CN111401789A - Building construction intelligent supervision system based on BIM - Google Patents

Building construction intelligent supervision system based on BIM Download PDF

Info

Publication number
CN111401789A
CN111401789A CN202010287740.3A CN202010287740A CN111401789A CN 111401789 A CN111401789 A CN 111401789A CN 202010287740 A CN202010287740 A CN 202010287740A CN 111401789 A CN111401789 A CN 111401789A
Authority
CN
China
Prior art keywords
construction
information
module
personnel
query module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010287740.3A
Other languages
Chinese (zh)
Inventor
金成高
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010287740.3A priority Critical patent/CN111401789A/en
Publication of CN111401789A publication Critical patent/CN111401789A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063114Status monitoring or status determination for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group
    • G06Q10/063116Schedule adjustment for a person or group
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to the technical field of building construction supervision, and discloses a building construction intelligent supervision system based on BIM, which comprises the following structures: a model workstation: the real information of the building is simulated through digital information simulation, the computer is used for carrying out virtual scene construction site arrangement, a virtual building model is established according to the real information of the building, and a project amount list to be generated is determined according to the obtained virtual building model information. The invention can search the current default value and the on-line personnel in time through the constructor query module and the on-line personnel query module, and the personnel scheduling module supplements the current on-line personnel to the position of the default value personnel in time, thereby ensuring the normal operation of construction.

Description

Building construction intelligent supervision system based on BIM
Technical Field
The invention relates to the technical field of building construction supervision, in particular to a building construction intelligent supervision system based on BIM.
Background
The Building Information model (Building Information Modeling) is based on various relevant Information data of a construction engineering project, is established, and simulates real Information of a Building through digital Information. The method has eight characteristics of information completeness, information relevance, information consistency, visualization, coordination, simulation, optimization and graphing property, and with the rapid development of the BIM technology in China, the engineering model drawn by the BIM technology can include information of all aspects of the model, and the method also needs to be applied to a supervision system of building construction frequently.
However, in the use process of the existing monitoring system, due to the fact that the staff lacking in work is difficult to monitor, the constructors on the current post are difficult to supplement effectively, and the current construction state and the planned construction state are difficult to compare, so that whether the current construction progress reaches the expected value or not is difficult to judge, and the construction period is easy to delay. Therefore, those skilled in the art provide a building construction intelligent supervision system based on BIM to solve the problems set forth in the above background art.
Disclosure of Invention
The invention aims to provide a building construction intelligent supervision system based on BIM, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a building construction intelligence supervisory systems based on BIM includes following structure:
a model workstation: simulating real information of a building through digital information simulation, performing virtual scene construction site arrangement by using a computer, establishing a virtual building model according to the real information of the building, and determining a project amount list to be generated according to the obtained virtual building model information;
the service control center: receiving, over a network, virtual building model information generated from a model workstation and generated engineering volume inventory information;
the construction center is as follows: receiving virtual building model information and generated project amount list information sent by a service control center through the Internet, and automatically generating project construction information;
a planning construction module: establishing a corresponding construction plan list according to the received virtual building model information and the generated engineering quantity list information, and sending the construction plan list to a construction information comparison module;
construction progress query module: the construction schedule management module is used for inquiring the construction progress information under the current construction state in real time and sending the construction schedule list to the construction information comparison module;
a construction position query module: the construction planning system is used for inquiring the construction position information of each current node in real time and sending the construction planning list to the construction information comparison module;
the construction information comparison module: the system comprises a planning construction module, a construction progress query module and a construction position query module, wherein the planning construction module is used for receiving corresponding construction information sent by the planning construction module, the construction progress query module and the construction position query module, comparing the construction information and storing the construction information in a database for storage;
constructor inquiry module: the system is used for inquiring constructor information under the current construction state and sending the constructor information to the personnel scheduling module through the Internet;
an online personnel query module: the system is used for inquiring the information of the constructors in the current online state and sending the information to the personnel scheduling module through the Internet;
a personnel scheduling module: the system is used for receiving the personnel information from the constructor query module and the on-line personnel query module, matching the personnel list missing on the corresponding post after processing the information, and finally sending the personnel list missing on the corresponding post to the construction center.
As a still further scheme of the invention: personnel scheduling module is arranged in receiving the staff member that lacks who reachs in coming the constructor inquiry module one, the staff member that lacks who lacks, the staff member three and the staff member N that lacks, and personnel scheduling module still is used for receiving the staff member that is in the position that derives in coming from online personnel inquiry module one, the staff member two that is in the position, staff member three and staff member N that is in the position, and wherein, the staff member that lacks corresponds with the staff member in the position.
As a still further scheme of the invention: the construction information comparison module further comprises a first data, a second data and a third data, wherein the first data is used for receiving data information sent by the planned construction module, the second data is used for receiving data information sent by the construction progress query module, and the third data is used for receiving data information sent by the construction position query module.
As a still further scheme of the invention: the planned construction module comprises engineering material usage and construction fund usage, the construction progress query module further comprises total construction tasks and residual construction task quantity, the construction position query module utilizes an image acquisition technology and an image analysis technology to acquire images and analyze the images, and meanwhile, the images and the angle, the height and the width corresponding to the virtual building model are compared, so that the accuracy of the images is improved.
Compared with the prior art, the invention has the beneficial effects that: the system can search the current default value and the on-line personnel in time through the constructor query module and the on-line personnel query module, and the personnel scheduling module supplements the current on-line personnel to the position of the default value personnel in time, thereby ensuring the normal construction.
Drawings
Fig. 1 is a schematic diagram of a building construction intelligent supervision system based on BIM.
Detailed Description
Referring to fig. 1, in embodiment 1 of the present invention, a building construction intelligent monitoring system based on BIM includes the following structures:
a model workstation: simulating real information of a building through digital information simulation, performing virtual scene construction site arrangement by using a computer, establishing a virtual building model according to the real information of the building, and determining a project amount list to be generated according to the obtained virtual building model information;
the service control center: receiving, over a network, virtual building model information generated from a model workstation and generated engineering volume inventory information;
the construction center is as follows: receiving virtual building model information and generated project amount list information sent by a service control center through the Internet, and automatically generating project construction information;
a planning construction module: establishing a corresponding construction plan list according to the received virtual building model information and the generated engineering quantity list information, and sending the construction plan list to a construction information comparison module;
construction progress query module: the construction schedule management module is used for inquiring the construction progress information under the current construction state in real time and sending the construction schedule list to the construction information comparison module;
a construction position query module: the construction planning system is used for inquiring the construction position information of each current node in real time and sending the construction planning list to the construction information comparison module;
the construction information comparison module: the system comprises a planning construction module, a construction progress query module and a construction position query module, wherein the planning construction module is used for receiving corresponding construction information sent by the planning construction module, the construction progress query module and the construction position query module, comparing the construction information and storing the construction information in a database for storage;
constructor inquiry module: the system is used for inquiring constructor information under the current construction state and sending the constructor information to the personnel scheduling module through the Internet;
an online personnel query module: the system is used for inquiring the information of the constructors in the current online state and sending the information to the personnel scheduling module through the Internet;
a personnel scheduling module: the system is used for receiving the personnel information from the constructor query module and the on-line personnel query module, matching the personnel list missing on the corresponding post after processing the information, and finally sending the personnel list missing on the corresponding post to the construction center.
Preferably: personnel scheduling module is arranged in receiving the staff member that lacks who reachs in coming the constructor inquiry module one, the staff member that lacks who lacks, the staff member three and the staff member N that lacks, and personnel scheduling module still is used for receiving the staff member that is in the position that derives in coming from online personnel inquiry module one, the staff member two that is in the position, staff member three and staff member N that is in the position, and wherein, the staff member that lacks corresponds with the staff member in the position.
Preferably: the construction information comparison module further comprises a first data, a second data and a third data, wherein the first data is used for receiving data information sent by the planned construction module, the second data is used for receiving data information sent by the construction progress query module, and the third data is used for receiving data information sent by the construction position query module.
Preferably: the planned construction module comprises engineering material usage and construction fund usage, the construction progress query module further comprises total construction tasks and residual construction task quantity, the construction position query module utilizes an image acquisition technology and an image analysis technology to acquire images and analyze the images, and meanwhile, the images and the angle, the height and the width corresponding to the virtual building model are compared, so that the accuracy of the images is improved.
In embodiment 2 of the present invention, a building construction intelligent supervision system based on BIM includes the following structures:
a model workstation: simulating real information of a building through digital information simulation, performing virtual scene construction site arrangement by using a computer, establishing a virtual building model according to the real information of the building, and determining a project amount list to be generated according to the obtained virtual building model information;
the service control center: receiving, over a network, virtual building model information generated from a model workstation and generated engineering volume inventory information;
the construction center is as follows: receiving virtual building model information and generated project amount list information sent by a service control center through the Internet, and automatically generating project construction information;
a planning construction module: establishing a corresponding construction plan list according to the received virtual building model information and the generated engineering quantity list information, and sending the construction plan list to a construction information comparison module;
construction progress query module: the construction schedule management module is used for inquiring the construction progress information under the current construction state in real time and sending the construction schedule list to the construction information comparison module;
a construction position query module: the construction planning system is used for inquiring the construction position information of each current node in real time and sending the construction planning list to the construction information comparison module;
the construction information comparison module: the system comprises a planning construction module, a construction progress query module and a construction position query module, wherein the planning construction module is used for receiving corresponding construction information sent by the planning construction module, the construction progress query module and the construction position query module, comparing the construction information and storing the construction information in a database for storage;
constructor inquiry module: the system is used for inquiring constructor information under the current construction state and sending the constructor information to the personnel scheduling module through the Internet;
an online personnel query module: the system is used for inquiring the information of the constructors in the current online state and sending the information to the personnel scheduling module through the Internet;
a personnel scheduling module: the system is used for receiving the personnel information from the constructor query module and the on-line personnel query module, matching the personnel list missing on the corresponding post after processing the information, and finally sending the personnel list missing on the corresponding post to the construction center.
Preferably: personnel scheduling module is arranged in receiving the staff member that lacks who reachs in coming the constructor inquiry module one, the staff member that lacks who lacks, the staff member three and the staff member N that lacks, and personnel scheduling module still is used for receiving the staff member that is in the position that derives in coming from online personnel inquiry module one, the staff member two that is in the position, staff member three and staff member N that is in the position, and wherein, the staff member that lacks corresponds with the staff member in the position.
Preferably: the construction information comparison module further comprises a first data, a second data and a third data, wherein the first data is used for receiving data information sent by the planned construction module, the second data is used for receiving data information sent by the construction progress query module, and the third data is used for receiving data information sent by the construction position query module.
Preferably: the planned construction module comprises the total number of constructors and the construction area, the construction progress query module further comprises the total construction task amount and the residual construction task amount, the construction position query module utilizes an image acquisition technology and an image analysis technology to acquire images and analyze the images, and meanwhile, the images and the angle, the height and the width corresponding to the virtual building model are compared, so that the accuracy of the images is improved.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention are equivalent to or changed within the technical scope of the present invention.

Claims (4)

1. The utility model provides a building construction intelligence supervisory systems based on BIM which characterized in that includes following structure:
a model workstation: simulating real information of a building through digital information simulation, performing virtual scene construction site arrangement by using a computer, establishing a virtual building model according to the real information of the building, and determining a project amount list to be generated according to the obtained virtual building model information;
the service control center: receiving, over a network, virtual building model information generated from a model workstation and generated engineering volume inventory information;
the construction center is as follows: receiving virtual building model information and generated project amount list information sent by a service control center through the Internet, and automatically generating project construction information;
a planning construction module: establishing a corresponding construction plan list according to the received virtual building model information and the generated engineering quantity list information, and sending the construction plan list to a construction information comparison module;
construction progress query module: the construction schedule management module is used for inquiring the construction progress information under the current construction state in real time and sending the construction schedule list to the construction information comparison module;
a construction position query module: the construction planning system is used for inquiring the construction position information of each current node in real time and sending the construction planning list to the construction information comparison module;
the construction information comparison module: the system comprises a planning construction module, a construction progress query module and a construction position query module, wherein the planning construction module is used for receiving corresponding construction information sent by the planning construction module, the construction progress query module and the construction position query module, comparing the construction information and storing the construction information in a database for storage;
constructor inquiry module: the system is used for inquiring constructor information under the current construction state and sending the constructor information to the personnel scheduling module through the Internet;
an online personnel query module: the system is used for inquiring the information of the constructors in the current online state and sending the information to the personnel scheduling module through the Internet;
a personnel scheduling module: the system is used for receiving the personnel information from the constructor query module and the on-line personnel query module, matching the personnel list missing on the corresponding post after processing the information, and finally sending the personnel list missing on the corresponding post to the construction center.
2. The BIM-based intelligent building construction supervision system according to claim 1, wherein the staff scheduling module is used for receiving the first available staff member, the second available staff member, the third available staff member and the N available staff member from the constructor query module, and the staff scheduling module is also used for receiving the first available staff member, the second available staff member, the third available staff member and the N available staff member from the online staff query module, wherein the available staff members correspond to the first available staff members.
3. The BIM-based intelligent building construction supervision system according to claim 1, wherein the construction information comparison module further comprises a first data, a second data and a third data, wherein the first data is used for receiving data information sent by the planned construction module, the second data is used for receiving data information sent by the construction progress query module, and the third data is used for receiving data information sent by the construction position query module.
4. The BIM-based intelligent building construction supervision system according to claim 1, wherein the planned construction module comprises engineering material usage and construction fund usage, the construction progress query module further comprises total construction task amount and residual construction task amount, the construction position query module is used for image acquisition and image analysis by using image acquisition technology and image analysis technology, and simultaneously, the angle, height and width corresponding to the image and the virtual building model are compared to improve the accuracy of the image.
CN202010287740.3A 2020-04-13 2020-04-13 Building construction intelligent supervision system based on BIM Withdrawn CN111401789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010287740.3A CN111401789A (en) 2020-04-13 2020-04-13 Building construction intelligent supervision system based on BIM

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010287740.3A CN111401789A (en) 2020-04-13 2020-04-13 Building construction intelligent supervision system based on BIM

Publications (1)

Publication Number Publication Date
CN111401789A true CN111401789A (en) 2020-07-10

Family

ID=71436885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010287740.3A Withdrawn CN111401789A (en) 2020-04-13 2020-04-13 Building construction intelligent supervision system based on BIM

Country Status (1)

Country Link
CN (1) CN111401789A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113869684A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM-based project progress management method, device and system
CN116882672A (en) * 2023-07-03 2023-10-13 广东鼎易建筑科技有限公司 Internet-based building engineering personnel management system
WO2024066058A1 (en) * 2022-09-27 2024-04-04 深圳先进技术研究院 Safety supervision resource scheduling method based on 4d building model and multi-objective optimization

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113869684A (en) * 2021-09-17 2021-12-31 湖南方圆工程咨询监理有限公司 BIM-based project progress management method, device and system
WO2024066058A1 (en) * 2022-09-27 2024-04-04 深圳先进技术研究院 Safety supervision resource scheduling method based on 4d building model and multi-objective optimization
CN116882672A (en) * 2023-07-03 2023-10-13 广东鼎易建筑科技有限公司 Internet-based building engineering personnel management system

Similar Documents

Publication Publication Date Title
CN109801038B (en) General engineering construction method based on BIM technology application
CN114493213A (en) Carbon emission data acquisition and processing method based on Internet of things
CN111401789A (en) Building construction intelligent supervision system based on BIM
CN108875273B (en) BIM-based foundation pit engineering forward design and operation and maintenance management system
CN105574593B (en) Track state static detection and control system and method based on cloud computing and big data
CN102903063A (en) Integral electricity market operation system
CN103065513A (en) Three-dimensional virtual training system of transformer equipment
CN114815757A (en) Digital twin virtual inspection method for cement plant
CN117351521A (en) Digital twinning-based power transmission line bird detection method, system, medium and equipment
CN109447466B (en) Overall process visual management and control system based on power distribution network communication network construction
CN115220378A (en) System based on BIM model and operation and maintenance information interaction in intelligent building management
CN116431707A (en) Agent technology-based virtual-actual integrated management and control system and method
CN116523187A (en) Engineering progress monitoring method and system based on BIM
ZHANG et al. Logical and Innovative Construction of Digital Twin City.
CN110085080A (en) A kind of transformer equipment maintenance emulation training method
CN116341064B (en) Modeling system and method of intelligent substation cloud system based on 3DMax modeling
CN116894639A (en) Multi-information fusion plan management system and method for Internet of things
CN116796633A (en) Power grid monitoring model correction method based on digital twin technology
CN110689263A (en) River channel quality management and control system based on BIM technology
CN110310048A (en) A kind of distribution planning overall process appraisal procedure and device
CN116167740A (en) Digital twin model construction method for intelligent maintenance of pumped storage power station
CN115098991A (en) Energy efficiency diagnosis method based on comprehensive energy simulation technology
CN113158317A (en) Civil engineering virtual model and modeling method
Li et al. Research on equipment maintenance guidance technology based on MR and digital twin
Deng Digital intelligent management platform for high-rise building construction based on bim technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20200710

WW01 Invention patent application withdrawn after publication