CN110070334A - The information processing method of project management and application - Google Patents

The information processing method of project management and application Download PDF

Info

Publication number
CN110070334A
CN110070334A CN201910209596.9A CN201910209596A CN110070334A CN 110070334 A CN110070334 A CN 110070334A CN 201910209596 A CN201910209596 A CN 201910209596A CN 110070334 A CN110070334 A CN 110070334A
Authority
CN
China
Prior art keywords
engineering project
project
information
account
management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910209596.9A
Other languages
Chinese (zh)
Inventor
雷晓萍
马国雷
李文明
王国庆
张译
王雪群
史正良
张丽
孙军芳
李国栋
金金
徐铁军
张广德
严海英
严天翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Qinghai Electric Power Co Ltd
Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Qinghai Electric Power Co Ltd, Information and Telecommunication Branch of State Grid Qinghai Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201910209596.9A priority Critical patent/CN110070334A/en
Publication of CN110070334A publication Critical patent/CN110070334A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Engineering & Computer Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Data Mining & Analysis (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

This application discloses a kind of information processing method of project management and applications.This method comprises: obtaining the basic information of engineering project in the case where determining engineering project to be processed;Basic information according to engineering project generates closed loop management process;Based on closed loop management process, successively to destiny account transmission flow node;In the case where receiving destiny account based on flow nodes transmission interactive instruction, processing is updated to the basic information of engineering project according to interactive instruction.By the application, solves project management system general in the related technology and be unable to satisfy user account demand, and handle the low problem of effect.

Description

The information processing method of project management and application
Technical field
This application involves project management fields, information processing method and application in particular to a kind of project management.
Background technique
General project management system generally lays particular emphasis on the node administrations such as project milestone, project process and project document etc. Data management, cannot achieve to information communication item contract managing bill, sell on credit payment plan and examination and approval document circulation, work to Do the individual demand of automatically generate etc..Therefore, the demand management of information system work, purchase of goods and materials information, contract The work such as information management, contract execution condition managing are all made of manual entry and arrange means, take a long time;In project management process All data needs to repeat typing, and heavy workload influences working efficiency.
In addition, to handle personnel more for contract dataset accounting, it is possible that data deviation when ultimately forming information report.
User account demand is unable to satisfy for project management system general in the related technology, and handles that effect is low to ask Topic, currently no effective solution has been proposed.
Summary of the invention
The application provides information processing method and the application of a kind of project management, to solve project general in the related technology Management system is unable to satisfy user account demand, and handles the low problem of effect.
According to the one aspect of the application, a kind of information processing method of project management is provided.This method comprises: true In the case where fixed engineering project to be processed, the basic information of the engineering project is obtained;Basis according to the engineering project Information generates closed loop management process;Based on the closed loop management process, successively to destiny account transmission flow node;It is connecing In the case where the destiny account is received based on flow nodes transmission interactive instruction, according to the interactive instruction to the work Journey item purpose basic information is updated processing.
Optionally, the basic information of the engineering project includes at least following one of any: the project of the engineering project Type, the procurement information of the engineering project, the plan information of the engineering project and the engineering project each contract Square information.
Optionally, the flow nodes of the engineering project refer at least to control link one of any as follows: the engineering The demand of project proposes report link, the bid link of the engineering project, the signing link of the engineering project, the engineering project Capital management link, the construction speed link of the engineering project.
Optionally, the method also includes: receive mailing print command in the case where, according to the mailing print refer to It enables and determines file to be posted;The corresponding target of the file to be posted is extracted from the corresponding manufacturer's information of the mail document Address;Mailing list is generated according to the destination address.
Optionally, the method also includes: determine whether the flow nodes of the engineering project are in pending state;To place The destiny account corresponding to the flow nodes of pending state sends pending prompt, wherein includes in the pending prompt: pending The Time Period Date of item, the points for attention of backlog and backlog.
Optionally, the method also includes: in the case where receiving inquiry instruction, from the current base of the engineering project Data information corresponding with the inquiry instruction is extracted in plinth information;Statistical disposition is carried out to the data information, determines institute State the process status of engineering project, wherein the process status of the engineering project refers at least to following one of any: the engineering The fund state of project, the contract situation of the engineering project, the bid situation of the engineering project, the engineering project are applied Work situation, the examination situation of the engineering project, the clearing situation of the engineering project.
Optionally, the method also includes: in the case where the basic information of the engineering project is updated, determine update Whether data are contract dataset;In the case where the more new data is contract dataset, generated according to updated contract dataset The fund information of the engineering project, wherein the fund information includes at least following one of any: examination & approval document, invoice are hung Account, payment funding plan.
Optionally, the method also includes: in the case where receiving the account management instruction that default account is sent, parsing Indicated account and the account management instruct corresponding adjustment operation in the account management instruction out;According to described in Adjustment operation is updated processing to the attribute of account indicated in account management instruction, wherein the category of the account Property include at least it is following one of any: role corresponding to the account, the corresponding stop and start state of the account.
Optionally, the corresponding different role of the account is configured with different rights range, and the extent of competence is for providing The flow nodes that the account can receive, and the classes of instructions that can be transmitted for providing the account.
Optionally, generating closed loop management process according to the basic information of the engineering project includes: to establish multiple BPM streams Journey configuration module, wherein the BPM process configuration module is associated with the engineering project;Base according to the engineering project Plinth information integrates data packaging unit associated with the multiple BPM process configuration module difference;By being multiplexed the BPM Process configuration module, and data packaging unit associated with the multiple BPM process configuration module difference, configure the work Journey item purpose whole flow nodes are to generate closed loop management process, wherein the flow nodes of the engineering project are with tree-shaped shape Formula is attached displaying.
According to the another aspect of the application, a kind of information processing application of project management is provided.The application includes: data Layer, for storing the basic information of engineering project, and the access request issued according to Business Logic to the basic information into Row access encapsulation;Business Logic interacts with the data Layer, the number finished for extracting encapsulation from the data Layer According to unit, to execute the information processing method of the project management of Arbitrary Term in the claims 1-10;Presentation layer, with the industry Business logical layer interacts, for showing the displaying information of the Business Logic output.
According to the another aspect of the application, a kind of storage medium is provided, the storage medium includes the program of storage, In, described program executes the information processing method of project management described in above-mentioned any one.
According to the another aspect of the application, a kind of processor is provided, the processor is for running program, wherein institute State the information processing method that project management described in above-mentioned any one is executed when program operation.
By the application, using following steps: in the case where determining engineering project to be processed, obtaining the engineering item Purpose basic information;Basic information according to the engineering project generates closed loop management process;Based on the closed loop management Process, successively to destiny account transmission flow node;Flow nodes transmission interaction is based on receiving the destiny account In the case where instruction, it is updated processing according to basic information of the interactive instruction to the engineering project, solves correlation General project management system is unable to satisfy user account demand in technology, and handles the low problem of effect.
That is, the application reaches unified number by providing the basic information of unified standard for entire closed management process It according to the technical purpose in source, solves in the related technology that basic information relies on hand-kept, and leads to that working efficiency is low, basis letter There is the management drawback of a large amount of deviations in breath.
And by the interactive instruction from trend destiny account transmission flow node, and according to destiny account to engineering The basic information of project is updated processing, avoids the case where artificial accounting data leads to data deviation generation, improves work The accuracy of the associated basic data of journey project.
Detailed description of the invention
The attached drawing constituted part of this application is used to provide further understanding of the present application, the schematic reality of the application Example and its explanation are applied for explaining the application, is not constituted an undue limitation on the present application.In the accompanying drawings:
Fig. 1 is the flow chart according to the information processing method of project management provided by the embodiments of the present application;
Fig. 2 is the flow chart applied according to the information processing of project management provided by the embodiments of the present application;And
Fig. 3 is according to a kind of schematic diagram of the information processing application of optional project management provided by the embodiments of the present application.
Specific embodiment
It should be noted that in the absence of conflict, the features in the embodiments and the embodiments of the present application can phase Mutually combination.The application is described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to make those skilled in the art more fully understand application scheme, below in conjunction in the embodiment of the present application Attached drawing, the technical scheme in the embodiment of the application is clearly and completely described, it is clear that described embodiment is only The embodiment of the application a part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people Member's every other embodiment obtained without making creative work, all should belong to the model of the application protection It encloses.
It should be noted that the description and claims of this application and term " first " in above-mentioned attached drawing, " Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way Data be interchangeable under appropriate circumstances, so as to embodiments herein described herein.In addition, term " includes " and " tool Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing a series of steps or units Process, method, system, product or equipment those of are not necessarily limited to be clearly listed step or unit, but may include without clear Other step or units listing to Chu or intrinsic for these process, methods, product or equipment.
According to an embodiment of the present application, a kind of information processing method of project management is provided.
Fig. 1 is the flow chart according to the information processing method of the project management of the embodiment of the present application.As shown in Figure 1, the party Method the following steps are included:
Step S102 obtains the basic information of the engineering project in the case where determining engineering project to be processed.
Step S104, the basic information according to the engineering project generate closed loop management process.
Step S106 is based on the closed loop management process, successively to destiny account transmission flow node.
Step S108, in the case where receiving the destiny account based on flow nodes transmission interactive instruction, according to Processing is updated according to basic information of the interactive instruction to the engineering project.
The information processing method of project management provided by the embodiments of the present application, by determining engineering project to be processed In the case of, obtain the basic information of the engineering project;Basic information according to the engineering project generates closed loop management stream Journey;Based on the closed loop management process, successively to destiny account transmission flow node;It is based on receiving the destiny account In the case that the flow nodes send interactive instruction, carried out according to basic information of the interactive instruction to the engineering project Update processing solves project management system general in the related technology and is unable to satisfy user account demand, and it is low to handle effect The problem of.
That is, the application reaches unified number by providing the basic information of unified standard for entire closed management process It according to the technical purpose in source, solves in the related technology that basic information relies on hand-kept, and leads to that working efficiency is low, basis letter There is the management drawback of a large amount of deviations in breath.
And by the interactive instruction from trend destiny account transmission flow node, and according to destiny account to engineering The basic information of project is updated processing, avoids the case where artificial accounting data leads to data deviation generation, improves work The accuracy of the associated basic data of journey project.
In an optional example, the basic information of above-mentioned engineering project includes at least following one of any: the work Journey item purpose item types, the procurement information of the engineering project, the engineering project plan information and the engineering item The each contract side's information of purpose.
Specifically, the item types of engineering project include: productivity technological transformation, productivity overhaul, unproductive technological transformation, non-life The major class such as the overhaul of production property, informationization, marketing investment, science and technology item, the maintenance of power grid O&M, power grid capital construction, financial special project.Further Ground can also include various project groups, such as include one under Information-based Item major class for the project of different major class below The projects group such as body platform, data center.
Specifically, each contract side's information of engineering project includes: trade name, manufacturer address, manufacturer's postcode, opens an account The information such as row, account, duty paragraph, Related Contact, contact phone, contact person's mailbox.Pass through each of unified management engineering project A contract side's information realizes the unified maintenance of each contract side's information, the base of each contract side is intuitively recognized convenient for user This situation.Further, in contract inputting, user directly can fill out choosing from multiple contract sides of typing.
Specifically, the plan information of engineering project includes: the coding of engineering project, the title of engineering project, engineering project Construction title, the plan fund of engineering project (such as: capital, Cheng Benjin, total) information.It should be understood that in work After journey item purpose aggregate plan determines, all plan informations of the engineering project can direct basis specify module to carry out at importing Reason.
Specifically, the procurement information of engineering project includes: the Mission Number of goods and materials and service, batch plan title, declares Time started, the deadline of declaring, the opening of bid time publication bulletin time, drafted.It should be understood that adopting in engineering project After purchase plan determines, all procurement informations of the engineering project can direct basis specify template, generate the bid (bid) of specification Data.
In an optional example, the basic information according to the engineering project generates closed loop management process and includes: Establish multiple BPM process configuration modules, wherein the BPM process configuration module is associated with the engineering project;According to described in The basic information of engineering project integrates data packaging unit associated with the multiple BPM process configuration module difference;Pass through It is multiplexed the BPM process configuration module, and data associated with the multiple BPM process configuration module difference encapsulation list Member configures whole flow nodes of the engineering project to generate closed loop management process, wherein the process of the engineering project Node is attached displaying with tree form.
Specifically, the information processing method of project management provided by the embodiments of the present application, by utilizing BPM process configuration group The modes such as part multiplexing, operation flow data integration are realized business datum integration interaction and project management process closed loop management, are reinforced Information resources share and vocational work collaboration.Wherein, the flow nodes shown in the form of TreeView Menu into connection, realize engineering Project mentions the signing ring of report link, the bid link of the engineering project, the engineering project in the demand of the engineering project The full Life Cycle of the control link such as section, the capital management link of the engineering project, the construction speed link of the engineering project Period management.
In an optional example, the information processing method of project management provided by the present application further include: receiving In the case where posting print command, file to be posted is determined according to the mailing print command;It is corresponding from the mail document The corresponding destination address of the file to be posted is extracted in manufacturer's information;Mailing list is generated according to the destination address.? That is, by the calling to manufacturer's information, and then Mailing list is easily and fast printed, it avoids and looks by hand in the related technology It askes, the work problem of record manufacturer address.
It should be understood that above-mentioned Mailing list is express delivery list or address list, wherein it is clear that the destination address is located at address The position of transparent enclosure is to matching on position and envelope on list.
It should be noted that: the format of above-mentioned Mailing list can be multiple preset formats, or user makes by oneself Adopted format.
In an optional example, the information processing method of project management provided by the present application further include: described in determining Whether the flow nodes of engineering project are in pending state;To the hair of destiny account corresponding to the flow nodes in pending state Send pending prompt, wherein include in the pending prompt: backlog, the points for attention of backlog and backlog Time Period Date.
That is, automatically generating the pending prompt of each account by the current state for precisely holding each flow nodes, solve Determined in the related technology by manually calculating and record the progress of work (project process), cause working efficiency lowly, can not treat Do the work problem that work is precisely held.
Specifically, above-mentioned backlog may include following classification: the pending prompt of project process, project demands are pending mentions Show, the pending prompt of contract circulation, the pending prompt of pending accounts payment.
Further, the pending prompt of project process includes 5, specifically: project has been checked and accepted, please in finished item in 30 days Clearing;The project acceptance inspection is more than 30 days, and not yet finished item is settled accounts;Clearing are completed in project, please contact Finance Department in 60 days Finished item final accounts;The not yet finished item final accounts more than 60 days are assigned in project clearing reply;Project online trial operation three Month, whether PLSCONFM carries out checking and accepting.
Further, the pending prompt of project demands includes 4, specifically: bid is declared and will be started after 2 weeks, please be timely Work out bidding document;The cut-off of next week demand unit, asks timely typing information;It is mentioned on the day of bulletin issuing time to (terminating in 5 days) Show: producer buys bidding documents;Prompt please pay close attention to acceptance of the bid result after the 20 days time of opening of bid.(stop mentioning after the notice on bid winning typing Show).
Further, the pending prompt of contract circulation includes 9, specifically: it has been received by notice on bid winning 5, not yet completes Contract is drafted;Have been received by notice on bid winning 20, not yet completion contract signing;It has been received by notice on bid winning 5, is not yet closed With information creating or association;It has been signed a contract that, manufacturer please be contact and issued invoice;The contract of being completed is drafted, and Party A is asked to start through method Circulation;Party A terminates through method circulation, and Party B please be prompted to start to circulate through method;Party B's circulation terminates, and Party B please be prompted to return contract; Party B's contract has been returned, and Party A is asked to sign and seal;Party A signs and seal completion, please return Party B.
Further, the pending prompt of pending accounts payment includes 17, specifically: ticket was arrived before invoice this month 24, has asked pending accounts; Invoice arrives ticket after last month 24, and this month asks pending accounts;Invoice typing pending accounts information, but typing pending accounts date not yet after 25 days;On The moon has passed through payment funding plan, row payment that come in after this month 5;It has done payment funding plan and has completed to examine, asked after 20 days The typing budget in finance control;Payment funding plan is done, the deadline is not examined in typing plan yet after 20 days;Fund is done Payment plan does not pass through examination & approval, row examination & approval that come in;One-time payment, contract have been signed, and payable 100%;Contract has been signed, can Payment 90%;Project has been checked and accepted, and payable 10%;Project, which has been checked and accepted, reaches 1 year, and payable 10%;The online trial operation of project, can prop up Pay 30%.
It should be understood that above content is schematic example, not to the pending prompt of the project process of the application, project The pending prompt of demand, the pending prompt of contract circulation, pending accounts pay pending prompt and are specifically limited, appeal schematic example it Outside, the pending prompt of the project process of the application, the pending prompt of project demands, the pending prompt of contract circulation, pending accounts pay pending mention Other suggestion contents can also be set as by showing.Further, the time limit on date referred in above-mentioned example citing is also schematic Citing not specifically limits the time limit on date involved in the pending prompt of the application.
It should be understood that administrative department and leaders are usually all to the development situation of project in engineering project Concern is convenient for management decision-maker to help administrative department and leaders to fully understand the specific progress of engineering project Decision-making foundation is grasped in time.Therefore, in a kind of optional example, the information processing method of project management provided by the present application is also It include: to be extracted from the current basal information of the engineering project and the inquiry in the case where receiving inquiry instruction Instruct corresponding data information;Statistical disposition is carried out to the data information, determines the process status of the engineering project, In, the process status of the engineering project refers at least to following one of any: the fund state of the engineering project, the engineering The contract situation of project, the bid situation of the engineering project, the condition of construction of the engineering project, the engineering project are tested Receive situation, the clearing situation of the engineering project.
That is, assigning situation by the fund to engineering project, fund adjustment situation, contract information, bid situation, checking and accepting Situation, clearing final accounts situation carry out statistical disposition, and the data supporting for understanding engineering project development condition is provided for management decision-maker, Solving leads to loss of learning/deviation by manually calculating in the related technology, effectively increases the management water of engineering project It is flat.
In an optional example, the information processing method of project management provided by the present application further include: in the work In the case that journey item purpose basic information is updated, determine whether more new data is contract dataset;It is to close in the more new data In the case where with data, the fund information of the engineering project is generated according to updated contract dataset, wherein the fund letter Breath includes at least following one of any: examination & approval document, invoice pending accounts, payment funding plan.
That is, base of the information processing method of project management provided by the embodiments of the present application by the engineering project that timely updates Contract dataset in plinth information realizes the maintenance for the convention contract signed to company, major maintenance content are as follows: pending accounts gold The information such as volume, pending accounts ratio, pending accounts date, payment amount, Payment Proportion, the date of payment.Further, in the engineering project Basic information in contract dataset be updated in the case where, the information processing method of project management provided by the embodiments of the present application Invoice pending accounts and examination & approval document can be also automatically generated according to the contract signing situation and contract payment method of engineering project, with It solves to realize and mention to determine data error brought by invoice pending accounts and examination & approval document using manual calculation in the related technology The technical effect of high work efficiency and management level.
That is, the information processing method of project management provided by the embodiments of the present application can provide according to customer service demand The business functions such as invoice batch pending accounts, asset examination and approval application are automatically generated, initial data (engineering project is utilized to the full extent Basic information), guarantee the accuracy and consistency of every form data of engineering project.
It should be understood that each contract for including in said contract data corresponds at least one invoice pending accounts and payment Information.
In an optional example, the information processing method of project management provided by the embodiments of the present application further include: In the case where receiving the account management instruction that default account is sent, account indicated in the account management instruction is parsed Family and the account management instruct corresponding adjustment operation;According to adjustment operation to institute in account management instruction The attribute of the account of instruction is updated processing, wherein the attribute of the account includes at least following one of any: the account Corresponding role, the corresponding stop and start state of the account.
That is, the information processing method of project management provided by the present application can also be managed account, i.e. additions and deletions change User account, and freeze user account.
Wherein, the corresponding different role of the account is configured with different rights range, and the extent of competence is for providing institute The flow nodes that account can receive are stated, and the classes of instructions that can be transmitted for providing the account.
That is, the information processing method of project management provided by the present application, is carried out by the basic information to engineering project Analysis, generates closed loop management process, specifically, each flow nodes in the closed loop management process are corresponding with different power Role is limited, and then different flow nodes are sent in the account of configuration different rights role, is realized through more authorization roles Flexibly control the technical effect of the extent of competence of multiple accounts.
Wherein, above-mentioned authorization role can be with are as follows: administrator, pending accounts person, department directors etc., each authorization role division have not Same extent of competence, ensure that business operation is not gone beyond one's commission, and hardness has standardized the management process of engineering project.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions It is executed in computer system, although also, logical order is shown in flow charts, and it in some cases, can be with not The sequence being same as herein executes shown or described step.
The embodiment of the present application also provides a kind of information processing applications of project management, it should be noted that the application is real The information processing application for applying the project management of example can be used for executing the letter that project management is used for provided by the embodiment of the present application Cease processing method.The information processing application of project management provided by the embodiments of the present application is introduced below.
Fig. 2 is the schematic diagram applied according to the information processing of the project management of the embodiment of the present application.As shown in Fig. 2, this The information processing application of mesh management includes: data Layer 21, Business Logic 23 and presentation layer 25.
Data Layer 21, for storing the basic information of engineering project, and the access request issued according to Business Logic 23 It accesses encapsulation to the basic information.
Business Logic 23 interacts with the data Layer 21, finishes for extracting encapsulation from the data Layer 21 Data cell, to execute the information processing method for the project management that above-mentioned Arbitrary Term example provides.
Presentation layer 25 interacts with the Business Logic 23, the displaying exported for showing the Business Logic 23 Information.
The information processing application of project management provided by the embodiments of the present application stores the base of engineering project by data Layer 21 Plinth information, and the access request issued according to Business Logic 23 accesses encapsulation to the basic information;Business Logic 23 interact with the data Layer 21, the data cell finished for extracting encapsulation from the data Layer 21, on executing The information processing method of the project management of Arbitrary Term example offer is provided;Presentation layer 25 interacts with the Business Logic 23, uses In the displaying information for showing that the Business Logic 23 exports, solving project management system general in the related technology can not expire Sufficient user account demand, and handle the low problem of effect.
That is, the application reaches unified number by providing the basic information of unified standard for entire closed management process It according to the technical purpose in source, solves in the related technology that basic information relies on hand-kept, and leads to that working efficiency is low, basis letter There is the management drawback of a large amount of deviations in breath.
And by the interactive instruction from trend destiny account transmission flow node, and according to destiny account to engineering The basic information of project is updated processing, avoids the case where artificial accounting data leads to data deviation generation, improves work The accuracy of the associated basic data of journey project.
In an optional example, information processing follows J2EE technical system using managed engineering project, and is somebody's turn to do Information processing application follows MVC application framework, wherein the application framework is logically divided into represent layer, Business Logic 23, number According to layer 21, particular technique framework is as shown in Figure 3.
Optionally, represent layer uses J2EE technical system and MVC application framework, wherein the also integrated interface of the presentation layer 25 Controller assemblies, interface operation component, FLEX component, JSP web pages component and service agent unit etc., and then guarantee information processing Beauty, multiplicity and the friendly style of the presentation layer 25 of application.
Optionally, Business Logic 23 is used for the interactive instruction sent based on user, extracts from data Layer 21 wait open up The data information shown, and the data information is sent to presentation layer 25 and is used.
Specifically, Business Logic 23 includes multiple functional modules, and such as: Basic Information Management module, for engineering item Purpose basic information carries out typing, modification, inquiry operation;Project Process management module, for the process to the engineering project Node carries out closed loop management;Account of the exchequer menu manager module is managed for the fund bill information to the engineering project Maintenance;User account management module is used to carry out claim management to the user account, and adds to the user account Add, freeze, delete operation;Comprehensive management module carries out summarizing displaying for the process status to the engineering project.
That is, Business Logic 23 is by Basic Information Management module to engineering project in an optional example Basic information carries out typing, modification, inquiry operation;Project Process management module closes the flow nodes of the engineering project Ring type management;Account of the exchequer menu manager module is managed maintenance to the fund bill information of the engineering project;User account pipe It manages module and claim management is carried out to the user account, and the user account is added, is freezed, delete operation;It is comprehensive It closes management module the process status of the engineering project is carried out summarizing displaying, executes what above-mentioned Arbitrary Term example provided to realize The information processing method of project management.
Wherein, above-mentioned Project Process management module further includes following one of any: mailing print module, for determine to In the case where posting file, the corresponding target of the file to be posted is extracted from the corresponding manufacturer's information of the mailing file Location, and Mailing list is generated according to the destination address;Reminding module is acted on behalf, for determining the flow nodes of the engineering project Whether charg`e d'affaires's state is in, and in the case where the flow nodes are in charg`e d'affaires's state, the corresponding finger of Xiang Suoshu flow nodes Determine account and sends pending prompt.
Wherein, above-mentioned account of the exchequer menu manager module further includes one of any as follows: pending accounts management module, for based on described The contract information of engineering project generates the corresponding invoice pending accounts of the engineering project;Asset examination and approval module, for being based on the work Journey item purpose contract information, generates the engineering project and examines document accordingly;Payment plan module, for being based on the engineering The contract information of project generates the corresponding payment funding plan of the engineering project.
Wherein, the user account management module further include: delineation of power module is carried out for the attribute to user account Update processing, wherein the attribute of the account includes at least following one of any: role corresponding to the account, the account The corresponding stop and start state in family, wherein the corresponding different role of the account is configured with different rights range, and the extent of competence is used In the flow nodes for providing that the account can receive, and the classes of instructions that can be transmitted for providing the account.
Optionally, data Layer 21 is made of data mapping layer and data source, wherein data mapping layer be used for data source into Row encapsulation access (executes what above-mentioned Arbitrary Term example provided so that Business Logic 23 can more concentrate on its essential function The information processing method of project management).That is, data mapping layer is by being packaged access to data source, so that service logic The dependence of 23 pairs of bottom data storage form of layer reduces, and is able to use a plurality of types of databases convenient for Business Logic 23.
Wherein, above-mentioned data source can be with are as follows: the data of databases storage, internal storage data, message queue, disk file Deng.
Finally, it should be noted that the application framework of the application is implemented on JAVA enterprise version platform, by by table Existing logic (presentation layer 25), service logic (Business Logic 23) are separated with mathematical logic (data Layer 21), are carrying out exploitation work Make, ensure that the standardization of exploitation, while also realizing the standard of the management overall process of engineering project by Flow driving technology Change.
In conclusion the embodiment of the present application realizes following technical effect:
1, by the way of the multiplexing of BPM process configuration component, operation flow data integration etc., realizing business datum integration Interactive and project management process closed loop management reinforces information resources share and vocational work collaboration.
2, data analysis is carried out by the basic information (the predominantly flow data of basic service) to engineering project, determined The business demand of engineering project, and then be that multiple accounts distribute different role based on business demand, realize the polygonal color of more permissions Flexible control, ensure that business operation is not gone beyond one's commission and the technical effect of the management process of specification engineering project.
3, automatically analyze calculating by the basic information (business datum) to engineering project, and by the analysis after calculating As a result it is updated in the basic information of engineering project, ensure that the consistency and accuracy of the basic information of engineering project, avoid The case where artificial verification leads to error when calculating generation.
4, (judge whether flow nodes are in pending shape by the real-time judge of the current state to each flow nodes State), and then send pending prompt in time to staff, thus caused by avoiding because of personal question Project Management careless omission and Economic loss.
5, by application framework being carried out layered shaping, each function carries out modularization when building application framework Processing handles data, process process modeling, so that building successfully application has stronger scalability, after application Continuous updating operation.
It includes processor and memory that the information processing of the project management, which is applied, and said units etc. are used as program unit Storage in memory, executes above procedure unit stored in memory by processor to realize corresponding function.
Include kernel in processor, is gone in memory to transfer corresponding program unit by kernel.Kernel can be set one Or more, the case where artificial accounting data leads to data deviation generation is avoided by adjusting kernel parameter, improves engineering The accuracy of the associated basic data of project.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, if read-only memory (ROM) or flash memory (flash RAM), memory include that at least one is deposited Store up chip.
The embodiment of the invention provides a kind of storage mediums, are stored thereon with program, real when which is executed by processor The information processing method of the existing project management.
The embodiment of the invention provides a kind of processor, the processor is for running program, wherein described program operation The information processing method of project management described in Shi Zhihang.
The embodiment of the invention provides a kind of equipment, equipment include processor, memory and storage on a memory and can The program run on a processor, processor perform the steps of when executing program in the feelings for determining engineering project to be processed Under condition, the basic information of the engineering project is obtained;Basic information according to the engineering project generates closed loop management process; Based on the closed loop management process, successively to destiny account transmission flow node;Institute is based on receiving the destiny account In the case where stating flow nodes transmission interactive instruction, carried out more according to basic information of the interactive instruction to the engineering project New processing.
Optionally, the basic information of the engineering project includes at least following one of any: the project of the engineering project Type, the procurement information of the engineering project, the plan information of the engineering project and the engineering project each contract Square information.
Optionally, the flow nodes of the engineering project refer at least to control link one of any as follows: the engineering The demand of project proposes report link, the bid link of the engineering project, the signing link of the engineering project, the engineering project Capital management link, the construction speed link of the engineering project.
Optionally, the method also includes: receive mailing print command in the case where, according to the mailing print refer to It enables and determines file to be posted;The corresponding target of the file to be posted is extracted from the corresponding manufacturer's information of the mail document Address;Mailing list is generated according to the destination address.
Optionally, the method also includes: determine whether the flow nodes of the engineering project are in pending state;To place The destiny account corresponding to the flow nodes of pending state sends pending prompt, wherein includes in the pending prompt: pending The Time Period Date of item, the points for attention of backlog and backlog.
Optionally, the method also includes: in the case where receiving inquiry instruction, from the current base of the engineering project Data information corresponding with the inquiry instruction is extracted in plinth information;Statistical disposition is carried out to the data information, determines institute State the process status of engineering project, wherein the process status of the engineering project refers at least to following one of any: the engineering The fund state of project, the contract situation of the engineering project, the bid situation of the engineering project, the engineering project are applied Work situation, the examination situation of the engineering project, the clearing situation of the engineering project.
Optionally, the method also includes: in the case where the basic information of the engineering project is updated, determine update Whether data are contract dataset;In the case where the more new data is contract dataset, generated according to updated contract dataset The fund information of the engineering project, wherein the fund information includes at least following one of any: examination & approval document, invoice are hung Account, payment funding plan.
Optionally, the method also includes: in the case where receiving the account management instruction that default account is sent, parsing Indicated account and the account management instruct corresponding adjustment operation in the account management instruction out;According to described in Adjustment operation is updated processing to the attribute of account indicated in account management instruction, wherein the category of the account Property include at least it is following one of any: role corresponding to the account, the corresponding stop and start state of the account.
Optionally, the corresponding different role of the account is configured with different rights range, and the extent of competence is for providing The flow nodes that the account can receive, and the classes of instructions that can be transmitted for providing the account.
Optionally, generating closed loop management process according to the basic information of the engineering project includes: to establish multiple BPM streams Journey configuration module, wherein the BPM process configuration module is associated with the engineering project;Base according to the engineering project Plinth information integrates data packaging unit associated with the multiple BPM process configuration module difference;By being multiplexed the BPM Process configuration module, and data packaging unit associated with the multiple BPM process configuration module difference, configure the work Journey item purpose whole flow nodes are to generate closed loop management process, wherein the flow nodes of the engineering project are with tree-shaped shape Formula is attached displaying.Equipment herein can be server, PC, PAD, mobile phone etc..
Present invention also provides a kind of computer program products, when executing on data processing equipment, are adapted for carrying out just The program of beginningization there are as below methods step: in the case where determining engineering project to be processed, the base of the engineering project is obtained Plinth information;Basic information according to the engineering project generates closed loop management process;Based on the closed loop management process, according to It is secondary to destiny account transmission flow node;Receiving feelings of the destiny account based on flow nodes transmission interactive instruction Under condition, processing is updated according to basic information of the interactive instruction to the engineering project.
Optionally, the basic information of the engineering project includes at least following one of any: the project of the engineering project Type, the procurement information of the engineering project, the plan information of the engineering project and the engineering project each contract Square information.
Optionally, the flow nodes of the engineering project refer at least to control link one of any as follows: the engineering The demand of project proposes report link, the bid link of the engineering project, the signing link of the engineering project, the engineering project Capital management link, the construction speed link of the engineering project.
Optionally, the method also includes: receive mailing print command in the case where, according to the mailing print refer to It enables and determines file to be posted;The corresponding target of the file to be posted is extracted from the corresponding manufacturer's information of the mail document Address;Mailing list is generated according to the destination address.
Optionally, the method also includes: determine whether the flow nodes of the engineering project are in pending state;To place The destiny account corresponding to the flow nodes of pending state sends pending prompt, wherein includes in the pending prompt: pending The Time Period Date of item, the points for attention of backlog and backlog.
Optionally, the method also includes: in the case where receiving inquiry instruction, from the current base of the engineering project Data information corresponding with the inquiry instruction is extracted in plinth information;Statistical disposition is carried out to the data information, determines institute State the process status of engineering project, wherein the process status of the engineering project refers at least to following one of any: the engineering The fund state of project, the contract situation of the engineering project, the bid situation of the engineering project, the engineering project are applied Work situation, the examination situation of the engineering project, the clearing situation of the engineering project.
Optionally, the method also includes: in the case where the basic information of the engineering project is updated, determine update Whether data are contract dataset;In the case where the more new data is contract dataset, generated according to updated contract dataset The fund information of the engineering project, wherein the fund information includes at least following one of any: examination & approval document, invoice are hung Account, payment funding plan.
Optionally, the method also includes: in the case where receiving the account management instruction that default account is sent, parsing Indicated account and the account management instruct corresponding adjustment operation in the account management instruction out;According to described in Adjustment operation is updated processing to the attribute of account indicated in account management instruction, wherein the category of the account Property include at least it is following one of any: role corresponding to the account, the corresponding stop and start state of the account.
Optionally, the corresponding different role of the account is configured with different rights range, and the extent of competence is for providing The flow nodes that the account can receive, and the classes of instructions that can be transmitted for providing the account.
Optionally, generating closed loop management process according to the basic information of the engineering project includes: to establish multiple BPM streams Journey configuration module, wherein the BPM process configuration module is associated with the engineering project;Base according to the engineering project Plinth information integrates data packaging unit associated with the multiple BPM process configuration module difference;By being multiplexed the BPM Process configuration module, and data packaging unit associated with the multiple BPM process configuration module difference, configure the work Journey item purpose whole flow nodes are to generate closed loop management process, wherein the flow nodes of the engineering project are with tree-shaped shape Formula is attached displaying.
It should be understood by those skilled in the art that, embodiments herein can provide as method, system or computer program Product.Therefore, complete hardware embodiment, complete software embodiment or reality combining software and hardware aspects can be used in the application Apply the form of example.Moreover, it wherein includes the computer of computer usable program code that the application, which can be used in one or more, The computer program implemented in usable storage medium (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) produces The form of product.
The application is referring to method, the process of equipment (application) and computer program product according to the embodiment of the present application Figure and/or block diagram describe.It should be understood that every one stream in flowchart and/or the block diagram can be realized by computer program instructions The combination of process and/or box in journey and/or box and flowchart and/or the block diagram.It can provide these computer programs Instruct the processor of general purpose computer, special purpose computer, Embedded Processor or other programmable data processing devices to produce A raw machine, so that being generated by the instruction that computer or the processor of other programmable data processing devices execute for real The device for the function of being specified in present one or more flows of the flowchart and/or one or more blocks of the block diagram.
These computer program instructions, which may also be stored in, is able to guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works, so that it includes referring to that instruction stored in the computer readable memory, which generates, Enable the manufacture of device, the command device realize in one box of one or more flows of the flowchart and/or block diagram or The function of being specified in multiple boxes.
These computer program instructions also can be loaded onto a computer or other programmable data processing device, so that counting Series of operation steps are executed on calculation machine or other programmable devices to generate computer implemented processing, thus in computer or The instruction executed on other programmable devices is provided for realizing in one or more flows of the flowchart and/or block diagram one The step of function of being specified in a box or multiple boxes.
In a typical configuration, calculating equipment includes one or more processors (CPU), input/output interface, net Network interface and memory.
Memory may include the non-volatile memory in computer-readable medium, random access memory (RAM) and/ Or the forms such as Nonvolatile memory, such as read-only memory (ROM) or flash memory (flash RAM).Memory is computer-readable Jie The example of matter.
Computer-readable medium includes permanent and non-permanent, removable and non-removable media can be by any method Or technology come realize information store.Information can be computer readable instructions, data structure, the module of program or other data. The example of the storage medium of computer includes, but are not limited to phase change memory (PRAM), static random access memory (SRAM), moves State random access memory (DRAM), other kinds of random access memory (RAM), read-only memory (ROM), electric erasable Programmable read only memory (EEPROM), flash memory or other memory techniques, read-only disc read only memory (CD-ROM) (CD-ROM), Digital versatile disc (DVD) or other optical storage, magnetic cassettes, tape magnetic disk storage or other magnetic storage devices Or any other non-transmission medium, can be used for storage can be accessed by a computing device information.As defined in this article, it calculates Machine readable medium does not include temporary computer readable media (transitory media), such as the data-signal and carrier wave of modulation.
It should also be noted that, the terms "include", "comprise" or its any other variant are intended to nonexcludability It include so that the process, method, commodity or the equipment that include a series of elements not only include those elements, but also to wrap Include other elements that are not explicitly listed, or further include for this process, method, commodity or equipment intrinsic want Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including element There is also other identical elements in process, method, commodity or equipment.
It will be understood by those skilled in the art that embodiments herein can provide as method, system or computer program product. Therefore, complete hardware embodiment, complete software embodiment or embodiment combining software and hardware aspects can be used in the application Form.It is deposited moreover, the application can be used to can be used in the computer that one or more wherein includes computer usable program code The shape for the computer program product implemented on storage media (including but not limited to magnetic disk storage, CD-ROM, optical memory etc.) Formula.
The above is only embodiments herein, are not intended to limit this application.To those skilled in the art, Various changes and changes are possible in this application.It is all within the spirit and principles of the present application made by any modification, equivalent replacement, Improve etc., it should be included within the scope of the claims of this application.

Claims (13)

1. a kind of information processing method of project management characterized by comprising
In the case where determining engineering project to be processed, the basic information of the engineering project is obtained;
Basic information according to the engineering project generates closed loop management process;
Based on the closed loop management process, successively to destiny account transmission flow node;
In the case where receiving the destiny account based on flow nodes transmission interactive instruction, according to the interactive instruction Processing is updated to the basic information of the engineering project.
2. the method according to claim 1, wherein the basic information of the engineering project includes at least following Meaning one of: the item types of the engineering project, the procurement information of the engineering project, the engineering project plan information, And each contract side's information of the engineering project.
3. the method according to claim 1, wherein the flow nodes of the engineering project refer at least to appoint as follows The control link of one of meaning: the demand of the engineering project proposes report link, the bid link of the engineering project, the engineering item Purpose signing link, the capital management link of the engineering project, the construction speed link of the engineering project.
4. the method according to claim 1, wherein the method also includes:
In the case where receiving mailing print command, file to be posted is determined according to the mailing print command;
The corresponding destination address of the file to be posted is extracted from the corresponding manufacturer's information of the mail document;
Mailing list is generated according to the destination address.
5. the method according to claim 1, wherein the method also includes:
Determine whether the flow nodes of the engineering project are in pending state;
Pending prompt is sent to destiny account corresponding to the flow nodes in pending state, wherein in the pending prompt Include: the Time Period Date of backlog, the points for attention of backlog and backlog.
6. the method according to claim 1, wherein the method also includes:
In the case where receiving inquiry instruction, extracts from the current basal information of the engineering project and refer to the inquiry Enable corresponding data information;
Statistical disposition is carried out to the data information, determines the process status of the engineering project, wherein the engineering project Process status refers at least to following one of any: the fund state of the engineering project, the contract situation of the engineering project, institute State the bid situation of engineering project, the condition of construction of the engineering project, the examination situation of the engineering project, the engineering item Purpose settles accounts situation.
7. according to the method described in claim 5, it is characterized in that, the method also includes:
In the case where the basic information of the engineering project is updated, determine whether more new data is contract dataset;
In the case where the more new data is contract dataset, the money of the engineering project is generated according to updated contract dataset Golden information, wherein the fund information includes at least following one of any: examination & approval document, invoice pending accounts, payment funding plan.
8. according to the method described in claim 5, it is characterized in that, the method also includes:
In the case where receiving the account management instruction that default account is sent, parse indicated in the account management instruction Account and the account management instruct corresponding adjustment to operate;
Processing is updated according to attribute of the adjustment operation to account indicated in account management instruction, wherein The attribute of the account includes at least following one of any: role corresponding to the account, the corresponding stop and start shape of the account State.
9. according to the method described in claim 5, it is characterized in that, the corresponding different role of the account is configured with different rights Range, the extent of competence is for providing the flow nodes that the account can receive, and for providing the account institute The classes of instructions that can be sent.
10. the method according to claim 1, wherein the basic information according to the engineering project generates closed loop Formula management process includes:
Establish multiple BPM process configuration modules, wherein the BPM process configuration module is associated with the engineering project;
According to the basic information of the engineering project, data associated with the multiple BPM process configuration module difference are integrated Encapsulation unit;
By being multiplexed the BPM process configuration module, and data associated with the multiple BPM process configuration module difference Encapsulation unit configures whole flow nodes of the engineering project to generate closed loop management process, wherein the engineering project Flow nodes displaying is attached with tree form.
11. a kind of information processing application of project management characterized by comprising
Data Layer, for storing the basic information of engineering project, and the access request according to Business Logic sending is to the base Plinth information accesses encapsulation;
Business Logic interacts with the data Layer, the data cell finished for extracting encapsulation from the data Layer, To execute the information processing method of the project management of Arbitrary Term in the claims 1-10;
Presentation layer interacts with the Business Logic, for showing the displaying information of the Business Logic output.
12. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein described program right of execution Benefit require any one of 1 to 10 described in project management information processing method.
13. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run Benefit require any one of 1 to 10 described in project management information processing method.
CN201910209596.9A 2019-03-19 2019-03-19 The information processing method of project management and application Pending CN110070334A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910209596.9A CN110070334A (en) 2019-03-19 2019-03-19 The information processing method of project management and application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910209596.9A CN110070334A (en) 2019-03-19 2019-03-19 The information processing method of project management and application

Publications (1)

Publication Number Publication Date
CN110070334A true CN110070334A (en) 2019-07-30

Family

ID=67366362

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910209596.9A Pending CN110070334A (en) 2019-03-19 2019-03-19 The information processing method of project management and application

Country Status (1)

Country Link
CN (1) CN110070334A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111753146A (en) * 2020-06-15 2020-10-09 贝壳技术有限公司 Aging information processing method, device, system, electronic equipment and storage medium
CN111754207A (en) * 2020-06-30 2020-10-09 深圳壹账通智能科技有限公司 Process instance management method and device, computer equipment and readable storage medium
CN113220772A (en) * 2021-05-17 2021-08-06 成都雨萌科技有限公司 Data processing method, system and related equipment
CN113495887A (en) * 2020-03-20 2021-10-12 北京沃东天骏信息技术有限公司 Data form processing method, device and system
CN113609831A (en) * 2021-08-05 2021-11-05 北京金堤科技有限公司 Method and device for generating product delivery flow template
CN115082042A (en) * 2022-07-20 2022-09-20 灵智信息服务(深圳)有限公司 Project management method based on data set, computer equipment and storage medium
WO2023093487A1 (en) * 2021-11-26 2023-06-01 北京字跳网络技术有限公司 Project stream determination method and apparatus, electronic device, and storage medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120016704A1 (en) * 2000-02-01 2012-01-19 Paul Morinville Automated Execution of Business Processes Using Dual Element Events
CN106300673A (en) * 2016-09-09 2017-01-04 黑龙江省电力科学研究院 A kind of intelligent substation adjustment method based on BPM BPM and system

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120016704A1 (en) * 2000-02-01 2012-01-19 Paul Morinville Automated Execution of Business Processes Using Dual Element Events
CN106300673A (en) * 2016-09-09 2017-01-04 黑龙江省电力科学研究院 A kind of intelligent substation adjustment method based on BPM BPM and system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董建峰等: "基于BPM的工程总承包项目管理系统研究", 《工程设计与计算机技术:第十五届全国工程设计计算机应用学术会议论文集》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113495887A (en) * 2020-03-20 2021-10-12 北京沃东天骏信息技术有限公司 Data form processing method, device and system
CN111753146A (en) * 2020-06-15 2020-10-09 贝壳技术有限公司 Aging information processing method, device, system, electronic equipment and storage medium
CN111754207A (en) * 2020-06-30 2020-10-09 深圳壹账通智能科技有限公司 Process instance management method and device, computer equipment and readable storage medium
CN113220772A (en) * 2021-05-17 2021-08-06 成都雨萌科技有限公司 Data processing method, system and related equipment
CN113609831A (en) * 2021-08-05 2021-11-05 北京金堤科技有限公司 Method and device for generating product delivery flow template
WO2023093487A1 (en) * 2021-11-26 2023-06-01 北京字跳网络技术有限公司 Project stream determination method and apparatus, electronic device, and storage medium
CN115082042A (en) * 2022-07-20 2022-09-20 灵智信息服务(深圳)有限公司 Project management method based on data set, computer equipment and storage medium

Similar Documents

Publication Publication Date Title
CN110070334A (en) The information processing method of project management and application
Li et al. Blockchain-enabled workflow operating system for logistics resources sharing in E-commerce logistics real estate service
Shojaei Exploring applications of blockchain technology in the construction industry
US7606699B2 (en) Modeling of forecasting and production planning data
CN104182894B (en) Network commodity distribution platform system and its application in foreign trade e-commerce field
CN109784681A (en) Power engineering project investment management system
US8671041B2 (en) Managing consistent interfaces for credit portfolio business objects across heterogeneous systems
US8340995B2 (en) Method and system of using artifacts to identify elements of a component business model
US20120047079A1 (en) Providing foundation application as enterprise services
CN110443701A (en) The logical card management method of one kind, supply chain financial system and electronic equipment
CN101256647A (en) Item management system being suitable for garden engineering
US8818884B2 (en) Architectural design for customer returns handling application software
US20060080326A1 (en) Method for reengineering of business processes
CN107292560A (en) Material storage management method and system
CN112199735A (en) Vertical e-commerce transaction platform based on block chain
Van Chuong et al. Robotic process automation and opportunities for Vietnamese market
US20090271240A1 (en) Method and system for strategic headcount planning with operational transition management of workforce
CN110766310A (en) Wisdom operation middle platform
Kuzmin et al. Simulating and reengineering stress management system—analysis of undesirable deviations
CN112990886B (en) Aviation industry data management display system based on mobile phone terminal
Møller ERP II-next-generation extended enterprise resource planning
Huang et al. Informatization design of raw material purchase and payment for feed processing enterprises under ERP system environment
Tian An effective model for consumer need prediction using big data analytics
US20140149186A1 (en) Method and system of using artifacts to identify elements of a component business model
Łobaziewicz Effectiveness of business process management in B2B model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730