CN110056370A - It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after - Google Patents

It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after Download PDF

Info

Publication number
CN110056370A
CN110056370A CN201910239006.7A CN201910239006A CN110056370A CN 110056370 A CN110056370 A CN 110056370A CN 201910239006 A CN201910239006 A CN 201910239006A CN 110056370 A CN110056370 A CN 110056370A
Authority
CN
China
Prior art keywords
attachment device
ring beam
jurisdiction
section
portal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910239006.7A
Other languages
Chinese (zh)
Inventor
杜飞
陈双
刘刚
亢秀山
蔡友刚
索宝山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201910239006.7A priority Critical patent/CN110056370A/en
Publication of CN110056370A publication Critical patent/CN110056370A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/08Lining with building materials with preformed concrete slabs
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining

Abstract

The invention discloses a kind of shield launchings and arrival end pipe piece to pour ring beam attachment device with after, ring beam is poured including after, section of jurisdiction, nut, gasket, bolt and end block, the nut, gasket, bolt and end block form portal attachment device, portal attachment device one end is protruded into portal section of jurisdiction, and it is fixedly connected by nut shimming, the gasket is arranged between nut and section of jurisdiction, the portal attachment device other end and end block are welded to connect, reinforcement welding in ring beam is poured behind the end block other side and shield launching and arrival end to connect, the present invention not only convenient and quick construction, and it is easy to operate, in addition good forming effect is connected, and section of jurisdiction will not be damaged, it avoids shield launching and reaches and pour ring beam not behind end pipe piece and portal position and can be carried out effective connection, it is big to also avoid common method bar planting hole pore-forming difficulty, air drill It is not easy to implement, the problem of water drilling is easy to injure section of jurisdiction reinforcing bar, and effect is low, quality is difficult to ensure.

Description

It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after
Technical field
The invention belongs to Shield Construction Technique fields, and in particular to a kind of shield launching and reach end pipe piece and pour ring beam with after Attachment device.
Background technique
Shield is the Fully-mechanized construction method of one of shallow mining method.It is to promote Shield-type machinery in ground, is led to It crosses shield shell and section of jurisdiction bearing surrounding country rock prevents the collapsing in tunnel.Cutting apparatus is used in front of excavation face simultaneously Soil excavation is carried out, by being unearthed, machinery is transported outside hole, by jack in rear pressurization jacking, and assembled precast concrete pipe Piece forms a kind of mechanized construction method of tunnel structure.Shield machine is a kind of rock tunnel(ling) machine using shield method.Shield Construction method is that development machine constructs tunnel its " shield " while driving, it is different from open type construction method.The basic work of shield machine The steel component for being exactly a cylindrical body as principle excavates soil when pushing ahead along canal axes.The cylinder component Shell, that is, shield, it plays a part of temporary support to the also unlined Tunnel Section excavated, and bears the pressure of surrounding soil layer Power, sometimes outside also subject to ground water pressure and by underground water gear.The operations such as excavation, casting, lining cutting are under the shielding of shield It carries out.
Country greatly develops infrastructure field at present, during underground engineering shield-tunneling construction, shield launching and arrival Pouring ring beam after end pipe piece and portal position need to effectively be connect, and common method is that bar planting, but bar planting process are carried out on section of jurisdiction In, bar planting hole pore-forming difficulty is big, and air drill is not easy to implement, and water drilling is easy to injure section of jurisdiction reinforcing bar, and effect is low, quality is difficult to ensure.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the existing defects, a kind of shield launching is provided and reach end pipe piece with After pour ring beam attachment device, infrastructure field is greatly developed to solve current country mentioned above in the background art, on ground In lower Project Shield work progress, pouring ring beam after shield launching and arrival end pipe piece and portal position need to effectively be connect, often It is bar planting to be carried out on section of jurisdiction, but during bar planting, bar planting hole pore-forming difficulty is big, and air drill is not easy to implement with method, water drilling is easy Section of jurisdiction reinforcing bar is injured, the problem of effect is low, quality is difficult to ensure.
To achieve the above object, the invention provides the following technical scheme: a kind of shield launching and arrival end pipe piece are poured with after Ring beam attachment device, including after pour ring beam, section of jurisdiction, nut, gasket, bolt and end block, the nut, gasket, bolt and end block Portal attachment device is formed, portal attachment device one end is protruded into portal section of jurisdiction, and is fixedly connected by nut shimming, The gasket is arranged between nut and section of jurisdiction, and the portal attachment device other end and end block are welded to connect, and the end block is another Reinforcement welding in ring beam is poured behind side and shield launching and arrival end to connect.
Shield launching and arrival end pipe piece are poured ring beam with after and connect by the portal attachment device, section of jurisdiction section of jurisdiction upper end It is provided with bolt hole, and shares ten.
The bolt is M27 bolt, and the nut and bolt matching are processed.
The nut, gasket, bolt are that steel material is made, and are heat dip zinc treating.
The end block is cut by Q235B steel plate, and having a size of thickness * height * width=10mm*60mm*60mm.
The end block pours ring beam reinforcing bar with after and is welded.
Compared with prior art, the present invention provides a kind of shield launchings and arrival end pipe piece to pour ring beam with after and connect dress Set, have it is following the utility model has the advantages that
The present invention not only convenient and quick construction, and it is easy to operate, good forming effect is in addition connected, and will not cause to section of jurisdiction It destroys, avoids shield launching and reach and pour ring beam not behind end pipe piece and portal position and can be carried out effective connection, also avoid often Big with method bar planting hole pore-forming difficulty, air drill is not easy to implement, and water drilling is easy to injure section of jurisdiction reinforcing bar, and effect is low, quality is difficult to ensure The problem of, it is not directed to part in the device and is the same as those in the prior art or can be realized by using the prior art, structure of the invention It is scientific and reasonable, it is safe and convenient to use, it provides a great help for people.
Detailed description of the invention
Attached drawing is used to provide further understanding of the present invention, and constitutes part of specification, with reality of the invention It applies example to be used to explain the present invention together, not be construed as limiting the invention, in the accompanying drawings:
Fig. 1 is that shield launching and arrival end pipe piece pour ring grid beam connection schematic diagram with after;
Fig. 2 is portal attachment device bolt schematic diagram;
Fig. 3 is portal attachment device gasket schematic diagram;
Fig. 4 is the diagrammatic cross-section of Fig. 3;
Fig. 5 is portal attachment device nut schematic diagram;
Fig. 6 is the diagrammatic cross-section of Fig. 5;
In figure: 1, pouring ring beam after;2, section of jurisdiction;3, nut;4, gasket;5, bolt;6, end block.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-6 is please referred to, the present invention provides a kind of technical solution: a kind of shield launching and reaching end pipe piece and pour ring beam with after Attachment device, including after pour ring beam 1, section of jurisdiction 2, nut 3, gasket 4, bolt 5 and end block 6, nut 3, gasket 4, bolt 5 and end block 6 form portal attachment devices, not only convenient and quick construction, but also easy to operate, in addition connect good forming effect, and will not be right Section of jurisdiction damages, and avoids shield launching and reaches and pours ring beam not behind end pipe piece and portal position and can be carried out effective connection, hole Door attachment device one end is protruded into portal section of jurisdiction 2, and is fixedly connected by the shimming of nut 34, and the setting of gasket 4 is in nut 3 and pipe Between piece 2, the portal attachment device other end and end block are welded to connect, and pour ring behind 6 other side of end block and shield launching and arrival end Reinforcement welding connects in beam 1, avoids that common method bar planting hole pore-forming difficulty is big, and air drill is not easy to implement, and water drilling is easy to injure pipe The problem of piece reinforcing bar, effect is low, quality is difficult to ensure.
Shield launching and arrival end pipe piece 2 are poured ring beam 1 with after and connect by portal attachment device, the setting of 2 section of jurisdiction upper end of section of jurisdiction There is bolt hole, and share ten, bolt 5 is M27 bolt, nut 3 and 5 accessory processing of bolt, and nut 3, gasket 4, bolt 5 are Steel material is made, and is heat dip zinc treating, and end block 6 is cut by Q235B steel plate, and having a size of thickness * height * width= 10mm*60mm*60mm, end block 6 pour 1 reinforcing bar of ring beam with after and are welded.
The working principle of the invention and process for using: in use, connecting shield launching and arrival by portal attachment device End pipe piece 2 pours ring beam 1 with after, and portal attachment device one end is protruded into portal section of jurisdiction 2 and is fixed by the shimming of nut 34, will be padded Piece 4 is mounted between nut 3 and section of jurisdiction 2, end block 6 is welded in the portal attachment device other end, by portal attachment device by shield It originates and reaches end pipe piece 2 and pour ring beam 1 with after and be attached, then the prepared screw-bolt hole when processing section of jurisdiction, each portal is reserved 10.
The present invention not only convenient and quick construction, and it is easy to operate, good forming effect is in addition connected, and will not be to section of jurisdiction It damages, avoids shield launching and reach and pour ring beam not behind end pipe piece and portal position and can be carried out effective connection, also avoid Common method bar planting hole pore-forming difficulty is big, and air drill is not easy to implement, water drilling is easy to injure section of jurisdiction reinforcing bar, and effect is low, quality is difficult to The problem of guarantee, is not directed to part in the device and is the same as those in the prior art or can be realized by using the prior art, the present invention It is scientific and reasonable for structure, it is safe and convenient to use, it provides a great help for people.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of shield launching and reach end pipe piece and pour ring beam attachment device with after, including after pour ring beam (1), section of jurisdiction (2), nut (3), gasket (4), bolt (5) and end block (6), it is characterised in that: the nut (3), gasket (4), bolt (5) and end block (6) Portal attachment device is formed, portal attachment device one end is protruded into portal section of jurisdiction (2), and passes through nut (3) shimming (4) It is fixedly connected, the gasket (4) is arranged between nut (3) and section of jurisdiction (2), and the portal attachment device other end and end block weld It connects in succession, pours ring beam (1) interior reinforcement welding behind end block (6) other side and shield launching and arrival end and connect.
2. a kind of shield launching according to claim 1 and arrival end pipe piece pour ring beam attachment device with after, feature exists In: shield launching and arrival end pipe piece (2) are poured ring beam (1) with after and connect by the portal attachment device, section of jurisdiction (2) section of jurisdiction Upper end is provided with bolt hole, and shares ten.
3. a kind of shield launching according to claim 1 and arrival end pipe piece pour ring beam attachment device with after, feature exists In: the bolt (5) is M27 bolt, the nut (3) and bolt (5) accessory processing.
4. a kind of shield launching according to claim 1 and arrival end pipe piece pour ring beam attachment device with after, feature exists In: the nut (3), gasket (4), bolt (5) it is that steel material is made, and is heat dip zinc treating.
5. a kind of shield launching according to claim 1 and arrival end pipe piece pour ring beam attachment device with after, feature exists In: the end block (6) is cut by Q235B steel plate, and having a size of thickness * height * width=10mm*60mm*60mm.
6. a kind of shield launching according to claim 1 and arrival end pipe piece pour ring beam attachment device with after, feature exists In: the end block (6) is poured ring beam (1) reinforcing bar with after and is welded.
CN201910239006.7A 2019-03-27 2019-03-27 It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after Pending CN110056370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910239006.7A CN110056370A (en) 2019-03-27 2019-03-27 It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910239006.7A CN110056370A (en) 2019-03-27 2019-03-27 It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after

Publications (1)

Publication Number Publication Date
CN110056370A true CN110056370A (en) 2019-07-26

Family

ID=67317507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910239006.7A Pending CN110056370A (en) 2019-03-27 2019-03-27 It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after

Country Status (1)

Country Link
CN (1) CN110056370A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356897A (en) * 2021-05-19 2021-09-07 中国建筑第五工程局有限公司 Shield access portal ring beam assembly type structure and construction method
CN116044442A (en) * 2023-03-31 2023-05-02 中建交通建设集团有限公司 Butt joint section structure in shield ground and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614304A (en) * 2009-08-05 2009-12-30 北京市政建设集团有限责任公司 The thermodynamic pipe in thermodynamic shield tunnel fixing force transfer bracket
CN103032078A (en) * 2012-12-08 2013-04-10 中铁十二局集团第二工程有限公司 Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN205225271U (en) * 2015-11-13 2016-05-11 中铁二院工程集团有限责任公司 Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN105910838A (en) * 2016-04-08 2016-08-31 同济大学 Circular whole loop tunnel structure test device
CN206053969U (en) * 2016-08-29 2017-03-29 广州市市政工程设计研究总院 A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure
CN108119159A (en) * 2018-01-25 2018-06-05 中铁第勘察设计院集团有限公司 Shield export & import interface processing structure and its method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614304A (en) * 2009-08-05 2009-12-30 北京市政建设集团有限责任公司 The thermodynamic pipe in thermodynamic shield tunnel fixing force transfer bracket
CN103032078A (en) * 2012-12-08 2013-04-10 中铁十二局集团第二工程有限公司 Parallel construction method for shield arrival tunnel portal ring beam and shield crossing station
CN205225271U (en) * 2015-11-13 2016-05-11 中铁二院工程集团有限责任公司 Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN105910838A (en) * 2016-04-08 2016-08-31 同济大学 Circular whole loop tunnel structure test device
CN206053969U (en) * 2016-08-29 2017-03-29 广州市市政工程设计研究总院 A kind of shield tunnel and open cut main body portal ring beam hermetic water-proof structure
CN108119159A (en) * 2018-01-25 2018-06-05 中铁第勘察设计院集团有限公司 Shield export & import interface processing structure and its method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113356897A (en) * 2021-05-19 2021-09-07 中国建筑第五工程局有限公司 Shield access portal ring beam assembly type structure and construction method
CN113356897B (en) * 2021-05-19 2023-09-12 中国建筑第五工程局有限公司 Assembled structure of shield passageway portal ring beam and construction method
CN116044442A (en) * 2023-03-31 2023-05-02 中建交通建设集团有限公司 Butt joint section structure in shield ground and construction method thereof
CN116044442B (en) * 2023-03-31 2023-06-02 中建交通建设集团有限公司 Butt joint section structure in shield ground and construction method thereof

Similar Documents

Publication Publication Date Title
CN107152285B (en) For shield launching and the servicing unit of reception
CN101614125A (en) V level surrounding rock tunnel job practices
CN102322027A (en) A kind of method that adopts the Mine Method expansion to dig shield tunnel construction subway station
CN105297807B (en) A kind of integrated pipe canal open cut development machine with automatic backfill function
CN109403987B (en) Shield end horizontal freezing and short steel box combined receiving device and construction method
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN112901207B (en) Treatment method for collapse in tunnel during arch change of secondary lining in sulfate corrosion section of operation tunnel
CN113153308B (en) Construction method for collapse section of double-arch tunnel
CN205225271U (en) Shield constructs portal collar tie beam structure suitable for shield constructs end not to be had with solid
CN103088830A (en) Construction method for composite outer wall structure of ultra-deep basement
CN105545323A (en) Construction method for open cut tunnel lining
CN113006825B (en) Arch changing construction method for tunnel collapse position
CN110056370A (en) It a kind of shield launching and reaches end pipe piece and pours ring beam attachment device with after
CN104831733A (en) Arch bridge abutment tunnel type large-angle inclined pile construction method
CN107489433A (en) A kind of tunnel CRD engineering methods anti-leakage structure and Antiseep method
CN208965598U (en) The Anti-seeping technology structure of grout curtain and underground chamber intersection area
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN107989620A (en) A kind of construction method of three hole closely-spaced tunnel
CN105041327B (en) Bored tunnel is counter to dig shield method of reseptance
CN107035383A (en) The supporting construction of extra-large cross-section loess tunnel and its excavation method
CN104790964A (en) Construction method for shield tunneling machine moving-out on condition of tunnel portal deviation
CN216342131U (en) Shield tunnel invades limit stake and handles reinforced structure
CN109026076B (en) Positioning and reinforcing device for transverse long guide pipe of non-middle-wall multi-arch tunnel and mounting method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190726