CN110056208A - A kind of adjustable tool-type temporary stairways of Fast Installation - Google Patents

A kind of adjustable tool-type temporary stairways of Fast Installation Download PDF

Info

Publication number
CN110056208A
CN110056208A CN201910337053.5A CN201910337053A CN110056208A CN 110056208 A CN110056208 A CN 110056208A CN 201910337053 A CN201910337053 A CN 201910337053A CN 110056208 A CN110056208 A CN 110056208A
Authority
CN
China
Prior art keywords
stair
rod
fission
steelframe
handrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910337053.5A
Other languages
Chinese (zh)
Other versions
CN110056208B (en
Inventor
肖学彦
吕哲
万鑫
曾大勇
石勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201910337053.5A priority Critical patent/CN110056208B/en
Publication of CN110056208A publication Critical patent/CN110056208A/en
Application granted granted Critical
Publication of CN110056208B publication Critical patent/CN110056208B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G27/00Temporary arrangements for giving access from one level to another for men or vehicles, e.g. steps, ramps

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention belongs to the realm of building construction, and in particular to a kind of adjustable tool-type temporary stairways of Fast Installation.The present invention includes that several identical stair are seperated, and stair fission lower part has the support rod of dismountable adjustable length;The stair fission is composed of steel construction piece, and stair fission includes dismountable guardrail of stair surface frame frame, the pedal being mounted on stair surface frame frame and stair surface frame frame both ends;It is provided between the connector stair fission adjacent for front and back and left and right and connects on the stair surface frame frame.Extension by stair fission in vertical and horizontal is installed, and development length, width and the tilt angle of adjustable stair are suitable for a variety of construction application scenes;Connection type is ingenious between temporary stairways fission, had both increased the consistency that each building body fission links together, and had also ensured the stability used;Temporary stairways fission unit of the invention is simple, lighting, and assembling is simple and quick, easy to use.

Description

A kind of adjustable tool-type temporary stairways of Fast Installation
Technical field
The invention belongs to the realm of building construction, and in particular to a kind of adjustable tool-type temporary stairways of Fast Installation.
Background technique
In construction engineering, it is often necessary to build using tool-type temporary stairways.Such as it is built for bottom is built When, need that construction worker is voluntarily led to from ground by temporary stairways or transport section building materials are to first layer and the above low-rise building Flooring.The temporary stairways of the prior art are generally located on inside the scaffolding structure of external surface of buildings or its, however In the specific use process, the temporary stairways of the prior art lack the adaptability to height, i.e., temporary stairways are due to its multiple It is stepped at same upward-inclination angle degree it is consistent, therefore be only suitable for fixed building bottom height, and be unable to satisfy due to building storey Stair height brought by height needs the variation of foot.In addition, the width of temporary stairways can not also be adjusted with tilt angle, when use, is same Sample has limitation.
Summary of the invention
Present invention aims at: in view of the above problems, provide a kind of adjustable tool-type of Fast Installation interim building Ladder improves the adaptation range and installation effectiveness of temporary stairways so that the height of stair, width and tilt angle are adjustable.
The present invention includes following technical scheme:
A kind of adjustable tool-type temporary stairways of Fast Installation, including several identical stair are seperated, and the stair are seperated It is divided into the first stair fission and other stair is seperated, other stair fissions bottom is provided with dismountable adjustable length Support rod;The stair fission is composed of steel construction piece, and stair fission includes stair surface frame frame, is mounted on stair surface frame frame On pedal and stair surface frame frame both ends dismountable guardrail;Be provided on the stair surface frame frame connector for front and back and It is connected between the adjacent stair fission in left and right.
By being connected one by one between stair fission, it is combined with each other, principle goes upstairs seperated quantity can be standing multiple, pass through control The height for making the seperated support rod installed one by one, can form different height temporary stairways, and adjustable tilt angle.Laterally It is seperated to connect each stair, the temporary stairways of different in width can be formed.Support rod is detachable on stair fission, and guardrail is in stair face It is detachable on frame, realize the lighting and installation convenience of temporary stairways.
Specifically, the stair surface frame frame is the inclination steelframe with one fixed width, installs one on each inclination steelframe A pedal, the back side both sides for tilting steelframe are symmetrical arranged support rod rod set, and two handrails are respectively installed in the two sides for tilting steelframe Set, tilt the one side bottom of steelframe along steelframe extending direction setting stair it is seperated between rod set, another side bottom is prolonged along steelframe Stretch direction setting stair fission connector;The bottom four corners of the inclination steelframe install support rod;The support rod rod set is logical When adjacent higher stair partial installation, the support rod correspondence of latter stair fission is inserted in support rod rod set for well format;Institute The closing of handrail bar sleeve bottom is stated, the stabilizer blade of handrail is inserted in the handrail bar sleeve of adjacent inclination steelframe;Bar between the stair are seperated Set is through-hole form, and when being transversely mounted multiple stair fissions, the stair fission connector on adjacent stair fission is inserted in stair point Rod set between body, to widen the width of temporary stairways.
Inclination steelframe can just be organized by type to be welded, and is three-dimensional steelframe triangular in shape, the one side of each inclination steelframe Two handrail bar sleeves are set, and handrail is mounted between former and later two inclination steelframes, dexterously while increasing handrail, by front and back Stair fission is fixed to each other, the stability of enhancing front and back stair fission.Two handrails of the same side of same inclination steelframe Set can be disposed adjacent, and guarantee that the handrail that front and back is installed has continuity.
Further, the support rod is made of first body of rod and second body of rod, and first body of rod is sleeved on the second bar In vivo mounting hole can be provided in corresponding position on second body of rod, first body of rod and second body of rod, it can be by screw rod by first body of rod It is fixed with second body of rod.By adjusting first body of rod different location corresponding with the second body of rod mounting hole, to adjust entire support The length of bar.Screw rod passes through first body of rod and fixes with the corresponding mounting hole of second body of rod, compared to sliding slot or threaded engagement Stretch mode, it is ensured that the stability of installation.
Further, first body of rod of the support rod is fixed by the bottom of clip and inclination steelframe.Tilt steelframe First body of rod that bottom four corners pass through clip and four support rods respectively is fixed.
Further, the two stabilizer blade size of front and back of the handrail bar sleeve and handrail matches, and the handrail stabilizer blade is entrenched in In handrail bar sleeve, since handrail bar sleeve bottom is closed, handrail is realized and is supported, the junction of handrail bar sleeve and handrail can also pass through Clip steps up to fix.
Further, the seperated connector is arc-shaped connecting rod, the connecting rod can be inserted in stair it is seperated between in rod set, It is fastened using fastener such as clip.
Further, the temporary stairways gradient is no more than 45 °.This tool-type temporary stairways, the peace as construction Full stair tilt angle is no more than 45 °, and preferably 30 °.
Further, transverse direction parallel to the ground can be installed between support rod by the way that clip is arranged outside support rod Gu stupefied reinforcement fastening.
Due to taking above technical scheme, the present invention has the advantages that
1, temporary stairways of the invention have the advantages that flexible adjustable, the extension of adjustable stair compared with prior art Length, width and tilt angle are suitable for a variety of construction application scenes;
2, connection type is ingenious between temporary stairways of the invention fission, has both increased what each building body fission linked together Consistency, while also ensuring the stability used;
3, temporary stairways fission unit of the invention is simple, and support rod is detachable on stair fission, and guardrail is in stair face It is detachable on frame, realize the lighting of temporary stairways;Assemble it is simple and quick, it is easy to use.
Detailed description of the invention
Attached drawing 1 is the main view of the stair fission for being not provided with support rod of the invention;
Attached drawing 2 is the main view of the stair fission of setting support rod of the invention;
Attached drawing 3 is the top view of stair fission of the invention;
Attached drawing 4 is single tool-type temporary stairways schematic diagram of the invention;
Attached drawing 5 is double tool-type temporary stairways schematic diagram of the invention.
1 is support rod in the figure, and 2 be inclination steelframe, and 3 be pedal, and 4 be support rod rod set, and 5 be handrail bar sleeve, and 6 be building Rod set between terraced seperated, 7 be stair fission connecting rod, 8 be handrail, 1-1 is first body of rod, 1-2 is second body of rod.
Specific embodiment
With reference to the accompanying drawing, the present invention is described in detail.
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and It is not used in the restriction present invention.
Embodiment
For certain construction site, building for temporary stairways is carried out.A kind of adjustable tool-type temporary stairways of Fast Installation, packet It is seperated to include several identical stair, the stair fission is divided into the first stair fission and other stair are seperated, and stair fission is as schemed Shown in 1- Fig. 3, soundness height stand bar, the first stair fission and other stair point are arranged in the first stair fission lower part For body based on stair surface frame frame, the stair surface frame frame is inclination steelframe 2, tilts and is equipped with one between the two sides of steelframe 2 A pedal 3;The back side both sides of inclination steelframe 2 are symmetrically welded support rod rod set 4, and the inner face for tilting the two sides of steelframe 2 respectively welds Two adjacent handrail bar sleeves 5, tilt the one side bottom of steelframe 2 along steelframe extending direction be welded with stair it is seperated between rod set 6, Another side bottom is welded with stair fission connecting rod 7 along steelframe extending direction;Other stair in addition to the first stair are seperated The bottom surface quadrangle of seperated inclination steelframe passes through clip respectively and is equipped with adjustable support rod 1, and the support rod 1 is by first body of rod 1-1 and the second body of rod 1-2 is formed, and first body of rod 1-1 is sleeved in the second body of rod 1-2, the first body of rod 1-1 and second body of rod The correspondence mounting hole for not having the body of rod longitudinally to extend is provided on 1-2, by adjusting the first body of rod 1-1 and the second body of rod 1-2 mounting hole Corresponding different location, to adjust the length of entire support rod 1.
Specific implementation method of the invention is as follows: according to the tilt angle meter of flooring height and the stair fission of required installation Stair fission quantity needed for calculating, in the present embodiment, selecting temporary stairways tilt angle is 30 °, first by the first stair fission It is placed according to distance is calculated, other stair fissions is successively installed, the support rod rod set 4 is through-hole form, adjacent stair point When body is installed, two support rod 1 of the front end correspondence of latter stair fission is inserted in the support rod rod set 4 of previous stair fission;It adjusts The support rod height of each stair fission is saved, guarantees to upwardly extend and successively fix in 30 °;In the specific implementation process, can lead to The height of support rod is overregulated to realize the control to pedal ladder height, and then the tilt angle of controllable stair;It is described to help Hand lever covers the closing of 5 bottoms, and handrail bar sleeve 5 and the two stabilizer blade size of front and back of handrail match, from the bottom up successively by each handrail 8 The chimeric handrail bar sleeve 5 for being inserted in adjacent inclination steelframe 2 of stabilizer blade in, since 5 bottom of handrail bar sleeve is closed to real to handrail 8 Now supporting, the junction of handrail bar sleeve 5 and handrail 8 can also step up to fix by clip, until the installation of all handrails 8 is completed, Form single tool-type temporary stairways schematic diagram as shown in Figure 4.Rod set 6 is through-hole form between the stair are seperated, works as needs Stair fission connection when widening the width of temporary stairways, when being transversely mounted multiple stair fissions, on laterally adjacent stair fission Rod set 6 between the stair for the building body fission that bar 7 connects needed for being inserted in are seperated, can increase clip and fix, in addition can select when necessary Selecting property the handrail 8 between laterally adjacent building body fission is dismantled, in order to obtain bigger space, forms double tool Formula temporary stairways, as shown in Figure 5.
In another embodiment, can be by the way that clip be arranged outside support rod, installation and ground are flat between support rod The solid stupefied reinforcement fastening of capable transverse direction.
The invention is not limited to specific embodiments above-mentioned.The present invention, which expands to, any in the present specification to be disclosed New feature or any new combination, and disclose any new method or process the step of or any new combination.

Claims (8)

1. a kind of adjustable tool-type temporary stairways of Fast Installation, it is characterised in that: it is seperated including several identical stair, it is described Stair fission is divided into the first stair fission and other stair are seperated, and other stair fissions bottom is provided with dismountable adjustable Save the support rod of length;The stair fission is composed of steel construction piece, and stair fission includes stair surface frame frame, is mounted on building Dismountable guardrail of pedal and stair surface frame frame both ends on tread frame;Connector use is provided on the stair surface frame frame It is connected between the adjacent stair fission in front and back and left and right.
2. tool-type temporary stairways according to claim 1, it is characterised in that: the stair surface frame frame is with a fixed width The inclination steelframe of degree, each, which is tilted, installs a pedal on steelframe, the back side both sides for tilting steelframe are symmetrical arranged support rod bar Two handrail bar sleeves are respectively installed in set, the two sides for tilting steelframe, and the one side bottom for tilting steelframe is arranged along steelframe extending direction Stair fission connector is arranged along steelframe extending direction in rod set between stair are seperated, another side bottom;The bottom of the inclination steelframe Portion quadrangle is installed by support rod;The support rod rod set is through-hole form, when adjacent higher stair partial installation, by latter stair Seperated support rod correspondence is inserted in support rod rod set;Handrail bar sleeve bottom closing, the stabilizer blade of handrail, which is inserted in, adjacent to incline In the handrail bar sleeve of oblique steelframe;Rod set is through-hole form between the stair are seperated, when being transversely mounted multiple stair fissions, adjacent building Stair fission connector on terraced fission is inserted in rod set between stair fission, to widen the width of temporary stairways.
3. tool-type temporary stairways according to claim 1, it is characterised in that: the support rod is by first body of rod and second The body of rod composition, first body of rod be sleeved in second body of rod can on second body of rod, first body of rod and second body of rod corresponding position It is provided with mounting hole, can be fixed first body of rod and second body of rod by screw rod.
4. tool-type temporary stairways according to claim 3, it is characterised in that: first body of rod of the support rod passes through card It binds round and is fixed with the bottom of inclination steelframe.
5. tool-type temporary stairways according to claim 2, it is characterised in that: the front and back two of the handrail bar sleeve and handrail Stabilizer blade size matches, and the handrail stabilizer blade is entrenched in handrail bar sleeve, since handrail bar sleeve bottom is closed, realizes branch to handrail The junction of support, handrail bar sleeve and handrail is fixed by clip.
6. tool-type temporary stairways according to claim 2, it is characterised in that: the stair fission connector is arc company Extension bar, the stair fission connector connecting rod can be inserted in stair it is seperated between in rod set, fastened using fastener.
7. tool-type temporary stairways according to claim 1, it is characterised in that: the temporary stairways gradient is no more than 45 °.
8. tool-type temporary stairways according to claim 1-7, it is characterised in that: can be by outside support rod Clip is set, the solid stupefied reinforcement fastening of transverse direction parallel to the ground is installed between support rod.
CN201910337053.5A 2019-04-25 2019-04-25 Install adjustable instrument formula interim stair fast Active CN110056208B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910337053.5A CN110056208B (en) 2019-04-25 2019-04-25 Install adjustable instrument formula interim stair fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910337053.5A CN110056208B (en) 2019-04-25 2019-04-25 Install adjustable instrument formula interim stair fast

Publications (2)

Publication Number Publication Date
CN110056208A true CN110056208A (en) 2019-07-26
CN110056208B CN110056208B (en) 2023-12-26

Family

ID=67320739

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910337053.5A Active CN110056208B (en) 2019-04-25 2019-04-25 Install adjustable instrument formula interim stair fast

Country Status (1)

Country Link
CN (1) CN110056208B (en)

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145166A (en) * 1998-11-12 2000-05-26 Nikko Co Ltd Stair for temporary scaffold
JP2002097800A (en) * 2001-08-22 2002-04-05 Nikko Co Ltd Continuous installation method of stairsway for temporary scaffold
KR200385098Y1 (en) * 2004-12-29 2005-05-25 조미동 Assembling type material stairs
US20080169456A1 (en) * 2007-01-16 2008-07-17 Ross Nancy A Balcony and stairway railing assemblies
KR20110077096A (en) * 2009-12-30 2011-07-07 김광부 Underground cable tunnel assembly stairway
KR20120131834A (en) * 2011-05-26 2012-12-05 주식회사 벤트코리아 Built-up high load safety stair using temporary bent
CN206205486U (en) * 2016-10-31 2017-05-31 邹仁才 A kind of module type fast-assembling safety climbing ladder
TWM547002U (en) * 2017-04-11 2017-08-11 La Feng Advertising Enterprise Co Ltd Combination staircase structure
CN208039666U (en) * 2018-04-02 2018-11-02 湖北索亚建设工程有限公司 Assembled stairs module
CN108797908A (en) * 2018-06-08 2018-11-13 中建五局土木工程有限公司 Assembled stair and its installation method and building engineering construction method
JP2019031837A (en) * 2017-08-08 2019-02-28 株式会社三共 Stair handrail for temporary scaffolding
CN208749149U (en) * 2018-08-13 2019-04-16 武汉建工集团股份有限公司 A kind of easy-to-mount tool type stairs
CN210422007U (en) * 2019-04-25 2020-04-28 中国五冶集团有限公司 Install interim stair of adjustable instrument formula fast

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000145166A (en) * 1998-11-12 2000-05-26 Nikko Co Ltd Stair for temporary scaffold
JP2002097800A (en) * 2001-08-22 2002-04-05 Nikko Co Ltd Continuous installation method of stairsway for temporary scaffold
KR200385098Y1 (en) * 2004-12-29 2005-05-25 조미동 Assembling type material stairs
US20080169456A1 (en) * 2007-01-16 2008-07-17 Ross Nancy A Balcony and stairway railing assemblies
KR20110077096A (en) * 2009-12-30 2011-07-07 김광부 Underground cable tunnel assembly stairway
KR20120131834A (en) * 2011-05-26 2012-12-05 주식회사 벤트코리아 Built-up high load safety stair using temporary bent
CN206205486U (en) * 2016-10-31 2017-05-31 邹仁才 A kind of module type fast-assembling safety climbing ladder
TWM547002U (en) * 2017-04-11 2017-08-11 La Feng Advertising Enterprise Co Ltd Combination staircase structure
JP2019031837A (en) * 2017-08-08 2019-02-28 株式会社三共 Stair handrail for temporary scaffolding
CN208039666U (en) * 2018-04-02 2018-11-02 湖北索亚建设工程有限公司 Assembled stairs module
CN108797908A (en) * 2018-06-08 2018-11-13 中建五局土木工程有限公司 Assembled stair and its installation method and building engineering construction method
CN208749149U (en) * 2018-08-13 2019-04-16 武汉建工集团股份有限公司 A kind of easy-to-mount tool type stairs
CN210422007U (en) * 2019-04-25 2020-04-28 中国五冶集团有限公司 Install interim stair of adjustable instrument formula fast

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张云雨;王勇为;王俊发;: "高层钢结构模块式组装吊装技术的应用", 安装, no. 10 *
黄涛;: "高层建筑中铝模板深化设计与工程应用", 低碳世界, no. 04 *

Also Published As

Publication number Publication date
CN110056208B (en) 2023-12-26

Similar Documents

Publication Publication Date Title
KR102157134B1 (en) Railing structure that can be assembled
US6354403B1 (en) Adjustable stair stringer and railing
CN108797908A (en) Assembled stair and its installation method and building engineering construction method
CN110056208A (en) A kind of adjustable tool-type temporary stairways of Fast Installation
CN210239225U (en) Interim steel construction stair that building engineering used
CZ16197A3 (en) Controllable staircase
US5123210A (en) Flight of stairs
CN208633406U (en) Assembled stair and working stair
CN210422007U (en) Install interim stair of adjustable instrument formula fast
CN207568213U (en) The support system of superimposed sheet and wallboard formed by integrally casting
JP4516585B2 (en) Internal staircase for building and its construction method
RU133166U1 (en) STAIRCASE STEP
CN203626154U (en) Truss reinforcing bar stair
CN216042482U (en) Concatenation formula operation platform
CN206957084U (en) The adjustable stair of riser height and the assembled architecture with the stair
JP5578905B2 (en) Unit type slope
CN105484453B (en) The Assembled stairs platform of gradient adjustable
KR200385098Y1 (en) Assembling type material stairs
JP3669762B2 (en) Assembly method of assembly stairs
CN102535771B (en) Large-span prestress string-crossed support steel stair
CN219973738U (en) Prefabricated stairway with adjustable width for assembled building
CN209686744U (en) A kind of steel structure stairway and building
KR20160127401A (en) A Joint Form Structure for Footbridge and Constructing Method
CN210288933U (en) Assembled metal guardrail of indoor stair
CN220550830U (en) Working platform for scissors prefabricated stairs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant