CN110069881A - A kind of rain sewerage Design and Build method based on BIM technology - Google Patents

A kind of rain sewerage Design and Build method based on BIM technology Download PDF

Info

Publication number
CN110069881A
CN110069881A CN201910360251.3A CN201910360251A CN110069881A CN 110069881 A CN110069881 A CN 110069881A CN 201910360251 A CN201910360251 A CN 201910360251A CN 110069881 A CN110069881 A CN 110069881A
Authority
CN
China
Prior art keywords
bim
design
model
construction
build
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910360251.3A
Other languages
Chinese (zh)
Inventor
路希鑫
王申杰
钱浩
汝刚
方义军
孙亚辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN201910360251.3A priority Critical patent/CN110069881A/en
Publication of CN110069881A publication Critical patent/CN110069881A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06NCOMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
    • G06N3/00Computing arrangements based on biological models
    • G06N3/12Computing arrangements based on biological models using genetic models
    • G06N3/126Evolutionary algorithms, e.g. genetic algorithms or genetic programming

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Biophysics (AREA)
  • Geometry (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Bioinformatics & Cheminformatics (AREA)
  • Bioinformatics & Computational Biology (AREA)
  • Evolutionary Computation (AREA)
  • Evolutionary Biology (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Molecular Biology (AREA)
  • Architecture (AREA)
  • Data Mining & Analysis (AREA)
  • Computing Systems (AREA)
  • Computational Linguistics (AREA)
  • Biomedical Technology (AREA)
  • Mathematical Physics (AREA)
  • Software Systems (AREA)
  • Artificial Intelligence (AREA)
  • General Health & Medical Sciences (AREA)
  • Civil Engineering (AREA)
  • Genetics & Genomics (AREA)
  • Physiology (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Sewage (AREA)

Abstract

The rain sewerage Design and Build method based on BIM technology that the invention discloses a kind of, belongs to construction technical field.The present invention is the following steps are included: step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity check, gradient inspection etc. in BIM model;Step 3. is based on genetic algorithm and optimizes to pipe network, directly modifies in BIM Design and Build model;Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build model and construction simulation scheme.Present invention improves city rain sewage discharges, preferably control environmental pollution, urban waterlogging.

Description

A kind of rain sewerage Design and Build method based on BIM technology
Technical field
The present invention relates to construction technical fields, more specifically to a kind of rain sewerage based on BIM technology Design and Build method.
Background technique
As China's urban-rural integration and urban modernization process are constantly accelerated, city stain disease discharge amount is increasing; Urban waterlogging phenomenon frequently occurs, and infrastructure of the rain sewage pipe as discharge rainwater and sewage is faced with increasing row Bleed off pressure power.Due to the problem of design of pipe networks is unreasonable and construction, many rain sewage networks is caused not to be well positioned to meet Use function.
The development of BIM (BuildingInformationModeling) technology, can for pipeline engineering minute design and Construction provides technical support.By BIM technology application, arrangement and method for construction can be predefined, avoids doing over again with optimizing design scheme, Waste is reduced, cost is saved.
Summary of the invention
1. technical problems to be solved by the inivention
In view of the defects existing in the prior art with deficiency, the rain sewerage based on BIM technology that the present invention provides a kind of Design and Build method improves city rain sewage discharge, preferably controls environmental pollution, urban waterlogging.
2. technical solution
In order to achieve the above objectives, technical solution provided by the invention are as follows:
A kind of rain sewerage Design and Build method based on BIM technology of the invention, comprising the following steps:
Step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;
Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity inspection in BIM model It looks into, gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, is directly repaired in BIM Design and Build model Change;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build Model and construction simulation scheme.
3. beneficial effect
Using technical solution provided by the invention, compared with prior art, have the following beneficial effects:
The present invention is based on the construction integrated models of BIM Design of three-dimensional visualization, carry out pipe network optimization, node inspection, collision Detection, pressure loss inspection, validity check, gradient inspection etc., optimize pipe network based on genetic algorithm, reduce rain sewage Pipe network whole design security risk.Visualization construction simulation scheme animation is formulated based on BIM model, is entangled at any time in work progress Partially, pipeline network construction security risk is reduced, lifting construction efficiency obtains preferable Social benefit and economic benefit.
Detailed description of the invention
Fig. 1 is construction process figure of the invention.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples:
Embodiment 1
It will be seen from figure 1 that a kind of rain sewerage Design and Build side based on BIM technology of the present embodiment Method, comprising the following steps:
Step 1. is based on the gradient and flow velocity creation rain sewage network BIM designs a model;
Step 2. carries out pipe network optimization, node inspection, collision detection, pressure loss inspection, validity inspection in BIM model It looks into, gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, is directly repaired in BIM Design and Build model Change;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build Model and construction simulation scheme.
A kind of rain sewerage Design and Build method based on BIM technology of the present embodiment, it is real according to the following steps It is existing:
Rain sewage network BIM Design and Build model, rainwater pipeline 4.83km, sewage are created based on the gradient and flow velocity Pipeline 9.77km;
It carries out pipe network in BIM model to optimize 13 times, node is checked 68 times and adjusted 42 times, is laid equal stress at collision detection 142 New adjustment;It at pressure loss inspection 53 and remodifies, at validity check 24, at gradient inspection 33 etc.;
Pipe network is optimized based on genetic algorithm, is adjusted pipe network system 26 times, is adjusted the gradient 43 times, flow velocity 41 is adjusted It is secondary, and all directly modify in BIM Design and Build model;
Visualization arrangement and method for construction animation is formulated based on BIM model, carry out scheme tells somebody what one's real intentions are, confides a technological secret;
It constructs, goes wrong in construction 36 times according to plan, 11 are solved by external coordination, and 25 times again excellent by pipe network Neutralizing is determined, and improves BIM Design and Build model and construction simulation scheme again after pipe network system adjustment.
Schematically the present invention and embodiments thereof are described above, description is not limiting, institute in attached drawing What is shown is also one of embodiments of the present invention, and actual method is not limited thereto.So if the common skill of this field Art personnel are enlightened by it, without departing from the spirit of the invention, are not inventively designed and the technical solution Similar frame mode and embodiment, are within the scope of protection of the invention.

Claims (1)

1. a kind of rain sewerage Design and Build method based on BIM technology, it is characterised in that: the following steps are included:
Step 1. is based on the gradient and flow velocity creates rain sewage network BIM Design and Build model;
Step 2. carried out in BIM model pipe network optimization, node inspection, collision detection, pressure loss inspection, validity check, Gradient inspection etc.;
Step 3. is based on genetic algorithm and optimizes to pipe network, directly modifies in BIM Design and Build model;
Step 4. is based on BIM model and formulates visualization arrangement and method for construction animation, and carry out scheme tells somebody what one's real intentions are, confides a technological secret;
Step 5. is constructed according to plan, the problem in construction is solved in time, and adjust BIM Design and Build model With construction simulation scheme.
CN201910360251.3A 2019-04-30 2019-04-30 A kind of rain sewerage Design and Build method based on BIM technology Pending CN110069881A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910360251.3A CN110069881A (en) 2019-04-30 2019-04-30 A kind of rain sewerage Design and Build method based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910360251.3A CN110069881A (en) 2019-04-30 2019-04-30 A kind of rain sewerage Design and Build method based on BIM technology

Publications (1)

Publication Number Publication Date
CN110069881A true CN110069881A (en) 2019-07-30

Family

ID=67369810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910360251.3A Pending CN110069881A (en) 2019-04-30 2019-04-30 A kind of rain sewerage Design and Build method based on BIM technology

Country Status (1)

Country Link
CN (1) CN110069881A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110427729A (en) * 2019-08-19 2019-11-08 中国十七冶集团有限公司 A kind of rain sewage treatment construction of sponge city and O&M method based on BIM technology

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107742170A (en) * 2017-10-25 2018-02-27 天津大学 A kind of storm sewer system the Hydraulic Design parameter optimization method
CN107832498A (en) * 2017-10-18 2018-03-23 陕西有色建设有限公司 A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method
CN108537519A (en) * 2018-05-03 2018-09-14 陕西理工大学 A kind of architectural design method based on BIM
CN109543233A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of electromechanical pipeline assembly construction method based on BIM technology

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107832498A (en) * 2017-10-18 2018-03-23 陕西有色建设有限公司 A kind of complicated construction technology based on BIM is told somebody what one's real intentions are method
CN107742170A (en) * 2017-10-25 2018-02-27 天津大学 A kind of storm sewer system the Hydraulic Design parameter optimization method
CN108537519A (en) * 2018-05-03 2018-09-14 陕西理工大学 A kind of architectural design method based on BIM
CN109543233A (en) * 2018-10-26 2019-03-29 中交第航务工程局有限公司 A kind of electromechanical pipeline assembly construction method based on BIM technology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
管昌生;龚亚洲;: "住宅小区地下管网建设中BIM技术的应用" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110427729A (en) * 2019-08-19 2019-11-08 中国十七冶集团有限公司 A kind of rain sewage treatment construction of sponge city and O&M method based on BIM technology

Similar Documents

Publication Publication Date Title
CN111382484B (en) Building pipeline arrangement optimization system based on BIM
CN109784004B (en) BIM technology-based special-shaped metal roof installation construction method
CN106250638A (en) A kind of backform comprehensive Design based on BIM and application process
CN106156383B (en) A kind of parametrization aerodynamic configuration digital-to-analogue and structured grid automatic generation method
CN106777460B (en) Method for determining pipe diameter and gradient of urban rainwater pipe network based on SWMM hydraulic model
CN107506561A (en) A kind of bridge forward design method based on BIM
CN105956278A (en) Detailed design method of mechanical and electrical engineering pipeline system based on Autodesk Revit
CN110069891A (en) A kind of Electromechanical Design based on BIM and review method
CN115600298A (en) BIM building forward design standardization plotting method based on revit
CN111931398A (en) Hydraulic valve integrated block supporting structure optimization method based on 3D printing
CN110069881A (en) A kind of rain sewerage Design and Build method based on BIM technology
CN110991997A (en) BIM technology-based comprehensive pipeline design construction method
CN112765711A (en) BIM modeling method for green building simulation calculation
CN107194112A (en) The method being laid out based on BIM to garden landscape
CN114925435A (en) Method for manufacturing BIM family of assembly type pipe-well pipe assembly module
CN107391856A (en) Optimize the method for water meter and valve location in a kind of water supply network subregion
CN107145643B (en) Intelligent design system and design method for sheet metal sculpture profile steel frame
CN110399666A (en) A method of the design of tube-type air preheater Parameterization Scheme is carried out based on NX software
CN104180042B (en) A kind of scheme of valve-shut off based on pipe network data prediction generates method
CN108664702B (en) Method for increasing design point lift of multi-stage centrifugal condensate pump
CN104298792A (en) Modularized design method and system for nuclear power station
Puleo et al. Water and energy saving in urban water systems: the ALADIN project
CN115618769A (en) Drainage system evaluation method and system based on hydraulic model
CN110083950B (en) Inverted siphon design construction method based on BIM technology
Li et al. The application value of BIM technology in prefabricated building based on EPC general contracting management model

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190730

RJ01 Rejection of invention patent application after publication