CN110085080A - A kind of transformer equipment maintenance emulation training method - Google Patents

A kind of transformer equipment maintenance emulation training method Download PDF

Info

Publication number
CN110085080A
CN110085080A CN201910337227.8A CN201910337227A CN110085080A CN 110085080 A CN110085080 A CN 110085080A CN 201910337227 A CN201910337227 A CN 201910337227A CN 110085080 A CN110085080 A CN 110085080A
Authority
CN
China
Prior art keywords
transformer equipment
training
dimensional artificial
transformer
data
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910337227.8A
Other languages
Chinese (zh)
Inventor
李晓洋
杨杰
李鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hainan Power Grid Co Ltd Hainan Power Transmission and Distribution Maintenance Branch
Original Assignee
Hainan Power Grid Co Ltd Hainan Power Transmission and Distribution Maintenance Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hainan Power Grid Co Ltd Hainan Power Transmission and Distribution Maintenance Branch filed Critical Hainan Power Grid Co Ltd Hainan Power Transmission and Distribution Maintenance Branch
Priority to CN201910337227.8A priority Critical patent/CN110085080A/en
Publication of CN110085080A publication Critical patent/CN110085080A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/20Education
    • G06Q50/205Education administration or guidance
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B5/00Electrically-operated educational appliances
    • G09B5/06Electrically-operated educational appliances with both visual and audible presentation of the material to be studied
    • G09B5/065Combinations of audio and video presentations, e.g. videotapes, videodiscs, television systems
    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Multimedia (AREA)
  • Health & Medical Sciences (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of transformer equipments to overhaul emulation training method, including following operating procedure: carrying out data acquisition for transformer equipment acquisition, and establishes three-dimensional artificial trining mock up in the way of based on BIM;Transformer equipment maintenance video integration is carried out in three-dimensional artificial trining mock up, Information Teaching course integrates, AI assessment models are integrated;Multimedia training displaying, interactive teaching and learning and AI evaluation operation are executed according to three-dimensional artificial trining mock up.Above-mentioned transformer equipment maintenance emulation training method, the details multimedia messages of energy actual display transformer equipment maintenance, enhancing service personnel operate level to grasp, the promotion of technical ability, improve electric power netting safe running.

Description

A kind of transformer equipment maintenance emulation training method
Technical field
The present invention relates to electric power overhaul teaching, training technical fields more particularly to a kind of transformer equipment to overhaul emulation training side Method.
Background technique
BIM, i.e. Building Information Model are to pass through number based on every relevant information data of construction-engineering project Real information possessed by word information emulator simulant building thing, by three-dimensional building model, realize project supervision, estate management, The functions such as equipment management, Digital manufacturing, engineering management.It has information completeness, information relevance, consistency on messaging, Visualization, harmony, simulation, optimization property and it can go out the big feature of figure eight.By construction unit, designing unit, unit in charge of construction, prison The projects participants such as unit are managed in identical platform, share same building information model.It is built conducive to project visualization, fining It makes.
But in electric power overhaul field, there is also more various technological deficiencies for current electric power overhaul training method:
Currently, grid company builds transformer equipment successively unifies inspection code, and require to promote the details grasp to device Ability, but the skills training of grid company transformer equipment service personnel at different levels can not carry out effectively currently without unified management Integration, some general workflows study have been carried out in unified skills training, but aggregate level relatively lags behind, and has been in step Section.There is an urgent need to the content displayings of transformer equipment maintenance multimedia messages by personnel.Meanwhile conventional skills training under normal circumstances without The simulated operation that method is realized, is difficult to realize more people and trains online
Instruction.It is periodically giveed training to training base, the investment of expense is big, and is limited to personnel time's arrangement, is also not easy In all-round popularization.
Summary of the invention
The purpose of the present invention is to provide a kind of transformer equipments to overhaul emulation training method, asks to solve above-mentioned technology Topic.
In order to achieve the above object, the technical scheme of the present invention is realized as follows:
A kind of transformer equipment provided by the invention overhauls emulation training method, including following operating procedure;
Step S100;It is acquired for transformer equipment and carries out data acquisition, and established three-dimensional artificial in the way of based on BIM and train Instruct model;
Step S200;Transformer equipment is carried out in the three-dimensional artificial trining mock up overhauls video integration, Information Teaching class Cheng Jicheng, AI assessment models are integrated;
Step S300;Multimedia training displaying, interactive teaching and learning and AI is executed according to the three-dimensional artificial trining mock up to comment Estimate operation.
Preferably, as an embodiment;In the step s 100, specifically comprise the following steps:
Step S110: one transformer equipment of selection carries out fining teaching cases construction;
Step S120: in the fining teaching cases process of construction for carrying out any one transformer equipment, to construction power transformation Capital construction part, transformer equipment are acquired to obtain basic acquisition data in standing, and the basic acquisition data are converted to power transformation BIM data carry out the modeling of the three-dimensional artificial trining mock up of transformer equipment using power transformation BIM data;Wherein, data are acquired substantially Object include structure inside the model and equipment of transformer equipment, show each main component inside transformer equipment;Substantially it adopts Collecting data mode includes text, video and audio;The power transformation BIM data are to turn basic acquisition data based on what BIM principle obtained Change data.
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into It includes following operating procedure that row transformer equipment, which overhauls video integration:
Step S210;It is taught for fining process flow corresponding to the transformer equipment in the three-dimensional artificial trining mock up The maintenance video acquisition that case carries out corresponding transformer equipment is learned, and carries out transformer equipment maintenance video to be integrated into three-dimensional artificial In trining mock up;
Step S220;When being integrated in the three-dimensional artificial trining mock up to transformer equipment maintenance video and combine more Media article carries out integrating, to be transferred and shown when Following course;Above-mentioned transformer equipment multimedia resource includes: The guiding book that threedimensional model, two-dimentional drawing, picture, text and related training resource make;
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into Integrated row information curricula includes following operating procedure:
Step S230;The video and audio of acquisition is handled, and making apparatus information bank, material database, knowledge base, teaching class Above-mentioned data are finally carried out integrated store to database by journey logic repository;
Step S240;Needs are transferred according to teaching, teaching is sent to database and transfers instruction;According to instruction is transferred, from number The displaying information that transformer equipment is transferred according to the facility information library in library, material database, knowledge base, curricula logic repository, from And integral device information displaying is carried out, equipment threedimensional model is shown and the details of decomposition model are shown.
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into Integrated row AI assessment models include following operating procedure:
Step S250;It establishes the educational assessment causality based on AI technology: formulating skills training and indices are evaluated Causality, using the self-learning capability in AI technology be each customized courseware of level student;
Step S260;The causality library of technical ability task instruction is established simultaneously;It, will in specific overhaul of the equipments training process The causality library of technical ability task instruction in transformer equipment maintenance training is engaged with 7S lean management, for overhaul of the equipments Process addition 7S lean in training manages content.
Preferably, as an embodiment;The 7S evaluation experience includes lean management 7S concept;Lean management 7S Concept includes arranging concept, rectifying concept, cleaning concept, clean concept, attainment concept, security concept and save concept.
Preferably, as an embodiment;Further include following operating procedure after executing step S300:
Step S400;By carrying out information towards browser and APP mode to overhaul emulation training method to transformer equipment Push and operation are implemented.
Compared with prior art, this have the advantage that:
A kind of transformer equipment provided by the invention overhauls emulation training method, including following operating procedure: setting for power transformation Standby acquisition carries out data acquisition, and establishes three-dimensional artificial trining mock up in the way of based on BIM;In the three-dimensional artificial training mould Transformer equipment maintenance video integration is carried out in type, Information Teaching course integrates, AI assessment models are integrated;According to the three-dimensional artificial Trining mock up executes multimedia training displaying, interactive teaching and learning and AI evaluation operation.
Above-mentioned transformer equipment provided by the invention overhauls emulation training method, and it makes use of transformer equipments to acquire data, and Three-dimensional artificial trining mock up is established in the way of based on BIM;Transformer equipment maintenance is carried out in the three-dimensional artificial trining mock up Video integration, Information Teaching course are integrated, AI assessment models are integrated, finally shown using aforesaid way realization multimedia training, Interactive teaching and learning and AI evaluation operation;Transformer equipment provided by the invention overhauls emulation training method, establishes a set of power transformation and sets System is commented in standby training, can the maintenance of actual display transformer equipment details multimedia messages, enhancing service personnel to the grasp of technical ability, mention Lift operations are horizontal, improve electric power netting safe running.
Detailed description of the invention
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the flow operations schematic diagram that transformer equipment provided in an embodiment of the present invention overhauls emulation training method;
Fig. 2 is the arrangement relation principle figure that transformer equipment provided in an embodiment of the present invention overhauls emulation training method.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the word of the orientation or positional relationship of certain instructions, be only for Convenient for the description present invention and simplify description, rather than the device or element of indication or suggestion meaning there must be specific side Position is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
In the description of the present invention, it should be noted that " connection " shall be understood in a broad sense, for example, it may be fixedly connected, It may be a detachable connection, or be integrally connected;It can be mechanical connection, be also possible to be electrically connected;It can be directly connected, The connection inside two elements can also be can be indirectly connected through an intermediary.For those of ordinary skill in the art For, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment one
Referring to Fig. 1, the embodiment of the invention provides a kind of transformer equipments to overhaul emulation training method, including operates step as follows Suddenly;
Step S100;It is acquired for transformer equipment and carries out data acquisition, and established three-dimensional artificial in the way of based on BIM and train Instruct model;
Step S200;Transformer equipment is carried out in the three-dimensional artificial trining mock up overhauls video integration, Information Teaching class Cheng Jicheng, AI assessment models are integrated;
Step S300;Multimedia training displaying, interactive teaching and learning and AI is executed according to the three-dimensional artificial trining mock up to comment Estimate operation.
Known to the main contents for analyzing above-mentioned transformer equipment maintenance emulation training method: above-mentioned transformer equipment maintenance emulation training Method for training establishes a set of transformer equipment training and comments system, the details multimedia messages of energy actual display transformer equipment maintenance, enhancing Service personnel is horizontal to grasp, the promotion operation of technical ability, improves electric power netting safe running.
Specific structure to transformer equipment provided in an embodiment of the present invention maintenance emulation training method and specific skill below Art effect, which is done, to be described in detail:
Preferably, as an embodiment;In the step s 100, specifically comprise the following steps:
Step S110: one transformer equipment of selection carries out fining teaching cases construction;
Step S120: in the fining teaching cases process of construction for carrying out any one transformer equipment, to construction power transformation Capital construction part, transformer equipment are acquired to obtain basic acquisition data in standing, and the basic acquisition data are converted to power transformation BIM data carry out the modeling of the three-dimensional artificial trining mock up of transformer equipment using power transformation BIM data;Wherein, data are acquired substantially Object include structure inside the model and equipment of transformer equipment, show each main component inside transformer equipment;Substantially it adopts Collecting data mode includes text, video and audio;The power transformation BIM data are to turn basic acquisition data based on what BIM principle obtained Change data.
It should be noted that according to the basic acquisition data of acquisition, and power transformation BIM data are converted, it carries out transformer equipment and builds If the threedimensional model modeling of fining;The acquisition target that above-mentioned basic acquisition data are related to includes but is not limited to the type of transformer equipment Number and equipment inside structure, clearly show each main component inside transformer equipment;Above-mentioned basic acquisition target can make to learn Member can clearly recognize, be familiar with the shape, internal structure and each main building block of transformer equipment.Above-mentioned basic acquisition number According to being related to parameter information (size, working condition, the skill that each main component is all inside transformer equipment and transformer equipment Art parameter etc.)
About above-mentioned technology contents need for example: 1, transformer equipment relate generally to include protection cabinets, cable, bus, Busbar, control box, transformer, power supply, switchgear, air-cooled controller, voltage & var control cabinet;Transformer equipment data mainly relate to And: the device datas such as transformer, breaker, disconnecting switch, GIS, switch cabinet equipment, end.2, power transformation BIM data: equipment Data (size, each part description, threedimensional model), equipment topology (transformer substation system structure, transformer equipment are distributed precedence relationship), ground It manages information (trend of road, neighboring buildings).3, fining modeling contents are as follows:
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into It includes following operating procedure that row transformer equipment, which overhauls video integration:
Step S210;It is taught for fining process flow corresponding to the transformer equipment in the three-dimensional artificial trining mock up The maintenance video acquisition that case carries out corresponding transformer equipment is learned, and carries out transformer equipment maintenance video to be integrated into three-dimensional artificial In trining mock up;
Step S220;When being integrated in the three-dimensional artificial trining mock up to transformer equipment maintenance video and combine more Media article carries out integrating, to be transferred and shown when Following course;Above-mentioned transformer equipment multimedia resource includes: The guiding book that threedimensional model, two-dimentional drawing, picture, text and related training resource make;
It should be noted that being modeled for different transformer equipment external forms, while transformer equipment inner main component being built Mould constructs the process for assembling whole equipment, and shows in subsequent progress transformer equipment maintenance craft process.
Transformer equipment maintenance craft multimedia process shows that production and the associated application of repair process are one persistently perfect Process, need to establish the addition of the interface energy continuous integrating later period threedimensional model of exploitation and the customization of fresh course, simultaneity factor Can persistent collection employee the problem of information intuitively reflect in next step need integrate training contents.
Above-mentioned video display needs to engage the training materials of multimedia making transformer equipment maintenance.Browser or mobile phone are provided Real-time query transformer equipment fining model, transformer equipment is held to overhaul multimedia training resource;Problem base continuous integrating is established, is remembered Record the knowledge track of each student;There is provided student training situation and checking makes the adjustable training emphasis of expert, teacher;Employee is provided In working site Online Video meeting inquiry backstage expert problem function, support field service personnel in real time to more matchmaker's data into Row search-read function.
Learn (front end) function about multimedia show: 1, transformer equipment overhauls multimedia simulation operation training system, leads to The unification of Multimedia Making Software and the regulation of process are crossed, educational multimedia producer is allowed to carry out courseware pipe by integrated system Reason.2, the multimedia resource of transformer equipment model, transformer equipment repair process is inquired by cell phone application.3, pass through system terminal The detailed model for inquiring each transformer equipment model race and key equipment decomposes.
Multimedia intelligent material handles (rear end) function: 1, rear end framework requires have opening, provides complete specifications Development interface can satisfy the demand of dominant systems and cross-platform quick application and development;2, back-end data base system administration request Have the compress technique of good data and index, there is lower volume expansions rate;In the condition that system hardware resources allow Under (such as server memory be not less than 16G), to very-large database and structuring/unstructured complex query realize response when Between can reach Millisecond, and do not increase with quantity of documents and efficiency reduces, database size only limited by hardware resource. 3, rear end Multi-media Material acquisition function will collect image, video, threedimensional model in conjunction with employee skill training requirement.It can be according to Power transformation profession concludes each training resource.
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into Integrated row information curricula includes following operating procedure:
Step S230;The video and audio of acquisition is handled, and making apparatus information bank, material database, knowledge base, teaching class Above-mentioned data are finally carried out integrated store to database by journey logic repository;
Step S240;Needs are transferred according to teaching, teaching is sent to database and transfers instruction;According to instruction is transferred, from number The displaying information that transformer equipment is transferred according to the facility information library in library, material database, knowledge base, curricula logic repository, from And integral device information displaying is carried out, equipment threedimensional model is shown and the details of decomposition model are shown.And above- mentioned information are taught Course is integrated to be additionally provided with courseware database, take an examination library, teacher, student's basic database and operation log recording library of giving lessons.
It should be noted that research BIM display technique abundant, and employee can be allowed to hand over using information management technique construction Mutually, learnt by above- mentioned information curricula, the detailed model for fully understanding each device model and key equipment decomposes, and fills Divide and understands courseware, examination paper etc., to provide more helps for guidance training.
Browser or mobile phone terminal real-time query transformer equipment fining model, transformer equipment maintenance multimedia training money are provided Source;Problem base continuous integrating is established, the knowledge track of each student is recorded;There is provided student training situation and checking makes expert, teacher Adjustable training emphasis;Employee is provided in the function of working site Online Video meeting inquiry backstage expert problem, is supported existing Field service personnel carries out search-read function to more matchmaker's data in real time.
Preferably, as an embodiment;In step s 200, according in the three-dimensional artificial trining mock up into Integrated row AI assessment models include following operating procedure:
Step S250;It establishes the educational assessment causality based on AI technology: formulating skills training and indices are evaluated Causality, using the self-learning capability in AI technology be each customized courseware of level student;
Step S260;The causality library of technical ability task instruction is established simultaneously;It, will in specific overhaul of the equipments training process The causality library of technical ability task instruction in transformer equipment maintenance training is engaged with 7S lean management, for overhaul of the equipments Process addition 7S lean in training manages content.
It should be noted that the causality based on 7S substation equipment maintenance and repair, Continuous optimization AI technical ability appraisement system, power transformation is set Standby maintenance training is engaged with 7S lean management, manages content for the process addition 7S lean in overhaul of the equipments training, Subsequent training quality is promoted with the management philosophy of 7S lean simultaneously;And knowledge mapping is evaluated using Continuous optimization, utilize elder generation Into the automatic summary finishing transformer equipment service personnel of artificial intelligence technology each stage train evaluation management method, help subsequent It promotes.
7S evaluation experience described above includes lean management 7S concept;Lean management 7S concept includes arranging concept, rectifying Concept, cleaning concept clean concept, attainment concept, security concept and save concept.It includes: to learn that the range of design is commented in 7S training The resources such as member's FAQs, the picture of equipment, threedimensional model, sound, animation form unified management 7S skills training resource;Knot The appraisement system of 7S managerial experiences combing pilot examination personnel is closed, while meeting the intersection of skill learning achievement inside transformer equipment Association, thus the integration capability of integrated management service personnel.
Service is commented about course of education AI training is established: being studied the training method of the AI skills training system of current mainstream, is connect It closes and refines three-dimensional mould shape, Portable overhaul operation training terminal, 7S lean management formulation access standards and specifications, establish and become System is commented in electric equipment training, builds system for the relevant all kinds of trainings of the following transformer equipment.And it is overhauled in conjunction with current transformer equipment Operation flow demand establishes the soft or hard environment for being able to satisfy indoor and outdoor skills training.Establish the relevant figure of transformer equipment training Piece, sound, the comprehensive displays method repair process such as file;Occupy transformer equipment training comment system be added Drawings and documents data management, Classification information management, data correlation management, data information inquiry, batch data import management, rights management, system configuration, connect Oral business etc..Above-mentioned its arranges relational result referring to fig. 2.
Preferably, as an embodiment;Further include following operating procedure after executing step S300:
Step S400;By carrying out information towards browser and APP mode to overhaul emulation training method to transformer equipment Push and operation are implemented.
It should be noted that mobile application is also made full use of in pilot application, the model of integrated transformer equipment repair apparatus, The data such as repair process, AI evaluation consolidate maintenance details to facilitate the newest maintenance knowledge of employee's real time review immediately.
AI assessment is studied for education sector application, and planning and designing individualized education, the transformer equipment inspection taught students in accordance with their aptitude System is repaired, and collects the data that knowledge hierarchy relies on;Eventually become analytic learning path and the structure of knowledge;It is described (such as to receive Collection upkeep operation file, process management interaction data, history work evaluation and test data, interactive teaching and learning data etc.) it needs for change The demand in electric equipment maintenance field establishes a set of knowledge mapping, and entirely imparts knowledge to students, comments by relational database, chart database storage The concept topological structure of valence finally researches and develops a set of transformer equipment maintenance training and evaluation system and mobile application client.
The present invention is not high for substation equipment maintenance and repair personnel skills training management level, with participation site examining and repairing equipment practical work Standardization, lean requirement contradict, research 3-D technology transformer equipment training application, and incorporate educational assessment because Fruit relation data, staff training data, increase foundational skills 7S evaluate and test data, using multidimensional data fusion and visualization technique, It establishes the fining technical ability training of transformer equipment maintenance craft process and comments system, be managed collectively for employee's mode of acquiring skill, and The study situation of real time monitoring personnel's technical ability mentions Grasping level, learning cost cost, personnel's attainment etc. by 7S evaluation and test It is supported for management.By backstage personnel's skill data model profound level analysis, realize leader in next step assessment team's technical ability at Long strategy manages basic teams and groups personnel skill master by application, establishes the transformer equipment training based on 7S management method and comments System promotes the foundational skills of crew by mobile application, promotes the teaching environment and learning atmosphere of foundation training.
The present invention also passes through pilot application, allows the unified management of later period staffs training resource.And meet power equipment from now on The demand for modernizing skills training carries out the production of model, the arrangement of operation flow by integrated system, finally obtains science Skills training management method and strategy are able to continue promotion to realize to power grid transformer equipment maintenance technical ability.Electric power is relationship The safe operation situation of the important foundation industry of national economy, equipment will have an impact the operating condition of entire power grid, formally Based on this particularity, when the network operation personnel newly to enter a profession carry out post and skills training, cannot will be currently running Electric system is as experiment product.In training process, practical operation test can neither be carried out in real equipment, less permission people Some accidents are set to simulate, allows employee's observation to go forward side by side and acts therefore deduce and handle, therefore establishes a set of transformer equipment training and comments and be It unites, the details multimedia messages of energy actual display transformer equipment maintenance, enhancing service personnel operates water to grasp, the promotion of technical ability It is flat, improve electric power netting safe running.
Finally, it should be noted that the above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Pipe present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (7)

1. a kind of transformer equipment overhauls emulation training method, which is characterized in that including following operating procedure;
Step S100;It is acquired for transformer equipment and carries out data acquisition, and establish three-dimensional artificial training mould in the way of based on BIM Type;
Step S200;Transformer equipment is carried out in the three-dimensional artificial trining mock up overhauls video integration, Information Teaching course collection It is integrated at, AI assessment models;
Step S300;Multimedia training displaying, interactive teaching and learning and AI assessment behaviour are executed according to the three-dimensional artificial trining mock up Make.
2. transformer equipment as described in claim 1 overhauls emulation training method, which is characterized in that in the step s 100, specifically Include the following steps:
Step S110: one transformer equipment of selection carries out fining teaching cases construction;
Step S120: in the fining teaching cases process of construction for carrying out any one transformer equipment, in construction substation Capital construction part, transformer equipment are acquired to obtain basic acquisition data, and the basic acquisition data are converted to power transformation BIM number According to, utilize power transformation BIM data carry out transformer equipment three-dimensional artificial trining mock up modeling;Wherein, pair of data is acquired substantially As the structure inside model and equipment including transformer equipment, each main component inside transformer equipment is shown;Basic acquisition number It include text, video and audio according to form;The power transformation BIM data are the turn over number for obtaining basic acquisition data based on BIM principle According to.
3. transformer equipment as claimed in claim 2 overhauls emulation training method, which is characterized in that in step s 200, according to It includes following operating procedure that transformer equipment maintenance video integration is carried out in the three-dimensional artificial trining mock up:
Step S210;For fining process flow teaching case corresponding to the transformer equipment in the three-dimensional artificial trining mock up Example carries out the maintenance video acquisition of corresponding transformer equipment, and carries out transformer equipment maintenance video to be integrated into three-dimensional artificial training In model;
Step S220;When integrating in the three-dimensional artificial trining mock up to transformer equipment maintenance video and combine multimedia Data carries out integrating, to be transferred and shown when Following course;Above-mentioned transformer equipment multimedia resource includes: three-dimensional The guiding book that model, two-dimentional drawing, picture, text and related training resource make.
4. transformer equipment as claimed in claim 3 overhauls emulation training method, which is characterized in that in step s 200, according to It includes following operating procedure that it is integrated that Information Teaching course is carried out in the three-dimensional artificial trining mock up:
Step S230;The video and audio of acquisition is handled, and making apparatus information bank, material database, knowledge base, curricula are patrolled Repository is collected, above-mentioned data are finally subjected to integrated store to database;
Step S240;Needs are transferred according to teaching, teaching is sent to database and transfers instruction;According to instruction is transferred, from database In facility information library, material database, knowledge base, curricula logic repository transfer the displaying information of transformer equipment, thus into Row integral device information shows that equipment threedimensional model is shown and the details of decomposition model are shown.
5. transformer equipment as claimed in claim 4 overhauls emulation training method, which is characterized in that in step s 200, according to It includes following operating procedure that it is integrated that AI assessment models are carried out in the three-dimensional artificial trining mock up:
Step S250;Establish the educational assessment causality based on AI technology: formulate skills training and indices evaluation because Fruit relationship is each customized courseware of level student using the self-learning capability in AI technology;
Step S260;The causality library of technical ability task instruction is established simultaneously;In specific overhaul of the equipments training process, by power transformation The causality library of technical ability task instruction in overhaul of the equipments training is engaged with 7S lean management, for overhaul of the equipments training In process addition 7S lean manage content.
6. transformer equipment as claimed in claim 5 overhauls emulation training method, which is characterized in that the 7S evaluates experience and includes Lean management 7S concept;Lean management 7S concept is general including arranging concept, rectification concept, cleaning concept, cleaning concept, attainment Thought, security concept and saving concept.
7. transformer equipment as claimed in claim 6 overhauls emulation training method, which is characterized in that execute step S300 it Afterwards, further include following operating procedure:
Step S400;By carrying out information push towards browser and APP mode to overhaul emulation training method to transformer equipment And operation is implemented.
CN201910337227.8A 2019-04-25 2019-04-25 A kind of transformer equipment maintenance emulation training method Pending CN110085080A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910337227.8A CN110085080A (en) 2019-04-25 2019-04-25 A kind of transformer equipment maintenance emulation training method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910337227.8A CN110085080A (en) 2019-04-25 2019-04-25 A kind of transformer equipment maintenance emulation training method

Publications (1)

Publication Number Publication Date
CN110085080A true CN110085080A (en) 2019-08-02

Family

ID=67416675

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910337227.8A Pending CN110085080A (en) 2019-04-25 2019-04-25 A kind of transformer equipment maintenance emulation training method

Country Status (1)

Country Link
CN (1) CN110085080A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112991506A (en) * 2021-03-24 2021-06-18 国网河北省电力有限公司石家庄供电分公司 High-voltage substation simulation training operating system based on VR
CN114241867A (en) * 2021-11-29 2022-03-25 国网甘肃省电力公司天水供电公司 Method and system for making and demonstrating electric power training courseware
CN114333436A (en) * 2021-12-17 2022-04-12 云南电网有限责任公司昆明供电局 Training device for decomposing and recombining transformer bushing and military cap structure

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1862582A (en) * 2006-06-20 2006-11-15 清华大学 Method based on value engineering for diagnosing production flow of discrete medium-sized and small automobile Fitting enterprise
CN105139714A (en) * 2015-10-10 2015-12-09 国电南瑞科技股份有限公司 Visualized simulation training system and method for electrified railway traction substation
CN105186353A (en) * 2015-09-22 2015-12-23 国网上海市电力公司 Transformer substation rotating equipment charged state display method based on three dimensional model
CN107025488A (en) * 2017-03-30 2017-08-08 广东中设智控科技股份有限公司 A kind of equipment checking maintenance method and system
CN108549991A (en) * 2018-04-20 2018-09-18 北京宇时易能科技发展有限公司 Overhaul command system and lean inspection base
CN108564347A (en) * 2018-04-20 2018-09-21 北京宇时易能科技发展有限公司 Overhaul whole process management system and lean inspection base

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1862582A (en) * 2006-06-20 2006-11-15 清华大学 Method based on value engineering for diagnosing production flow of discrete medium-sized and small automobile Fitting enterprise
CN105186353A (en) * 2015-09-22 2015-12-23 国网上海市电力公司 Transformer substation rotating equipment charged state display method based on three dimensional model
CN105139714A (en) * 2015-10-10 2015-12-09 国电南瑞科技股份有限公司 Visualized simulation training system and method for electrified railway traction substation
CN107025488A (en) * 2017-03-30 2017-08-08 广东中设智控科技股份有限公司 A kind of equipment checking maintenance method and system
CN108549991A (en) * 2018-04-20 2018-09-18 北京宇时易能科技发展有限公司 Overhaul command system and lean inspection base
CN108564347A (en) * 2018-04-20 2018-09-21 北京宇时易能科技发展有限公司 Overhaul whole process management system and lean inspection base

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112991506A (en) * 2021-03-24 2021-06-18 国网河北省电力有限公司石家庄供电分公司 High-voltage substation simulation training operating system based on VR
CN112991506B (en) * 2021-03-24 2022-05-20 国网河北省电力有限公司石家庄供电分公司 High-voltage substation simulation training operating system based on VR
CN114241867A (en) * 2021-11-29 2022-03-25 国网甘肃省电力公司天水供电公司 Method and system for making and demonstrating electric power training courseware
CN114333436A (en) * 2021-12-17 2022-04-12 云南电网有限责任公司昆明供电局 Training device for decomposing and recombining transformer bushing and military cap structure
CN114333436B (en) * 2021-12-17 2024-03-05 云南电网有限责任公司昆明供电局 Training device for decomposing and reorganizing structure of transformer sleeve and armcap

Similar Documents

Publication Publication Date Title
CN110085080A (en) A kind of transformer equipment maintenance emulation training method
Xu et al. Practice and exploration on teaching reform of engineering project management course in universities based on BIM simulation technology
CN104090816B (en) A kind of extra-high voltage steel tube tower simulation training system and method
Jie et al. Application of educational data mining on analysis of students' online learning behavior
Shi et al. Review on development of smart education
CN111401789A (en) Building construction intelligent supervision system based on BIM
CN116580610A (en) Virtual transformer station operation and maintenance VR training and real training system
CN202167154U (en) Open logistic transportation monitoring training teaching platform based on internet of things
CN114647313A (en) Teaching simulation method and teaching simulation system for rail transit operation
Su et al. Research on college students’ course selection recommendation model based on big data and cloud computing
CN109166060A (en) Teaching platform and application method under a kind of tourism background
Dong et al. Framework of the teaching process based on machine learning and innovation ability cultivation in big data background
Xu et al. An application of big data learning analysis based on MOOC platform
Liang Research On The Quality Evaluation Of Higher Education Information Management Based On Weighted Topsis
Dong et al. An expert system for bridge crane training system based on virtual reality
Zhao et al. Design and Implementation of the “Internet plus” Intelligent power simulation and learning system
Wang Reform of business english practice teaching system based on obe teaching concept
Gao et al. Design and typical application of digital twin architecture in Smart Grid
Gao et al. The Research and Development of Integrated Operation-Maintenance Simulation Training System [J]
Wang et al. Research on higher vocational teaching quality improvement based on educational big data
Ouyang et al. Exploring Intelligent Higher Education of Law: Moot Court Based on VR and AI Technology
Wang et al. Research and Application of a New Type of Substation Transportation Inspection Simulation Training System
CN110379230A (en) A kind of Modeling Teaching of Mathematics learning system
Zhang Design and implementation of college physical education intelligent management system based on big data cloud platform
Cao Research on Sports Computer Integrated Management System Based on Network Environment under the Background of Smart Sports

Legal Events