frame (16) composition;The combination groove (7) It is made of the groove of falling isosceles trapezoid (11), top rectangular groove (18);The combination boss (8) is by top rectangular boss (17), isosceles trapezoid boss (10) is constituted;Several end connecting screws (12) are being located at the combination groove (7) just Center, and pre-plugged is good, height will be lower than the upper surface of combination boss (8);Described bar frame (16) the You Lianggen water Flat reinforcing bar (160), several reinforcing steel bar frames (161) are constituted;Half positioned at described concrete bed component (1) both ends combines groove (9), it is made of half of combination groove (7), complete combination groove (7) will be constituted at docking;The end connects It locks boss (14) and the chain groove in the end (15) progress is chain, so that the two neighboring concrete bed component (1) with the accuracy of overall stability and position;
The concrete bar shaped bearing capacity component (2) is by two centrally located funneling leakage excrement holes (20), two difference Half funneling leakage excrement hole (61), two end connections T-shaped hole (21), two ends positioned at two sides connect T-shaped hole casing (22), two upper reinforcing bar (23), two lower reinforcing bars (24), two vertical reinforcing bars (25), two horizontal reinforcements (26), intermediate lands (27), two intermediate connections jack (28), two intermediate connection jack casing (29), superposed rectangle facing concrete (200), the isosceles trapezoid bottom concrete (201) positioned at lower part is constituted;The intermediate lands (27) are located at the coagulation The two sides of native bar shaped bearing capacity component (2), and it is located at middle;Intermediate connection jack (28) is located at intermediate lands (27) The center of side, and perpendicular to the side of intermediate lands (27), the outside of intermediate connection jack (28) connects for centre Patch hole sleeve (29);Funneling leakage excrement hole (20) described in two, two end connections T-shaped hole (21) are located at same center On line;
The end attaching nut (3) is located at two ends connection T-shaped hole of the concrete bar shaped bearing capacity component (2) (21) in, and it is connected with end connecting screw (12) by screw thread;
Intermediate connection steel bolt (4) is on concrete bar shaped bearing capacity component (2) intermediate lands (27) described in two Intermediate connection jack (28) in, the two neighboring concrete bar shaped bearing capacity component (2) is connected as an entirety, is increased Add its rigidity;
The sealed gum cap (5) is located at two ends connection T-shaped hole (21) of the concrete bar shaped bearing capacity component (2) It is interior, and in the surface of the end attaching nut (3);Sealed gum cap (5) upper surface and the concrete The upper surface of bar shaped bearing capacity component (2) carries out tight closure in the same plane, to end connection T-shaped hole (21);
Funneling leakage excrement hole (6) of the combination is by half leakage positioned at described concrete bar shaped bearing capacity component (2) two sides Bucket type leaks excrement hole (61), constitutes when the two neighboring concrete bar shaped bearing capacity component (2) combines.
2. a kind of dismountable concrete leakage dropping-board according to claim 1, it is characterised in that: the bar frame (16), the upper reinforcing bar (23), the lower reinforcing bar (24), the vertical reinforcing bar (25), the horizontal reinforcement (26), institute Intermediate connection steel bolt (4), end connection T-shaped hole casing (22), intermediate connection jack casing (29) stated are equal Floating rust need to be removed in advance, require to carry out hot galvanizing processing according still further to hot dip galvanizing process.
3. a kind of dismountable concrete leakage dropping-board according to claim 1, it is characterised in that: described two vertically connect Connect hole (13), the chain boss in the end (14), the chain groove in the end (15) are respectively positioned on same center line;Institute The vertical connecting hole (13) stated is through-hole structure, convenient for being connected with concrete prefabricated dropping pit below.
CN201910475639.8A 2019-06-04 2019-06-04 A kind of dismountable concrete leakage dropping-board Pending CN110089442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910475639.8A CN110089442A (en) 2019-06-04 2019-06-04 A kind of dismountable concrete leakage dropping-board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910475639.8A CN110089442A (en) 2019-06-04 2019-06-04 A kind of dismountable concrete leakage dropping-board

Publications (1)

Publication Number Publication Date
CN110089442A true CN110089442A (en) 2019-08-06

Family

ID=67450101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910475639.8A Pending CN110089442A (en) 2019-06-04 2019-06-04 A kind of dismountable concrete leakage dropping-board

Country Status (1)

Country Link
CN (1) CN110089442A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677094A (en) * 2020-07-06 2020-09-18 黑龙江省牧川装配式建筑有限公司 Prefabricated pig house excrement ditch of assembled prestressed concrete
CN113057105A (en) * 2021-03-25 2021-07-02 山东大学 Prefabricated manure trough and construction method thereof
CN115336536A (en) * 2022-09-20 2022-11-15 河北省畜牧总站(河北省畜牧业监测预警服务中心) Flocks of sheep breed and excrement and urine fermentation system
IT202100020045A1 (en) * 2021-07-27 2023-01-27 Alleviamo S R L PERFECTED MODULAR FLOOR FOR LIVESTOCK FARMS

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020029536A1 (en) * 2000-09-11 2002-03-14 Ramon Sala Prat Flooring
CN104126514A (en) * 2013-01-23 2014-11-05 郑州翎羽新材料有限公司 Excrement leaking plate
CN205946847U (en) * 2016-06-23 2017-02-15 江苏三源生物科技有限公司 Feces leaking plate
CN108684574A (en) * 2018-04-24 2018-10-23 郑州大智农牧科技有限公司 A kind of livestock and poultry cultivation liquid dung processing high intensity interlock type concrete leakage dropping-board
CN208258701U (en) * 2018-06-04 2018-12-21 张登超 Leakage dropping-board
CN109699502A (en) * 2019-02-26 2019-05-03 郑州大智农牧科技有限公司 A kind of assembly concrete leakage dropping-board
CN210298955U (en) * 2019-06-04 2020-04-14 黑龙江省牧川装配式建筑有限公司 Detachable concrete excrement leaking plate

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20020029536A1 (en) * 2000-09-11 2002-03-14 Ramon Sala Prat Flooring
CN104126514A (en) * 2013-01-23 2014-11-05 郑州翎羽新材料有限公司 Excrement leaking plate
CN205946847U (en) * 2016-06-23 2017-02-15 江苏三源生物科技有限公司 Feces leaking plate
CN108684574A (en) * 2018-04-24 2018-10-23 郑州大智农牧科技有限公司 A kind of livestock and poultry cultivation liquid dung processing high intensity interlock type concrete leakage dropping-board
CN208258701U (en) * 2018-06-04 2018-12-21 张登超 Leakage dropping-board
CN109699502A (en) * 2019-02-26 2019-05-03 郑州大智农牧科技有限公司 A kind of assembly concrete leakage dropping-board
CN210298955U (en) * 2019-06-04 2020-04-14 黑龙江省牧川装配式建筑有限公司 Detachable concrete excrement leaking plate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111677094A (en) * 2020-07-06 2020-09-18 黑龙江省牧川装配式建筑有限公司 Prefabricated pig house excrement ditch of assembled prestressed concrete
CN113057105A (en) * 2021-03-25 2021-07-02 山东大学 Prefabricated manure trough and construction method thereof
IT202100020045A1 (en) * 2021-07-27 2023-01-27 Alleviamo S R L PERFECTED MODULAR FLOOR FOR LIVESTOCK FARMS
CN115336536A (en) * 2022-09-20 2022-11-15 河北省畜牧总站(河北省畜牧业监测预警服务中心) Flocks of sheep breed and excrement and urine fermentation system
CN115336536B (en) * 2022-09-20 2024-01-16 河北省畜牧总站(河北省畜牧业监测预警服务中心) Sheep flock breeding and fecal fermentation system

Similar Documents

Publication Publication Date Title
CN110089442A (en) A kind of dismountable concrete leakage dropping-board
CN209482709U (en) A kind of in-situ concrete wall subsiding crack typified form
CN208887880U (en) A kind of cement board vibratory equipment
CN204199687U (en) A kind of bath is fallen plate-girder side shaping tool formula between defending and is hung die device
CN209368658U (en) A kind of precast beam with locating piece
CN210791388U (en) Cement product forming machine
CN205712565U (en) A kind of prefabricated two-sided wall
CN208293744U (en) Precast concrete tubulose integral sewage treatment pool
CN109699502A (en) A kind of assembly concrete leakage dropping-board
CN210298955U (en) Detachable concrete excrement leaking plate
CN209711064U (en) A kind of assembly concrete leakage dropping-board
CN208163934U (en) A kind of septic tank mould
CN110130271A (en) A kind of construction method of side wall concrete single-sided formwork reinforcement
CN201614601U (en) Well lid structure
CN205502058U (en) Pin -connected panel tower crane foundation
CN211298026U (en) Concatenation formula cell type leaks dropping board
CN109955383A (en) A kind of concrete mixer water supply device
CN208563755U (en) A kind of precast hollow constructional column for wall connecting
CN209429284U (en) A kind of overlength reinforced concrete water pond expansion joint processing mechanism
CN106476139A (en) Improved concrete mixer
CN207620050U (en) A kind of buried water tank of board-type
CN111470804A (en) Non-metal composite material cover for tunnel and its making method
CN206646646U (en) Interior ring type steel tube regeneration monolith assembling structure
CN104264668A (en) Pile mold of X-shaped model pile and production method thereof
CN205348421U (en) A bury formula waterproof construction for side wall movement joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination