CN110056715A - A kind of ship titanium alloy tube leads to cabin method - Google Patents

A kind of ship titanium alloy tube leads to cabin method Download PDF

Info

Publication number
CN110056715A
CN110056715A CN201910197809.0A CN201910197809A CN110056715A CN 110056715 A CN110056715 A CN 110056715A CN 201910197809 A CN201910197809 A CN 201910197809A CN 110056715 A CN110056715 A CN 110056715A
Authority
CN
China
Prior art keywords
titanium alloy
alloy tube
cabin
frame body
outer frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910197809.0A
Other languages
Chinese (zh)
Inventor
黄雷
施方乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hudong Zhonghua Shipbuilding Group Co Ltd
Original Assignee
Hudong Zhonghua Shipbuilding Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hudong Zhonghua Shipbuilding Group Co Ltd filed Critical Hudong Zhonghua Shipbuilding Group Co Ltd
Priority to CN201910197809.0A priority Critical patent/CN110056715A/en
Publication of CN110056715A publication Critical patent/CN110056715A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B71/00Designing vessels; Predicting their performance
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L5/00Devices for use where pipes, cables or protective tubing pass through walls or partitions
    • F16L5/02Sealing
    • F16L5/04Sealing to form a firebreak device

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Ocean & Marine Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of ship titanium alloy tubes to lead to cabin method, steel bulkhead or the deck of watertight and fire protection requirement are installed on naval vessel for titanium alloy tube, the logical cabin method is based on following titanium alloy tube device, described device includes: titanium alloy tube, the steel outer frame body being set on the titanium alloy tube, it is filled in the steel outer frame body and the titanium alloy tube is formed by interbedded fire-proof packing, be filled in the fire prevention calking at the both ends of the interlayer;The logical cabin method includes the following steps: step 1, according to piping installation diagram, determines the crossing cabin position of titanium alloy tube;Step 2, the crossing cabin hole for opening up predetermined diameter at crossing cabin position on bulkhead or deck;Step 3, fixed steel outer frame body are in crossing cabin hole.Beneficial effects of the present invention are to solve the case where titanium alloy tube is difficult to the reality ship application obstacle to caused by together with welded steel, and realize the fire prevention of crossing cabin part both ends, Smoke prevention and watertight and separate.

Description

A kind of ship titanium alloy tube leads to cabin method
Technical field
The invention belongs to shipbuilding technical fields, and in particular to a kind of ship titanium alloy tube leads to cabin method.
Background technique
Titanium is a kind of important structural metal to grow up the 1950s, and titanium alloy has intensity height, corrosion resistance Well, the features such as heat resistance is high.Titanium alloy tube is applied in naval vessel seawater pipe or other systems, the strong, longevity with corrosion resistance Long feature is ordered, application prospect is extensive.
Currently, in view of current demand, relevant department is just planning titanium alloy pipeline and is starting gradually to promote and apply on naval vessel.
It is difficult under normal circumstances since titanium alloy material and steel can react generation frangible compounds, easily brittle failure at high temperature To weld together.So shipyard is difficult to directly adopt when titanium alloy pipeline is installed with the steel bulkhead of watertight and fire protection requirement Conventional compound plate or reinforcing sleeve.
Summary of the invention
Aiming at the problems existing in the prior art, the present invention provides a kind of ship titanium alloy tube and leads to cabin method, the present invention It has been able to solve the case where titanium alloy tube is difficult to the reality ship application obstacle to caused by together with welded steel, and has realized and wears The fire prevention of cabin part both ends, Smoke prevention and watertight separate.
To achieve the above object, the invention adopts the following technical scheme:
A kind of ship titanium alloy tube leads to cabin method, is installed with the steel cabin of watertight and fire protection requirement on naval vessel for titanium alloy tube Wall or deck, the logical cabin method are based on following titanium alloy tube device, and described device includes: titanium alloy tube, is set in the titanium Steel outer frame body on compo pipe, is filled in the steel outer frame body and the titanium alloy tube is formed by interbedded fire prevention Filler is filled in the fire prevention calking at the both ends of the interlayer;
The logical cabin method includes the following steps:
Step 1, according to piping installation diagram, determine the crossing cabin position of titanium alloy tube;
Step 2, the crossing cabin hole for opening up predetermined diameter at crossing cabin position on bulkhead or deck;
Step 3, fixed steel outer frame body are in crossing cabin hole;
Step 4, installation titanium alloy tube, and support frame is installed at titanium alloy tube both ends;
Step 5 is formed by between interlayer in steel outer frame body and titanium alloy tube fire-proof packing is perfused;
Fire prevention calking is perfused at interlayer both ends in step 6.
Bulkhead or deck is made to be in the medium position of the length of steel outer frame body in the step 3.
Predetermined diameter described in the step 2 is equal to the outer diameter of the steel outer frame body, steel outer frame body in the step 3 It is welded to connect with crossing cabin hole.
The welding of one end of steel outer frame body and compound plate described in the step 3, the other end of compound plate and crossing cabin hole are welded.
The fire-proof packing is inorganic airtight and watertight padding.
The fire prevention calking uses organic putty, is prepared by resin and fire retardant;
The fire prevention calking uses inorganic putty, is configured by binder and curing agent.
The length of the steel outer frame body is not less than 250mm, and the thickness of the fire prevention calking at the interlayer both ends is not Less than 25mm.
The logical cabin method includes:
Step 7 carries out watertight, is airtight, fire prevention experiment, it is ensured that the watertight of the titanium alloy tube device, airtight, fire protecting performance reach Preassigned.
Compared with prior art, the invention has the benefit that
1. having conveniently realized steel bulkhead or deck that titanium alloy tube is installed with watertight and fire protection requirement on naval vessel, and realize Fire resisting separation and watertight separate;
2. realizing the insulation between pipeline and hull bulkhead, it can prevent stray electrical current in piping from generating, optimize titanium alloy tube conduct The use environment of seawaterline;
3. passing through the fire-proof packing and putty that destroy between steel outer tube, it is convenient to which the disassembly for carrying out piping does not need to lead to It crosses firer and dismantles realization, maintenance and repacking are convenient;
4. the cross section geometry of outer tube is slightly larger than pipeline flange, compared slightly with the installation compound plate outer dimension of common pipeline There is reduction, therefore arranges and require to meet shipyard requirement;
5. avoiding the direct welding of titanium alloy material and steel part, construct convenient for shipyard;
The contact with sea water 6. steel part is got along well, ensure that the anticorrosion ability of pipeline.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is the overall structure diagram of titanium alloy tube device.
Fig. 2 is schematic diagram of the steel outer frame body directly with bulkhead welding.
Fig. 3 is the schematic diagram that steel outer frame body is fixedly connected by compound plate with bulkhead.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, those of ordinary skill in the art are obtained every other under that premise of not paying creative labor Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom" "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown, is merely for convenience of description of the present invention and simplification of the description, rather than the dress of indication or suggestion meaning It sets or element must have a particular orientation, be constructed and operated in a specific orientation, therefore should not be understood as to limit of the invention System.
As shown in Figure 1-3, the present embodiment provides a kind of ship titanium alloy tubes to lead to cabin method, for titanium alloy tube on naval vessel On be installed with steel bulkhead 5 or the deck of watertight and fire protection requirement, the logical cabin method is based on following titanium alloy tube device, the dress Setting includes: titanium alloy tube 1, and the steel outer frame body 2 being set on the titanium alloy tube 1 is filled in the steel outer frame body 2 and institute It states titanium alloy tube 1 and is formed by interbedded fire-proof packing 3, be filled in the fire prevention calking 4 at the both ends of the interlayer;
The logical cabin method includes the following steps:
Step 1, according to piping installation diagram, determine the crossing cabin position of titanium alloy tube 1;
Step 2, the crossing cabin hole for opening up predetermined diameter at crossing cabin position on bulkhead 5 or deck;
Step 3, fixed steel outer frame body 2 are in crossing cabin hole;
Step 4, installation titanium alloy tube 1, and support frame is installed at 1 both ends of titanium alloy tube;
Step 5 is formed by perfusion fire-proof packing 3 between interlayer in steel outer frame body 2 and titanium alloy tube 1;
Fire prevention calking 4 is perfused at interlayer both ends in step 6.
Preferably, bulkhead 5 or deck is made to be in the length of steel outer frame body 2 in step 3 described in the present embodiment Medium position.
As further preferred, predetermined diameter described in step 2 described in the present embodiment is equal to the outer of the steel outer frame body 2 Diameter, steel outer frame body 2 and crossing cabin hole are welded to connect in the step 3.
It is multiple as further preferred, one end welding of steel outer frame body described in step 3 described in the present embodiment 2 and compound plate 6 The other end of plate 6 and crossing cabin hole are welded.
As further preferred, fire-proof packing 3 described in the present embodiment is inorganic airtight and watertight padding.
As further preferred, the organic putty of the use of fire prevention calking 4 described in the present embodiment, by resin and fire retardant preparation;
As further preferred, the inorganic putty of the use of fire prevention calking 4 described in the present embodiment, by binder and curing agent configuration.
As further preferred, the length of steel outer frame body 2 described in the present embodiment is not less than 250mm, the interlayer both ends The thickness of the fire prevention calking 4 be not less than 25mm.
Leading to cabin method as further preferred, described in the present embodiment includes:
Step 7 carries out watertight, is airtight, fire prevention experiment, it is ensured that the watertight of the titanium alloy tube device, airtight, fire protecting performance reach Preassigned.
Watertight inspection
The 0.1MPa water pressure test, 1h is without drainage.
Airtight inspection
Measuring distance is 100mm, and the nozzle for being 12mm with internal diameter, the compressed air with the blowing pressure for 0.049MPa blows to sealing The side of part, blow 2~5min, if other side ne-leakage phenomenon is qualification.
Fire resistance test
It being carried out according to CB3386.2-92, duration of test runs is no less than 1h, and test process should be able to prevent cigarette and flame from passing through, Unexposed surface temperature rise meets 5.5.1 chapters and sections in CB3386.2-92 and provides in stipulated time.
Although above-described embodiment makes specific descriptions to the present invention, come for those of ordinary skill in the art It says, it is understood that can be modified within spirit and scope of the invention based on present disclosure not departing from Or improve, these modification and improvement are all within spirit and scope of the invention.

Claims (9)

1. a kind of ship titanium alloy tube leads to cabin method, the steel of watertight and fire protection requirement is installed on naval vessel for titanium alloy tube Bulkhead (5) or deck, which is characterized in that the logical cabin method is based on following titanium alloy tube device, and described device includes: titanium alloy It manages (1), the steel outer frame body (2) being set on the titanium alloy tube (1) is filled in the steel outer frame body (2) and the titanium Compo pipe (1) is formed by interbedded fire-proof packing (3), is filled in the fire prevention calking (4) at the both ends of the interlayer;
The logical cabin method includes the following steps:
Step 1, according to piping installation diagram, determine the crossing cabin position of titanium alloy tube (1);
Step 2, the crossing cabin hole for opening up predetermined diameter at crossing cabin position on bulkhead (5) or deck;
Step 3, fixed steel outer frame body (2) are in crossing cabin hole;
Step 4, installation titanium alloy tube (1), and support frame is installed at titanium alloy tube (1) both ends;
Step 5 is formed by perfusion fire-proof packing (3) between interlayer in steel outer frame body (2) and titanium alloy tube (1);
Fire prevention calking (4) are perfused at interlayer both ends in step 6.
2. wanting 1 the ship titanium alloy tube is asked to lead to cabin method according to right, which is characterized in that make cabin in the step 3 Wall (5) or deck are in the medium position of the length of steel outer frame body (2).
3. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that pre- described in the step 2 Determine the outer diameter that diameter is equal to the steel outer frame body (2), steel outer frame body (2) and crossing cabin hole are welded to connect in the step 3.
4. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that steel described in the step 3 One end of matter outer frame body (2) and compound plate (6) is welded, and the other end of compound plate (6) and crossing cabin hole are welded.
5. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that the fire-proof packing (3) is Inorganic airtight and watertight padding.
6. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that the fire prevention calking (4) is adopted With organic putty, matched by resin and fire retardant.
7. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that the fire prevention calking (4) is adopted With inorganic putty, configured by binder and curing agent.
8. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that the steel outer frame body (2) Length be not less than 250mm, the thickness of the fire prevention calking (4) at the interlayer both ends is not less than 25mm.
9. ship titanium alloy tube according to claim 1 leads to cabin method, which is characterized in that the logical cabin method includes:
Step 7 carries out watertight, is airtight, fire prevention experiment, it is ensured that the watertight of the titanium alloy tube device, airtight, fire protecting performance reach Preassigned.
CN201910197809.0A 2019-03-15 2019-03-15 A kind of ship titanium alloy tube leads to cabin method Pending CN110056715A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910197809.0A CN110056715A (en) 2019-03-15 2019-03-15 A kind of ship titanium alloy tube leads to cabin method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910197809.0A CN110056715A (en) 2019-03-15 2019-03-15 A kind of ship titanium alloy tube leads to cabin method

Publications (1)

Publication Number Publication Date
CN110056715A true CN110056715A (en) 2019-07-26

Family

ID=67316055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910197809.0A Pending CN110056715A (en) 2019-03-15 2019-03-15 A kind of ship titanium alloy tube leads to cabin method

Country Status (1)

Country Link
CN (1) CN110056715A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483735A (en) * 2020-12-04 2021-03-12 沪东中华造船(集团)有限公司 Refrigerant water pipe cabin-penetrating installation method
CN113212689A (en) * 2021-05-28 2021-08-06 江南造船(集团)有限责任公司 Penetration piece arrangement method, system, medium and equipment based on ship fire protection design
CN114962798A (en) * 2022-04-27 2022-08-30 无锡海核装备科技有限公司 Cabin penetrating structure of mechanical penetrating piece for titanium alloy radiation shielding cabin

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201680069U (en) * 2009-11-26 2010-12-22 上海大学 Cabin-penetration sealing device for metal pipeline
CN105805426A (en) * 2016-03-30 2016-07-27 上海火克新材料有限公司 Pipeline penetration device
WO2018030641A1 (en) * 2016-08-10 2018-02-15 김정운 Double heat insulation sleeve for passing plastic pipe and wire through steel plate
CN207554984U (en) * 2017-10-19 2018-06-29 沪东中华造船(集团)有限公司 A kind of ship combustible gas detecting pipe crossing cabin fixing device
CN208153865U (en) * 2018-04-08 2018-11-27 湖南金航船舶制造有限公司 A kind of hold seal for pipe joints mechanism
CN208474674U (en) * 2018-06-21 2019-02-05 上海火克新材料有限公司 A kind of grouting formula fire-proof sealing device peculiar to vessel
CN208474675U (en) * 2018-06-21 2019-02-05 上海火克新材料有限公司 A kind of marine pipeline fire proof seal runs through device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201680069U (en) * 2009-11-26 2010-12-22 上海大学 Cabin-penetration sealing device for metal pipeline
CN105805426A (en) * 2016-03-30 2016-07-27 上海火克新材料有限公司 Pipeline penetration device
WO2018030641A1 (en) * 2016-08-10 2018-02-15 김정운 Double heat insulation sleeve for passing plastic pipe and wire through steel plate
CN207554984U (en) * 2017-10-19 2018-06-29 沪东中华造船(集团)有限公司 A kind of ship combustible gas detecting pipe crossing cabin fixing device
CN208153865U (en) * 2018-04-08 2018-11-27 湖南金航船舶制造有限公司 A kind of hold seal for pipe joints mechanism
CN208474674U (en) * 2018-06-21 2019-02-05 上海火克新材料有限公司 A kind of grouting formula fire-proof sealing device peculiar to vessel
CN208474675U (en) * 2018-06-21 2019-02-05 上海火克新材料有限公司 A kind of marine pipeline fire proof seal runs through device

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
唐元斌: "钛合金管在舰船上应用的工艺研究", 《造船技术》 *
柴镇江: "DGM-NG型船用管路通舱耐火密封装置的研制和应用", 《船舶》 *
王超众等: "海洋平台建造中管线穿舱方案分析", 《石油和化工设备》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112483735A (en) * 2020-12-04 2021-03-12 沪东中华造船(集团)有限公司 Refrigerant water pipe cabin-penetrating installation method
CN113212689A (en) * 2021-05-28 2021-08-06 江南造船(集团)有限责任公司 Penetration piece arrangement method, system, medium and equipment based on ship fire protection design
CN114962798A (en) * 2022-04-27 2022-08-30 无锡海核装备科技有限公司 Cabin penetrating structure of mechanical penetrating piece for titanium alloy radiation shielding cabin

Similar Documents

Publication Publication Date Title
CN110056715A (en) A kind of ship titanium alloy tube leads to cabin method
CN204176159U (en) Boats and ships and upper pipeline crossing cabin part thereof
CN101559827B (en) Smoke exhaust pipe penetration method
KR101163410B1 (en) through-structure of gas pipe in ship
CN207183990U (en) The poling sealing device that a kind of cable passes through special cabin
CN201385774Y (en) Compartment structure of fume exhaust tube
JP4993620B2 (en) Construction method of inner wall mounting member on synthetic segment and installation structure of inner wall mounting member on synthetic segment
CN209620666U (en) A kind of unsymmetric structure fireproof blocking of converter transformer valve-side sleeve valve hall hole
CN104911605A (en) Anticorrosion device for pipelines of yacht
CN205190984U (en) Sleeve pipe is sacrificed to marine sea water system anticorrosion cast iron
CN109217198A (en) Device is run through on a kind of Shipbuilding pipe road
CN205173726U (en) Seal structure of drilling platform crossing cabin spare
CN214699556U (en) Novel fire-resistant tuber pipe and structure thereof
CN215334894U (en) A fire prevention leads to cabin spare for non-metallic pipe
CN210460828U (en) Exhaust pipe protection device
CN220891465U (en) Fire control pipe anti-burst device
CN101054805B (en) Fire-prevention protection method for underwater tunnel concrete structure
CN202202259U (en) Tube expansion sealing type guy cable
CN107066688B (en) GFRP anti-floating design method for water area drilling and blasting tunnel crossing pipeline
RU2724093C1 (en) Pipeline system for fire extinguishing
CN220082358U (en) High corrosion-resistant fire-fighting plastic composite pipeline
CN220828613U (en) Long-life steam direct-buried pipe fixing pier
CN109737271A (en) A kind of flexible anode mounting structure for pipeline internal corrosion
CN215635611U (en) Multipurpose rubber expansion device
CN204493921U (en) Trenchless engineering special anti-corrosion thermal insulation pipe

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726