CN110067506A - Thruster of jumbo front haulage mechanism - Google Patents
Thruster of jumbo front haulage mechanism Download PDFInfo
- Publication number
- CN110067506A CN110067506A CN201910429223.2A CN201910429223A CN110067506A CN 110067506 A CN110067506 A CN 110067506A CN 201910429223 A CN201910429223 A CN 201910429223A CN 110067506 A CN110067506 A CN 110067506A
- Authority
- CN
- China
- Prior art keywords
- wirerope
- fixed
- fixed body
- tension device
- thruster
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 title claims abstract description 41
- 239000011435 rock Substances 0.000 claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 238000000034 method Methods 0.000 description 9
- 230000008569 process Effects 0.000 description 8
- 238000010586 diagram Methods 0.000 description 6
- 238000010276 construction Methods 0.000 description 4
- 239000000203 mixture Substances 0.000 description 3
- 241001391944 Commicarpus scandens Species 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000008859 change Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B15/00—Supports for the drilling machine, e.g. derricks or masts
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Mechanical Engineering (AREA)
- Earth Drilling (AREA)
Abstract
A kind of thruster of jumbo front haulage mechanism, including front end wirerope I, front end pulley assembly and tension device I;I rear end of front end wirerope is mounted on tension device I, and wirerope I front end in front end is mounted in the preceding fixing axle of rock drill mounting base;Multiple detents are equipped at intervals in the tension device I, the back-end component in front end wirerope I is put into the different detents of tension device I, realize that rear end limits with this.The present invention realizes effective tensioning of propeller wirerope, while steel rope replacing difficulty can be greatly reduced, and promotes replacement efficiency.
Description
Technical field
The present invention relates to a kind of traction mechanism more particularly to a kind of thruster of jumbo front haulage mechanisms.
Background technique
Front end wirerope is by front end articulated joint, wirerope body, rear hinged in existing thruster of jumbo front haulage mechanism
Head composition, preceding articulated joint and the preceding fixed axis connection in rock drill mounting base;Articulated joint is hinged by pin shaft and tension device afterwards,
Wherein location hole of the pin shaft on tension device, and limited with split pin;Wirerope body is passed through from tension device, tenses dress
It is equipped with multiple rows of location hole;Big adjusting and minor adjustment are divided into the adjusting of front haulage mechanism elasticity, are adjusted to rear articulated joint greatly
Installation corresponding with the location hole of different location;Minor adjustment is to guarantee that rear end articulated joint and tension device relative position are constant
In the case of, the position of integrally-regulated tension device.
In progradation, front end wirerope belongs to active wirerope, inside always with the presence of pulling force, always in
Tight shape.In retraction process, rear end wirerope belongs to active wirerope, inside always with the presence of pulling force, always in tensioning
Shape, and front end wirerope belongs to passive wirerope in the process, inside substantially without pulling force, relaxed state is in, in this shape
Under state, wirerope body is from the phenomenon in the gap deviate from the groove of pulley and be stuck between support plate and pulley frequent occurrence,
Wirerope body is easily caused to be squeezed off.It is tensioned in the state of if wirerope is in relaxation in front end, in progradation
In, rate of tension is excessive again for front end wirerope, is easy to break.
Simultaneously as tension device is located inside propeller, and in the lower section of propelling cylinder, space is extremely narrow, these
Great difficulty all is brought to pulling pin during the steel rope replacing of front end, device to hole etc., leads to the replacement effect for replacing front end wirerope
Rate is very low.
Summary of the invention
In view of the defects existing in the prior art, the present invention proposes a kind of thruster of jumbo front haulage mechanism.
The present invention is realized by following technical scheme:
Thruster of jumbo front haulage mechanism, including front end wirerope I, front end pulley assembly and tension device I;The front end
I rear end of wirerope is mounted on tension device I, and wirerope I front end in front end is mounted in the preceding fixing axle of rock drill mounting base;Institute
It states and is equipped at intervals with multiple detents in tension device I, the back-end component in front end wirerope I is put into the different cards of tension device I
In position, realize that rear end limits with this.
Further, the front end wirerope I includes back-end component, wirerope body and front end component;The back-end component is adopted
With rear end fixed block, and it is affixed with wirerope body one end, after the wirerope body bypasses front end pulley assembly, by rear end fixed block
It is put into detent.
Further, the detent includes lower baffle plate, front apron and two overhead gages;The front apron is U-shaped board, before described
Baffle is fixed in tension device I, and the lower baffle plate is fixed on the bottom surface of tension device I, the corresponding fixation of two overhead gages
In the top surface of tension device I, and there are gap between two overhead gages, after which is greater than wirerope body diameter and is less than
Hold fixed block width.
Further, the front end component includes front end fixed body, nose threads section, location nut and thrust spring;
The nose threads section and the wirerope body other end are affixed, and the nose threads section is arranged in the fixed body of front end, described
Thrust spring is sleeved in nose threads section, and the location nut is engaged with nose threads section, and is contacted with thrust spring;It is described
The thrust spring of front end wirerope I can be contacted in front end I stress of wirerope with fixed body front apron.
Further, the front end fixed body includes pin shaft hole, fixed body front apron, two fixed body overhead gages, fixed bodies
Lower baffle plate and two fixed body side plates;The pin shaft hole is mounted in the preceding fixing axle in rock drill mounting base, two fixed bodies
Side plate is corresponding to be mounted on pin shaft hole side, and the fixed body lower baffle plate is fixed on two fixed body side plate bottom surfaces, institute
Stating fixed body front apron is U-shaped board, and fixed body front apron is fixed in two fixed body side plates, and two fixed body overhead gages are opposite
That answers is fixed on the top surface of two fixed body side plates, and there are gaps between two fixed plate overhead gages.
Further, the front end pulley assembly includes support plate and pulley;The pulley is mounted in support plate, the branch
Fagging is connected with propelling cylinder.
The invention has the advantages that:
1, traction mechanism can guarantee that front end wirerope I can prevent always in tensioning state in propulsion and retraction process before this
Wirerope body is deviate from from pulley, and then be greatly reduced wirerope body squeezes off risk.
2, it is eliminated when traction mechanism is replaced after the damage of front end wirerope I before this and wears pin shaft and split pin, greatly
Width reduces replacing construction, has a clear superiority in tunnel face surface construction.
Detailed description of the invention
Fig. 1 is existing traction mechanism structure chart one;
Fig. 2 is existing traction mechanism structure chart two;
Fig. 3 is existing traction mechanism structure chart three;
Fig. 4 is existing traction mechanism Local map one;
Fig. 5 is existing traction mechanism Local map two;
Fig. 6 is existing front end pulley assembly structure chart;
Fig. 7 is existing front haulage mechanism structure figure one;
Fig. 8 is existing front haulage mechanism structure figure two;
Fig. 9 is existing rock drill mounting base structure chart;
Figure 10 is thruster of jumbo front haulage mechanism rear end partial schematic diagram of the invention;
Figure 11 is thruster of jumbo front haulage device front end partial schematic diagram of the invention;
Figure 12 is thruster of jumbo front haulage mechanism rear end tension device schematic diagram one of the invention;
Figure 13 is thruster of jumbo front haulage mechanism rear end tension device schematic diagram two of the invention;
Figure 14 is thruster of jumbo front haulage mechanism steel wire rope rear end schematic diagram of the invention;
Figure 15 is thruster of jumbo front haulage mechanism steel wire rope front-end view of the invention;
Figure 16 is thruster of jumbo front haulage device front end fixed body schematic diagram of the invention.
Specific embodiment
To keep the purposes, technical schemes and advantages of the invention implemented clearer, below in conjunction in the embodiment of the present invention
Attached drawing, technical solution in the embodiment of the present invention is further described in more detail.In the accompanying drawings, identical from beginning to end or class
As label indicate same or similar element or element with the same or similar functions.Described embodiment is the present invention
A part of the embodiment, instead of all the embodiments.The embodiments described below with reference to the accompanying drawings are exemplary, it is intended to use
It is of the invention in explaining, and be not considered as limiting the invention.Based on the embodiments of the present invention, ordinary skill people
Member's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.Under
Face is described in detail the embodiment of the present invention in conjunction with attached drawing.
As shown in Figures 1 to 5, the movement of rock drill 4 is by propelling cylinder 3 and front haulage machine on thruster of jumbo
Structure, the cooperation of rear haulage mechanism are completed;Front haulage mechanism is by front end wirerope II 1, front end pulley assembly 8, tension device II 10
Composition, front end pulley assembly 8 include support plate 81 and pulley 82;Rear haulage mechanism is by rear end wirerope 2, reel 6, oil tube bracket
9 compositions.Rock drill 4 is fixed in rock drill mounting base 5;The piston rod 31 and propeller of propelling cylinder 3 are relatively fixed, cylinder barrel 32
It can move forward and backward, and cylinder barrel 32 and reel mounting base 7 are relatively fixed, while cylinder barrel 32 and front end pulley assembly 8 are relatively fixed;Volume
Disk 6 and reel mounting base 7 are relatively fixed, and can rotate in reel mounting base 7;The rear end of front end wirerope II 1 and propulsion
Device tail portion is relatively fixed, and the front end of front end wirerope II 1 and rock drill mounting base 5 are relatively fixed, at the same front end wirerope II 1 around
Cross front end pulley assembly 8;2 front end of rear end wirerope and oil tube bracket 9 are fixed, and the rear end of rear end wirerope 2 and rock drill are installed
Seat 5 is fixed, while rear end wirerope 2 bypasses reel 6.
Progradation are as follows: propelling cylinder 3 extends, and front end pulley assembly 8 and reel mounting base 7 is driven to move forward;Due to front end
The rear end of wirerope II 1 is fixed, during front end pulley assembly 8 moves forward, before front end wirerope II 1 pulls rock drill mounting base 5
It moves, rock drill 4 moves forward therewith;Reel 6 moves forward with reel mounting base 7, and rear end wirerope 2 is mobile with rock drill mounting base 5.
Retraction process are as follows: propelling cylinder 3 bounces back, and reel mounting base 7 is driven to move back, and then reel 6 is driven to move back;Reel 6
Rear end wirerope 2 is acted on, since the front end of rear end wirerope 2 and oil tube bracket 9 are fixed, under the drive of reel 6, rear end steel
Cord 2 drives rock drill mounting base 5 to move back, and then rock drill 4 is driven to move back.
As shown in Figure 7 to 9, front end wirerope II 1 is hinged by front end in existing thruster of jumbo front haulage mechanism
First 101, wirerope body 102, rear articulated joint 103 form, and preceding articulated joint 101 connects with the preceding fixing axle 51 in rock drill mounting base 5
It connects;Articulated joint 103 is hinged by pin shaft 11 and tension device II 10 afterwards, wherein positioning of the pin shaft 11 on tension device II 10
Hole 1002, and limited with split pin 12;Wirerope body 102 is passed through from tension device 10, and tension device II 10 has multiple rows of positioning
Hole 1002;To the adjusting of front haulage mechanism elasticity be divided into it is big adjust and minor adjustment, be adjusted to greatly by rear articulated joint 103 from it is different
The corresponding installation of location hole 1002 of position;Minor adjustment is to guarantee rear end articulated joint 103 and 10 relative position of tension device not
In the case where change, the position of integrally-regulated tension device II 10.
In progradation, front end wirerope II 1 belongs to active wirerope, inside always with the presence of pulling force, locate always
In tensioning shape.In retraction process, rear end wirerope 2 belongs to active wirerope, inside always with the presence of pulling force, be in always
Be tensioned shape, and front end wirerope II 1 belongs to passive wirerope in the process, inside substantially without pulling force, be in relaxed state,
In this case, frequent occurrence wirerope body 102 from deviating from the groove of pulley 82 and be stuck between support plate 81 and pulley 82
Gap in phenomenon, easily cause wirerope body 2 to be squeezed off.If wirerope 1 is in it in the state of relaxation in front end
Tensioning, then in progradation, rate of tension is excessive again for front end wirerope 1, is easy to break.
Simultaneously as tension device II 10 is located inside propeller, and in the lower section of propelling cylinder 3, space is extremely narrow,
These all bring great difficulty to pulling pin in II 1 replacement process of front end wirerope, device to hole etc., cause to replace front end wirerope 1
Replacement efficiency it is very low.
In view of the defects existing in the prior art, the present invention proposes a kind of thruster of jumbo front haulage mechanism.Specific side
Case is as follows:
As shown in Figure 10 to Figure 16, thruster of jumbo front haulage mechanism, including front end wirerope I 13, front end pulley assembly 8
With tension device I 14;Wirerope I 13 rear end in front end is mounted on tension device I 14, and wirerope I 13 front end in front end is mounted on chisel
In the preceding fixing axle 51 of rock machine mounting base 5;Multiple detents are equipped at intervals in tension device I 14, after in front end wirerope I 13
End pieces are put into the different detents of tension device I 14, realize that rear end limits with this.
As shown in figure 14, front end wirerope I 13 includes back-end component, wirerope body 131 and front end component;Back-end component is adopted
With rear end fixed block 132, and it is affixed with 131 one end of wirerope body, after wirerope body 131 bypasses front end pulley assembly 8, by rear end
Fixed block 132 is put into detent.
As shown in Figure 12 and Figure 13, detent includes lower baffle plate 141, front apron 142 and two overhead gages 143;Front apron 142
For U-shaped board, front apron 12 is fixed in tension device I 14, and lower baffle plate 141 is fixed on the bottom surface of tension device I 14, two upper gears
The corresponding top surface for being fixed on tension device I 14 of plate 143, and there are gap between two overhead gages 143, the gap width is big
In 131 diameter of wirerope body and it is less than 132 width of rear end fixed block.
As shown in figure 15, front end component includes front end fixed body 133, nose threads section 134, location nut 136 and thrust
Spring 135;Nose threads section 134 and 131 other end of wirerope body are affixed, and nose threads section 134 is arranged in front end fixed body 133
In, thrust spring 135 is sleeved in nose threads section 134, and location nut 136 is engaged with nose threads section 134, and with thrust bullet
Spring 135 contacts;The thrust spring 135 of front end wirerope I 13 understands in front end I 13 stress of wirerope and fixed body front apron 1332
Contact.
As shown in figure 16, front end fixed body 133 is including on 1332, two pin shaft hole 1331, fixed body front apron fixed bodies
Baffle 1333, fixed body lower baffle plate 1334 and two fixed body side plates;Before pin shaft hole 1331 is mounted in rock drill mounting base 5
In fixing axle 51, two fixed body side plates are corresponding to be mounted on 1331 side of pin shaft hole, and fixed body lower baffle plate 1334 is fixed
On two fixed body side plate bottom surfaces, fixed body front apron 1332 is U-shaped board, and fixed body front apron 1332 is fixed on two fixations
In the plate of side, the corresponding top surface for being fixed on two fixed body side plates of two fixed body overhead gages 1333, and two fixed plates
There are gaps between overhead gage 1333.
As shown in figure 11, front end pulley assembly 8 includes support plate 81 and pulley 82;Pulley 82 is mounted in support plate 81,
Support plate 81 is connected with propelling cylinder 3.
The front end of front end wirerope I 13 is mounted in the preceding fixing axle 51 of rock drill mounting base 5, front end wirerope I 13
Rear end is mounted on tension device I 14, and wirerope body 131 bypasses the groove of pulley 81.Adjusting to front haulage mechanism elasticity
It is divided into big adjusting and minor adjustment, is adjusted to greatly the rear end fixed block 132 of new front wirerope 13 being put into novel tension device
In 14 different detents, the lower baffle plate 141 of each detent, front apron 142, overhead gage 143 in front end I 13 stress of wirerope,
Rear end is limited;Minor adjustment be guarantee rear end fixed block 132 and tension device I 14 relative position it is constant in the case where, it is whole
The position of body adjusting tension device I 14.Location nut 136 is engaged with nose threads 134, and is contacted with thrust spring 135.Front end
The front end thrust spring 135 of wirerope I 13 can be contacted in front end I 13 stress of wirerope with fixed body front apron 1332.
After installing propeller front haulage mechanism, entire novel front haulage is tensioned according to normal tensioning step and dynamics
Mechanism, after tensioning, thrust spring 135 is in confined state.
Traction mechanism can guarantee that front end wirerope I can be prevented always in tensioning state in propulsion and retraction process before this
Only wirerope body is deviate from from pulley, and then be greatly reduced wirerope body squeezes off risk.
It is eliminated when traction mechanism is replaced after the damage of front end wirerope I before this and wears pin shaft and split pin, substantially
Replacing construction is reduced, is had a clear superiority in tunnel face surface construction.
Finally it should be noted that: the above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof;To the greatest extent
The present invention is described in detail with reference to preferred embodiments for pipe, it should be understood by those ordinary skilled in the art that: still
It can modify to a specific embodiment of the invention or some technical features can be equivalently replaced;Without departing from this hair
The spirit of bright technical solution should all cover within the scope of the technical scheme claimed by the invention.
Claims (6)
1. thruster of jumbo front haulage mechanism, it is characterised in that: including front end wirerope I, front end pulley assembly and tension
Device I;
I rear end of front end wirerope is mounted on tension device I, and wirerope I front end in front end is mounted on rock drill mounting base
In preceding fixing axle;
Multiple detents are equipped at intervals in the tension device I, the back-end component in front end wirerope I is put into tension device I
In different detents, realize that rear end limits with this.
2. thruster of jumbo front haulage according to claim 1 mechanism, it is characterised in that: the front end wirerope I
Including back-end component, wirerope body and front end component;
The back-end component uses rear end fixed block, and affixed with wirerope body one end, and the wirerope body bypasses preceding head sheave
After assembly, rear end fixed block is put into detent.
3. thruster of jumbo front haulage according to claim 2 mechanism, it is characterised in that: the detent includes lower block
Plate, front apron and two overhead gages;
The front apron is U-shaped board, and the front apron is fixed in tension device I, and the lower baffle plate is fixed on tension device I
Bottom surface, the corresponding top surface for being fixed on tension device I of two overhead gages, and there are gap, the gaps between two overhead gages
Width is greater than wirerope body diameter and is less than rear end fixed block width.
4. thruster of jumbo front haulage according to claim 2 mechanism, it is characterised in that: the front end component includes
Front end fixed body, nose threads section, location nut and thrust spring;
The nose threads section and the wirerope body other end are affixed, and the nose threads section is arranged in the fixed body of front end, described
Thrust spring is sleeved in nose threads section, and the location nut is engaged with nose threads section, and is contacted with thrust spring;
The thrust spring of the front end wirerope I can be contacted in front end I stress of wirerope with fixed body front apron.
5. thruster of jumbo front haulage according to claim 2 mechanism, it is characterised in that: the front end fixed body packet
Include pin shaft hole, fixed body front apron, two fixed body overhead gages, fixed body lower baffle plate and two fixed body side plates;
The pin shaft hole is mounted in the preceding fixing axle in rock drill mounting base, and two fixed body side plates are corresponding to be mounted on pin
On axis hole side, the fixed body lower baffle plate is fixed on two fixed body side plate bottom surfaces, and the fixed body front apron is U-shaped
Plate, fixed body front apron are fixed in two fixed body side plates, and two fixed body overhead gages are corresponding to be fixed on two fixations
The top surface of side plate, and there are gaps between two fixed plate overhead gages.
6. thruster of jumbo front haulage according to claim 1 mechanism, it is characterised in that: the front end pulley assembly
Including support plate and pulley;The pulley is mounted in support plate, and the support plate is connected with propelling cylinder.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910429223.2A CN110067506A (en) | 2019-05-22 | 2019-05-22 | Thruster of jumbo front haulage mechanism |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910429223.2A CN110067506A (en) | 2019-05-22 | 2019-05-22 | Thruster of jumbo front haulage mechanism |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110067506A true CN110067506A (en) | 2019-07-30 |
Family
ID=67371175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910429223.2A Pending CN110067506A (en) | 2019-05-22 | 2019-05-22 | Thruster of jumbo front haulage mechanism |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110067506A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200985258Y (en) * | 2006-11-30 | 2007-12-05 | 上海港机重工有限公司 | Adjustable traction device |
CN203050698U (en) * | 2013-01-30 | 2013-07-10 | 张家口宣化华泰矿冶机械有限公司 | Feed mechanism for mine drilling tunnelling |
CN204569236U (en) * | 2015-02-04 | 2015-08-19 | 徐州重型机械有限公司 | Wire-rope connecting device and pre-tightening apparatus thereof and super lifting device are surpassed |
CN208122770U (en) * | 2018-03-16 | 2018-11-20 | 河北菲克森煤矿机械制造有限公司 | A kind of wirerope cylinder frame cylindrical drill machine |
CN209942737U (en) * | 2019-05-22 | 2020-01-14 | 徐州徐工铁路装备有限公司 | Front traction mechanism of drill jumbo propeller |
-
2019
- 2019-05-22 CN CN201910429223.2A patent/CN110067506A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN200985258Y (en) * | 2006-11-30 | 2007-12-05 | 上海港机重工有限公司 | Adjustable traction device |
CN203050698U (en) * | 2013-01-30 | 2013-07-10 | 张家口宣化华泰矿冶机械有限公司 | Feed mechanism for mine drilling tunnelling |
CN204569236U (en) * | 2015-02-04 | 2015-08-19 | 徐州重型机械有限公司 | Wire-rope connecting device and pre-tightening apparatus thereof and super lifting device are surpassed |
CN208122770U (en) * | 2018-03-16 | 2018-11-20 | 河北菲克森煤矿机械制造有限公司 | A kind of wirerope cylinder frame cylindrical drill machine |
CN209942737U (en) * | 2019-05-22 | 2020-01-14 | 徐州徐工铁路装备有限公司 | Front traction mechanism of drill jumbo propeller |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103016004B (en) | The method and a kind of vibration isolation digger that a kind of reciprocating impact reaction force attenuation is oriented to | |
CN103832410B (en) | Support foot device and walking machine | |
CN110067506A (en) | Thruster of jumbo front haulage mechanism | |
CN209942737U (en) | Front traction mechanism of drill jumbo propeller | |
CN202022257U (en) | Track rigidity tensioning mechanism | |
CN113306355A (en) | Semi-active suspension system of automobile | |
CN208954693U (en) | Frame winch drum clamps special self-locking cylinder | |
CN211446120U (en) | Wire feeding system free of spring beating for weaving hexagonal net | |
CN202022662U (en) | Top-arranged vertical drag chain mechanism | |
CN212356130U (en) | Tensioning structure for efficiently and safely adjusting slack side of goods elevator compensation chain | |
CN211035157U (en) | Telescopic sliding ring | |
US2284556A (en) | Sanding machine | |
CN210564410U (en) | Light hydraulic propulsion device | |
CN207705832U (en) | A kind of X-type arm auto take-up and the charging pile with the device | |
CN208916689U (en) | A kind of marine magnetic survey hawser folding and unfolding guiding device | |
CN201873245U (en) | Automatic anchoring device for head telescopic equipment of adhesive tape machine | |
CN202864863U (en) | Steel wire rope guide mechanism of aerial work platform | |
CN117145189A (en) | Engineering construction safety hanging basket | |
CN201535350U (en) | Tensioning and buffering device of chain speed doubling mechanism | |
CN216302982U (en) | Elevator overspeed device tensioner | |
CN214697741U (en) | Catwalk tubular column conveying system | |
CN208585342U (en) | A kind of protection mechanism of anti-stop-band mandril track takeup damage | |
CN218664675U (en) | Traction pay-off device for transmission flexible shaft finished product | |
CN202935325U (en) | Anti-slip supporting leg device and traveling machine | |
CN201826889U (en) | Detachable oil cylinder connecting seat for telescopic tail of scraper conveyer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |