CN110084537A - A kind of the secondary water-supply control method and system of demand orientation - Google Patents

A kind of the secondary water-supply control method and system of demand orientation Download PDF

Info

Publication number
CN110084537A
CN110084537A CN201910430514.3A CN201910430514A CN110084537A CN 110084537 A CN110084537 A CN 110084537A CN 201910430514 A CN201910430514 A CN 201910430514A CN 110084537 A CN110084537 A CN 110084537A
Authority
CN
China
Prior art keywords
water
threshold value
district domain
period
flow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910430514.3A
Other languages
Chinese (zh)
Inventor
邹亨保
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Hua Yan Water Utilities Co Ltd
Original Assignee
Wuhu Hua Yan Water Utilities Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Hua Yan Water Utilities Co Ltd filed Critical Wuhu Hua Yan Water Utilities Co Ltd
Priority to CN201910430514.3A priority Critical patent/CN110084537A/en
Publication of CN110084537A publication Critical patent/CN110084537A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/04Domestic or like local pipe systems
    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03BINSTALLATIONS OR METHODS FOR OBTAINING, COLLECTING, OR DISTRIBUTING WATER
    • E03B7/00Water main or service pipe systems
    • E03B7/07Arrangement of devices, e.g. filters, flow controls, measuring devices, siphons, valves, in the pipe systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

The invention discloses the secondary water-supply control methods and system of a kind of demand orientation, by being divided to Water District domain and water period, and acquire the flow parameter of user's water, it can add up and obtain the use water total flow of each water period in the domain of Water District, reflect the substantially situation of water use peak and low ebb in each Water District domain, by the way that it is compared with pre-set with water flow threshold value, judge whether each Water District domain in certain water period is more than with water flow threshold value with water total flow, it then can be when reaching beyond with water flow threshold value water period the time, improve the operation power of the terminal pressurized equipment in the Water District domain, it is unsmooth with water caused by preventing because of hydraulic pressure deficiency, avoid lag issues when secondary water supply system secondary booster in the prior art.

Description

A kind of the secondary water-supply control method and system of demand orientation
Technical field
The present invention relates to water supply control fields, particularly relate to the secondary water-supply control method and system of a kind of demand orientation.
Background technique
Secondary water-supply refers to that unit or personal city public water supply or self-built facility supply water are stored, pressurizeed, and passes through pipe Road is again for user or personal form, for the user of skyscraper, secondary water-supply be maintain just to commonly use water must can not Few part.Existing secondary water-supply control method is mostly using the method measured to the hydraulic pressure in water supply pipe, in water It forces down and starts pressure pump when threshold value to the progress secondary booster that supplies water, but either hydraulic pressure detection or the starting of water pump are all deposited In certain delay, water pump can not tell at once when pressurizeing, and exist for secondary booster and lag, user when with water still It so will receive influence.
Summary of the invention
In view of this, it is an object of the invention to propose the secondary water-supply control method and system of a kind of demand orientation, solution Certainly in the prior art there is lag in secondary booster.
Based on a kind of above-mentioned purpose secondary water-supply control method of demand orientation provided by the invention, comprising the following steps:
According to the overlay area of secondary water-supply terminal pressurized equipment, each Water District domain is marked off, and if dividing time into Dry water period;
The flow parameter of user's water is acquired, while recording the time of flow generation;
By in same Water District domain, each user of each water period is cumulative with water flow, obtains and respectively uses in the domain of Water District The water period uses water total flow, is recorded in database;
It is compared with pre-set with water flow threshold value, judges each Water District domain in the total with water of certain water period When whether flow is more than with water flow threshold value, record is more than the Water District domain and water period with water flow threshold value, is stored into In database;
When reaching beyond with water flow threshold value water period the time, the terminal pressurized equipment in the Water District domain is improved Operation power, in the Water District domain supply water carry out secondary booster.
Preferably, further comprising the steps of:
When the time is close to more than with water flow threshold value water period, the Water in Water Tank in the Water District domain is checked in advance Amount carries out preparatory moisturizing to the water tank of not up to water setting value.
Preferably, further comprising the steps of:
The water pressures in each Water District domain are acquired, hydraulic pressure will be measured and be compared with preset standard water pressure, it is real When adjust terminal pressurized equipment operation power.
Preferably, further comprising the steps of:
Each Water District domain is according to priority classified;
When the hydraulic pressure deficiency in the domain of Water District, secondary increasing preferentially is carried out to the water supply in the higher Water District domain of priority Pressure.
Preferably, further comprising the steps of:
Periodically being updated with water flow data to database purchase, and be calculated over again with water flow threshold value Water District domain and water period data.
A kind of secondary water-supply control system of demand orientation, comprising:
Flow collection module, to being acquired with water flow for user;
Data processing module is handled with water flow data, and is compared with pre-set with water flow threshold value It is right, obtain to be more than Water District domain and the water period for using water flow threshold value;
Database is carried out to water flow data more than with the Water District domain of water flow threshold value and water period data Storage;
Terminal pressurized equipment can carry out secondary booster to supplying water;
Control module is more than Water District domain and the water period number for using water flow threshold value according to storing in database According to controlling the operation power of terminal pressurized equipment.
Preferably, in control system further include:
Water detection module, is mounted in secondary water supply tank, detects to the water in water tank, and by data measured It is sent to control module;
Water supplement apparatus is connect with secondary water supply tank, can carry out moisturizing to water tank;
Control module is according to more than the Water District domain and water period data of using water flow threshold value and water detection module Measurement data, can control water supplement apparatus to water tank carry out moisturizing.
Preferably, in control system further include:
Water-pressure survey module can detect water pressures and be sent to control module;
Control module is according to water-pressure survey as a result, the operation power to terminal pressurized equipment is adjusted.
Preferably, in control system further include:
Priority block can be configured the priority in Water District domain, and be sent to control module;
Control module provides priority data according to priority block, and adjustment terminal pressurized equipment carries out two and surveys the excellent of pressurization First grade.
From the above it can be seen that the secondary water-supply control method and system of a kind of demand orientation provided by the invention, By dividing to Water District domain and water period, and the flow parameter of user's water is acquired, can add up obtains and use water The use water total flow of each water period, reflects the substantially situation of water use peak and low ebb in each Water District domain, leads in region It crosses and it is compared with pre-set with water flow threshold value, judge each Water District domain always being flowed with water in certain water period Whether amount is more than to use water flow threshold value, then can improve the use when reaching beyond with water flow threshold value water period the time The operation power of terminal pressurized equipment in water area, it is unsmooth with water caused by preventing because of hydraulic pressure deficiency, it avoids in the prior art Secondary water supply system secondary booster when lag issues.
Detailed description of the invention
Fig. 1 is the control method flow diagram of the embodiment of the present invention;
Fig. 2 is the control system module connection diagram of the embodiment of the present invention.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with specific embodiment, and reference Attached drawing, the present invention is described in more detail.
It should be noted that all statements for using " first " and " second " are for differentiation two in the embodiment of the present invention The non-equal entity of a same names or non-equal parameter, it is seen that " first " " second " only for the convenience of statement, does not answer It is interpreted as the restriction to the embodiment of the present invention, subsequent embodiment no longer illustrates this one by one.
A kind of secondary water-supply control method of demand orientation, comprising the following steps:
According to the overlay area of secondary water-supply terminal pressurized equipment, each Water District domain is marked off, and if dividing time into Dry water period;
The flow parameter of user's water is acquired, while recording the time of flow generation;
By in same Water District domain, each user of each water period is cumulative with water flow, obtains and respectively uses in the domain of Water District The water period uses water total flow, is recorded in database;
It is compared with pre-set with water flow threshold value, judges each Water District domain in the total with water of certain water period When whether flow is more than with water flow threshold value, record is more than the Water District domain and water period with water flow threshold value, is stored into In database;
When reaching beyond with water flow threshold value water period the time, the terminal pressurized equipment in the Water District domain is improved Operation power, in the Water District domain supply water carry out secondary booster.
By dividing to Water District domain and water period, and the flow parameter of user's water is acquired, can added up The use water total flow for obtaining each water period in the domain of Water District, reflects that water use peak and low ebb are substantially in each Water District domain Situation judges each Water District domain in certain water period by the way that it to be compared with pre-set with water flow threshold value With water total flow whether be more than with water flow threshold value, then can when reaching beyond with water flow threshold value water period the time, The operation power for improving the terminal pressurized equipment in the Water District domain, it is unsmooth with water caused by preventing because of hydraulic pressure deficiency, it avoids existing There are the lag issues when secondary water supply system secondary booster in technology.
Optionally, this method is further comprising the steps of:
When the time is close to more than with water flow threshold value water period, the Water in Water Tank in the Water District domain is checked in advance Amount carries out preparatory moisturizing to the water tank of not up to water setting value.Since secondary water-supply needs to carry out by the water that water tank stores Pressurization, if water shortage in water tank then be easy to cause hydraulic pressure inadequate, to influence user when the water use peak phase arrives Just common water, and if keeping water tank full water for a long time, can undoubtedly accumulate again in the long-time for causing water with water trough period and Waste.
Due to not ensuring that entirely accurate with the statistics of water flow, there are special circumstances and error in actual use, If improving the operation power of terminal pressurized equipment simply, when may result in water consumption reduction, the excessive initiation safety of hydraulic pressure Accident, optionally, this method are further comprising the steps of:
The water pressures in each Water District domain are acquired, hydraulic pressure will be measured and be compared with preset standard water pressure, it is real When adjust terminal pressurized equipment operation power.
Optionally, this method is further comprising the steps of:
Each Water District domain is according to priority classified;
When the hydraulic pressure deficiency in the domain of Water District, secondary increasing preferentially is carried out to the water supply in the higher Water District domain of priority Pressure.It, can be in particular time or particular job, to different fields of employment, different usages by the way that priority is arranged Distinguished with water, it is preferential to guarantee that urgency level is higher and use water.
Optionally, this method is further comprising the steps of:
Periodically being updated with water flow data to database purchase, and be calculated over again with water flow threshold value Water District domain and water period data, can be improved accuracy when control system judges.
A kind of secondary water-supply control system of demand orientation, comprising:
Flow collection module, to being acquired with water flow for user;
Data processing module is handled with water flow data, and is compared with pre-set with water flow threshold value It is right, obtain to be more than Water District domain and the water period for using water flow threshold value;
Database is carried out to water flow data more than with the Water District domain of water flow threshold value and water period data Storage;
Terminal pressurized equipment can carry out secondary booster to supplying water;
Control module is more than Water District domain and the water period number for using water flow threshold value according to storing in database According to controlling the operation power of terminal pressurized equipment.
By setting flow collection module and data processing module, it can calculate in each Water District domain and use the water time each Section uses water flow data, and by being compared with pre-set with water flow threshold value, obtains to be more than with water flow threshold value Water District domain and water period, control module can be according to being more than with the Water District domain of water flow threshold value and with the water time Section, is adjusted the operation power of the terminal pressurized equipment in the domain of Water District, unsmooth with water caused by preventing because of hydraulic pressure deficiency, Avoid lag issues when secondary water supply system secondary booster in the prior art.
Since secondary water-supply needs the water stored by water tank to be pressurized, if when the water use peak phase arrives, water tank In water shortage, then be easy to cause hydraulic pressure inadequate, to influence the just common water of user, and if keeping water tank full for a long time Water undoubtedly can accumulate and waste in the long-time for causing water with water trough period again.
Optionally, it is additionally provided with water detection module in control system, installs in secondary water supply tank, to the water in water tank It is detected, and data measured is sent to control module;
Water supplement apparatus is connect with secondary water supply tank, can carry out moisturizing to water tank;
The control module is detected according to more than with the Water District domain of water flow threshold value and water period data and water The measurement data of module can control water supplement apparatus to carry out moisturizing to water tank.
Due to not ensuring that entirely accurate with the statistics of water flow, there are special circumstances and error in actual use, If improving the operation power of terminal pressurized equipment simply, when may result in water consumption reduction, the excessive initiation safety of hydraulic pressure Accident.Optionally, it is additionally provided with water-pressure survey module in control system, water pressures can be detected and is sent to the control Module;
The control module is according to water-pressure survey as a result, the operation power to terminal pressurized equipment is adjusted.
Optionally, in control system further include:
Priority block can be configured the priority in Water District domain, and be sent to control module;
The control module provides priority data according to the priority block, adjusts the terminal pressurized equipment and carries out Two survey the priority of pressurization.It, can be in particular time or particular job, to different uses by the way that priority block is arranged Place, different usage are distinguished with water, preferential to guarantee that urgency level is higher and use water.
It should be understood by those ordinary skilled in the art that: the discussion of any of the above embodiment is exemplary only, not It is intended to imply that the scope of the present disclosure (including claim) is limited to these examples;Under thinking of the invention, above embodiments Or can also be combined between the technical characteristic in different embodiments, step can be realized with random order, and be existed such as Many other variations of the upper different aspect of the invention, for simplicity, they are not provided in details.
Although having been incorporated with specific embodiments of the present invention, invention has been described, according to retouching for front It states, many replacements of these embodiments, modifications and variations will be apparent for those of ordinary skills.Example Such as, discussed embodiment can be used in other memory architectures (for example, dynamic ram (DRAM)).
The embodiment of the present invention be intended to cover fall into all such replacements within the broad range of appended claims, Modifications and variations.Therefore, all within the spirits and principles of the present invention, any omission, modification, equivalent replacement, the improvement made Deng should all be included in the protection scope of the present invention.

Claims (9)

1. a kind of secondary water-supply control method of demand orientation, which comprises the following steps:
According to the overlay area of secondary water-supply terminal pressurized equipment, each Water District domain is marked off, and divides time into several Water period;
The flow parameter of user's water is acquired, while recording the time of flow generation;
By in same Water District domain, each user of each water period is cumulative with water flow, when obtaining in the domain of Water District respectively with water Between section use water total flow, be recorded in database;
It is compared with pre-set with water flow threshold value, judges that water total flow is used in certain water period in each Water District domain Whether when being more than with water flow threshold value, record is more than the Water District domain and water period with water flow threshold value, is stored into data In library;
When reaching beyond with water flow threshold value water period the time, the fortune of the terminal pressurized equipment in the Water District domain is improved Row power carries out secondary booster to supplying water in the Water District domain.
2. a kind of secondary water-supply control method of demand orientation according to claim 1, which is characterized in that further include following Step:
When the time is close to more than with water flow threshold value water period, the water volume in water tank in the Water District domain is checked in advance, it is right Not up to the water tank of water setting value carries out preparatory moisturizing.
3. a kind of secondary water-supply control method of demand orientation according to claim 1, which is characterized in that further include following Step:
The water pressures in each Water District domain are acquired, hydraulic pressure will be measured and be compared with preset standard water pressure, are adjusted in real time Save the operation power of terminal pressurized equipment.
4. a kind of secondary water-supply control method of demand orientation according to claim 1, which is characterized in that further include following Step:
Each Water District domain is according to priority classified;
When the hydraulic pressure deficiency in the domain of Water District, secondary booster preferentially is carried out to the water supply in the higher Water District domain of priority.
5. a kind of secondary water-supply control method of demand orientation according to claim 1, which is characterized in that further include following Step:
Periodically being updated with water flow data to database purchase, and be calculated over again and use water with water flow threshold value Region and water period data.
6. a kind of secondary water-supply control system of demand orientation characterized by comprising
Flow collection module, to being acquired with water flow for user;
Data processing module is handled with water flow data, and is compared with pre-set with water flow threshold value, is obtained It is out more than Water District domain and the water period with water flow threshold value;
Database is stored to water flow data more than with the Water District domain of water flow threshold value and water period data;
Terminal pressurized equipment can carry out secondary booster to supplying water;
Control module is more than Water District domain and the water period data for using water flow threshold value according to storing in database, right The operation power of terminal pressurized equipment is controlled.
7. a kind of secondary water-supply control system of demand orientation according to claim 6, which is characterized in that the control system In system further include:
Water detection module, is mounted in secondary water supply tank, detects to the water in water tank, and data measured is sent To control module;
Water supplement apparatus is connect with secondary water supply tank, can carry out moisturizing to water tank;
The control module is according to more than the Water District domain and water period data of using water flow threshold value and water detection module Measurement data, can control water supplement apparatus to water tank carry out moisturizing.
8. a kind of secondary water-supply control system of demand orientation according to claim 6, which is characterized in that the control system In system further include:
Water-pressure survey module can detect water pressures and be sent to the control module;
The control module is according to water-pressure survey as a result, the operation power to terminal pressurized equipment is adjusted.
9. a kind of secondary water-supply control system of demand orientation according to claim 6, which is characterized in that the control system In system further include:
Priority block can be configured the priority in Water District domain, and be sent to control module;
The control module provides priority data according to the priority block, adjusts the terminal pressurized equipment and carries out two surveys The priority of pressurization.
CN201910430514.3A 2019-05-22 2019-05-22 A kind of the secondary water-supply control method and system of demand orientation Pending CN110084537A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910430514.3A CN110084537A (en) 2019-05-22 2019-05-22 A kind of the secondary water-supply control method and system of demand orientation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910430514.3A CN110084537A (en) 2019-05-22 2019-05-22 A kind of the secondary water-supply control method and system of demand orientation

Publications (1)

Publication Number Publication Date
CN110084537A true CN110084537A (en) 2019-08-02

Family

ID=67421342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910430514.3A Pending CN110084537A (en) 2019-05-22 2019-05-22 A kind of the secondary water-supply control method and system of demand orientation

Country Status (1)

Country Link
CN (1) CN110084537A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820845A (en) * 2019-11-26 2020-02-21 珠海格力电器股份有限公司 Water supply system and water pressure pressurization method and device thereof
CN111968010A (en) * 2020-08-15 2020-11-20 湖南钜达程水务有限公司 Control method and system for pressurized water supply equipment and storage medium
CN112783125A (en) * 2020-12-31 2021-05-11 深圳市水务技术服务有限公司 Intelligent water supply information acquisition and scheduling system and method
CN116432863A (en) * 2023-05-18 2023-07-14 安徽舜禹水务股份有限公司 Integral peak-shifting scheduling method for secondary water supply based on mathematical programming

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567427A (en) * 2016-11-14 2017-04-19 郑州大学 Regulation and control device for water supply flows in peak period of water supply factory and method of regulation and control device
CN108842857A (en) * 2018-08-17 2018-11-20 魏远良 A kind of self study intelligence peak regulation secondary water supply system and its control method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567427A (en) * 2016-11-14 2017-04-19 郑州大学 Regulation and control device for water supply flows in peak period of water supply factory and method of regulation and control device
CN108842857A (en) * 2018-08-17 2018-11-20 魏远良 A kind of self study intelligence peak regulation secondary water supply system and its control method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820845A (en) * 2019-11-26 2020-02-21 珠海格力电器股份有限公司 Water supply system and water pressure pressurization method and device thereof
CN111968010A (en) * 2020-08-15 2020-11-20 湖南钜达程水务有限公司 Control method and system for pressurized water supply equipment and storage medium
CN111968010B (en) * 2020-08-15 2022-07-29 中国建筑第五工程局有限公司 Control method and system of pressurized water supply equipment and storage medium
CN112783125A (en) * 2020-12-31 2021-05-11 深圳市水务技术服务有限公司 Intelligent water supply information acquisition and scheduling system and method
CN116432863A (en) * 2023-05-18 2023-07-14 安徽舜禹水务股份有限公司 Integral peak-shifting scheduling method for secondary water supply based on mathematical programming

Similar Documents

Publication Publication Date Title
CN110084537A (en) A kind of the secondary water-supply control method and system of demand orientation
JP5329871B2 (en) Leakage node estimation device
TW200631027A (en) Memory sensing circuit and method for low voltage operation
CN101728588B (en) Wireless communication terminal and method for determining battery electric quantity thereof
CA2546993A1 (en) Fuel tank level monitoring system and method
CN104597406B (en) Lithium battery energy storage battery power system capacity declines analysis and processing method and analysis processing device
CN202631760U (en) Full-automatic evaporation station
CN108842857A (en) A kind of self study intelligence peak regulation secondary water supply system and its control method
EP1832737A3 (en) Abnormality-determining device and method for fuel supply system
CN101340090A (en) Method of determining voltage stability margin for load shedding within an electrical power system
CN102565709B (en) Method and device for monitoring capacity of battery pack
CN109374083B (en) Liquid level acquisition method and device for vertical oil tank and early warning system for receiving and transmitting oil level
CN102231771A (en) Automatic recording method and system for conversation
ATE377155T1 (en) METHOD FOR MONITORING THE GAS PREFILL PRESSURE IN HYDRO STORAGE
CN104848906A (en) Measurement structure and method of liquid consumption amount and real-time measurement method
CN105091973A (en) Device and method for detecting water level in water tank
CN208844663U (en) A kind of self study intelligence peak regulation secondary water supply system
CN103439758B (en) For the data processing method of rain sensor
CN104972187A (en) Wire Electric Discharge Machine
CN105114148B (en) A kind of automobile engine oil supervising device and method
US20160004268A1 (en) Power supply system comprising a preprocessing device
CN101858774A (en) Device and method for measuring oil consumption
CN109200826B (en) Water purifying equipment and filter element service life detection system and method thereof
CN110863533B (en) Operation control method of peak shaving equipment
CN208700643U (en) The adaptive clean water control system of more water quality

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination