CN110046775A - Based on three-dimensional Nuclear Power Plant Equipment object module management method and system - Google Patents

Based on three-dimensional Nuclear Power Plant Equipment object module management method and system Download PDF

Info

Publication number
CN110046775A
CN110046775A CN201810030367.6A CN201810030367A CN110046775A CN 110046775 A CN110046775 A CN 110046775A CN 201810030367 A CN201810030367 A CN 201810030367A CN 110046775 A CN110046775 A CN 110046775A
Authority
CN
China
Prior art keywords
equipment
dimensional
information
facility information
pool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810030367.6A
Other languages
Chinese (zh)
Inventor
张光昱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINA NUCLEAR POWER (BEIJING) SIMULATION TECHNOLOGY Co Ltd
China General Nuclear Power Corp
CGN Power Co Ltd
Original Assignee
CHINA NUCLEAR POWER (BEIJING) SIMULATION TECHNOLOGY Co Ltd
China General Nuclear Power Corp
CGN Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHINA NUCLEAR POWER (BEIJING) SIMULATION TECHNOLOGY Co Ltd, China General Nuclear Power Corp, CGN Power Co Ltd filed Critical CHINA NUCLEAR POWER (BEIJING) SIMULATION TECHNOLOGY Co Ltd
Priority to CN201810030367.6A priority Critical patent/CN110046775A/en
Publication of CN110046775A publication Critical patent/CN110046775A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T15/003D [Three Dimensional] image rendering

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Quality & Reliability (AREA)
  • Computer Graphics (AREA)
  • Operations Research (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Information Retrieval, Db Structures And Fs Structures Therefor (AREA)

Abstract

The invention discloses one kind to be based on three-dimensional Nuclear Power Plant Equipment object module management method and system, and method includes: that the essential information of all devices object is saved using storage file;It loads and parses storage file, a facility information object is generated according to every record in storage file, and establish the information object list comprising all facility information objects, the reference of equipment three dimensional object is saved in facility information object equipment three dimensional object and facility information object to associate, object pool is created, equipment three dimensional object and information object list are all put into object pool and are managed;Based on the information object list, equipment three dimensional object is recalled from object pool and is carried out using and the equipment three dimensional object used being put into object pool.The present invention can effectively manage high-volume object.

Description

Based on three-dimensional Nuclear Power Plant Equipment object module management method and system
Technical field
The present invention relates to nuclear power fields, more particularly to one kind to be based on three-dimensional Nuclear Power Plant Equipment object module manager Method.
Background technique
With the development of nuclear power technology, to the training of staff in nuclear power station, higher requirements are also raised, but Inside nuclear power station, especially there is very high radioactivity, this brings to the training of nuclear power station related personnel in containment Great difficulty.Nuclear power plant's virtual reality system is that nuclear power plant's threedimensional model is established using data, such as can be in Unity3D platform The virtual nuclear power plant system of one three-dimensional visualization of upper building, so that trainee is familiar with core in the case where no radiation hazard Power station structure carries out various operations.But nuclear power in-plant equipment is numerous, and according to incompletely statistics, main various machines in reactor building It tool equipment about up to ten thousand, needs to establish model to these equipment in nuclear power plant's virtual reality system, and realize Modularized pipe Function is managed, mainly has genealogical classification and display, show that equipment, equipment are positioned according to major loop, equipment search, facility information label It has been shown that, thus it is how aobvious to device model object progress modularization management, subsystem in reactor building in unity3D platform Show and efficent use of resources becomes a urgent problem to be solved.
Summary of the invention
The technical problem to be solved in the present invention is that in view of the above drawbacks of the prior art, providing a kind of based on three-dimensional empty Nucleoid electric power factory equipment object module management method and system.
The technical solution adopted by the present invention to solve the technical problems is: constructing a kind of based on three-dimensional Nuclear Power Plant Equipment Object module management method, comprising:
Storing step: the essential information of all devices object is saved using storage file;
Load step: loading and parses storage file, and equipment three dimensional object and facility information object are associated, and leads to It crosses information object list of the object pool to all equipment three dimensional objects and comprising all facility information objects and carries out unification Management;
Management process: be based on the information object list, recalled from object pool equipment three dimensional object carry out using, and The equipment three dimensional object used is put into object pool.
Based in three-dimensional Nuclear Power Plant Equipment object module management method described in the present invention 1, the load is walked Suddenly it specifically includes:
Storage file is loaded and parsed, a facility information object is generated according to every record in storage file, and build The vertical information object list comprising all facility information objects;
According to name-matches principle, the reference of equipment three dimensional object is saved in facility information object with equipment three-dimensional is right As associating with facility information object;
Object pool is created, equipment three dimensional object and information object list are all put into object pool and are managed.
Based in three-dimensional Nuclear Power Plant Equipment object module management method described in the present invention 1, the management is walked Suddenly it specifically includes:
When needing using equipment three dimensional object, the conditional information of input is obtained, is obtained by information object list query Meet the facility information object of the conditional information, and find the equipment three dimensional object associated by it, in information object list The facility information object setting that inquiry is obtained occupies mark, and by the obtained associated equipment three dimensional object of inquiry from object It is called out in pond;
After equipment three dimensional object has used, object pool is put it into, while it is closed in information object list The occupancy of the facility information object of connection, which identifies, to be removed.
Based in three-dimensional Nuclear Power Plant Equipment object module management method described in the present invention 1, the storage is literary Part is excel file.
Based in three-dimensional Nuclear Power Plant Equipment object module management method described in the present invention 1, load step with And management process is executed in Unity3D platform.
The invention also discloses one kind to be based on three-dimensional Nuclear Power Plant Equipment object module management system, comprising:
Storage unit, for using storage file to save the essential information of all devices object;
Loading unit associates equipment three dimensional object and facility information object for loading and parsing storage file, And by object pool to all equipment three dimensional objects and the information object list comprising all facility information objects carry out Unified management;
Administrative unit, for be based on the information object list, recalled from object pool equipment three dimensional object carry out using, And the equipment three dimensional object used is put into object pool.
It is based in three-dimensional Nuclear Power Plant Equipment object module management system of the present invention, the loading unit Include:
Subelement is loaded, storage file is loaded and parse, an equipment letter is generated according to every record in storage file Object is ceased, and establishes the information object list comprising all facility information objects;
Object association unit, for saving equipment three dimensional object in facility information object according to name-matches principle Reference is to associate equipment three dimensional object and facility information object;
Equipment three dimensional object and information object list are all put into object for creating object pool by object pool creating unit It is managed in pond.
It is based in three-dimensional Nuclear Power Plant Equipment object module management system of the present invention, administrative unit packet It includes:
Object recalls subelement, for obtaining the conditional information of input, obtains meeting institute by information object list query The facility information object of conditional information is stated, and finds the equipment three dimensional object associated by it, it will inquiry in information object list Obtained facility information object setting occupies mark, and the associated equipment three dimensional object that inquiry obtains is adjusted out of object pool It uses;
Object discharges subelement, for putting it into object pool, while in information after equipment three dimensional object has used The occupancy of facility information object associated by it is identified in list object and is removed.
It is based in three-dimensional Nuclear Power Plant Equipment object module management system of the present invention, the storage file For excel file.
It is based in three-dimensional Nuclear Power Plant Equipment object module management system of the present invention, loading unit and pipe Reason unit is integrated in Unity3D platform.
Implement of the invention based on three-dimensional Nuclear Power Plant Equipment object module management method and system, having following has Beneficial effect: the present invention passes through the essential information for using storage file to save all devices object convenient for the modification of device object Storage file is loaded and parsed, equipment three dimensional object and facility information object are associated, meets needs in industry, and pass through Information object list of the object pool to all equipment three dimensional objects and comprising all facility information objects carries out unified pipe Reason can effectively manage high-volume object convenient for managing the calling and release of object.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this The embodiment of invention for those of ordinary skill in the art without creative efforts, can also basis The attached drawing of offer obtains other attached drawings:
Fig. 1 is the flow chart of load step of the invention;
Fig. 2 is object mapping relations schematic diagram;
Fig. 3 is Object Management group schematic diagram.
Specific embodiment
To facilitate the understanding of the present invention, a more comprehensive description of the invention is given in the following sections with reference to the relevant attached drawings.In attached drawing Give exemplary embodiments of the invention.But the invention can be realized in many different forms, however it is not limited to this paper institute The embodiment of description.On the contrary, purpose of providing these embodiments is make it is more thorough and comprehensive to the disclosure.
Unless otherwise defined, all technical and scientific terms used herein and belong to technical field of the invention The normally understood meaning of technical staff is identical.Term as used herein in the specification of the present invention is intended merely to description tool The purpose of the embodiment of body, it is not intended that in the limitation present invention.
In order to better understand the above technical scheme, in conjunction with appended figures and specific embodiments to upper It states technical solution to be described in detail, it should be understood that the specific features in the embodiment of the present invention and embodiment are to the application The detailed description of technical solution, rather than the restriction to technical scheme, in the absence of conflict, the present invention are implemented Technical characteristic in example and embodiment can be combined with each other.
Preferred embodiment includes: based on three-dimensional Nuclear Power Plant Equipment object module management method
Storing step: the essential information of all devices object, such as object type, label, institute are saved using storage file The information such as category system, title.For the ease of modification information, in the present embodiment, the storage file is excel file, it is preferred that It can be specially csv file.
Table 1
Upper table 1 is exactly file format demonstration, and the object of the inside is primary Ioops main pump object information, some bases of the object This information lists out, can increase new object and modification inside this table, right by file recording apparatus data Each and every one component up to ten thousand is managed operation in scene, facilitates carry out later maintenance, carries out additions and deletions to scene device and change to remove, system point Class, label the operation such as show, can all be realized by editing this document, and do not need change program and recompilate generation Code, it is more flexible and controllable, it greatly reduced maintenance cost and time.
Load step: loading and parses storage file, and equipment three dimensional object and facility information object are associated, and leads to It crosses information object list of the object pool to all equipment three dimensional objects and comprising all facility information objects and carries out unification Management;
With reference to Fig. 1, by taking Unity3D platform as an example, in unity environment, equipment three dimensional object itself is that do not have equipment Information, it is therefore desirable to which, according to acquisition of information in file, load step specifically includes in the present embodiment:
S21, load simultaneously parse storage file, generate a facility information object according to every record in storage file, And establish the information object list comprising all facility information objects;
S22, according to name-matches principle, the reference of equipment three dimensional object is saved in facility information object with by equipment three Dimensional object and facility information object associate, as shown in Fig. 2, illustrating the mapping of facility information object and equipment three dimensional object Relationship.
S23, creation object pool, equipment three dimensional object and information object list are all put into object pool and are managed.
Management process: be based on the information object list, recalled from object pool equipment three dimensional object carry out using, and The equipment three dimensional object used is put into object pool.The present embodiment is put into all objects in object pool, and passes through letter Breath list object is managed, including is shown according to system, room query etc..With reference to Fig. 3, the management process is specifically wrapped It includes:
Object when some process is needed using equipment three dimensional object, needed for being lent from object pool.Specifically, obtaining The conditional information for taking input is obtained the facility information object for meeting the conditional information by information object list query, and looked for To the equipment three dimensional object associated by it, the facility information object setting for obtaining inquiry in information object list occupies mark Know, and the associated equipment three dimensional object that inquiry obtains is called out out of object pool;
After process has used equipment three dimensional object, need to give back object.Specifically, equipment three dimensional object is put into pair As pond, while the occupancy of the facility information object associated by it being identified in information object list and is removed.
For example, when entering single system display scene, such as input RCP system, pass through information object list query Obtaining all system informations is the facility information object of RCP, and finds the equipment three dimensional object of mapping, in information object list The occupancy mark that the object has been used mark is set, associated object is called out and shown out of object pool, is realized single System is shown.These objects are put into object pool after having used, while mark is occupied to disposing, waiting is adjusted next time With, avoid resource repetition create and recycling.
Based on the same inventive concept, the invention also discloses one kind to be based on three-dimensional Nuclear Power Plant Equipment object module pipe Reason system, comprising:
Storage unit, for using storage file to save the essential information of all devices object;
Loading unit associates equipment three dimensional object and facility information object for loading and parsing storage file, And by object pool to all equipment three dimensional objects and the information object list comprising all facility information objects carry out Unified management;
Administrative unit, for be based on the information object list, recalled from object pool equipment three dimensional object carry out using, And the equipment three dimensional object used is put into object pool.
Specifically, the storage file is excel file.Loading unit and administrative unit are integrated in Unity3D platform.
Specifically, the loading unit includes:
Subelement is loaded, storage file is loaded and parse, an equipment letter is generated according to every record in storage file Object is ceased, and establishes the information object list comprising all facility information objects;
Object association unit, for saving equipment three dimensional object in facility information object according to name-matches principle Reference is to associate equipment three dimensional object and facility information object;
Equipment three dimensional object and information object list are all put into object for creating object pool by object pool creating unit It is managed in pond.
Specifically, administrative unit includes:
Object recalls subelement, for obtaining the conditional information of input, obtains meeting institute by information object list query The facility information object of conditional information is stated, and finds the equipment three dimensional object associated by it, it will inquiry in information object list Obtained facility information object setting occupies mark, and the associated equipment three dimensional object that inquiry obtains is adjusted out of object pool It uses;
Object discharges subelement, for putting it into object pool, while in information after equipment three dimensional object has used The occupancy of facility information object associated by it is identified in list object and is removed.
In conclusion implement it is of the invention based on three-dimensional Nuclear Power Plant Equipment object module management method and system, It has the advantages that the essential information that the present invention will use storage file to save all devices object, is convenient for device object Modification equipment three dimensional object and facility information object are associated, met in industry by loading and parsing storage file It needs, and passes through information object list of the object pool to all equipment three dimensional objects and comprising all facility information objects It is managed collectively, convenient for managing the calling and release of object, can effectively manage high-volume object.
Foregoing description is related to various units, and perhaps these units of subelement or subelement generally include hardware and/or hard The combination (such as solidification software) of part and software.These units or subelement can also include comprising instruction (for example, software refers to Enable) computer-readable medium (for example, non-volatile media), when processor executes these instructions, so that it may execute the present invention Various functional characteristics.Correspondingly, unless explicitly requested, the scope of the present invention not by the unit specifically mentioned in embodiment or The limitation of specific hardware and/or software feature in person's subelement.As non-limitative example, the present invention in embodiment can be with Software is executed by one or more processors (such as microprocessor, digital signal processor, baseband processor, microcontroller) to refer to Enable (such as being stored in non-volatile memory and/or permanent memory).In addition, the present invention can also use specific integrated circuit (ASIC) and/or other hardware elements execute.It should be pointed out that dividing above in the description of various units or subelement It is cut into these units or subelement, is for clarity.However, in actual implementation, various units or subelement Boundary can be fuzzy.For example, any or all functionalities unit or subelement herein can share various hardware And/or software element.In another example any and/or all functional unit or subelement herein can be by shared processing Device executes software instruction completely or partially to implement.In addition, the various software subelements being performed by one or more processors can To be shared between various software units.Correspondingly, unless explicitly requested, the scope of the present invention is not by various hardware and/or software The limitation of the mandatory boundary of interelement.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited to above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (10)

1. one kind is based on three-dimensional Nuclear Power Plant Equipment object module management method characterized by comprising
Storing step: the essential information of all devices object is saved using storage file;
Load step: loading and parses storage file, and equipment three dimensional object and facility information object are associated, and by pair As information object list of the pond to all equipment three dimensional objects and comprising all facility information objects is managed collectively;
Management process: being based on the information object list, and equipment three dimensional object is recalled from object pool and is carried out using and making The equipment three dimensional object being finished is put into object pool.
2. according to claim 1 be based on three-dimensional Nuclear Power Plant Equipment object module management method, which is characterized in that The load step specifically includes:
Storage file is loaded and parsed, a facility information object is generated according to every record in storage file, and establish packet Information object list containing all facility information objects;
According to name-matches principle, saved in facility information object the reference of equipment three dimensional object with by equipment three dimensional object and Facility information object associates;
Object pool is created, equipment three dimensional object and information object list are all put into object pool and are managed.
3. according to claim 1 be based on three-dimensional Nuclear Power Plant Equipment object module management method, which is characterized in that The management process specifically includes:
When needing using equipment three dimensional object, the conditional information of input is obtained, is met by information object list query The facility information object of the conditional information, and the equipment three dimensional object associated by it is found, it will be looked into information object list It askes obtained facility information object setting and occupies mark, and the associated equipment three dimensional object that inquiry is obtained is out of object pool It calls out;
After equipment three dimensional object has used, object pool is put it into, while will be associated by it in information object list The occupancy of facility information object, which identifies, to be removed.
4. according to claim 1 be based on three-dimensional Nuclear Power Plant Equipment object module management method, which is characterized in that The storage file is excel file.
5. according to claim 1 be based on three-dimensional Nuclear Power Plant Equipment object module management method, which is characterized in that Load step and management process are executed in Unity3D platform.
6. one kind is based on three-dimensional Nuclear Power Plant Equipment object module management system characterized by comprising
Storage unit, for using storage file to save the essential information of all devices object;
Loading unit associates equipment three dimensional object and facility information object, and lead to for loading and parsing storage file It crosses information object list of the object pool to all equipment three dimensional objects and comprising all facility information objects and carries out unification Management;
Administrative unit, for be based on the information object list, recalled from object pool equipment three dimensional object carry out using, and The equipment three dimensional object used is put into object pool.
7. according to claim 6 be based on three-dimensional Nuclear Power Plant Equipment object module management system, which is characterized in that The loading unit includes:
Subelement is loaded, storage file is loaded and parse, a facility information pair is generated according to every record in storage file As, and establish the information object list comprising all facility information objects;
Object association unit, for saving the reference of equipment three dimensional object in facility information object according to name-matches principle Equipment three dimensional object and facility information object to be associated;
Equipment three dimensional object and information object list are all put into object pool by object pool creating unit for creating object pool It is managed.
8. according to claim 6 be based on three-dimensional Nuclear Power Plant Equipment object module management system, which is characterized in that Administrative unit includes:
Object recalls subelement, for obtaining the conditional information of input, obtains meeting the item by information object list query The facility information object of part information, and the equipment three dimensional object associated by it is found, inquiry is obtained in information object list The setting of facility information object occupy mark, and the obtained associated equipment three dimensional object of inquiry is called out out of object pool Come;
Object discharges subelement, for putting it into object pool, while in information object after equipment three dimensional object has used The occupancy of facility information object associated by it is identified in list and is removed.
9. according to claim 6 be based on three-dimensional Nuclear Power Plant Equipment object module management system, which is characterized in that The storage file is excel file.
10. according to claim 6 be based on three-dimensional Nuclear Power Plant Equipment object module management system, feature exists In loading unit and administrative unit are integrated in Unity3D platform.
CN201810030367.6A 2018-01-12 2018-01-12 Based on three-dimensional Nuclear Power Plant Equipment object module management method and system Pending CN110046775A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810030367.6A CN110046775A (en) 2018-01-12 2018-01-12 Based on three-dimensional Nuclear Power Plant Equipment object module management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810030367.6A CN110046775A (en) 2018-01-12 2018-01-12 Based on three-dimensional Nuclear Power Plant Equipment object module management method and system

Publications (1)

Publication Number Publication Date
CN110046775A true CN110046775A (en) 2019-07-23

Family

ID=67264269

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810030367.6A Pending CN110046775A (en) 2018-01-12 2018-01-12 Based on three-dimensional Nuclear Power Plant Equipment object module management method and system

Country Status (1)

Country Link
CN (1) CN110046775A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111273968A (en) * 2020-01-17 2020-06-12 上海米哈游天命科技有限公司 Object calling method, device, equipment and medium

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130326388A1 (en) * 2012-05-31 2013-12-05 State Grid Corporation Of China Power grid visualization system and method based on three-dimensional gis technology
CN106383957A (en) * 2016-09-23 2017-02-08 中广核工程有限公司 Nuclear power design achievement release system and method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130326388A1 (en) * 2012-05-31 2013-12-05 State Grid Corporation Of China Power grid visualization system and method based on three-dimensional gis technology
CN106383957A (en) * 2016-09-23 2017-02-08 中广核工程有限公司 Nuclear power design achievement release system and method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王志华: "面向智能变电站仿真技术的移动可视化监控系统设计与实现", 《CNKI中国知网》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111273968A (en) * 2020-01-17 2020-06-12 上海米哈游天命科技有限公司 Object calling method, device, equipment and medium

Similar Documents

Publication Publication Date Title
CN106528129B (en) A kind of Web application interface generation system and method
CN106250100B (en) Analyzing logic control method and device
CN109445886A (en) A kind of interface display method, system and terminal device
CN101788906B (en) Resource management method and system thereof
CN104360859A (en) Visual service development method and system
CN110400067A (en) A kind of method and system of purpose balance management
CN110471754A (en) Method for exhibiting data, device, equipment and storage medium in job scheduling
CN109445794B (en) Page construction method and device
CN101727626A (en) Method and system for customizing electronic operation flow
CN110046775A (en) Based on three-dimensional Nuclear Power Plant Equipment object module management method and system
CN114115840B (en) Variable jump method and device for nuclear power station DCS system application software
CN104462940A (en) Monitoring method and device for computer USB interface
CN113918507B (en) Method and device for adapting deep learning framework to AI acceleration chip
CN113177088B (en) Multi-scale simulation big data management system for material irradiation damage
CN105917307A (en) User interface framework
CN111680275A (en) Authority management method and system of industrial personal computer control system, storage medium and equipment
CN112417345B (en) Rendering method, rendering device, electronic equipment and storage medium
CN109190969A (en) Weighing-appliance management-control method, system, weighing-appliance management middleware and medium
CN111626444B (en) Model maintenance dynamic self-adaption method, device and system based on regulation and control cloud and storage medium
CN108710716A (en) Light puts the design drawing generation method and device at station in a kind of optical transmission system
JP2003150762A (en) Cooperation method for project information and its system
CN110221827B (en) Data processing method and related device
JP3353787B2 (en) Standard document creation support method
CN113050934A (en) Form driving intelligent development method, device and storage medium
CN103390055A (en) File transmission method and system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190723