CN110080780A - A kind of rapid constructing method for urban underground space - Google Patents

A kind of rapid constructing method for urban underground space Download PDF

Info

Publication number
CN110080780A
CN110080780A CN201910342841.3A CN201910342841A CN110080780A CN 110080780 A CN110080780 A CN 110080780A CN 201910342841 A CN201910342841 A CN 201910342841A CN 110080780 A CN110080780 A CN 110080780A
Authority
CN
China
Prior art keywords
ring beam
channel
lower support
construction
pilot tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910342841.3A
Other languages
Chinese (zh)
Inventor
何继华
肖毅
王峰
徐振龙
李小军
杨建明
赵瑞亮
杨西富
巩森
许彪
邓涛
王后高
方业飞
武俊杰
王瑞萍
姜潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Original Assignee
Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd filed Critical Sixth Engineering Co Ltd of China Railway 23rd Bureau Group Co Ltd
Priority to CN201910342841.3A priority Critical patent/CN110080780A/en
Publication of CN110080780A publication Critical patent/CN110080780A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to a kind of construction method, especially a kind of rapid constructing method for urban underground space.This method is the following steps are included: S1. open cut channel;S2. preliminary bracing is carried out in channel;S3. the construction of strengthened ring beam system is carried out in channel;S4. boring construction;S5. Second Lining Construction is carried out to transverse passage-way.Provided by the present invention for the rapid constructing method of urban underground space, before boring construction, first carry out the construction of strengthened ring beam system, can the inner wall supporting intensity in advance to channel strengthen, so as to start boring construction as early as possible, the preparation duration before shortening secondary lining, help to realize rapid construction.

Description

A kind of rapid constructing method for urban underground space
Technical field
The present invention relates to a kind of construction method, especially a kind of rapid constructing method for urban underground space.
Background technique
Subway construction is a ring important in Urban Underground Space Excavation.With the development of economy, each medium-and-large-sized city is equal There is strong subway construction demand, a large amount of durations are tight, the subway construction task of task weight to produce.In subway construction process In, the control of duration is particularly important, and subway work difficulty is big, it is more to involve between each work post, pulls one hair and move the whole body, due to The limitation of all kinds of objective factors, usually can be relatively estimated tighter there is a situation where the construction period.
Subway tunnel excavation is carried out according to existing construction method, usually first open cut goes out channel, then carries out to channel Second Lining Construction, then carry out boring construction, this mode expend long in time limit, often will appear duration inadequate situation.
Summary of the invention
Goal of the invention of the invention is: in subway tunnel digging process of the existing technology, expend the duration compared with Long problem provides a kind of rapid constructing method for urban underground space.
To achieve the goals above, the technical solution adopted by the present invention are as follows:
A kind of rapid constructing method for urban underground space, comprising the following steps: S1. open cut channel;S2. in channel Interior carry out preliminary bracing;S3. the construction of strengthened ring beam system is carried out in channel;S4. boring construction;S5. two are carried out to transverse passage-way Secondary lining construction.Provided by the present invention for the rapid constructing method of urban underground space, before boring construction, first added Strong ring beam system construction, can the inner wall supporting intensity in advance to channel strengthen, so as to start boring construction as early as possible, The preparation duration before shortening secondary lining, help to realize rapid construction.
As a preferred solution of the present invention, in step s 2, preliminary bracing structure is formed;Step S2 includes: S21. logical Steel grating is installed in road;S22. lock foot anchor tube construction is carried out in channel;S23. the construction of shotcrete in channel.
As a preferred solution of the present invention, step S2 further include: supporting construction carries out backfill slip casting to S24. behind in the early stage, Fill the gap between preliminary bracing structure and the soil body.
As a preferred solution of the present invention, in step s 24, slip casting is backfilled twice;When first time backfilling slip casting, Grouting pressure is terminated with controlling slurries from excavation face spilling;In second of backfill slip casting, the range of grouting pressure control is 0.4MPa—0.6MPa。
As a preferred solution of the present invention, step S3 includes: that S31. installs lower pilot tunnel strengthened ring beam;S32., middle drift is installed Strengthened ring beam, middle drift strengthened ring beam lower end are connected with lower pilot tunnel strengthened ring beam;S33. pilot tunnel strengthened ring beam, upper pilot tunnel are installed Strengthened ring beam lower end is connected with middle drift strengthened ring beam upper end;S34., vault combined type pilot tunnel ring beam is installed.
As a preferred solution of the present invention, lower pilot tunnel strengthened ring beam include several first lower support elements, it is second lower several Support member and several third lower support elements;First lower support element extends in the short transverse in channel, and the second lower support element is in channel Length direction on extend, third lower support element extends in the width direction in channel;It is supported under second lower support element and third Part is connected to form frame structure, and first lower support element one end is connected with the node of frame structure.
As a preferred solution of the present invention, middle drift strengthened ring beam includes propping up in supporting element and several second in several first Support member;In step s 32, comprising the following steps: S321. abolishes middle drift bottom plate grid;S322. by supporting element in several first It is hung in from the grid cavity abolished, is distributed supporting element in first along the short transverse of pilot tunnel, supporting element in connection first Lower end and the first lower support element upper end;S323. pass through supporting element in second and connect supporting element in each first, make to prop up in second Support member is vertical with supporting element in first.
As a preferred solution of the present invention, upper pilot tunnel strengthened ring beam includes several first upper supporting pieces, the second upper supporting piece; In step S33, comprising the following steps: S331. abolishes pilot tunnel bottom plate grid;S332. by several first upper supporting pieces from It is hung in the grid cavity abolished, is distributed the first upper supporting piece along the short transverse of pilot tunnel, in connection first under supporting element The upper end of supporting element in end and first;S333. each first upper supporting piece is connected by the second upper supporting piece, makes the second upper supporting piece It is vertical with the first upper supporting piece;S334. upper pilot tunnel ring beam and the soil body are connected.
As a preferred solution of the present invention, the first upper supporting piece, supporting element and the first lower support element are H-type in first Steel;Strengthened ring beam system further includes splice plate, and the first upper supporting piece is connected with supporting element in first by splice plate, and first lower Support member is connected with supporting element in first by splice plate.
As a preferred solution of the present invention, in step sl, comprising the following steps: S11. pre-buried dowel in channel.
In conclusion by adopting the above-described technical solution, the beneficial effects of the present invention are:
Provided by the present invention for the rapid constructing method of urban underground space, before Second Lining Construction, first added Strong ring beam system construction, can the inner wall supporting intensity in advance to channel strengthen, so as to shorten the preparation before secondary lining Duration helps to realize rapid construction.
Detailed description of the invention
Fig. 1 is knot of the rapid constructing method provided by the invention under installation when pilot tunnel strengthened ring beam, under the first visual angle Structure schematic diagram;
Fig. 2 is knot of the rapid constructing method provided by the invention under installation when pilot tunnel strengthened ring beam, under the second visual angle Structure schematic diagram;
Fig. 3 be rapid constructing method provided by the invention in an installation pilot tunnel strengthened ring beam when, the knot under the first visual angle Structure schematic diagram;
Fig. 4 be rapid constructing method provided by the invention in an installation pilot tunnel strengthened ring beam when, the knot under the second visual angle Structure schematic diagram;
Fig. 5 is knot of the rapid constructing method provided by the invention when installing pilot tunnel strengthened ring beam, under the first visual angle Structure schematic diagram;
Fig. 6 is knot of the rapid constructing method provided by the invention when installing pilot tunnel strengthened ring beam, under the second visual angle Structure schematic diagram.
Icon: the first lower support element of 11-;The second lower support element of 12-;13- third lower support element;Supporting element in 21- first; Supporting element in 22- second;The first upper supporting piece of 31-;The second upper supporting piece of 32-.
Specific embodiment
With reference to the accompanying drawing, the present invention is described in detail.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
Embodiment
Please refer to Fig. 1-Fig. 3.The embodiment of the invention provides a kind of rapid constructing method for urban underground space, this Kind of construction method is used to construct out channel in urban underground space, is particularly suitable for subway work.By taking certain subway work as an example, this Invent provide channel rapid constructing method the following steps are included:
S1. open cut channel;S2. preliminary bracing is carried out in channel;S3. the construction of strengthened ring beam system is carried out in channel; S4. boring construction;S5. Second Lining Construction is carried out to transverse passage-way.
Wherein, step S2 is specifically included:
S21., steel grating is installed in channel;
S22. lock foot anchor tube construction is carried out in channel;
S23. the construction of shotcrete in channel;
S24. supporting construction carries out backfill slip casting behind in the early stage, fills the gap between preliminary bracing structure and the soil body.
Step S22 the following steps are included:
The anchor tube for installing anchor head is inserted into anchor hole by S221. drilling anchor hole;
S222. anchor tube is connected with grouting pump with filling adaptor;
S223. grouting pump is opened, makes cement slurry full of anchor tube;
S224. sealing off and covering anchorage nozzle.
In step s 24, slip casting is backfilled twice;First time backfill slip casting when, grouting pressure with control slurries from Excavation face spilling terminates;In second of backfill slip casting, the range of grouting pressure control is 0.4MPa -0.6MPa.
Step S3 includes:
S31., lower pilot tunnel strengthened ring beam is installed;
S32., middle drift strengthened ring beam is installed, middle drift strengthened ring beam lower end is connected with lower pilot tunnel strengthened ring beam;
S33. pilot tunnel strengthened ring beam is installed, upper pilot tunnel strengthened ring beam lower end is connected with middle drift strengthened ring beam upper end;
S34., vault combined type pilot tunnel ring beam is installed.
Specifically, lower pilot tunnel strengthened ring beam includes several first lower support elements 11, several second lower support elements 12 and several Third lower support element 13;First lower support element 11 extends in the short transverse in channel, length of second lower support element 12 in channel Degree side upwardly extends, and third lower support element 13 extends in the width direction in channel;It is supported under second lower support element 12 and third Part 13 is connected to form frame structure, and 11 one end of the first lower support element is connected with the node of frame structure.
Further, the first lower support element 11 and the second lower support element 12 are H profile steel, and third lower support element 13 is I-shaped Steel.
Middle drift strengthened ring beam includes supporting element 22 in supporting element 21 and several second in several first.
In step s 32, comprising the following steps: S321. abolishes middle drift bottom plate grid;S322. it will be propped up in several first Support member 21 is hung in from the grid cavity abolished, and is distributed supporting element 21 in first along the short transverse of pilot tunnel, connection first The upper end of the lower end of middle supporting element 21 and the first lower support element 11;S323. it is connected by supporting element 22 in second and is propped up in each first Support member 21 keeps supporting element 22 in second vertical with supporting element 21 in first.
Supporting element 21 is H profile steel in first, and supporting element 22 is I-steel in second.
After step S323 terminates, also follow the steps below:
S324. the grid for abolishing position is connect with supporting element 21 in first, fill concrete.
Upper pilot tunnel strengthened ring beam includes several first upper supporting pieces 31 and the second upper supporting piece 32.
In step S33, comprising the following steps:
S331. pilot tunnel bottom plate grid is abolished;
S332. several first upper supporting pieces 31 are hung in from the grid cavity abolished, makes 31 edge of the first upper supporting piece The short transverse of pilot tunnel is distributed, and connects the upper end of supporting element 21 in the lower end and first of supporting element 21 in first;
S333. each first upper supporting piece 31 is connected by the second upper supporting piece 32, made on the second upper supporting piece 32 and first Supporting element 31 is vertical;
S334. upper pilot tunnel ring beam and the soil body are connected.
It is further comprising the steps of after step S334 completion:
S335. fill concrete.
Further, supporting element 21 and the first lower support element 11 are H profile steel in first;Strengthened ring beam system further includes spelling Fishplate bar, the first upper supporting piece 31 are connected with supporting element 21 in first by splice plate, are supported in the first lower support element 11 and first Part 21 is connected by splice plate.Specifically, the end that is connected with the first supporting element of the first upper supporting piece 31 is equipped with splice plate, first Lower support element 11 also is provided with splice plate with the end that supporting element 21 is connected in first.
The two sides of supporting element 21 and the first lower support element 11, are additionally provided with deep floor in the first upper supporting piece 31, first, Deep floor is connected with H profile steel, and in H profile steel two sides, a deep floor is arranged every 20cm-40cm.Specifically, in this implementation In example, one deep floor is set every 30cm.
It is provided by the present invention for the beneficial effect of the rapid constructing method of urban underground space:
Before boring construction, first carry out the construction of strengthened ring beam system, can in advance the inner wall supporting intensity to channel into Row is strengthened, and so as to start boring construction as early as possible, the preparation duration before shortening secondary lining, helps to realize rapid construction.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (10)

1. a kind of rapid constructing method for urban underground space, which comprises the following steps:
S1. open cut channel;
S2. preliminary bracing is carried out in the channel;
S3. the construction of strengthened ring beam system is carried out in the channel;
S4. boring construction;
S5. Second Lining Construction is carried out to the channel.
2. the rapid constructing method according to claim 1 for urban underground space, which is characterized in that in the step In S2, preliminary bracing structure is formed;
The step S2 includes:
S21. steel grating is installed in the channel;
S22. lock foot anchor tube construction is carried out in the channel;
S23. the construction of shotcrete in the channel.
3. the rapid constructing method according to claim 2 for urban underground space, which is characterized in that the step S2 Further include:
S24. backfill slip casting is carried out behind in the preliminary bracing structure, fill the gap between preliminary bracing structure and the soil body.
4. the rapid constructing method according to claim 3 for urban underground space, which is characterized in that in step S24 In, slip casting is backfilled twice;
When first time backfilling slip casting, grouting pressure is terminated with controlling slurries from excavation face spilling;
In second of backfill slip casting, the range of grouting pressure control is 0.4MPa -0.6MPa.
5. being used for the rapid constructing method of urban underground space according to any one of claim 2-4, feature exists In the step S3 includes:
S31., lower pilot tunnel strengthened ring beam is installed;
S32., middle drift strengthened ring beam is installed, middle drift strengthened ring beam lower end is connected with the lower pilot tunnel strengthened ring beam;
S33. pilot tunnel strengthened ring beam, the upper pilot tunnel strengthened ring beam lower end and middle drift strengthened ring beam upper end phase are installed Even;
S34., vault combined type pilot tunnel ring beam is installed.
6. the rapid constructing method according to claim 5 for urban underground space, which is characterized in that the lower pilot tunnel Strengthened ring beam includes several first lower support elements, several second lower support elements and several third lower support elements;
First lower support element extends in the short transverse in the channel, length of second lower support element in the channel Degree side upwardly extends, and the third lower support element extends in the width direction in the channel;
Second lower support element and the third lower support element are connected to form frame structure, first lower support element one end with The node of the frame structure is connected.
7. the rapid constructing method according to claim 6 for urban underground space, which is characterized in that the middle drift Strengthened ring beam includes supporting element in supporting element and several second in several first;
In the step S32, comprising the following steps:
S321. middle drift bottom plate grid is abolished;
S322. supporting element in several first is hung in from the grid cavity abolished, makes in first supporting element along the height of pilot tunnel Spend directional spreding, the lower end of supporting element and the upper end of the first lower support element in connection first;
S323. pass through supporting element in second and connect supporting element in each first, make to prop up in supporting element and described first in described second Support member is vertical.
8. the rapid constructing method according to claim 7 for urban underground space, which is characterized in that the upper pilot tunnel Strengthened ring beam includes several first upper supporting pieces, the second upper supporting piece;
In the step S33, comprising the following steps:
S331. pilot tunnel bottom plate grid is abolished;
S332. several first upper supporting pieces are hung in from the grid cavity abolished, makes the first upper supporting piece along the height of pilot tunnel Directional spreding is spent, the upper end of supporting element in the lower end and first of supporting element in first is connected;
S333. each first upper supporting piece is connected by the second upper supporting piece, makes to prop up on second upper supporting piece and described first Support member is vertical;
S334. upper pilot tunnel ring beam and the soil body are connected.
9. the rapid constructing method according to claim 8 for urban underground space, which is characterized in that on described first Supporting element, supporting element and the first lower support element are H profile steel in first;
The strengthened ring beam system further includes splice plate, and supporting element passes through splice plate in first upper supporting piece and described first It is connected, first lower support element is connected with supporting element in described first by splice plate.
10. the rapid constructing method according to claim 1 for urban underground space, which is characterized in that in the step In rapid S1, comprising the following steps:
S11. the pre-buried dowel in the channel.
CN201910342841.3A 2019-04-26 2019-04-26 A kind of rapid constructing method for urban underground space Pending CN110080780A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910342841.3A CN110080780A (en) 2019-04-26 2019-04-26 A kind of rapid constructing method for urban underground space

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910342841.3A CN110080780A (en) 2019-04-26 2019-04-26 A kind of rapid constructing method for urban underground space

Publications (1)

Publication Number Publication Date
CN110080780A true CN110080780A (en) 2019-08-02

Family

ID=67416899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910342841.3A Pending CN110080780A (en) 2019-04-26 2019-04-26 A kind of rapid constructing method for urban underground space

Country Status (1)

Country Link
CN (1) CN110080780A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203559904U (en) * 2013-07-09 2014-04-23 北京城建设计发展集团股份有限公司 Reinforced supporting structure for creating horsehead on reversal borehole wall shaft well side wall
CN203742611U (en) * 2013-07-08 2014-07-30 北京城建设计发展集团股份有限公司 Strengthening supporting structure for opening ingate on side wall of tunnel under preliminary supporting condition
CN103993885A (en) * 2014-05-28 2014-08-20 北京市政建设集团有限责任公司 Construction method for underground excavation tunnel side-direction hole opening supporting system
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN108625407A (en) * 2018-06-26 2018-10-09 北京市政建设集团有限责任公司 A kind of open-cut station tunneling segment structure waterproof method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203742611U (en) * 2013-07-08 2014-07-30 北京城建设计发展集团股份有限公司 Strengthening supporting structure for opening ingate on side wall of tunnel under preliminary supporting condition
CN203559904U (en) * 2013-07-09 2014-04-23 北京城建设计发展集团股份有限公司 Reinforced supporting structure for creating horsehead on reversal borehole wall shaft well side wall
CN103993885A (en) * 2014-05-28 2014-08-20 北京市政建设集团有限责任公司 Construction method for underground excavation tunnel side-direction hole opening supporting system
CN108286266A (en) * 2018-03-27 2018-07-17 中铁局集团第二工程有限公司 A method of exempt to remove using object in light and dark digging in combination and builds underground structure
CN108625407A (en) * 2018-06-26 2018-10-09 北京市政建设集团有限责任公司 A kind of open-cut station tunneling segment structure waterproof method

Similar Documents

Publication Publication Date Title
CN101775988B (en) Method for constructing from inclined shaft to main tunnel in weak surrounding rock
US3412562A (en) Structural wall and method
CN102966108A (en) Construction method of deep foundation pit close to building and adopting underground structure as internal support
KR101121538B1 (en) Diaphragm wall tunnel method - dtm, and tunnel structure using diaphragm wall
CN110318772A (en) Canal in Loess Area is greatly across the asymmetric bore tunnel supporting construction of small interval and construction method
JPH1046523A (en) Simple temporary bridge temporary pier building construction method
KR102215505B1 (en) Construction method of internal pre-support tunnel for complete blocking water of all directions of the tunnel
KR101792844B1 (en) Under ground structure construction method using underground column wall and under ground structure therewith
KR20030097085A (en) A Precast Concrete Block for Retaining-Wall and Construction Method of Retaining-Wall for using Top-down Method
JP5351125B2 (en) Open shield machine start method of open shield method
CN114352292A (en) Shallow-buried bias-pressure multi-arch tunnel construction method for weathering phyllite stratum
CN109469068A (en) A kind of rich water soft stratum excavation of foundation pit and Support Method
CN110080780A (en) A kind of rapid constructing method for urban underground space
KR101386558B1 (en) Construction method of earth retaining wall using phc pile
CN109083187A (en) A kind of new-type tower crane foundation construction method
CN109209440A (en) large-span tunnel vault settlement processing method
CN212670647U (en) Underground space exploitation utilizes protection architecture under subway in soft soil stratum
KR20190038244A (en) Underground road way construction method
CN105507909A (en) Section steel arch frame supporting method of tunnel
KR101625101B1 (en) Steel pipe wall temporary construction method
JPH09279609A (en) Building method of precast reinforced concrete-made underground structure
JP2008223392A (en) Repair reinforcement method for existing quay wall and its repair reinforcement structure
CN111379576B (en) Method for connecting primary support and large-diameter pipe shed in shed cover construction
KR101524302B1 (en) Construction method for underground structure without temporary structure
JPH07279172A (en) Method for setting tie rod anchor in deep layer ground

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802