CN110080230A CN201910202608.5A CN201910202608A CN110080230A CN 110080230 A CN110080230 A CN 110080230A CN 201910202608 A CN201910202608 A CN 201910202608A CN 110080230 A CN110080230 A CN 110080230A
Authority
CN
China
Prior art keywords
cofferdam
water burst
water
diversion pipe
foundation ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910202608.5A
Other languages
Chinese (zh)
Inventor
吴波
黄宗辉
黄惟
邓政
李志刚
赵涵滢
罗建波
李静
智学民
蒙国往
吴冬
卢福聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi University
Sinohydro Bureau 1 Co Ltd
Original Assignee
Guangxi University
Sinohydro Bureau 1 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi University, Sinohydro Bureau 1 Co Ltd filed Critical Guangxi University
Priority to CN201910202608.5A priority Critical patent/CN110080230A/en
Publication of CN110080230A publication Critical patent/CN110080230A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Sewage (AREA)

Abstract

The invention discloses a kind of structures for handling bottom of foundation ditch water burst, comprising: cofferdam is arranged at circular water burst, for obstructing connection at water burst and extraneous, filtering material is filled in the cofferdam, forms filter layer;Diversion pipe is equipped with inlet and outlet, and for guiding the water at water burst to flow out, the water inlet of the diversion pipe extends into the cofferdam, and the water outlet of the diversion pipe extends to outside the cofferdam;Cover board is covered on the cofferdam, and the cofferdam forms confined space;And operating platform, it is covered in around the cofferdam and the top of the cover board, plays sealing function.Structure of the invention can effectively retain the silt particle that water burst is taken out of, silt particle is prevented to be lost, and reduce the probability for accident occur.Construction method of the invention greatly shortens the construction time, ensure that the construction speed of engineering.

Description

A kind of structure and its construction method handling bottom of foundation ditch water burst
Technical field
The present invention relates to the realm of building construction, in particular to a kind of structure and its construction party for handling bottom of foundation ditch water burst Method.
Background technique
With the development of urban construction, the development of the underground space is driven, the underground space of current all kinds of purposes is in the world It is developed in each big and medium-sized cities.The construction of these underground spaces mostly uses low-cost, easy for construction cut and cover method, A large amount of base pit engineerings are produced therefrom, and scale and depth continue to increase.In Excavation Process, water burst can be encountered often Phenomenon, or even there is piping.How quickly, safe and reliable solution burst problem becomes numerous engineers and technicians face one Item important topic.In current Excavation Process, the main processing method of foundation pit water burst occur is: boring around first at the water burst Secondly grout pipe is arranged in hole in steel sleeve, by steel sleeve indentation drilling, then with cotton yarn and quick hardening cement by steel sleeve with It is sealed at the gap of ground and finally utilizes grouting pump by polyurethane slurries through in grout pipe injection hole.Then the prior art needs to spend Plenty of time at the water burst around cloth hole, piping water can not be limited and take the soil in foundation pit out of, the deficiencies of construction equipment is complicated.
The information disclosed in the background technology section is intended only to increase the understanding to general background of the invention, without answering When being considered as recognizing or imply that the information constitutes the prior art already known to those of ordinary skill in the art in any form.
Summary of the invention
The purpose of the present invention is to provide a kind of structures for handling bottom of foundation ditch water burst, can effectively prevent silt outflow, with And quickly handle bottom of foundation ditch water burst.
It is another object of the present invention to provide a kind of structures and its construction method for handling bottom of foundation ditch water burst.
To achieve the above object, the present invention provides a kind of structures for handling bottom of foundation ditch water burst, comprising: cofferdam, ring It is arranged at water burst, for obstructing connection at water burst and extraneous, filtering material is filled in the cofferdam, forms filter layer; Diversion pipe is equipped with inlet and outlet, and for guiding the water at water burst to flow out, the water inlet of the diversion pipe is enclosed to described Extend in weir, the water outlet of the diversion pipe extends to outside the cofferdam;Cover board is covered on the cofferdam, the cofferdam Form confined space;And operating platform, it is covered in around the cofferdam and the top of the cover board, plays sealing and make With;Wherein, in the state that the cofferdam, diversion pipe, cover board and operating platform are installed, after the water export at water burst, By the diversion pipe, into the cofferdam, mud jacking is blocked.
Preferably, in above-mentioned technical proposal, the cofferdam is surrounded by multilayer sandbag.
Preferably, in above-mentioned technical proposal, the filtering material is rubble.
A kind of construction method handling bottom of foundation ditch water burst, comprising the following steps:
(1) it is tentatively blocked with sealing agent at water burst, diversion pipe is set at water burst;
(2) at the water burst around cofferdam is set, sandstone is then inserted in cofferdam, forms filter layer;
(3) cover board is covered on cofferdam, and cofferdam is made to form a closed space, it then will be in cofferdam by diversion pipe Water extraction;
(4) soil compaction is backfilled around cofferdam and above cover board, forms an operating platform;
(5) when water burst is controlled, after water leakage is reduced, by diversion pipe to progress mud jacking closure at the water burst of substrate.
Preferably, in above-mentioned technical proposal, the distance of cofferdam bottom described in the distance of the diversion pipe is not less than 40cm.
Preferably, in above-mentioned technical proposal, cofferdam, cofferdam inner wall are encircled into multilayer sandbag at water burst in step (2) Distance at water burst is not less than 1m.
Preferably, in above-mentioned technical proposal, the ballast grain sizes of the filter layer are 20-30mm, and the height of filter layer is 30- 40cm。
Preferably, in above-mentioned technical proposal, the quality of the cover board is not less than 500kg.
Preferably, in above-mentioned technical proposal, the operating platform is in a circular table shape, and upper bottom surface diameter is not less than 3m, bottom surface Diameter is not less than 5m, highly not less than 2.5m.
Compared with prior art, the invention has the following beneficial effects:
(1) structure of present invention processing bottom of foundation ditch water burst, can in time make a response to water burst, can effectively retain water burst The silt particle taken out of, prevents silt particle to be lost, and reduces the probability for accident occur.
(2) water burst can be discharged except foundation pit, foundation pit construction is made to can be avoided the shadow of water burst by construction method of the invention It rings, ensure that the condition of dry work.Involved material can be obtained from construction site, not need independent Customization Tool, be reduced Project cost.Greatly shorten the construction time, ensure that the construction speed of engineering.
Detailed description of the invention
Fig. 1 is the overall schematic of the structure of processing bottom of foundation ditch water burst according to the present invention.
Specific embodiment
With reference to the accompanying drawing, specific embodiments of the present invention will be described in detail, it is to be understood that guarantor of the invention Shield range is not limited by the specific implementation.
Unless otherwise explicitly stated, otherwise in entire disclosure and claims, term " includes " or its change Changing such as "comprising" or " including " etc. will be understood to comprise stated element or component, and not exclude other members Part or other component parts.
As shown in Figure 1, the structure of a kind of processing bottom of foundation ditch water burst of specific embodiment, including cofferdam according to the present invention 1, diversion pipe 2, cover board 3 and operating platform 4.Cofferdam 1 is encircled into multilayer sandbag around 5 at the water burst, i.e. cofferdam 1 is around gushing 5 setting at water, for obstructing at water burst 1 and extraneous connection.Filtering material after filling in cofferdam 1, and form filter layer 6, mistake Filter material material is made of rubble.Diversion pipe 2 is equipped with inlet and outlet, and the water inlet of diversion pipe 2 extends into cofferdam 1, is discharged Mouth extends to outside cofferdam 1.Diversion pipe 2 is used to export at water burst 1 water.1 upper cover of cofferdam is equipped with cover board 3, forms cofferdam 1 close Close space.Operating platform 4 is covered in around cofferdam 1 and the top of cover board 3, plays the role of sealing.Wherein, it is enclosed described In the state that weir, diversion pipe, cover board and operating platform are installed, by water burst water export after, by the diversion pipe to Mud jacking blocks in the cofferdam.
A kind of construction method handling bottom of foundation ditch water burst, comprising the following steps:
(1) it is carried out picking chisel cleaning at bottom of foundation ditch water burst 5 according to site operation situation, using sealing agent at water burst 5 Tentatively blocked.The 5 setting diversion pipe 2 at water burst, the diameter of diversion pipe 2 are 20cm.
(2) 5 surrounding pile, 5 layers of sandbag at water burst build up cofferdam 1 and trample tightly, using sandbag own wt to base Bottom carries out compacting and anti-filtering, must assure that sandbag stability after the completion of pile.Wherein, distance of 1 inner wall of cofferdam at water burst Not less than 1m, diversion pipe 2 is placed on apart from 1 bottom of cofferdam not less than at 40cm height.
(3) sandstone is inserted in cofferdam 1, forms filter layer 6, and the ballast grain sizes range of filter layer 6 is 20-30mm, filtering The altitude range of layer is 30-40cm.It fills sandstone and forms filter layer, can prevent water burst from taking away the soil in ground.It was filling It should ensure that the particle in each layer does not occur mobile and water burst and can smoothly flow out in journey.
(4) heavy cover board 3 is covered on cofferdam 1, the quality of cover board is not less than 500kg.Cover board 3 is covered to further ensure that The stability in cofferdam 1, and a closed space is formed with cofferdam 1.Then by the water extraction in 2 cofferdam 1 of diversion pipe, outside Row.
(5) earthwork is backfilled around cofferdam 1, forms round table-like operating platform 4.Round table-like operating platform upper bottom surface diameter Not less than 3m, bottom surface diameter not less than 5m, highly not less than 2.5m.Pay attention to being compacted backfill.
(6) after compacting after a period of time, water burst is controlled, and water leakage is reduced.Finally by diversion pipe 2 to substrate Mud jacking closure is carried out at water burst.
The aforementioned description to specific exemplary embodiment of the invention is in order to illustrate and illustration purpose.These descriptions It is not wishing to limit the invention to disclosed precise forms, and it will be apparent that according to the above instruction, can much be changed And variation.The purpose of selecting and describing the exemplary embodiment is that explaining specific principle of the invention and its actually answering With so that those skilled in the art can be realized and utilize a variety of different exemplary implementation schemes of the invention and Various chooses and changes.The scope of the present invention is intended to be limited by claims and its equivalents.

Claims (9)

1. a kind of structure for handling bottom of foundation ditch water burst characterized by comprising
Cofferdam is arranged at circular water burst, for obstructing connection at water burst and extraneous, is filled with filter material in the cofferdam Material forms filter layer;
Diversion pipe is equipped with inlet and outlet, and for guiding the water at water burst to flow out, the water inlet of the diversion pipe is to institute It states in cofferdam and extends, the water outlet of the diversion pipe extends to outside the cofferdam;
Cover board is covered on the cofferdam, and the cofferdam forms confined space;And
Operating platform, is covered in around the cofferdam and the top of the cover board, plays sealing function;
Wherein, in the state that the cofferdam, diversion pipe, cover board and operating platform are installed, after the water export at water burst, By the diversion pipe, into the cofferdam, mud jacking is blocked.
2. the structure of processing bottom of foundation ditch water burst according to claim 1, which is characterized in that the cofferdam is by multilayer sandbag It surrounds.
3. the structure of processing bottom of foundation ditch water burst according to claim 1, which is characterized in that the filtering material is broken Stone.
4. a kind of construction method for handling bottom of foundation ditch water burst, which comprises the following steps:
(1) it is tentatively blocked with sealing agent at water burst, diversion pipe is set at water burst;
(2) at the water burst around cofferdam is set, sandstone is then inserted in cofferdam, forms filter layer;
(3) cover board is covered on cofferdam, cofferdam is made to form a closed space, is then taken out the water in cofferdam by diversion pipe Out;
(4) soil compaction is backfilled around cofferdam and above cover board, forms an operating platform;
(5) when water burst is controlled, after water leakage is reduced, by diversion pipe to progress mud jacking closure at the water burst of substrate.
5. handling the construction method of bottom of foundation ditch water burst according to claim 4, which is characterized in that the distance of the diversion pipe The distance of the cofferdam bottom is not less than 40cm.
6. handling the construction method of bottom of foundation ditch water burst according to claim 4, which is characterized in that in water burst in step (2) Place is encircled into cofferdam with multilayer sandbag, and distance of the cofferdam inner wall at water burst is not less than 1m.
7. handling the construction method of bottom of foundation ditch water burst according to claim 4, which is characterized in that the rubble of the filter layer Partial size is 20-30mm, and the height of filter layer is 30-40cm.
8. handling the construction method of bottom of foundation ditch water burst according to claim 4, which is characterized in that the quality of the cover board is not Lower than 500kg.
9. handling the construction method of bottom of foundation ditch water burst according to claim 4, which is characterized in that the operating platform is in circle Mesa-shaped, upper bottom surface diameter is not less than 3m, bottom surface diameter not less than 5m, highly not less than 2.5m.
CN201910202608.5A 2019-03-18 2019-03-18 A kind of structure and its construction method handling bottom of foundation ditch water burst Pending CN110080230A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910202608.5A CN110080230A (en) 2019-03-18 2019-03-18 A kind of structure and its construction method handling bottom of foundation ditch water burst

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910202608.5A CN110080230A (en) 2019-03-18 2019-03-18 A kind of structure and its construction method handling bottom of foundation ditch water burst

Publications (1)

Publication Number Publication Date
CN110080230A true CN110080230A (en) 2019-08-02

Family

ID=67413279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910202608.5A Pending CN110080230A (en) 2019-03-18 2019-03-18 A kind of structure and its construction method handling bottom of foundation ditch water burst

Country Status (1)

Country Link
CN (1) CN110080230A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593284A (en) * 2019-09-23 2019-12-20 中交第二航务工程局有限公司 Seepage prevention method for construction of underwater bearing platform in solution hole and solution gap development area
CN114439025A (en) * 2022-01-14 2022-05-06 上海建工二建集团有限公司 Quick-assembly type leaking stoppage cofferdam and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6160921A (en) * 1984-08-31 1986-03-28 Taisei Corp Method of constructing impervious wall
CN101245886A (en) * 2008-03-13 2008-08-20 武汉京冶地基基础工程有限责任公司 Processing method for deep building pit piping
CN104895118A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN105780793A (en) * 2016-04-06 2016-07-20 中建交通建设集团有限公司 Emergency treatment method for sudden gushing of high confined water stratum foundation pit
CN206784415U (en) * 2017-05-22 2017-12-22 中国建筑第八工程局有限公司 Piping in foundation pit fast plugging device
CN207392266U (en) * 2017-10-27 2018-05-22 南通市达欣工程股份有限公司 Underground surpasses artesian water device for plugging

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6160921A (en) * 1984-08-31 1986-03-28 Taisei Corp Method of constructing impervious wall
CN101245886A (en) * 2008-03-13 2008-08-20 武汉京冶地基基础工程有限责任公司 Processing method for deep building pit piping
CN104895118A (en) * 2015-06-24 2015-09-09 江苏省建筑科学研究院有限公司 Underground diaphragm wall internal corner position piping plug structure and grouting processing method thereof
CN105780793A (en) * 2016-04-06 2016-07-20 中建交通建设集团有限公司 Emergency treatment method for sudden gushing of high confined water stratum foundation pit
CN206784415U (en) * 2017-05-22 2017-12-22 中国建筑第八工程局有限公司 Piping in foundation pit fast plugging device
CN207392266U (en) * 2017-10-27 2018-05-22 南通市达欣工程股份有限公司 Underground surpasses artesian water device for plugging

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593284A (en) * 2019-09-23 2019-12-20 中交第二航务工程局有限公司 Seepage prevention method for construction of underwater bearing platform in solution hole and solution gap development area
CN114439025A (en) * 2022-01-14 2022-05-06 上海建工二建集团有限公司 Quick-assembly type leaking stoppage cofferdam and construction method thereof

Similar Documents

Publication Publication Date Title
CN105780793B (en) A kind of high artesian stratum Foundation Pit Pouring emergency processing method
CN101245886B (en) Processing method for deep building pit piping
CN102345300A (en) Construction method of underground structures of seacoasts and artificial islands
CN103437339A (en) Construction method for sealing karst cave near trench wall of underground continuous wall in karst stratum
CN104110038A (en) Construction method for large-area pit support structure in deep-sludge type soft soil area
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN107761753A (en) A kind of foundation ditch water burst rapid rescue slip casting method for blocking
WO2023178908A1 (en) High-pressure pre-filled karst cave pile foundation construction method
CN110318410A (en) A kind of deep basal pit chance artesian water is prominent to gush decompression drought stress construction method
CN110080169A (en) A kind of construction method reclaimed fields from the sea utilized based on basement
CN112921173A (en) South ionic rare earth in-situ leaching system and method
CN110080230A (en) A kind of structure and its construction method handling bottom of foundation ditch water burst
CN107059904B (en) A kind of underground pipe gallery ponding well excavation method
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN113431045B (en) Construction method for rotary drilling pore-forming karst leaking stoppage
CN201459737U (en) Foundation pit supporting structure
CN111206610A (en) Construction method for treating piping of exploration hole of foundation pit by curtain grouting method
CN104988914A (en) Cast-in-situ bored pile breakage processing method under water area environment
CN104652427A (en) Construction method of drilling pile
CN112627212B (en) Water-faced cofferdam inner tube well dewatering dry excavation construction method
CN102235008B (en) Engineering pile deviation preventing structure of soft soil foundation and pretreatment method
CN111424695B (en) Seepage-proofing and leakage-stopping method for deep-buried karst pipeline
CN110670613B (en) Foundation pit elevator shaft water seepage prevention structure and construction method thereof
CN101586341A (en) Water sealing method for civil engineering groundwork
CN111139854A (en) Construction method for treating piping of exploration hole of foundation pit by drainage grouting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190802

RJ01 Rejection of invention patent application after publication