CN110083659A - Multi-source data read method and relevant device based on distributed system - Google Patents

Multi-source data read method and relevant device based on distributed system Download PDF

Info

Publication number
CN110083659A
CN110083659A CN201910219301.6A CN201910219301A CN110083659A CN 110083659 A CN110083659 A CN 110083659A CN 201910219301 A CN201910219301 A CN 201910219301A CN 110083659 A CN110083659 A CN 110083659A
Authority
CN
China
Prior art keywords
data
interface
source
database
subdata base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910219301.6A
Other languages
Chinese (zh)
Inventor
赵成龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
OneConnect Smart Technology Co Ltd
Original Assignee
OneConnect Smart Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by OneConnect Smart Technology Co Ltd filed Critical OneConnect Smart Technology Co Ltd
Priority to CN201910219301.6A priority Critical patent/CN110083659A/en
Publication of CN110083659A publication Critical patent/CN110083659A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/25Integrating or interfacing systems involving database management systems
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/27Replication, distribution or synchronisation of data between databases or within a distributed database system; Distributed database system architectures therefor

Abstract

This application involves pedestal O&M technical fields, disclose a kind of multi-source data read method and relevant device based on distributed system, wherein method include: acquisition project need data multiple data sources and corresponding data-interface;The corresponding data-interface in master data source is labeled as master data interface;Boss's database of the data for receiving the master data interface and the slave subdata base of the data for receiving other data-interfaces are established in the database;After the instruction for receiving the calling data that the project issues, the corresponding data-interface of described instruction is judged according to described instruction;Corresponding subdata base is called according to the data-interface.The application is by the Data induction of multiple data sources into two subdata bases, it is placed on from subdata base from the data of data source, it does not need to switch when calling multiple data between data source, it is possible to reduce change the number of database, improve the stability of system operation.

Description

Multi-source data read method and relevant device based on distributed system
Technical field
This application involves field of computer technology is arrived, a kind of multi-source data reading based on distributed system is especially related to Take method and relevant device.
Background technique
In the project development based on distributed system, project is connect with multiple data sources, according to the state of project operation Data are called from different data sources in different moments, and distributed system is resulted in often to adjust from different data sources in this way It is handled with data, and different data sources forms heterogeneous data source, thus needs in the scene of project development Switch repeatedly in multiple databases, causes project system to run unstable, and generation system runs slow problem.
So providing how one kind reduces the problem of database of switching times is urgent need to resolve.
Summary of the invention
The main purpose of the application is to provide a kind of multi-source data based on distributed system with reduction switch data library Read method, device, computer equipment.
In order to achieve the above-mentioned object of the invention, the application proposes a kind of multi-source data read method based on distributed system, Include:
Obtain the structural framing of the pending item based on distributed system;
According to the attribute information of the structural framing, the corresponding multiple data sources for the data that the project needs are determined Mark;
It obtains the multiple data source and identifies corresponding data-interface;
The master data source identification that user terminal is sent is received, the multiple data source mark is tagged to respectively corresponding In data-interface, the corresponding data-interface in the master data source identification is labeled as master data interface, the master data is connect Other data-interfaces other than mouthful mark as data-interface, wherein the master data source identification is the user terminal root It is generated according to the master data source selection operation of user;
Boss's database is established in the database and from subdata base, boss's database is for receiving the main number It is described to be used to receive the data from data-interface from subdata base according to the data of interface;
After the instruction for receiving the calling data that the project issues, call the institute of data-interface indicated by described instruction right The subdata base answered, to obtain data.
Further, the master data source identification for receiving user terminal and sending, by the multiple data source mark point It is not tagged in corresponding data-interface, the corresponding data-interface in the master data source identification is labeled as master data interface, After the step of data-interface other than the master data interface is marked as data-interface, comprising:
Section note is carried out from data-interface to described using towards tangent plane programming.
Further, it after the instruction for receiving the calling data that the project issues, calls indicated by described instruction Data-interface institute the step of after, comprising:
Judge whether the subdata base corresponding with the data-interface is from subdata base;
If the subdata base corresponding with the data-interface is from subdata base, after calling end of data, from institute It states from subdata base and is switched to boss's database.
Further, if the subdata base corresponding with the data-interface is from subdata base, when calling number After, after described the step of being switched to boss's database from subdata base, comprising:
Obtain the data being not called upon in the subdata base;
The data being not called upon in the subdata base are deleted, to clear up the memory of the subdata base.
Further, it after the instruction for receiving the calling data that the project issues, calls indicated by described instruction Data-interface corresponding to subdata base the step of after, comprising:
Obtain boss's database uses memory accounting;
If boss's database is more than preset accounting threshold value using memory accounting, according to boss's database In data successively delete data from the sequencing that the primary data source uploads to boss's database, until the boss Database is less than or equal to the accounting threshold value using memory accounting.
Further, it after the instruction for receiving the calling data that the project issues, calls indicated by described instruction Data-interface corresponding to subdata base the step of after, comprising:
Obtain the call number of each data-interface;
Each data-interface is arranged according to sequence from big to small according to the call number of each data-interface Sequence, forms data-interface call number sequencing table, includes each data-interface and corresponding calling time in the sequencing table Number;
The sequencing table is sent to the user terminal.
Further, the call number according to each data-interface is to each data-interface according to from big to small Sequence be ranked up, formed data-interface call number sequencing table the step of after, comprising:
Judge whether primary data-interface is master data interface on the sequencing table;
The primary data-interface on the sequencing table is changed to the request of master data interface to described if it is not, sending User terminal.
The application also provides a kind of multi-source data reading device based on distributed system, comprising:
Frame module is obtained, for obtaining the structural framing of the pending item based on distributed system;
Source module is obtained, for the attribute information according to the structural framing, determines the data institute that the project needs Corresponding multiple data source marks;
Interface module is obtained, identifies corresponding data-interface for obtaining the multiple data source;
Mark module, for receiving the master data source identification of user terminal transmission, by the multiple data source mark point It is not tagged in corresponding data-interface, the corresponding data-interface in the master data source identification is labeled as master data interface, Other data-interfaces other than the master data interface are marked as data-interface, wherein the master data source identification It is that the user terminal is generated according to the master data source selection operation of user;
Module is established, for establishing boss's database in the database and from subdata base, boss's database is used It is described to be used to receive the data from data-interface from subdata base in the data for receiving the master data interface;
Calling module calls indicated by described instruction after the instruction for receiving the calling data that the project issues Data-interface corresponding to subdata base, to obtain data.
The application also provides a kind of computer equipment, including memory and processor, and the memory is stored with computer The step of program, the processor realizes any of the above-described the method when executing the computer program.
The application also provides a kind of computer readable storage medium, is stored thereon with computer program, the computer journey The step of method described in any of the above embodiments is realized when sequence is executed by processor.
The multi-source data read method and relevant device based on distributed system of the application, by the data of multiple data sources It concludes into two subdata bases, and the data in key data source are placed in boss's database, from the data of data source It is placed on from subdata base, does not need to switch when calling multiple data between data source, it is possible to reduce change database Number improves the stability of system operation.
Detailed description of the invention
Fig. 1 is the flow diagram of the multi-source data read method based on distributed system of one embodiment of the application;
Fig. 2 is the structural schematic block diagram of the multi-source data reading device based on distributed system of one embodiment of the application;
Fig. 3 is the structural schematic block diagram of the multi-source data reading device based on distributed system of one embodiment of the application;
Fig. 4 is the structural schematic block diagram of the multi-source data reading device based on distributed system of one embodiment of the application;
Fig. 5 is the structural schematic block diagram of the multi-source data reading device based on distributed system of one embodiment of the application;
Fig. 6 is the structural schematic block diagram of the multi-source data reading device based on distributed system of one embodiment of the application;
Fig. 7 is the structural schematic block diagram of the computer equipment of one embodiment of the application.
The embodiments will be further described with reference to the accompanying drawings for realization, functional characteristics and the advantage of the application purpose.
Specific embodiment
It is with reference to the accompanying drawings and embodiments, right in order to which the objects, technical solutions and advantages of the application are more clearly understood The application is further elaborated.It should be appreciated that specific embodiment described herein is only used to explain the application, not For limiting the application.
Referring to Fig.1, the embodiment of the present application provides a kind of multi-source data read method based on distributed system, including step It is rapid:
S1, the structural framing for obtaining the pending item based on distributed system;
S2, according to the attribute information of the structural framing, determine multiple data corresponding to data that the project needs Source identification;
S3, the corresponding data-interface of the multiple data source mark is obtained;
S4, the master data source identification that user terminal is sent is received, the multiple data source mark is tagged to pair respectively In the data-interface answered, the corresponding data-interface in the master data source identification is labeled as master data interface, by the main number It marks according to other data-interfaces other than interface as data-interface, wherein the master data source identification is the user What end was generated according to the master data source selection operation of user;
S5, boss's database is established in the database and from subdata base, boss's database is described for receiving The data of master data interface, it is described to be used to receive the data from data-interface from subdata base;
S6, after receiving the instructions of the callings data that the project issues, data-interface indicated by calling described instruction Corresponding subdata base, to obtain data.
As described in above-mentioned steps S1, distributed system is that distributed system (distributed system) is built upon net Software systems on network, project operation are based on the distributed system.The structural framing of project include each task of project with And the data that each task needs to use or call.After server is connect with project, project information is got, according to project information Get the structural framing of project.
As described in above-mentioned steps S2, server reads the attribute information of each structural framing, reads the data that each frame needs Type and data source, wherein above-mentioned data type and above-mentioned data source are to belong to above-mentioned attribute information.Because of each frame The data type that frame needs is different, and to the requirement of the timeliness of data, when obtaining data simultaneously also according to above-mentioned attribute Acquisition of information data source interface.The type for the data that multiple data source interfaces are needed with project respectively corresponds.Data source Refer to the modular element with generation data or storing data, the mark on the element, that is, data source mark, to multiple Element adds different marks, to distinguish.Attribute information of the server according to frame, data required for identifying project The corresponding data source mark in source.
As described in above-mentioned steps S3, when project receives the data of user terminal or system upload, each user terminal Title or systematic name each mean a data source identification.Data source is connect with project by a data-interface, number It can be the such as USB interface title on hardware according to the corresponding data source mark of interface, be also possible to be wirelessly connected such as bluetooth Title, title of mobile network's connecting object of connecting object etc., the data-interface of wireless connection are that data source mark is hard IP address where part.Server obtains the data source mark either wireless network connection by the port serial port of hardware The data source mark of IP address obtain the data-interface of data source.In a specific embodiment, an investigation is ground Study carefully and the mass data of a certain trade company is needed to be studied, which has oneself a merchant database orcale, simultaneously should The transaction data of platform where trade company is stored in another transaction data base postgresql, then this project is investigated Above-mentioned orcale and postgresql is data source, while reading the data-interface mark of merchant database and transaction data base Know, then gets data-interface and identify corresponding data-interface.In other embodiments, the data source mark of database connection Know more than two.
As described in above-mentioned steps S4, data source mark have it is multiple, when calling data, one of data source Data are main sources, and the data of other data sources are secondary sources.User terminal is according to required data type and number According to demand informations such as attributes, data source is marked, the most data source of data is labeled as main source, database Other data sources of connection are defaulted as secondary source.Server receives after user terminal selected master data source, by main number It is labeled as master data interface according to the corresponding data-interface in source, while by other data sources other than the master data source Data-interface marks as data-interface.
As described in above-mentioned steps S5, database (Database) is to come tissue, storage and management data according to data structure Warehouse of the foundation on computer memory device.It is the file cabinet that can be considered electronization in itself in simple terms --- storage electronics The place of file, user such as can increase to the data in file, intercept, update, deleting newly at the operation.Server is in database In establish two subdata bases, and connect one of subdata base with above-mentioned master data interface, be served only for storage master data The data of the corresponding data source of interface.Another subdata base and other be separately connected from data-interface, for storing other Its data from the corresponding data source of data-interface.Wherein, boss's database is used for for connecting with external server Directly the data in boss's database are used for external server.It is establishing after subdata base, is often getting one from number According to source, be from subdata base it is above-mentioned establish a space from data source, and with entitled space life from data source Name.
Such as above-mentioned steps S6, when project needs data, distributed system sends out the instruction for calling data to database. After server receives instruction, which is parsed according to default rule, obtains out the attribute information for instructing the data of needs, so Afterwards according to the attribute information of data, judge to instruct which data source is corresponding data be specifically, then according to data come The corresponding relationship in source and data-interface, the data for identifying that the instruction needs should be obtained from which data-interface.Then it controls Distributed system corresponding with data-interface subdata base connection calls boss's database in database or from subdata Library, to carry out the data of acquisition instruction demand from boss's database or from subdata base.It thus only need to be from a database The data of multiple data sources can be got.
In one embodiment, the master data source identification that above-mentioned reception user terminal is sent, the multiple data source mark Knowledge is tagged to respectively in corresponding data-interface, and the corresponding data-interface in the master data source identification is connect labeled as master data Mouthful, after the step of other data-interfaces other than the master data interface are marked as data-interface, comprising:
S411, section note is carried out from data-interface to described using towards tangent plane programming.
It is the abbreviation of Aspect Oriented Programming, mainly towards tangent plane programming, that is, AOP in the present embodiment It is for carrying out section note from data-interface for each.It is connection from data-interface from subdata base, therefore, each from son Database corresponds to multiple from data-interface.When needs in subdata base when calling data, convenient for preferably calling out data, It just has to determine corresponding data source and corresponding data-interface.This programme will be from the corresponding each data of subdata base Interface is marked, and carries out section note by AOP, the corresponding data-interface of data is quickly identified convenient for server, from And rapidly navigate to specific data source.In the specifically used data source of method roofing control.
In one embodiment, after the above-mentioned instruction for receiving the calling data that the project issues, described instruction is called After the step of subdata base corresponding to indicated data-interface, comprising:
Whether subdata base corresponding with the data-interface described in S7, judgement is from subdata base;
If S8, the subdata base corresponding with the data-interface be from subdata base, after calling end of data, from It is described to be switched to boss's database from subdata base.
In the present embodiment, it is above-mentioned get the corresponding data-interface of instruction after, judge the corresponding subnumber of above-mentioned data-interface It whether is from subdata base according to library.User terminal first judges master data source when boss's database is arranged with from subdata base, Then the master data interface with database interface is got according to master data source, and adds label on master data interface.This Place, server judges whether there is above-mentioned label on data-interface, if it is not, determining that above-mentioned data-interface is connect from data Mouthful, corresponding subdata base is from subdata base.It is calling before the data in subdata base, is getting data-interface first Interface ID judges the title from data source, then adjusts again from subdata base with from the identical space of data source name Use data.After server is from the calling in subdata base, database is cut from from subdata base again with distributed system It gains and is connect with boss's database, timely to call the data in boss's database again.
In one embodiment, if the above-mentioned subdata base corresponding with the data-interface be from subdata base, when After calling end of data, after described the step of being switched to boss's database from subdata base, comprising:
The data being not called upon from subdata base described in S9, acquisition;
S10, the data being not called upon from subdata base are deleted, to clear up the memory of the subdata base.
In the present embodiment, with many from the corresponding data of data source from subdata base, but not necessarily whole quilts Project system calls, and only calls corresponding data according to the instruction received, therefore the data having do not have to call, and these are not Certain space is being occupied from subdata base with the data of calling, the time, which has been grown, to be taken from the space of subdata base, to make It can not upload to from the data of data source from subdata base.Therefore, after server parses the instructions of above-mentioned calling data, obtaining is needed Then the data validation for not having above-mentioned attribute from subdata base is the data of never call by the attribute of the data to be called, Then the data of these never calls are deleted, clears up the memory from subdata base, save space, make entire database operation more It is smooth.
In one embodiment, above-mentioned according to the data-interface, call subdata base corresponding with the data-interface The step of after, comprising:
S11, the use memory accounting for obtaining boss's database;
If S12, boss's database are more than preset accounting threshold value using memory accounting, according to boss's number Data are successively deleted from the sequencing that the primary data source uploads to boss's database according to the data in library, until described Boss's database is less than or equal to the accounting threshold value using memory accounting.
In the present embodiment, boss's database is a cloud storage space, has certain memory headroom.When the memory headroom It when the data volume of storage reaches a fixed number, will affect the data of the reception primary data source of boss's database, and then will affect item Mesh system calls the speed of the data of boss's database, to slow down the speed of service of project system.Therefore, it is necessary to boss Database is cleared up, and is avoided boss's data database storing excessive and is slowed down the data of project system calling boss's database Speed.Server reads the attribute of boss's database first, gets total storage size of boss's database, obtains simultaneously The memory size of all data on boss's database obtains the master then by above-mentioned memory size divided by total storage size The memory accounting of subdata base, memory accounting are a percentage.Then the memory accounting and preset accounting threshold value are carried out Compare, if memory accounting is greater than accounting threshold value, illustrates the overabundance of data in boss's database, then by the number in boss's database According to being deleted.The sequencing of boss's database is uploaded to according to data, preferential delete uploads to boss's database earliest On data, it is every delete certain data after, the memory accounting of boss's database is obtained again, if the memory obtained again accounts for Than being still greater than accounting threshold value, then continue to delete data in the order described above.In this way, until memory accounting is less than or equal to accounting threshold Value.It keeps the space of boss's database sufficiently large in this way, keeps quickly uploading when uploading to data on boss's database.
In one embodiment, after the above-mentioned instruction for receiving the calling data that the project issues, described instruction is called After the step of subdata base corresponding to indicated data-interface, comprising:
S611, the call number for obtaining each data-interface;
S612, according to each data-interface call number to each data-interface according to sequence from big to small into Row sequence forms data-interface call number sequencing table, includes each data-interface and corresponding tune in the sequencing table Use number;
S613, the sequencing table is sent to the user terminal.
In the present embodiment, after project, which has issued, calls data command, the designated recorder that server issues project, with The calling log of formation project calling data.Server reads the calling log, obtains the call number of each data-interface.So Afterwards according to above-mentioned call number, each data-interface is ranked up, forms sequencing table, to indicate what each data-interface was called Frequency, while the number that also each data-interface is called loads the corresponding position on sequencing table.Then the sequencing table is sent out User terminal is given, the calling situation of each data source is analyzed convenient for staff.
In one embodiment, the above-mentioned call number according to each data-interface to each data-interface according to from After the step of arriving small sequence greatly to be ranked up, forming data-interface call number sequencing table, comprising:
S614, judge whether primary data-interface is master data interface on the sequencing table;
S615, the primary data-interface on the sequencing table is changed to the request of master data interface if it is not, generating To the user terminal.
In the present embodiment, server reads the primary data-interface on sequencing table, the i.e. most data of calling data Then the data-interface is compared by interface with the master data interface that above-mentioned user terminal defines, see whether be the same data Interface, if so, it is reasonable for illustrating that the data-interface is defined as master data interface.If it is not, then illustrating that the data-interface is fixed Justice is that main data-interface is more unreasonable, so that switching times are not least, therefore generates the request of change master data interface extremely User terminal, in order to change master data interface after customer analysis.
In conclusion the multi-source data read method based on distributed system of the application, by the data of multiple data sources It concludes into two subdata bases, and the data in key data source are placed in boss's database, from the data of data source It is placed on from subdata base, does not need to switch when calling multiple data between data source, it is possible to reduce change database Number improves the stability of system operation.
Referring to Fig. 2, a kind of multi-source data reading device based on distributed system is also provided in the embodiment of the present application, is wrapped It includes:
Frame module 1 is obtained, for obtaining the structural framing of the pending item based on distributed system;
Source module 2 is obtained, for the attribute information according to the structural framing, determines the data institute that the project needs Corresponding multiple data source marks;
Interface module 3 is obtained, identifies corresponding data-interface for obtaining the multiple data source;
Mark module 4, for receiving the master data source identification of user terminal transmission, by the multiple data source mark point It is not tagged in corresponding data-interface, the corresponding data-interface of the master data interface is labeled as master data interface, by institute It states the data-interface other than master data interface to mark as data-interface, wherein the master data source identification is the use Family end is generated according to the master data source selection operation of user;
Module 5 is established, for establishing boss's database in the database and from subdata base, boss's database is used It is described to be used to receive the data from data-interface from subdata base in the data for receiving the master data interface;
Calling module 6 calls indicated by described instruction after the instruction for receiving the calling data that the project issues Data-interface corresponding to subdata base, to obtain data.
In the present embodiment, distributed system is that distributed system (distributed system) is built upon on network Software systems, project operation be based on the distributed system.The structural framing of project includes each task of project and each Task needs the data for using or calling.After acquisition frame module 1 is connect with project, project information is got, is believed according to project Breath gets the structural framing of project.
The attribute information that source module 2 reads each structural framing is obtained, data type and number that each frame needs are read According to source, wherein above-mentioned data type and above-mentioned data source are to belong to above-mentioned attribute information.The number needed by each frame It is different according to type, and to the requirement of the timeliness of data, number is obtained also according to above-mentioned attribute information simultaneously when obtaining data According to source interface.The type for the data that multiple data source interfaces are needed with project respectively corresponds.Data source, which refers to have, to be produced The modular element of data or storing data is given birth to, the mark on the element, that is, data source mark, not to multiple element addition Same mark, to distinguish.Obtain attribute information of the source module 2 according to frame, required data source of identifying project Corresponding data source mark.
When project receives the data of user terminal or system upload, each user terminal title or systematic name each mean one A data source identification.Data source is connect with project by a data-interface, the corresponding data source mark of data-interface Know the such as USB interface title that can be on hardware, is also possible to be wirelessly connected the title such as bluetooth connection object, mobile network The title etc. of connecting object, the data-interface of wireless connection are the IP address where the hardware of data source mark.Obtain interface Module 3 obtain by the data of the data source mark either IP address of wireless network connection of the port serial port of hardware come Source identifies to obtain the data-interface of data source.In a specific embodiment, an investigation needs a certain trade company Mass data is studied, which has oneself a merchant database orcale, while the platform where the trade company Transaction data is stored in another transaction data base postgresql, then this project investigation above-mentioned orcale and Postgresql is data source, while reading the data-interface mark of merchant database and transaction data base, is then obtained Corresponding data-interface is identified to data-interface.In other embodiments, the data source of database connection identifies more than two.
Data source mark have it is multiple, when calling data, the data of one of data source are main sources, The data of his data source are secondary sources.User terminal according to demand informations such as required data type and data attributes, Data source is marked, the most data source of data is labeled as main source, other data of database connection are come Source is defaulted as secondary source.Mark module 4 receives after user terminal selected master data source, by the corresponding data in master data source Interface flag be main data-interface, while by the data-interface of other data sources other than the master data source mark be From data-interface.
Database (Database) is to carry out the foundation of tissue, storage and management data according to data structure in computer storage Warehouse in equipment.It is the file cabinet that can be considered electronization in itself in simple terms --- the place of storage electronic document, Yong Huke The data in file are increased newly, intercept, update, delete etc. with operation.It establishes module 5 and establishes two subnumbers in the database It according to library, and connect one of subdata base with above-mentioned master data interface, is served only for the corresponding data of storage master data interface The data in source.Another subdata base and other be separately connected from data-interface, for store other its from data-interface pair The data for the data source answered.Wherein, boss's database is for connecting with external server, for directly by boss's data Data in library are used for external server.It is establishing after subdata base, is often getting one from data source, from subdata Be in library it is above-mentioned establish a space from data source, and with entitled space name from data source.
When project needs data, distributed system sends out the instruction for calling data to database.Calling module 6 receives To after instruction, which is parsed according to default rule, the attribute information for instructing the data of needs is obtained out, then according to data Attribute information, calling module 6, which identifies out, instructs which data source is corresponding data be specifically, then according to data come The corresponding relationship in source and data-interface, the data for identifying that the instruction needs should be obtained from which data-interface.Then it calls Module 6 controls the subdata base connection corresponding with the data-interface of above-mentioned distributed system, calls boss's data in database Library or from subdata base, to carry out the data of acquisition instruction demand from boss's database or from subdata base.It thus only need to be from The data of multiple data sources can be got in one database.
Referring to Fig. 3, in one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
Module 411 is explained, for carrying out section note from data-interface to described using towards tangent plane programming.
It is the abbreviation of Aspect Oriented Programming, mainly towards tangent plane programming, that is, AOP in the present embodiment It is for carrying out section note from data-interface for each.It is connection from data-interface from subdata base, therefore, each from son Database corresponds to multiple from data-interface.When needs in subdata base when calling data, convenient for preferably calling out data, It just has to determine corresponding data source and corresponding data-interface.This programme explains module 411 will be from subdata base pair The each data-interface answered is marked, and carries out section note by AOP, quickly identifies that data are corresponding convenient for server Data-interface, to rapidly navigate to specific data source.In the specifically used data source of method roofing control.
Referring to Fig. 4, in one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
First judgment module 7, for judging whether the subdata base corresponding with the data-interface is from subdata Library;
Switching module 8, if being from subdata base, when calling number for the subdata base corresponding with the data-interface After, boss's database is switched to from subdata base from described.
In the present embodiment, it is above-mentioned get the corresponding data-interface of instruction after, first judgment module 7 judges that above-mentioned data connect Whether the corresponding subdata base of mouth is from subdata base.User terminal first judges when boss's database is arranged with from subdata base Then master data source out gets the master data interface with database interface according to master data source, and in master data interface Upper addition label.Herein, first judgment module 7 judges whether there is above-mentioned label on data-interface, if it is not, determining above-mentioned Data-interface is from data-interface, and corresponding subdata base is from subdata base.It is calling before the data in subdata base, it is first The interface ID for first getting data-interface, judges the title from data source, then again from subdata base and from data source Title calls data in identical space.After server is from the calling in subdata base, switching module 8 by database with Distributed system is connect with boss's database from switching back into from subdata base again, timely to call in boss's database again Data.
In one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
Never call module 9, for obtaining the data being not called upon from subdata base;
First removing module 10, for deleting the data being not called upon from subdata base, to clear up the son The memory of database.
In the present embodiment, with many from the corresponding data of data source from subdata base, but not necessarily whole quilts Project system calls, and only calls corresponding data according to the instruction received, therefore the data having do not have to call, and these are not Certain space is being occupied from subdata base with the data of calling, the time, which has been grown, to be taken from the space of subdata base, to make It can not upload to from the data of data source from subdata base.Therefore, after never call module 9 parses the instructions of above-mentioned calling data, The attribute for needing the data called is obtained, is then never call by the data validation for not having above-mentioned attribute from subdata base Data, then the first removing module 10 deletes the data of these never calls, clears up the memory from subdata base, saves space, Keep entire database operation more smooth.
Referring to Fig. 5, in one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
Accounting module 11 is obtained, for obtaining the use memory accounting of boss's database;
Second removing module 12, if the memory accounting that uses for boss's database is more than preset accounting threshold value, Then the sequencing of boss's database is uploaded to successively from the primary data source according to the data in boss's database Data are deleted, until boss's database is less than or equal to the accounting threshold value using memory accounting.
In the present embodiment, boss's database is a cloud storage space, has certain memory headroom.When the memory headroom It when the data volume of storage reaches a fixed number, will affect the data of the reception primary data source of boss's database, and then will affect item Mesh system calls the speed of the data of boss's database, to slow down the speed of service of project system.Therefore, it is necessary to boss Database is cleared up, and is avoided boss's data database storing excessive and is slowed down the data of project system calling boss's database Speed.The attribute that accounting module 11 reads boss's database first is obtained, total storage size of boss's database is got, The memory sizes of all data on boss's database is obtained simultaneously, then by above-mentioned memory size divided by total storage size, The memory accounting of boss's database is obtained, memory accounting is a percentage.Then by the memory accounting and preset accounting Threshold value is compared, if memory accounting is greater than accounting threshold value, illustrates the overabundance of data in boss's database, then second deletes mould Block 12 deletes the data in boss's database.The sequencing that boss's database is uploaded to according to data, is preferentially deleted Except the data uploaded on boss's database earliest, after the certain data of every deletion, the memory for obtaining boss's database again is accounted for Than continuing to delete data in the order described above if the memory accounting obtained again is still greater than accounting threshold value.In this way, until Memory accounting is less than or equal to accounting threshold value.It keeps the space of boss's database sufficiently large in this way, data is made to upload to the boss It keeps quickly uploading when on database.
Referring to Fig. 6, in one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
Times of acquisition module 611, for obtaining the call number of each data-interface;
Sorting module 612, for the call number according to each data-interface to each data-interface according to from big It is ranked up to small sequence, forms data-interface call number sequencing table, include each data-interface in the sequencing table And corresponding call number;
Sending module 613, for the sequencing table to be sent to the user terminal.
In the present embodiment, after project, which has issued, calls data command, times of acquisition module 611 is by the finger of project sending Fixed record, to form the calling log that project calls data.Times of acquisition module 611 reads the calling log, obtains each number According to the call number of interface.Then according to above-mentioned call number, sorting module 612 is ranked up each data-interface, is formed Sequencing table to indicate the called frequency of each data-interface, while also sorting the number load that each data-interface is called Corresponding position on table.Then the sequencing table is sent to user terminal by sending module 613, analyzes each data convenient for staff The calling situation in source.
In one embodiment, the above-mentioned multi-source data reading device based on distributed system further include:
Second judgment module 614, for judging whether primary data-interface is master data interface on the sequencing table;
Request module 615 is sent, if primary data-interface is not master data interface on the sequencing table, is sent Primary data-interface on the sequencing table is changed to the request of master data interface to the user terminal.
In the present embodiment, the second judgment module 14 reads the primary data-interface on sequencing table, that is, calls data most More data-interfaces, then the second judgment module 14 compares the master data interface that the data-interface is defined with above-mentioned user terminal Compared with seeing whether be the same data-interface, if so, it is reasonable for illustrating that the data-interface is defined as master data interface.If no It is that then to illustrate that the data-interface is defined as master data interface more unreasonable, so that switching times are not least, therefore send and ask Modulus block 15 sends the request of change master data interface to user terminal, in order to change master data interface after customer analysis.
In conclusion the multi-source data reading device based on distributed system of the application, by the data of multiple data sources It concludes into two subdata bases, and the data in key data source are placed in boss's database, from the data of data source It is placed on from subdata base, does not need to switch when calling multiple data between data source, it is possible to reduce change database Number improves the stability of system operation.
Referring to Fig. 7, a kind of computer equipment is also provided in the embodiment of the present application, which can be server, Its internal structure can be as shown in Figure 7.The computer equipment includes processor, the memory, network connected by system bus Interface and database.Wherein, the processor of the Computer Design is for providing calculating and control ability.The computer equipment is deposited Reservoir includes non-volatile memory medium, built-in storage.The non-volatile memory medium is stored with operating system, computer program And database.The internal memory provides environment for the operation of operating system and computer program in non-volatile memory medium.It should The database of computer equipment is used to store boss's database, from subdata base, the data such as data of data source.The computer The network interface of equipment is used to communicate with external terminal by network connection.The computer program is executed by processor Shi Yishi A kind of existing multi-source data read method based on distributed system.
Above-mentioned processor executes the step of method that the above-mentioned multi-source data based on distributed system is read: obtaining and is based on dividing The structural framing of the pending item of cloth system;According to the attribute information of the structural framing, the project needs are determined Data corresponding multiple data sources mark;It obtains the multiple data source and identifies corresponding data-interface;It connects The master data source identification that user terminal is sent is received, the multiple data source mark is tagged to corresponding data-interface respectively In, the corresponding data-interface in the master data source identification is labeled as master data interface, other than the master data interface Other data-interfaces mark as data-interface, wherein the master data source identification is the user terminal according to user What master data source selection operation generated;Boss's database is established in the database and from subdata base, boss's data Library is used to receive the data of the master data interface, described to be used to receive the data from data-interface from subdata base;It connects After the instruction for receiving the calling data that the project issues, subdata corresponding to data-interface indicated by described instruction is called Library, to obtain data.
In one embodiment, above-mentioned processor executes the master data source identification that the reception user terminal is sent, by institute It states multiple data source marks to be tagged to respectively in corresponding data-interface, the corresponding data in the master data source identification is connect The step of mouthful being labeled as master data interface, the data-interface other than the master data interface marked as data-interface it Afterwards, comprising: carry out section note from data-interface to described using towards tangent plane programming.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling data-interface institute indicated by described instruction, comprising: judgement is described corresponding with the data-interface Whether subdata base is from subdata base;If the subdata base corresponding with the data-interface is to work as tune from subdata base After end of data, boss's database is switched to from subdata base from described.
In one embodiment, it is if above-mentioned processor executes the subdata base corresponding with the data-interface From subdata base, after calling end of data, after described the step of being switched to boss's database from subdata base, packet It includes: obtaining the data being not called upon in the subdata base;The data being not called upon in the subdata base are deleted, with cleaning The memory of the subdata base.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling subdata base corresponding to data-interface indicated by described instruction, comprising: obtain boss's number Memory accounting is used according to library;If boss's database is more than preset accounting threshold value using memory accounting, according to institute The data stated in boss's database successively delete data from the sequencing that the primary data source uploads to boss's database, Until boss's database is less than or equal to the accounting threshold value using memory accounting.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling subdata base corresponding to data-interface indicated by described instruction, comprising: obtain each data-interface Call number;Each data-interface is carried out according to sequence from big to small according to the call number of each data-interface Sequence forms data-interface call number sequencing table, includes each data-interface and corresponding calling in the sequencing table Number;The sequencing table is sent to the user terminal.
In one embodiment, above-mentioned processor executes the call number according to each data-interface to each described After the step of data-interface is ranked up according to sequence from big to small, forms data-interface call number sequencing table, comprising: Judge whether primary data-interface is master data interface on the sequencing table;If it is not, sending the on the sequencing table One data-interface is changed to the request of master data interface to the user terminal.
In conclusion the computer equipment of the application, by the Data induction of multiple data sources into two subdata bases, and And the data in key data source are placed in boss's database, are placed on from subdata base from the data of data source, are being called It does not need to switch when multiple data between data source, it is possible to reduce change the number of database, improve the stabilization of system operation Property.
It will be understood by those skilled in the art that structure shown in Fig. 7, only part relevant to application scheme is tied The block diagram of structure does not constitute the restriction for the computer equipment being applied thereon to application scheme.
One embodiment of the application also provides a kind of computer readable storage medium, is stored thereon with computer program, calculates Machine program realizes a kind of multi-source data read method based on distributed system when being executed by processor, specifically: acquisition is based on The structural framing of the pending item of distributed system;According to the attribute information of the structural framing, determine that the project needs The corresponding multiple data source marks for the data wanted;It obtains the multiple data source and identifies corresponding data-interface; The master data source identification that user terminal is sent is received, the multiple data source mark is tagged to corresponding data-interface respectively In, the corresponding data-interface in the master data source identification is labeled as master data interface, other than the master data interface Other data-interfaces mark as data-interface, wherein the master data source identification is the user terminal according to user What master data source selection operation generated;Boss's database is established in the database and from subdata base, boss's data Library is used to receive the data of the master data interface, described to be used to receive the data from data-interface from subdata base;It connects After the instruction for receiving the calling data that the project issues, subdata corresponding to data-interface indicated by described instruction is called Library, to obtain data.
In one embodiment, above-mentioned processor executes the master data source identification that the reception user terminal is sent, by institute It states multiple data source marks to be tagged to respectively in corresponding data-interface, the corresponding data in the master data source identification is connect The step of mouthful being labeled as master data interface, the data-interface other than the master data interface marked as data-interface it Afterwards, comprising: carry out section note from data-interface to described using towards tangent plane programming.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling data-interface institute indicated by described instruction, comprising: judgement is described corresponding with the data-interface Whether subdata base is from subdata base;If the subdata base corresponding with the data-interface is to work as tune from subdata base After end of data, boss's database is switched to from subdata base from described.
In one embodiment, it is if above-mentioned processor executes the subdata base corresponding with the data-interface From subdata base, after calling end of data, after described the step of being switched to boss's database from subdata base, packet It includes: obtaining the data being not called upon in the subdata base;The data being not called upon in the subdata base are deleted, with cleaning The memory of the subdata base.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling subdata base corresponding to data-interface indicated by described instruction, comprising: obtain boss's number Memory accounting is used according to library;If boss's database is more than preset accounting threshold value using memory accounting, according to institute The data stated in boss's database successively delete data from the sequencing that the primary data source uploads to boss's database, Until boss's database is less than or equal to the accounting threshold value using memory accounting.
In one embodiment, the instruction for the calling data that the project issues is received described in above-mentioned processor execution Afterwards, after the step of calling subdata base corresponding to data-interface indicated by described instruction, comprising: obtain each data-interface Call number;Each data-interface is carried out according to sequence from big to small according to the call number of each data-interface Sequence forms data-interface call number sequencing table, includes each data-interface and corresponding calling in the sequencing table Number;The sequencing table is sent to the user terminal.
In one embodiment, above-mentioned processor executes the call number according to each data-interface to each described After the step of data-interface is ranked up according to sequence from big to small, forms data-interface call number sequencing table, comprising: Judge whether primary data-interface is master data interface on the sequencing table;If it is not, sending the on the sequencing table One data-interface is changed to the request of master data interface to the user terminal.
In conclusion the computer readable storage medium of the application, by the Data induction of multiple data sources to two subnumbers According in library, and the data in key data source are placed in boss's database, are placed on from the data of data source from subdata base In, it does not need to switch when calling multiple data between data source, it is possible to reduce change the number of database, improve system fortune Capable stability.
Those of ordinary skill in the art will appreciate that realizing all or part of the process in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, the computer program can be stored in a non-volatile computer In read/write memory medium, the computer program is when being executed, it may include such as the process of the embodiment of above-mentioned each method.Wherein, Any reference used in provided herein and embodiment to memory, storage, database or other media, Including non-volatile and/or volatile memory.Nonvolatile memory may include read-only memory (ROM), programming ROM (PROM), electrically programmable ROM (EPROM), electrically erasable ROM (EEPROM) or flash memory.Volatile memory may include Random access memory (RAM) or external cache.By way of illustration and not limitation, RAM is available in many forms, Such as static state RAM (SRAM), dynamic ram (DRAM), synchronous dram (SDRAM), double speed are according to rate SDRAM (SSRSDRAM), enhancing Type SDRAM (ESDRAM), synchronization link (Synchlink) DRAM (SLDRAM), memory bus (Rambus) direct RAM (RDRAM), direct memory bus dynamic ram (DRDRAM) and memory bus dynamic ram (RDRAM) etc..
It should be noted that, in this document, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that the process, device, article or the method that include a series of elements not only include those elements, and And further include other elements that are not explicitly listed, or further include for this process, device, article or method institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including being somebody's turn to do There is also other identical elements in the process, device of element, article or method.
The foregoing is merely preferred embodiment of the present application, are not intended to limit the scope of the patents of the application, all utilizations Equivalent structure or equivalent flow shift made by present specification and accompanying drawing content is applied directly or indirectly in other correlations Technical field, similarly include in the scope of patent protection of the application.

Claims (10)

1. a kind of multi-source data read method based on distributed system characterized by comprising
Obtain the structural framing of the pending item based on distributed system;
According to the attribute information of the structural framing, multiple data source marks corresponding to the data of the project needs are determined Know;
It obtains the multiple data source and identifies corresponding data-interface;
The master data source identification that user terminal is sent is received, the multiple data source mark is tagged to corresponding data respectively In interface, by the corresponding data-interface in the master data source identification be labeled as master data interface, by the master data interface with Other outer data-interfaces mark as data-interface, wherein the master data source identification be the user terminal according to What the master data source selection operation at family generated;
Boss's database is established in the database and from subdata base, boss's database connects for receiving the master data The data of mouth, it is described to be used to receive the data from data-interface from subdata base;
After the instruction for receiving the calling data that the project issues, call corresponding to data-interface indicated by described instruction Subdata base, to obtain data.
2. the multi-source data read method based on distributed system as described in claim 1, which is characterized in that the reception is used The multiple data source mark is tagged in corresponding data-interface by the master data source identification that family end is sent respectively, will The corresponding data-interface in the master data source identification is labeled as master data interface, by other numbers other than the master data interface After the step of marking according to interface as data-interface, comprising:
Section note is carried out from data-interface to described using towards tangent plane programming.
3. the multi-source data read method based on distributed system as described in claim 1, which is characterized in that described to receive After the instruction for the calling data that the project issues, subdata base corresponding to data-interface indicated by described instruction is called After step, comprising:
Judge whether the subdata base corresponding with the data-interface is from subdata base;
If the subdata base corresponding with the data-interface be from subdata base, after calling end of data, from it is described from Subdata base is switched to boss's database.
4. the multi-source data read method based on distributed system as claimed in claim 3, which is characterized in that if described Subdata base corresponding with the data-interface is after calling end of data, to be cut from subdata base from described from subdata base After the step of changing to boss's database, comprising:
Obtain the data being not called upon in the subdata base;
The data being not called upon in the subdata base are deleted, to clear up the memory of the subdata base.
5. the multi-source data read method based on distributed system as described in claim 1, which is characterized in that described to receive After the instruction for the calling data that the project issues, subdata base corresponding to data-interface indicated by described instruction is called After step, comprising:
Obtain boss's database uses memory accounting;
If boss's database is more than preset accounting threshold value using memory accounting, according in boss's database Data successively delete data from the sequencing that the primary data source uploads to boss's database, until boss's data Library is less than or equal to the accounting threshold value using memory accounting.
6. the multi-source data read method based on distributed system as described in claim 1, which is characterized in that described to receive After the instruction for the calling data that the project issues, subdata base corresponding to data-interface indicated by described instruction is called After step, comprising:
Obtain the call number of each data-interface;
Each data-interface is ranked up according to sequence from big to small according to the call number of each data-interface, shape It include each data-interface and corresponding call number in the sequencing table at data-interface call number sequencing table;
The sequencing table is sent to the user terminal.
7. the multi-source data read method based on distributed system as claimed in claim 6, which is characterized in that described according to each The call number of the data-interface is ranked up each data-interface according to sequence from big to small, forms data-interface After the step of call number sequencing table, comprising:
Judge whether primary data-interface is master data interface on the sequencing table;
The primary data-interface on the sequencing table is changed to the request of master data interface to the user if it is not, sending End.
8. a kind of multi-source data reading device based on distributed system characterized by comprising
Frame module is obtained, for obtaining the structural framing of the pending item based on distributed system;
Source module is obtained, for the attribute information according to the structural framing, corresponding to the data for determining the project needs Multiple data sources mark;
Interface module is obtained, identifies corresponding data-interface for obtaining the data source;
Mark module marks the multiple data source mark for receiving the master data source identification of user terminal transmission respectively Remember in corresponding data-interface, the corresponding data-interface in the master data source identification is labeled as master data interface, by institute It states other data-interfaces other than master data interface to mark as data-interface, wherein the master data source identification is institute State what user terminal was generated according to the master data source selection operation of user;
Module is established, for establishing boss's database in the database and from subdata base, boss's database is for connecing The data of the master data interface are received, it is described to be used to receive the data from data-interface from subdata base;
Calling module calls number indicated by described instruction after the instruction for receiving the calling data that the project issues According to subdata base corresponding to interface, to obtain data.
9. a kind of computer equipment, including memory and processor, the memory are stored with computer program, feature exists In the step of processor realizes any one of claims 1 to 7 the method when executing the computer program.
10. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the computer program The step of method described in any one of claims 1 to 7 is realized when being executed by processor.
CN201910219301.6A 2019-03-21 2019-03-21 Multi-source data read method and relevant device based on distributed system Pending CN110083659A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910219301.6A CN110083659A (en) 2019-03-21 2019-03-21 Multi-source data read method and relevant device based on distributed system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910219301.6A CN110083659A (en) 2019-03-21 2019-03-21 Multi-source data read method and relevant device based on distributed system

Publications (1)

Publication Number Publication Date
CN110083659A true CN110083659A (en) 2019-08-02

Family

ID=67413400

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910219301.6A Pending CN110083659A (en) 2019-03-21 2019-03-21 Multi-source data read method and relevant device based on distributed system

Country Status (1)

Country Link
CN (1) CN110083659A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113139797A (en) * 2020-02-18 2021-07-20 国网河北省电力有限公司 High-efficiency power auditing method based on satellite map technology

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102483693A (en) * 2009-02-10 2012-05-30 阿雅斯迪公司 Systems and methods for visualization of data analysis
CN106372994A (en) * 2016-08-31 2017-02-01 北京炎黄新星网络科技有限公司 Method and system for processing orders
US20170046361A1 (en) * 2015-08-10 2017-02-16 American Express Travel Related Services Company, Inc Systems, methods, and apparatuses for creating a shared file system between a mainframe and distributed systems
US20170116206A1 (en) * 2015-10-27 2017-04-27 TalkCycle LLC dba FrontSpin Real-time synchronization of data between disparate cloud data sources
US20170249321A1 (en) * 2016-02-25 2017-08-31 Sap Se Load back of archived data
US20180253451A1 (en) * 2017-03-05 2018-09-06 Jonathan Sean Callan System and method for enforcing the structure and content of databases synchronized over a distributed ledger

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102483693A (en) * 2009-02-10 2012-05-30 阿雅斯迪公司 Systems and methods for visualization of data analysis
US20170046361A1 (en) * 2015-08-10 2017-02-16 American Express Travel Related Services Company, Inc Systems, methods, and apparatuses for creating a shared file system between a mainframe and distributed systems
US20170116206A1 (en) * 2015-10-27 2017-04-27 TalkCycle LLC dba FrontSpin Real-time synchronization of data between disparate cloud data sources
US20170249321A1 (en) * 2016-02-25 2017-08-31 Sap Se Load back of archived data
CN106372994A (en) * 2016-08-31 2017-02-01 北京炎黄新星网络科技有限公司 Method and system for processing orders
US20180253451A1 (en) * 2017-03-05 2018-09-06 Jonathan Sean Callan System and method for enforcing the structure and content of databases synchronized over a distributed ledger

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
贺智明;王鹏飞;: "基于Hibernate的高校网络教育平台的设计与实现", 江西理工大学学报, no. 04, 30 August 2006 (2006-08-30) *
阳成飞;周晓光;李光强;: "基于巡检终端的燃气管网增量数据采集系统设计与实现", 测绘与空间地理信息, no. 12, 25 December 2014 (2014-12-25) *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113139797A (en) * 2020-02-18 2021-07-20 国网河北省电力有限公司 High-efficiency power auditing method based on satellite map technology
CN113139797B (en) * 2020-02-18 2022-08-02 国网河北省电力有限公司 High-efficiency power auditing method based on satellite map technology

Similar Documents

Publication Publication Date Title
KR100932803B1 (en) Method and system for an atomically updated, central cache memory
CN109039870B (en) Mail sending method, system, computer device and storage medium
CN110399420A (en) A kind of deriving method, electronic equipment and the medium of configurableization Excel format
US20130157696A1 (en) Method of Displaying Contact Information
CN108009784B (en) A kind of inside and outside collaborative office management system based on project document
US8280922B2 (en) User-interest driven launching pad of mobile application and method of operating the same
CN101330657B (en) Address list system and implementing method thereof
US20130157723A1 (en) Method of Displaying Contact Information
US5237679A (en) Method and system for automatic deletion of a folder having temporary document relationships within a data processing system
CN109636306A (en) Node-flow shifting method, device, terminal and storage medium
CN113239004B (en) Method and device for synchronizing notes
US20020077155A1 (en) Method for using memory area in mobile communication terminal
CN103701653B (en) The processing method of a kind of interface hot plug configuration data and network configuration server
CN109308258A (en) Building method, device, computer equipment and the storage medium of test data
US20080177745A1 (en) Method of Distributing Contact and Calendar Records
CN104219356A (en) Method and device for displaying and searching contact man information and mobile terminal
CN110083659A (en) Multi-source data read method and relevant device based on distributed system
CN110147258A (en) Improve method, apparatus, computer equipment and the storage medium of program loading efficiency
US20120317201A1 (en) Method of Distributing Contact and Calendar Records
CN102694901A (en) Method and apparatus for managing user information
CN108133088B (en) Self-adaptive creation method and system of CAD (computer-aided design) model
US5500887A (en) Data access method for subscriber location information
US7725105B2 (en) Mobile site management system
CN106372121B (en) Server and data processing method
JP6841228B2 (en) File information collection system, method and program

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination