CN110059957A - Project task is unpacked method, apparatus, project management equipment and storage medium - Google Patents

Project task is unpacked method, apparatus, project management equipment and storage medium Download PDF

Info

Publication number
CN110059957A
CN110059957A CN201910310520.5A CN201910310520A CN110059957A CN 110059957 A CN110059957 A CN 110059957A CN 201910310520 A CN201910310520 A CN 201910310520A CN 110059957 A CN110059957 A CN 110059957A
Authority
CN
China
Prior art keywords
project
task
packet
contract
unpacking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910310520.5A
Other languages
Chinese (zh)
Inventor
苏金柱
张宏建
周玉峰
李志鑫
李鹏斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xindi Energy Engineering Technology Co Ltd
Original Assignee
Xindi Energy Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xindi Energy Engineering Technology Co Ltd filed Critical Xindi Energy Engineering Technology Co Ltd
Priority to CN201910310520.5A priority Critical patent/CN110059957A/en
Publication of CN110059957A publication Critical patent/CN110059957A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The application proposes the method, apparatus of unpacking, project management equipment and computer readable storage medium of a kind of integrated project task.Wherein, method includes: that the people that unpacks of the project task is determined according to mode information of giving out a contract for a project;The structure of unpacking of the project task is determined according to item types information;The project task is unpacked into multiple tasks packet step by step according to the setting information of unpacking of the people that unpacks.The application, which provides the convenient and legal tool of unpacking for user, can greatly promote project management efficiency and quality, save manpower and time cost.

Description

Project task is unpacked method, apparatus, project management equipment and storage medium
Technical field
This application involves unpack method, project tasks of project management field more particularly to a kind of project task to unpack Device, project management equipment and non-transitorycomputer readable storage medium.
Background technique
With social development, whole people's living standard is generally improved, and requires in terms of mental experience higher and higher, leads to the relationship people Raw engineering project increasingly complicates, and project management requires more and more finer.During project management, item is needed Mesh manager, manager at different levels decompose project task layer by layer, split into specific task packet layer by layer, and disparity items is unpacked Regular different, this is a hard work, expends a large amount of manpower and time cost, inefficiency.
Summary of the invention
The application is intended to solve at least some of the technical problems in related technologies.
It unpacks method for this purpose, the application first aspect embodiment proposes a kind of project task, it can be big by this method Big to promote project management efficiency, save manpower and time cost.
The application second aspect embodiment proposes a kind of project and unpacks device.
The application third aspect embodiment proposes a kind of project management equipment.
The application fourth aspect embodiment proposes another project management equipment.
The 5th aspect embodiment of the application proposes a kind of non-transitorycomputer readable storage medium.
The method to solve the above problems, project task of the application first aspect embodiment is unpacked, comprising: receive project and appoint Give out a contract for a project mode information and the type information of business;The people that unpacks of the project task is determined according to the mode information of giving out a contract for a project;According to The type information determines the structure of unpacking of the project task;It unpacks described in reception the setting information of unpacking of people, according to institute It states structure of unpacking and the project task is unpacked into multiple tasks packet step by step.
It is unpacked method according to the project task of the embodiment of the present application, by giving out a contract for a project mode information and type information determination is unpacked People and structure of unpacking, according to unpacking, setting information and structure of unpacking can carry out unpacking for project task automatically, compared to correlation Technology can quickly decompose project task, promote project management efficiency, save manpower and time cost.
In some embodiments, the mode of giving out a contract for a project of the project task includes managing system and contract system, described according to Mode of giving out a contract for a project information determines the people that unpacks of the project task, comprising: the mode of giving out a contract for a project is managing system, then by employer's conduct The people that unpacks;Alternatively, the mode of giving out a contract for a project is contract system, then by meeting packet people as the people that unpacks.
In some embodiments, the type of the project task includes gas engineering project and comprehensive engineering project, institute State the structure of unpacking that the project task is determined according to the type information, comprising: the structure of unpacking of the gas engineering project Including project, profession and subsystem, wherein the task covering grade of the project, the profession and the subsystem reduces step by step; The structure of unpacking of the comprehensive engineering project includes the project, device, unit, the profession and the subsystem, wherein The project, described device, the unit, the profession and the subsystem task covering grade reduce step by step.
In some embodiments, the project task is unpacked method further include: obtains the task packet category of every level task packet Property;It is verified according to the reasonability that the task packet attribute splits corresponding level task packet.The task packet attribute includes Task names, the duration, price, hierarchical relationship, sub- grade rule, task leader, it is described according to the task packet attribute to correspondence The reasonability that level task packet is split is verified, comprising: the duration of next level task packet is without departing from this level task packet Duration;In contract system, the accumulative price of next level task packet is no more than the price of this level task packet;Meet the level The setting requirements of relationship, sub- grade rule and the task leader.It is carried out by the reasonability split to corresponding level task packet Verification, can unpack unreasonable or mistake of unpacking etc. to avoid task, the accuracy that raising task is unpacked.
In some embodiments, the project task is unpacked method further include: is generated and is sent out according to the selection instruction for the people that unpacks Packet msu message;Bao Renzai, which is met, according to the msu message specification of giving out a contract for a project gives out a contract for a project whether need higher level employer audit, Ke Yi Giving out a contract for a project again for people of docking packet is monitored to a certain extent.
The device to solve the above problems, project task of the application second aspect embodiment is unpacked, comprising: receiving module, For receiving give out a contract for a project mode information and the type information of project task;First determining module is believed for mode of giving out a contract for a project according to Breath determines the people that unpacks of the project task;Second determining module, for determining the project task according to the type information Structure of unpacking;Unpack module, for receiving the setting information of unpacking of the people that unpacks, with unpack according to structure will described in Project task unpacks into multiple tasks packet step by step.
It is unpacked device according to the project task of the embodiment of the present application, by giving out a contract for a project mode information and type information determination is unpacked People and structure of unpacking, according to unpacking, setting information and structure of unpacking can carry out unpacking for project task automatically, compared to correlation Technology can quickly decompose project task, promote project management efficiency, save manpower and time cost.
In some embodiments, the mode of giving out a contract for a project of the project task includes managing system and contract system, and described first determines Module mode information of giving out a contract for a project according to determine the project task unpack people when be specifically used for, be in the mode of giving out a contract for a project When managing system, by employer as the people that unpacks, alternatively, when the mode of giving out a contract for a project is contract system, by meeting packet people as institute State the people that unpacks.
In some embodiments, the type of the project task includes gas engineering project and comprehensive engineering project, institute State the second determining module according to the type information determine the project task unpack structure when be specifically used for, the combustion gas The structure of unpacking of engineering project includes project, profession and subsystem, wherein the project, the profession and the subsystem Task covering grade reduces step by step, the structure of unpacking of the comprehensive engineering project include the project, device, unit, it is described specially Industry and the subsystem, wherein the project, described device, the unit, the profession and the subsystem task covering Grade reduces step by step.
In some embodiments, the project task is unpacked device further include: correction verification module, for obtaining every level task The task packet attribute of packet, verifies according to the reasonability that the task packet attribute splits corresponding level task packet.
In some embodiments, the task packet attribute includes task names, duration, price, hierarchical relationship, sub- grade rule Then, task leader, the correction verification module the reasonability that corresponding level task packet is split according to the task packet attribute into It is specifically included when row verification: duration of the duration of next level task packet without departing from this level task packet;It is next in contract system The accumulative price of level task packet is no more than the price of this level task packet;It is regular and described to meet described hierarchical relationship, sub- grade The setting requirements of task leader.
It is verified, can unpack to avoid task unreasonable or unpacked by the reasonability split to corresponding level task packet Mistake etc., the accuracy that raising task is unpacked.
In some embodiments, the project task is unpacked device further include: and auditing module, the auditing module are used for, Msu message of giving out a contract for a project is generated according to the selection instruction for the people that unpacks, connects whether Bao Renzai gives out a contract for a project according to the msu message specification of giving out a contract for a project It needs higher level employer to audit, giving out a contract for a project again for people of packet can be docked to a certain extent and be monitored.
The project management equipment of the application third aspect embodiment, comprising: input device and display device, and as above Project task described in embodiment is unpacked device.
According to the project management equipment of the embodiment of the present application, unpack device by using the project task of above example, Rapidly project task can be unpacked, it is time saving and energy saving, improve the efficiency of project management.
The project management equipment of the application fourth aspect embodiment, comprising: including memory, processor and be stored in storage On device and the computer program that can run on a processor, when the processor executes described program, realize that the project is appointed Business is unpacked method.
A kind of non-transitorycomputer readable storage medium of the application fourth aspect embodiment, is stored thereon with computer Program realizes that the project task is unpacked method when the program is executed by processor.
The additional aspect of the application and advantage will be set forth in part in the description, and will partially become from the following description It obtains obviously, or recognized by the practice of the application.
Detailed description of the invention
The application is above-mentioned and/or additional aspect and advantage will become from the following description of the accompanying drawings of embodiments Obviously and it is readily appreciated that, in which:
Fig. 1 is the flow chart of method of being unpacked according to the project of one embodiment of the application;
Fig. 2 is the schematic diagram according to the information set interface of unpacking of one embodiment of the application;
Fig. 3 is the flow chart of method of being unpacked according to the project of another embodiment of the application;
Fig. 4 is the schematic diagram of process of being unpacked according to the project of one embodiment of the application;
Fig. 5 is the flow chart of method of being unpacked according to the project of the further embodiment of the application;
Fig. 6 is the schematic diagram according to the information set interface of unpacking of one embodiment of the application;
Fig. 7 is the block diagram of device of being unpacked according to the project of one embodiment of the application;
Fig. 8 is the block diagram of device of being unpacked according to the project of another embodiment of the application;
Fig. 9 is the block diagram according to the project management equipment of one embodiment of the application;
Figure 10 is the block diagram according to the project management equipment of another embodiment of the application;
Figure 11 is the block diagram according to the project management equipment of the further embodiment of the application.
Appended drawing reference:
Project unpack device 1000, receiving module 1100, the first determining module 1200, the second determining module 1300, unpack Module 1400, correction verification module 1500, auditing module 1600;
Project management equipment 2000, input unit 2100, display device 2200;
Processor 2300, memory 2400, communication interface 2500, bus 2600.
Specific embodiment
Embodiments herein is described below in detail, examples of the embodiments are shown in the accompanying drawings, wherein from beginning to end Same or similar label indicates same or similar element or element with the same or similar functions.Below with reference to attached The embodiment of figure description is exemplary, it is intended to for explaining the application, and should not be understood as the limitation to the application.
Below with reference to the accompanying drawings method of being unpacked according to the project task of the application first aspect embodiment is described.
Fig. 1 is the flow chart of method of being unpacked according to the project task of one embodiment of the application.As shown in Figure 1, this Shen It please the project method of unpacking include S1, S2 and S3 provided by embodiment.
S1 receives give out a contract for a project mode information and the type information of project task.
In some embodiments, the mode of giving out a contract for a project of project task may include managing system and contract system, specifically, Ke Yiyou Project manager is configured by the input unit mode that will give out a contract for a project, and the mode information that will give out a contract for a project is transmitted to project task and unpacks Device.
In some embodiments, the type of project task may include comprehensive intermediate item, gas engineering project, power supply engineering Project, water supply actuality, HVAC project, oiling aerating project etc., wherein comprehensive intermediate item can be multiple associated item tasks Combination.Specifically, item types can be configured by project manager by input unit, and type information is transmitted to Project task is unpacked device.
S2 identifies project the people that unpacks of task according to mode of giving out a contract for a project, and is identified project the knot of unpacking of task according to type information Structure.
In embodiment, disparity items type, corresponding structure difference of unpacking.It usually can be set in projects field 3-5 grades are unpacked, such as: the structure of unpacking of gas engineering project may include project, profession and subsystem, wherein according to project, Profession and the serial task covering grade of subsystem reduce step by step;The structure of unpacking of comprehensive engineering project includes project, device, list Member, profession and subsystem, wherein reduce step by step according to the serial task covering grade of project, device, unit, profession and subsystem. For another example the three-level that project, profession and subsystem also can be set for water supply project project or power supply engineering project is unpacked Structure can specifically determine the structure of unpacking of disparity items task according to the demand of engineering project and various regulations.Further Ground, so that rule of unpacking has more passability, can be theoretically adapted to according to customized every grade title unpacked of item types All industries, all items tasks are unpacked.
In some embodiments, mode of giving out a contract for a project is different, corresponding people's difference of unpacking.For example, the mode that selects to give out a contract for a project is management System, then by employer as the people that unpacks;Alternatively, mode of giving out a contract for a project is contract system, then by meeting packet people as the people that unpacks.Specifically, according to According to the mode of giving out a contract for a project of user setting, project task device of unpacking can automatically select and be responsible for unpacking by whom, and to the responsible person that unpacks It sends and reminds, in order to know in time.Wherein, level down is unpacked, and can safeguard the setting information of upper layer grade task packet first, Such as the task package informatin edit page provided in input unit, corresponding attribute is filled in, is unpacked if to continue level down, It can choose managing system, otherwise, can choose contract system.
S3 receives the setting information of unpacking for the people that unpacks, project task is unpacked into multiple tasks step by step according to structure is unpacked Packet.
Specifically, information of unpacking can be arranged by input device and display device or human-computer interaction device in the people that unpacks, Such as the task package informatin of the upper level of maintenance, the task packet of each level is either added according to structure of unpacking or is passed through man-machine The fractionation number etc. of the secondary packet of interactive interface addition and corresponding task packet.Such as integration engineering project, as shown in Fig. 2, There can be corresponding " device, the unit, profession " three-level of task type optional and quantity that each task packet is split;And for normal Rule gas engineering project can have " profession " grade optional, after the completion of selection, continue the hierarchical information that maintenance newly increases, if be not required to Continue to unpack downwards, can choose contract system, so unpack to " profession " level, split still further below, is " subsystem " Task packet, in this way, unpack people and the unpack structure setting for example above according to rule of unpacking, circulation is unpacked until entire item step by step Mesh fractionation finishes.
Wherein it is possible to which by the selection of each level or the corresponding choosing of design is arranged on human-computer interaction interface or display interface Unit is selected as shown in Fig. 2, being select and set by input unit, and then chosen, split and is believed according to publication Breath maintenance.Unpacking, people's setting is unpacked after setting information, then can be generated the task packet of multiple levels of corresponding structure of unpacking with And the task that each task packet includes, and then chosen before the task packet to be issued, it is issued, the item of information being checked It will become order one by one, and be shown in the order information page, and be supplied to and meet packet people, and then meeting packet people can be according to received task Packet carries out operation.
It is unpacked method according to the project task of the embodiment of the present application, by giving out a contract for a project mode information and type information determination is unpacked People and structure of unpacking, according to unpacking, setting information and structure of unpacking can carry out unpacking for project task automatically, compared to correlation Technology can quickly decompose project task, promote project management efficiency, save manpower and time cost.
Further, in order to guarantee the reasonability unpacked and project manager's experience deficiency be avoided to cause difference of unpacking Mistake, in some embodiments of the present application, as shown in figure 3, the project task method of unpacking further includes S4.
S4 obtains the task packet attribute of every level task packet, verifies each layer according to the task packet attribute of each level task packet The reasonability that grade task packet is split.
In some embodiments, every level task packet of fractionation, which is all defaulted, increases task attribute, for example, task names, work Phase, price, hierarchical relationship, sub- grade rule, task leader etc. can carry out verification of unpacking according to task attribute, specifically, can To be arranged verification rule according to these task attributes, so according to verification rule analysis unpack the reasonability of data, compliance, with And prices match and duration matching are carried out to the influence that entire project is unpacked.For example, the duration of verification attached bag cannot wrap beyond father Duration, i.e., the duration of duration of next level task packet without departing from this level task packet;In contract system, attached bag adds up price not It can exceed that father's contract price lattice, i.e., the accumulative price of next level task packet is no more than the price of this level task packet, and whether full Sufficient hierarchical relationship, sub- grade rule and setting requirements of task leader etc., it is thus possible to the fractionation of task packet is more reasonably carried out, It avoids project manager from unpacking to go wrong, improves accuracy of unpacking.
Below by taking comprehensive engineering project is unpacked as an example, Fig. 4 is to be torn open according to the project task of one embodiment of the application The schematic diagram of packet procedures has to meet rule of unpacking as shown in figure 4, task is unpacked, the structure for example, disparity items type is unpacked Difference, comprehensive engineering project can carry out task fractionation according to the structure of unpacking of project, device, unit, profession, subsystem, By taking a gas fueling station project as an example, gas fueling station project may include multiple gas storage devices, aerator, mating Operation device etc., further, each device may include multiple power supply units, fire fighting unit, life office room unit etc., Each unit according to circumstances may be responsible for design comprising personnel such as Civil Specialities, structure discipline, tube profession, power specialties, Each profession requires design, school is examined, four audit, authorization task subsystems;Difference give out a contract for a project mode it is corresponding unpack people difference, Contract system or managing system can choose for comprehensive engineering project, contract system is responsible for unpacking by meeting packet people, and managing system is by giving out a contract for a project People is responsible for unpacking.Project manager is unpacked after setting information by input unit input, system according to unpack setting information oneself Dynamic selection is unpacked people and the setting information according to the people that unpacks, and is unpacked according to unpacking structure and recycle step by step to task up to entire item Mesh fractionation finishes, as shown in figure 4, splitting the comprehensive engineering project according to structure is unpacked are as follows: XX project-N number of specific device- N number of N number of specific profession-N number of specific subsystem of specific unit-.When unpacking, every level task packet defaults increase task packet category Property, such as task names, duration, price, hierarchical relationship, level rule, task leader etc., it is torn open according to these rules to verify Reasonability, the compliance of packet, thus more acurrate efficient carry out task fractionation.
In some embodiments, as shown in figure 5, the project task method of unpacking of the embodiment of the present application further includes S5.
S5 generates msu message of giving out a contract for a project according to the selection instruction for the people that unpacks, and according to giving out a contract for a project, msu message specification meets Bao Renzai Give out a contract for a project and higher level employer whether is needed to audit.
Specifically, as shown in fig. 6, human-computer interaction interface can be set give out a contract for a project mode and whether examine junior give out a contract for a project and The selecting unit of other information, the people that unpacks can input selection instruction by human-computer interaction interface, for example, select to give out a contract for a project mode for " managing system ", by " whether examining junior to give out a contract for a project " select button, whether setting, which examines junior, is given out a contract for a project.Wherein, give out a contract for a project in basis Msu message, which determines, to be needed to audit junior when giving out a contract for a project, then the people that will be unpacked by its higher level before junior employer gives out a contract for a project examines Core, junior employer could continue to give out a contract for a project after, and otherwise, junior employer can be directly transmitted task packet, from And junior employer can be supervised.
It is unpacked method by a kind of project task of the embodiment of the present application, project manager and all levels of management personnel can be with Quickly project task is decomposed, promotes project management efficiency, saves time and human cost;Pass through system automatic Verification Rule of unpacking can be to avoid the mistake as caused by experience deficiency, to promote project management efficiency and quality.
Fig. 7 is the block diagram of device of being unpacked according to the project task of one embodiment of the application, as shown in fig. 7, the application The project task of embodiment unpack device 1000 include receiving module 1100, the first confirmation module 1200, the second confirmation module It 1300 and unpacks module 1400.
Wherein, receiving module 1100 is used to receive give out a contract for a project mode information and the type information of project task.
Specifically, give out a contract for a project mode information and item types information can be arranged in project manager by input unit, and Setting information is transmitted to receiving module 1100.
First determining module 1200 is used for the people that unpacks of task of identifying project according to mode information of giving out a contract for a project.In some embodiments In, mode of giving out a contract for a project is different, corresponding people's difference of unpacking.For example, the mode that selects to give out a contract for a project is managing system, then by employer as unpacking People;Alternatively, mode of giving out a contract for a project is contract system, then by meeting packet people as the people that unpacks.Specifically, the first determining module 1200 is according to user The mode of giving out a contract for a project being arranged, can automatically select and be responsible for unpacking by whom, and sends and remind to the responsible person that unpacks, in order to know in time Dawn.Wherein, level down is unpacked, and can safeguard the setting information of upper layer grade task packet first, such as provided in input unit Task package informatin edit page, fills in corresponding attribute, unpacks if to continue level down, can choose managing system, otherwise, It can choose contract system.
Second determining module 1300 is used for the structure of unpacking of task of identifying project according to type information.In some embodiments In, the type of project task may include comprehensive intermediate item, gas engineering project, power supply engineering project, water supply actuality, HVAC item Mesh, oiling aerating project etc., wherein comprehensive intermediate item can be the combination of multiple associated item tasks.Disparity items type pair The structure difference of unpacking answered, the second determining module 1300 determine structure of unpacking according to item types.It is logical in projects field Often it can be set 3-5 grades and unpack, such as: the structure of unpacking of gas engineering project may include project, profession and subsystem, In, reduce step by step according to the serial task covering grade of project, profession and subsystem;The structure of unpacking of comprehensive engineering project includes Project, device, unit, profession and subsystem, wherein according to the serial task packet of project, device, unit, profession and subsystem Level reduces step by step.For another example project, profession and subsystem also can be set for water supply project project or power supply engineering project The three-level of system is unpacked structure, specifically can determine unpacking for disparity items task according to the demand of engineering project and various regulations Structure.It is possible to further so that rule of unpacking has more passability, manage according to customized every grade title unpacked of item types By be above adapted to all industries, all items tasks is unpacked.
Module of unpacking 1400 is used to receive the setting information of unpacking of the people that unpacks, with basis unpack structure by project task step by step Unpack into multiple tasks packet.
Specifically, information of unpacking can be arranged by input device and display device or human-computer interaction device in the people that unpacks, Such as the task package informatin of the upper level of maintenance, the task packet of each level is either added according to structure of unpacking or is passed through man-machine The fractionation number etc. of the secondary packet of interactive interface addition and corresponding task packet.Such as integration engineering project, as shown in Fig. 2, There can be corresponding " device, the unit, profession " three-level of task type optional and quantity that each task packet is split;And for normal Rule gas engineering project can have " profession " grade optional, after the completion of selection, continue the hierarchical information that maintenance newly increases, if be not required to Continue to unpack downwards, can choose contract system, so unpack to " profession " level, split still further below, is " subsystem " Task packet, in this way, unpack people and the unpack structure setting for example above according to rule of unpacking, circulation is unpacked until entire item step by step Mesh fractionation finishes.
Wherein it is possible to which by the selection of each level or the corresponding choosing of design is arranged on human-computer interaction interface or display interface Unit is selected, is select and set by input unit, and then chosen, split and maintenance of information according to publication.? The people that unpacks setting is unpacked after setting information, then can be generated multiple levels of corresponding structure of unpacking task packet and each task The task that packet includes, and then chosen before the task packet to be issued, it is issued, the item of information being checked will become one by one Order is shown in the order information page, is supplied to connect and wraps people, and then meets packet people to be made according to received task packet Industry.
It is unpacked device 2000 according to the project task of the embodiment of the present application, passes through the first determining module 1200 and second and determine Module 1300 determines unpack people and structure of unpacking, and by module 1400 of unpacking, unpacking step by step for project task is carried out, compared to phase Pass technology can quickly decompose project task, promote project management efficiency, save manpower and time cost.
Further, in some embodiments, as shown in figure 8, project is unpacked, device 1000 further includes correction verification module 1500, Correction verification module 1500 is used to obtain the task attribute of every level task packet, is split according to task attribute to corresponding level task packet Reasonability is verified.
In some embodiments, the task packet that every level is split, which is all defaulted, increases task attribute.For example, task names, work Phase, price, level grade relationship, level rule, task leader etc., correction verification module 1500 can be more reasonable according to these rules Carry out task packet fractionation meets the setting requirements of hierarchical relationship, sub- grade rule and the task leader with this.For example, according to The analysis of the task attributes such as duration, price discipline, hierarchical relationship, level rule is unpacked the reasonability of data, compliance and to whole The influence that a project is unpacked carries out prices match and duration matching;The duration for verifying attached bag cannot undertake to perform work within a time limit and according to specifications the phase beyond father, i.e., next Duration of the duration of level task packet without departing from this level task packet;In contract system, attached bag adds up price and wraps no more than father Price, i.e., the accumulative price of next level task packet are no more than the price etc. of this level task packet.It is thus possible to more reasonably into Row task packet is split, and is avoided project manager from unpacking and is gone wrong, and accuracy of unpacking is improved.
In some embodiments, as shown in figure 8, project is unpacked, device 1000 further includes auditing module 1600, auditing module 1600, for generating msu message of giving out a contract for a project according to the selection instruction for the people that unpacks, meet Bao Renzai according to msu message specification of giving out a contract for a project and give out a contract for a project Higher level employer whether is needed to audit.Specifically, as shown in fig. 6, the task package informatin page that can be provided in input unit Face is further continued for unpacking downwards after having filled in corresponding task attribute, and every level-one attached bag that increases then continues the level letter that maintenance newly increases Breath determines the responsible person that unpacks according to selection contract system or managing system, may also select whether examination & approval junior's packet option with this Whether determine needs higher level to examine when junior's packet is given out a contract for a project.Maintenance published method and means of payment letter are also needed before release tasks packet Breath is so split to subsystem.After the completion of all information maintenance, selects the task packet to be issued to be issued, can generate item by item Order information.
It is unpacked device 1000 by the project task of the embodiment of the present application, project manager and all levels of management personnel can be with Quickly project task is decomposed, promotes project management efficiency, saves time and human cost;Pass through system automatic Verification Rule of unpacking can be to avoid the mistake as caused by experience deficiency, to promote project management efficiency and quality.
As shown in figure 9, the project management equipment 2000 of the application third aspect embodiment includes input unit 2100, display Device 2200 and the project task of above example are unpacked device 1000.
Wherein, input unit 2100 can receive user input instruction, such as setting item types and give out a contract for a project mode with And the correlation attribute information of project, display device 2200 can show setting information and project task unpack device 1000 processing Process or the relevant information of result, project task device 1000 of unpacking unpack to project task according to setting information, specifically The process of unpacking be referred to above example method of unpacking explanation.
According to the project management equipment 2000 of the embodiment of the present application, unpack dress by using the project task of above example 1000 are set, project task fractionation can be quickly carried out, improve the efficiency of project management.
Figure 10 is according to the block diagram of another project management equipment of one embodiment of the application, as shown in Figure 10, originally The project of application embodiment appoints management equipment 2000 to include that processor (processor) 2300 is communicated to connect with processor 2000 Memory (memory) 2400 and storage on a memory and the computer program that can run on a processor, processor are held When the row computer program, realize that the project task of above example is unpacked method.
In some embodiments, as shown in figure 11, project management equipment 2000 can also include communication interface (Communication Interface) 2500 and bus 2600.Wherein, processor 2300, memory 2400 and communication interface 2500 can complete mutual communication by bus 2600.Communication interface 2500 can be used for information transmission.Processor 2300 The logical order in memory 2400 can be called, to execute the project task method for splitting of above example.
In some embodiments, the logical order in memory 2400 can be realized simultaneously by way of SFU software functional unit When sold or used as an independent product, it can store in a computer readable storage medium.Memory 2400 is made For a kind of computer readable storage medium, it can be used for storing software program, computer executable program, in the embodiment of the present application The corresponding program instruction/module of method.Processor 2300 is by running the software program being stored in memory 2400, instruction And module, thereby executing functional application and data processing, i.e. project task in realization above method embodiment is split Method.
In some embodiments, memory 2400 may include storing program area and storage data area, wherein storing program area It can application program needed for storage program area, at least one function;Storage data area can store the use according to terminal device The data etc. created.In addition, memory 2400 may include high-speed random access memory, it can also include non-volatile deposit Reservoir.
In the description of this specification, reference term " one embodiment ", " some embodiments ", " example ", " specifically show The description of example " or " some examples " etc. means specific features, structure, material or spy described in conjunction with this embodiment or example Point is contained at least one embodiment or example of the application.In the present specification, schematic expression of the above terms are not It must be directed to identical embodiment or example.Moreover, particular features, structures, materials, or characteristics described can be in office It can be combined in any suitable manner in one or more embodiment or examples.In addition, without conflicting with each other, the skill of this field Art personnel can tie the feature of different embodiments or examples described in this specification and different embodiments or examples It closes and combines.
In addition, term " first ", " second " are used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance Or implicitly indicate the quantity of indicated technical characteristic.Define " first " as a result, the feature of " second " can be expressed or Implicitly include at least one this feature.In the description of the present application, the meaning of " plurality " is at least two, such as two, three It is a etc., unless otherwise specifically defined.
Any process described otherwise above or method description are construed as in flow chart or herein, and expression includes It is one or more for realizing custom logic function or process the step of executable instruction code module, segment or portion Point, and the range of the preferred embodiment of the application includes other realization, wherein can not press shown or discussed suitable Sequence, including according to related function by it is basic simultaneously in the way of or in the opposite order, Lai Zhihang function, this should be by the application Embodiment person of ordinary skill in the field understood.
Expression or logic and/or step described otherwise above herein in flow charts, for example, being considered use In the order list for the executable instruction for realizing logic function, may be embodied in any computer-readable medium, for Instruction execution system, device or equipment (such as computer based system, including the system of processor or other can be held from instruction The instruction fetch of row system, device or equipment and the system executed instruction) it uses, or combine these instruction execution systems, device or set It is standby and use.For the purpose of this specification, " computer-readable medium ", which can be, any may include, stores, communicates, propagates or pass Defeated program is for instruction execution system, device or equipment or the dress used in conjunction with these instruction execution systems, device or equipment It sets.The more specific example (non-exhaustive list) of computer-readable medium include the following: there is the electricity of one or more wirings Interconnecting piece (electronic device), portable computer diskette box (magnetic device), random access memory (RAM), read-only memory (ROM), erasable edit read-only storage (EPROM or flash memory), fiber device and portable optic disk is read-only deposits Reservoir (CDROM).In addition, computer-readable medium can even is that the paper that can print described program on it or other are suitable Medium, because can then be edited, be interpreted or when necessary with it for example by carrying out optical scanner to paper or other media His suitable method is handled electronically to obtain described program, is then stored in computer storage.
It should be appreciated that each section of the application can be realized with hardware, software, firmware or their combination.Above-mentioned In embodiment, software that multiple steps or method can be executed in memory and by suitable instruction execution system with storage Or firmware is realized.Such as, if realized with hardware in another embodiment, following skill well known in the art can be used Any one of art or their combination are realized: have for data-signal is realized the logic gates of logic function from Logic circuit is dissipated, the specific integrated circuit with suitable combinational logic gate circuit, programmable gate array (PGA), scene can compile Journey gate array (FPGA) etc..
Those skilled in the art are understood that realize all or part of step that above-described embodiment method carries It suddenly is that relevant hardware can be instructed to complete by program, the program can store in a kind of computer-readable storage medium In matter, which when being executed, includes the steps that one or a combination set of embodiment of the method.
It, can also be in addition, can integrate in a processing module in each functional unit in each embodiment of the application It is that each unit physically exists alone, can also be integrated in two or more units in a module.Above-mentioned integrated mould Block both can take the form of hardware realization, can also be realized in the form of software function module.The integrated module is such as Fruit is realized and when sold or used as an independent product in the form of software function module, also can store in a computer In read/write memory medium.
Storage medium mentioned above can be read-only memory, disk or CD etc..Although having been shown and retouching above Embodiments herein is stated, it is to be understood that above-described embodiment is exemplary, and should not be understood as the limit to the application System, those skilled in the art can be changed above-described embodiment, modify, replace and become within the scope of application Type.

Claims (15)

  1. A kind of method 1. project task is unpacked, which is characterized in that the project task method of unpacking includes:
    Receive give out a contract for a project mode information and the type information of project task;
    The people that unpacks of the project task is determined according to the mode information of giving out a contract for a project;
    The structure of unpacking of the project task is determined according to the type information;
    It unpacks the setting information of unpacking of people, is unpacked into step by step with to unpack structure according to for the project task more described in reception A task packet.
  2. The method 2. project task according to claim 1 is unpacked, which is characterized in that the mode packet of giving out a contract for a project of the project task Managing system and contract system are included, the mode information of giving out a contract for a project according to determines the people that unpacks of the project task, comprising:
    The mode of giving out a contract for a project is managing system, then by employer as the people that unpacks;
    Alternatively, the mode of giving out a contract for a project is contract system, then by meeting packet people as the people that unpacks.
  3. The method 3. project task according to claim 1 is unpacked, which is characterized in that the type of the project task includes combustion Gas engineering project and comprehensive engineering project, the structure of unpacking that the project task is determined according to the type information, packet It includes:
    The structure of unpacking of the gas engineering project includes project, profession and subsystem, wherein the project, it is described profession and The task covering grade of the subsystem reduces step by step;
    The structure of unpacking of the comprehensive engineering project includes the project, device, unit, the profession and the subsystem, Wherein, the task covering grade of the project, described device, the unit, the profession and the subsystem reduces step by step.
  4. The method 4. project task according to claim 2 is unpacked, which is characterized in that project task method of unpacking also is wrapped It includes:
    Obtain the task packet attribute of every level task packet;
    It is verified according to the reasonability that the task packet attribute splits corresponding level task packet.
  5. The method 5. project task according to claim 4 is unpacked, which is characterized in that the task packet attribute includes task name Title, duration, price, hierarchical relationship, sub- grade rule, task leader, it is described in charge of a grade to respective layer according to the task packet attribute The reasonability that business packet is split is verified, comprising:
    Duration of the duration of next level task packet without departing from this level task packet;
    In contract system, the accumulative price of next level task packet is no more than the price of this level task packet;
    Meet the setting requirements of described hierarchical relationship, sub- grade rule and the task leader.
  6. The method 6. project task according to claim 1 is unpacked, which is characterized in that project task method of unpacking also is wrapped It includes:
    Msu message of giving out a contract for a project is generated according to the selection instruction for the people that unpacks;
    Bao Renzai, which is met, according to the msu message specification of giving out a contract for a project gives out a contract for a project whether need higher level employer audit.
  7. The device 7. a kind of project task is unpacked, which is characterized in that project task device of unpacking includes:
    Receiving module, for receiving give out a contract for a project mode information and the type information of project task;
    First determining module determines the people that unpacks of the project task for mode information of giving out a contract for a project according to;
    Second determining module, for determining the structure of unpacking of the project task according to the type information;
    Module of unpacking is appointed for receiving the setting information of unpacking of the people that unpacks with unpacking structure according to for the project Multiple tasks packet is unpacked into business step by step.
  8. The device 8. project task according to claim 7 is unpacked, which is characterized in that the mode packet of giving out a contract for a project of the project task Managing system and contract system are included, first determining module determines unpacking for the project task in mode information of giving out a contract for a project according to It is specifically used for when people, when the mode of giving out a contract for a project is managing system, by employer as the people that unpacks, alternatively, giving out a contract for a project described When mode is contract system, by meeting packet people as the people that unpacks.
  9. The device 9. project task according to claim 7 is unpacked, which is characterized in that the type of the project task includes combustion Gas engineering project and comprehensive engineering project, second determining module are determining the project task according to the type information Unpack structure when be specifically used for, the structure of unpacking of the gas engineering project includes project, profession and subsystem, wherein institute The task covering grade for stating project, the profession and the subsystem reduces step by step, the structure of unpacking of the comprehensive engineering project Including the project, device, unit, the profession and the subsystem, wherein the project, described device, the unit, The profession and the task covering grade of the subsystem reduce step by step.
  10. The device 10. project task according to claim 8 is unpacked, which is characterized in that the project task unpacks device also Include:
    Correction verification module, it is in charge of a grade to respective layer according to the task packet attribute for obtaining the task packet attribute of every level task packet The reasonability that business packet is split is verified.
  11. The device 11. project task according to claim 10 is unpacked, which is characterized in that the task packet attribute includes task Title, duration, price, hierarchical relationship, sub- grade rule, task leader, the correction verification module is according to the task packet attribute It is specifically included when being verified to the reasonability that corresponding level task packet is split:
    Duration of the duration of next level task packet without departing from this level task packet;
    In contract system, the accumulative price of next level task packet is no more than the price of this level task packet;
    Meet the setting requirements of described hierarchical relationship, sub- grade rule and the task leader.
  12. The device 12. project task according to claim 7 is unpacked, which is characterized in that the project task unpacks device also Including auditing module, the auditing module is used for, and msu message of giving out a contract for a project is generated according to the selection instruction for the people that unpacks, according to the hair Packet msu message specification meets Bao Renzai and gives out a contract for a project whether need higher level employer audit.
  13. 13. a kind of project management equipment, which is characterized in that the project management equipment includes:
    Input device and display device;
    As the described in any item project tasks of claim 7-12 are unpacked device.
  14. 14. a kind of project management equipment, which is characterized in that including memory, processor and store on a memory and can locate The computer program run on reason device, which is characterized in that when the processor executes described program, realize such as claim 1-6 In any project task unpack method.
  15. 15. a kind of non-transitorycomputer readable storage medium, is stored thereon with computer program, which is characterized in that the program It is realized when being executed by processor as project task as claimed in any one of claims 1 to 6 is unpacked method.
CN201910310520.5A 2019-04-17 2019-04-17 Project task is unpacked method, apparatus, project management equipment and storage medium Pending CN110059957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910310520.5A CN110059957A (en) 2019-04-17 2019-04-17 Project task is unpacked method, apparatus, project management equipment and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910310520.5A CN110059957A (en) 2019-04-17 2019-04-17 Project task is unpacked method, apparatus, project management equipment and storage medium

Publications (1)

Publication Number Publication Date
CN110059957A true CN110059957A (en) 2019-07-26

Family

ID=67319299

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910310520.5A Pending CN110059957A (en) 2019-04-17 2019-04-17 Project task is unpacked method, apparatus, project management equipment and storage medium

Country Status (1)

Country Link
CN (1) CN110059957A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967838A (en) * 2020-07-16 2020-11-20 译筑信息科技(上海)有限公司 Intelligent 4D plan management and control method based on BIM

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392310A (en) * 2014-11-13 2015-03-04 深圳市玖昔物联科技发展有限公司 Networked work coordinated management system
CN104463558A (en) * 2014-11-13 2015-03-25 深圳市玖昔物联科技发展有限公司 Networked work cooperative system and method
CN106372819A (en) * 2016-11-25 2017-02-01 中国电子科技集团公司第三十八研究所 Cooperation device and method in research and development process of complex electromechanical product
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN108197779A (en) * 2017-12-15 2018-06-22 四川省大益科技有限公司 Build service management
CN108921430A (en) * 2018-06-29 2018-11-30 合肥微商圈信息科技有限公司 A kind of acquisition methods and system of project work amount
CN109583027A (en) * 2018-10-31 2019-04-05 中车工业研究院有限公司 A kind of analogue system and method based on distributed collaborative

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104392310A (en) * 2014-11-13 2015-03-04 深圳市玖昔物联科技发展有限公司 Networked work coordinated management system
CN104463558A (en) * 2014-11-13 2015-03-25 深圳市玖昔物联科技发展有限公司 Networked work cooperative system and method
CN106372819A (en) * 2016-11-25 2017-02-01 中国电子科技集团公司第三十八研究所 Cooperation device and method in research and development process of complex electromechanical product
CN106910044A (en) * 2017-02-27 2017-06-30 努比亚技术有限公司 Project process based reminding method and system
CN108197779A (en) * 2017-12-15 2018-06-22 四川省大益科技有限公司 Build service management
CN108921430A (en) * 2018-06-29 2018-11-30 合肥微商圈信息科技有限公司 A kind of acquisition methods and system of project work amount
CN109583027A (en) * 2018-10-31 2019-04-05 中车工业研究院有限公司 A kind of analogue system and method based on distributed collaborative

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
何清华: "《项目管理》", 30 June 2011, 同济大学出版社 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111967838A (en) * 2020-07-16 2020-11-20 译筑信息科技(上海)有限公司 Intelligent 4D plan management and control method based on BIM

Similar Documents

Publication Publication Date Title
Zhao et al. Job satisfaction of project managers in green construction projects: Constituents, barriers, and improvement strategies
Jureta et al. Revisiting the core ontology and problem in requirements engineering
US5586252A (en) System for failure mode and effects analysis
WO2019056710A1 (en) Supplier recommendation method and apparatus, and computer readable storage medium
US20130151421A1 (en) Real-time project progress entry: applying project team member-entered progress immediately to the project plan
JP2008186478A (en) Computer executable workflow control system
Poth et al. Effective quality management: value-and risk-based software quality management
Shabi et al. Planning the verification, validation, and testing process: a case study demonstrating a decision support model
WO2004019247A2 (en) Assessment of an organization’s customer relationship management capabilities
US20120311525A1 (en) Application management system
US20140258882A1 (en) Collaborative task management
Wang et al. An information product approach for total information awareness
CN110059957A (en) Project task is unpacked method, apparatus, project management equipment and storage medium
US9199172B2 (en) System for software work events
Moisiadis Prioritising use cases and scenarios
Gifford et al. Delivering on outcomes: the experience of Maori health service providers
Fei et al. Total quality management in Malaysian government agencies: Conditions for successful implementation of organizational change
JP5119816B2 (en) Business risk management device, method and program
Devos et al. IT Governance in SMEs: Trust or control?
US20030220824A1 (en) Enterprise organization operational flow management system
Tilbury Shaping child welfare policy via performance measurement
US20080195453A1 (en) Organisational Representational System
Dung et al. Modular argumentation for modelling legal doctrines of performance relief
Janssen et al. Towards guidance in assessing and communicating uncertainties
US20070276716A1 (en) Method For Retrieval of Available Intervals

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination