CN110069881A - A kind of rain sewerage Design and Build method based on BIM technology - Google Patents
A kind of rain sewerage Design and Build method based on BIM technology Download PDFInfo
- Publication number
- CN110069881A CN110069881A CN201910360251.3A CN201910360251A CN110069881A CN 110069881 A CN110069881 A CN 110069881A CN 201910360251 A CN201910360251 A CN 201910360251A CN 110069881 A CN110069881 A CN 110069881A
- Authority
- CN
- China
- Prior art keywords
- bim
- design
- model
- construction
- build
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 19
- 238000005516 engineering process Methods 0.000 title claims abstract description 11
- 238000010276 construction Methods 0.000 claims abstract description 25
- 238000007689 inspection Methods 0.000 claims abstract description 19
- 239000010865 sewage Substances 0.000 claims abstract description 12
- 238000012800 visualization Methods 0.000 claims abstract description 7
- 238000001514 detection method Methods 0.000 claims abstract description 6
- 230000002068 genetic effect Effects 0.000 claims abstract description 6
- 238000004088 simulation Methods 0.000 claims abstract description 6
- 238000005457 optimization Methods 0.000 claims abstract description 5
- 238000003912 environmental pollution Methods 0.000 abstract description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000007547 defect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 201000010099 disease Diseases 0.000 description 1
- 208000037265 diseases, disorders, signs and symptoms Diseases 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 230000003472 neutralizing effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N3/00—Computing arrangements based on biological models
- G06N3/12—Computing arrangements based on biological models using genetic models
- G06N3/126—Evolutionary algorithms, e.g. genetic algorithms or genetic programming
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Biophysics (AREA)
- Geometry (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Bioinformatics & Computational Biology (AREA)
- Evolutionary Computation (AREA)
- Evolutionary Biology (AREA)
- Computer Hardware Design (AREA)
- General Engineering & Computer Science (AREA)
- Molecular Biology (AREA)
- Architecture (AREA)
- Data Mining & Analysis (AREA)
- Computing Systems (AREA)
- Computational Linguistics (AREA)
- Biomedical Technology (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- Artificial Intelligence (AREA)
- General Health & Medical Sciences (AREA)
- Civil Engineering (AREA)
- Genetics & Genomics (AREA)
- Physiology (AREA)
- Structural Engineering (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Sewage (AREA)
Abstract
The rain sewerage Design and Build method based on BIM technology that the invention discloses a kind of, belongs to construction technical field.The present invention is the following steps are included: step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity check, gradient inspection etc. in BIM model;Step 3. is based on genetic algorithm and optimizes to pipe network, directly modifies in BIM Design and Build model;Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build model and construction simulation scheme.Present invention improves city rain sewage discharges, preferably control environmental pollution, urban waterlogging.
Description
Technical field
The present invention relates to construction technical fields, more specifically to a kind of rain sewerage based on BIM technology
Design and Build method.
Background technique
As China's urban-rural integration and urban modernization process are constantly accelerated, city stain disease discharge amount is increasing;
Urban waterlogging phenomenon frequently occurs, and infrastructure of the rain sewage pipe as discharge rainwater and sewage is faced with increasing row
Bleed off pressure power.Due to the problem of design of pipe networks is unreasonable and construction, many rain sewage networks is caused not to be well positioned to meet
Use function.
The development of BIM (BuildingInformationModeling) technology, can for pipeline engineering minute design and
Construction provides technical support.By BIM technology application, arrangement and method for construction can be predefined, avoids doing over again with optimizing design scheme,
Waste is reduced, cost is saved.
Summary of the invention
1. technical problems to be solved by the inivention
In view of the defects existing in the prior art with deficiency, the rain sewerage based on BIM technology that the present invention provides a kind of
Design and Build method improves city rain sewage discharge, preferably controls environmental pollution, urban waterlogging.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of rain sewerage Design and Build method based on BIM technology of the invention, comprising the following steps:
Step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;
Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity inspection in BIM model
It looks into, gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, is directly repaired in BIM Design and Build model
Change;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build
Model and construction simulation scheme.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, have the following beneficial effects:
The present invention is based on the construction integrated models of BIM Design of three-dimensional visualization, carry out pipe network optimization, node inspection, collision
Detection, pressure loss inspection, validity check, gradient inspection etc., optimize pipe network based on genetic algorithm, reduce rain sewage
Pipe network whole design security risk.Visualization construction simulation scheme animation is formulated based on BIM model, is entangled at any time in work progress
Partially, pipeline network construction security risk is reduced, lifting construction efficiency obtains preferable Social benefit and economic benefit.
Detailed description of the invention
Fig. 1 is construction process figure of the invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
Embodiment 1
It will be seen from figure 1 that a kind of rain sewerage Design and Build side based on BIM technology of the present embodiment
Method, comprising the following steps:
Step 1. is based on the gradient and flow velocity creation rain sewage network BIM designs a model;
Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity inspection in BIM model
It looks into, gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, is directly repaired in BIM Design and Build model
Change;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build
Model and construction simulation scheme.
A kind of rain sewerage Design and Build method based on BIM technology of the present embodiment, it is real according to the following steps
It is existing:
Rain sewage network BIM Design and Build model, rainwater pipeline 4.83km, sewage are created based on the gradient and flow velocity
Pipeline 9.77km;
It carries out pipe network in BIM model to optimize 13 times, node is checked 68 times and adjusted 42 times, is laid equal stress at collision detection 142
New adjustment;It at pressure loss inspection 53 and remodifies, at validity check 24, at gradient inspection 33 etc.;
Pipe network is optimized based on genetic algorithm, is adjusted pipe network system 26 times, is adjusted the gradient 43 times, flow velocity 41 is adjusted
It is secondary, and all directly modify in BIM Design and Build model;
Visualization arrangement and method for construction animation is formulated based on BIM model, carry out scheme tells somebody what one's real intentions are, confides a technological secret;
It constructs, goes wrong in construction 36 times according to plan, 11 are solved by external coordination, and 25 times again excellent by pipe network
Neutralizing is determined, and improves BIM Design and Build model and construction simulation scheme again after pipe network system adjustment.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing
What is shown is also one of embodiments of the present invention, and actual method is not limited thereto.So if the common skill of this field
Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution
Similar frame mode and embodiment, are within the scope of protection of the invention.
Claims (1)
1. a kind of rain sewerage Design and Build method based on BIM technology, it is characterised in that: the following steps are included:
Step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;
Step 2. carried out in BIM model pipe network optimization, node inspection, collision detection, pressure loss inspection, validity check,
Gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, directly modifies in BIM Design and Build model;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build model
With construction simulation scheme.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360251.3A CN110069881A (en) | 2019-04-30 | 2019-04-30 | A kind of rain sewerage Design and Build method based on BIM technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910360251.3A CN110069881A (en) | 2019-04-30 | 2019-04-30 | A kind of rain sewerage Design and Build method based on BIM technology |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110069881A true CN110069881A (en) | 2019-07-30 |
Family
ID=67369810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910360251.3A Pending CN110069881A (en) | 2019-04-30 | 2019-04-30 | A kind of rain sewerage Design and Build method based on BIM technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110069881A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110427729A (en) * | 2019-08-19 | 2019-11-08 | 中国十七冶集团有限公司 | A kind of rain sewage treatment construction of sponge city and O&M method based on BIM technology |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107742170A (en) * | 2017-10-25 | 2018-02-27 | 天津大学 | A kind of storm sewer system the Hydraulic Design parameter optimization method |
CN107832498A (en) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method |
CN108537519A (en) * | 2018-05-03 | 2018-09-14 | 陕西理工大学 | A kind of architectural design method based on BIM |
CN109543233A (en) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | A kind of electromechanical pipeline assembly construction method based on BIM technology |
-
2019
- 2019-04-30 CN CN201910360251.3A patent/CN110069881A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107832498A (en) * | 2017-10-18 | 2018-03-23 | 陕西有色建设有限公司 | A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method |
CN107742170A (en) * | 2017-10-25 | 2018-02-27 | 天津大学 | A kind of storm sewer system the Hydraulic Design parameter optimization method |
CN108537519A (en) * | 2018-05-03 | 2018-09-14 | 陕西理工大学 | A kind of architectural design method based on BIM |
CN109543233A (en) * | 2018-10-26 | 2019-03-29 | 中交第航务工程局有限公司 | A kind of electromechanical pipeline assembly construction method based on BIM technology |
Non-Patent Citations (1)
Title |
---|
管昌生;龚亚洲;: "住宅小区地下管网建设中BIM技术的应用" * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110427729A (en) * | 2019-08-19 | 2019-11-08 | 中国十七冶集团有限公司 | A kind of rain sewage treatment construction of sponge city and O&M method based on BIM technology |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111382484B (en) | Building pipeline arrangement optimization system based on BIM | |
CN109784004B (en) | BIM technology-based special-shaped metal roof installation construction method | |
CN106250638A (en) | A kind of backform comprehensive Design based on BIM and application process | |
CN106156383B (en) | A kind of parametrization aerodynamic configuration digital-to-analogue and structured grid automatic generation method | |
CN106777460B (en) | Method for determining pipe diameter and gradient of urban rainwater pipe network based on SWMM hydraulic model | |
CN107506561A (en) | A kind of bridge forward design method based on BIM | |
CN105956278A (en) | Detailed design method of mechanical and electrical engineering pipeline system based on Autodesk Revit | |
CN110069891A (en) | A kind of Electromechanical Design based on BIM and review method | |
CN115600298A (en) | BIM building forward design standardization plotting method based on revit | |
CN111931398A (en) | Hydraulic valve integrated block supporting structure optimization method based on 3D printing | |
CN110069881A (en) | A kind of rain sewerage Design and Build method based on BIM technology | |
CN110991997A (en) | BIM technology-based comprehensive pipeline design construction method | |
CN112765711A (en) | BIM modeling method for green building simulation calculation | |
CN107194112A (en) | The method being laid out based on BIM to garden landscape | |
CN114925435A (en) | Method for manufacturing BIM family of assembly type pipe-well pipe assembly module | |
CN107391856A (en) | Optimize the method for water meter and valve location in a kind of water supply network subregion | |
CN107145643B (en) | Intelligent design system and design method for sheet metal sculpture profile steel frame | |
CN110399666A (en) | A method of the design of tube-type air preheater Parameterization Scheme is carried out based on NX software | |
CN104180042B (en) | A kind of scheme of valve-shut off based on pipe network data prediction generates method | |
CN108664702B (en) | Method for increasing design point lift of multi-stage centrifugal condensate pump | |
CN104298792A (en) | Modularized design method and system for nuclear power station | |
Puleo et al. | Water and energy saving in urban water systems: the ALADIN project | |
CN115618769A (en) | Drainage system evaluation method and system based on hydraulic model | |
CN110083950B (en) | Inverted siphon design construction method based on BIM technology | |
Li et al. | The application value of BIM technology in prefabricated building based on EPC general contracting management model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190730 |
|
RJ01 | Rejection of invention patent application after publication |