CN110042841A - A kind of underwater mixed mud pouring construction method of cloth bag water proof - Google Patents

A kind of underwater mixed mud pouring construction method of cloth bag water proof Download PDF

Info

Publication number
CN110042841A
CN110042841A CN201910371965.4A CN201910371965A CN110042841A CN 110042841 A CN110042841 A CN 110042841A CN 201910371965 A CN201910371965 A CN 201910371965A CN 110042841 A CN110042841 A CN 110042841A
Authority
CN
China
Prior art keywords
cloth bag
water proof
bag body
proof cloth
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910371965.4A
Other languages
Chinese (zh)
Inventor
姬永生
郭煜诚
徐之山
周样梅
时方鸣
严久鑫
陈鑫冰
陈豪
张莉
吴守荣
石博文
刘本琳
刘翔宇
徐圣楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201910371965.4A priority Critical patent/CN110042841A/en
Publication of CN110042841A publication Critical patent/CN110042841A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/06Placing concrete under water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0023Cast, i.e. in situ or in a mold or other formwork
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0061Production methods for working underwater

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention discloses a kind of underwater mixed mud pouring construction method of cloth bag water proof, the water proof cloth bag includes the water proof cloth bag body that upper and lower side is open and the Grouting Pipe that is mounted in water proof cloth bag body, the Grouting Pipe is connected to the upper end opening of water proof cloth bag body, the lower ending opening of water proof cloth bag body is bundled into knot that can be undone by a pull, it is to have knot that can be undone by a pull line on the knot that can be undone by a pull, the other end of knot that can be undone by a pull line is stretched out from the inside of water proof cloth bag body across Grouting Pipe;Then top aqueous layer and lower part concrete layer will be divided into using water proof cloth bag body inside casing, casting concrete completes construction into water proof cloth bag body finally by Grouting Pipe.The present invention can in the case where not prior draining so that underwater concreting quality reach with land peer-level, drain progress synchronous with pouring, improve overall structure compactness, substantially increase Forming Quality.

Description

A kind of underwater mixed mud pouring construction method of cloth bag water proof
Technical field
The present invention relates to a kind of underwater mixed mud pouring construction methods of cloth bag water proof, belong to underwater foundation construction field.
Background technique
With the development of economy, scientific and technological progress, demand of the human society to resource are also growing.It is got in land resources Come it is more in short supply in the case where, exploitation land occupation sphere area 70% marine resources be particularly important, ocean structure such as bridge spanning the sea, The relevant technologies such as offshore platform, sea wall, shore protection, breakwater, seabed tunnel and man-made island also become the research hotspot of engineering circles.
The construction method of concrete placed under water is divided into cofferdam draining and does not drain two kinds.Cofferdam draining is that underwater foundation is applied The major way of work, but the problems such as there are complicated construction technique, constructional difficulties, big displacement, construction cost, which is basically consumed in, to be enclosed In the drainage system of weir;Drainage construction is not constructed using underwater non-dispersible concrete mainly, to meet the underwater of concrete It is not dispersed, it needs to mix anti-dispersant in concrete.Currently used anti-dispersant generates concrete performance a series of Adverse effect: 1) anti-dispersant and portland cement are incompatible, greatly reduce the mechanical strength of concrete;2) Mixed With Admixture The consistency of cement slurry increases afterwards, and working performance of concrete declines to a great extent, and underwater casting is second-rate, and is easy when pumping stifled Pipe causes to pour interruption;3) anti-dispersant is expensive causes folk prescription Cost of Concrete to increase.
Therefore, if can pour concrete and water segregation in the case where not draining, common coagulation can be used Soil completes construction, will be with important economic significance.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of underwater mixed mud pouring construction sides of cloth bag water proof Method guarantees the working performance of concrete, and construction is simple, save the cost when underwater casting.
To achieve the goals above, the underwater mixed mud pouring construction method of a kind of cloth bag water proof that the present invention uses, it is described Water proof cloth bag includes the water proof cloth bag body that upper and lower side is open and the Grouting Pipe that is mounted in water proof cloth bag body, the Grouting Pipe It being connected to the upper end opening of water proof cloth bag body, it is to have knot that can be undone by a pull line on the knot that can be undone by a pull that the lower ending opening of water proof cloth bag body, which is bundled into knot that can be undone by a pull, The other end of knot that can be undone by a pull line is stretched out from the inside of water proof cloth bag body across Grouting Pipe;
Casing is first mounted on the bottom, then top aqueous layer and lower part coagulation will be divided into using water proof cloth bag body inside casing Soil layer, finally by Grouting Pipe, into water proof cloth bag body, casting concrete completes construction.
Preferably, the underwater concreting construction method, comprising the following steps:
1) casing is transferred: transferring casing as required;
2) install water proof cloth bag: into water proof cloth bag body, cement injection net slurry sinks under water water proof cloth bag, when cloth bag is visited It pulls knot that can be undone by a pull line to open the lower port of water proof cloth bag body when bottom, Grouting Pipe, coagulation is transferred simultaneously with steady rate concrete perfusion Water proof cloth bag lower port is pushed to casing side wall by soil, forms top aqueous layer and lower part concrete layer;
3) it pours: continuing with steady rate concrete perfusion, water proof cloth bag inner concrete remains full state, coagulation Soil pushes cloth bag and top aqueous layer mobile, and Grouting Pipe is with cloth bag hoisting depth until cloth bag is emerged horizontal plane.
Preferably, the concrete used is divergence >=700mm self-compacting concrete.
Preferably, the lower end of the water proof cloth bag body paves, area is 1.2-2 times of casing floor space.
Preferably, being equipped with threaded sleeve between the Grouting Pipe and the upper end opening of water proof cloth bag body.
The principle of the present invention is: casing inner space being divided into top aqueous layer and lower part concrete first with water proof cloth bag Layer, suitable cement paste is then perfused into cloth bag bottoms out cloth bag, pulls knot that can be undone by a pull the end of a thread, opens the tying of cloth bag lower part, Due to the promotion by water-in-bag cement paste, cloth bag paves to casing inner wall position, Continuous Perfusion concrete, by cloth bag and water layer The horizontal plane until cloth bag is emerged is pushed up together.
Compared with prior art, the beneficial effects of the present invention are:
1) present invention solves the problems, such as that displacement is big in the drainage construction of cofferdam.Existing cofferdam construction needs to take out by mechanical Water in cofferdam is discharged water, and cofferdam and draining cost are high.The present invention between concrete layer and external aqueous environment by setting A cloth bag water barrier is set, concrete is placed in the package of water proof cloth bag and casing, concrete is avoided to connect with external aqueous environment Touching solves the problems, such as that concrete is contacted with water and causes isolation and aggregate separated, it is ensured that do not drain the quality of pouring construction under water Reach land and pours peer-level.
2) present invention solves the problems, such as that underwater non-dispersible workability of concrete is poor, mechanical strength is low.It is existing not drain Underwater construction is carried out to need using underwater non-dispersible concrete, due to joined the underwater non-dispersible concrete of anti-dispersant It is low that there are intensity, and consistency is big, problem at high cost.The present invention uses cloth bag water proof, is poured, is mentioned using self-compacting concrete High structural strength, reduces construction cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of interval water cloth bag of the present invention;
Fig. 2 is the sinking schematic diagram of water proof cloth bag of the present invention;
Fig. 3 is that water proof cloth bag of the present invention paves schematic diagram;
Fig. 4 is that water proof cloth bag of the invention pours schematic diagram one;
Fig. 5 is that water proof cloth bag of the invention pours schematic diagram two;
In figure: 1, Grouting Pipe, 2, threaded sleeve, 3, water proof cloth bag body, 4, knot that can be undone by a pull, 5, knot that can be undone by a pull line, 6, cement paste, 7, shield Cylinder, 8, horizontal plane, 9, self-compacting concrete.
Specific embodiment
In order to make the objectives, technical solutions and advantages of the present invention clearer, the present invention is carried out below further detailed It describes in detail bright.However, it should be understood that the specific embodiments described herein are merely illustrative of the present invention, it is not limited to this hair Bright range.
As shown in Figure 1, a kind of underwater mixed mud pouring construction method of cloth bag water proof, the water proof cloth bag includes that upper and lower side is equal The water proof cloth bag body 3 of opening and the Grouting Pipe 1 being mounted in water proof cloth bag body 3, the Grouting Pipe 1 are upper with water proof cloth bag body 3 End opening connection, it is to have knot that can be undone by a pull line 5 on the knot that can be undone by a pull 4 that the lower ending opening of water proof cloth bag body 3, which is bundled into knot that can be undone by a pull 4, knot that can be undone by a pull line 5 it is another One end passes through Grouting Pipe 1 from the inside of water proof cloth bag body 3 and stretches out horizontal plane 8;
Casing 7 is first mounted on the bottom, top aqueous layer and lower part then will be divided into inside casing 7 using water proof cloth bag body 3 Concrete layer, finally by Grouting Pipe 1, into water proof cloth bag body 3, casting concrete completes construction.
As the improvement of embodiment, the underwater concreting construction method the following steps are included:
1) casing is transferred: transferring casing 7 as required;
2) install water proof cloth bag: as shown in Figure 2 and Figure 3, into water proof cloth bag body 3, cement injection net slurry 6 sinks water proof cloth bag Enter the bottom, knot that can be undone by a pull line 5 is pulled to open the lower port of water proof cloth bag body 3 when cloth bag bottoms out, it is same with steady rate concrete perfusion When transfer Grouting Pipe 1, cloth bag lower port is pushed to casing side wall by concrete, forms top aqueous layer and lower part concrete layer;
3) it pours: as shown in Figure 4, Figure 5, continuing with steady rate concrete perfusion, cloth bag inner concrete, which remains, to be filled Full state, concrete push cloth bag and top aqueous layer mobile, and Grouting Pipe 1 is with cloth bag hoisting depth until cloth bag is emerged horizontal plane 8。
Wherein, cloth bag when in use, is sunk under water by cement injection net slurry 6, is being bottomed out by the water proof cloth bag body 3 The knot that can be undone by a pull of Shi Lakai cloth bag lower part, concrete perfusion simultaneously continue to transfer Grouting Pipe 1, fill shape in concrete always in cloth bag State will not deform.
As the improvement of embodiment, threaded sleeve 2 is installed between the Grouting Pipe 1 and the upper end opening of water proof cloth bag body 3, Install convenient.
As the improvement of embodiment, the lower end of the water proof cloth bag body 3 area that paves is 1.2-2 times of 7 floor space of casing, Ensure the concrete poured into water proof cloth bag body 3, can be effective, uniform in the bottom of casing 7 and completely paves.
As the improvement of embodiment, the height of water proof cloth bag body 3 can flexible choice as needed.
As the improvement of embodiment, the concrete used for divergence >=700mm self-compacting concrete 9, stablize by performance, Using effect is good.
Embodiment 1
Using underwater concreting construction method of the invention, Specific construction process is as follows:
(1) casing is transferred
Casing is transferred by Design of Construction Organization requirement;
(2) prepare water proof cloth bag
Prepare the dual openings cloth bag with certain tensile strength, the area that paves of cloth bag is about casing floor space 1.5 again;
(3) water proof cloth bag connects Grouting Pipe
The upper opening of water proof cloth bag is connected with Grouting Pipe by threaded sleeve, cloth bag under shed is bundled into knot that can be undone by a pull, knot that can be undone by a pull The end of a thread is stretched out on the water surface by Grouting Pipe;
(4) water proof cloth bag protective wall water proof
Appropriate cement paste is perfused into water proof cloth bag cloth bag sinks under water, pulls knot that can be undone by a pull the end of a thread to beat when cloth bag bottoms out Mouth under cloth bag is opened, Grouting Pipe is transferred simultaneously with steady rate concrete perfusion, concrete is divergence not less than 700mm from close Mouth under cloth bag is pushed to casing side wall, forms cloth bag water barrier by real concrete;
(5) continue slip casting to pour complete
Continue that self-compacting concrete is perfused with steady rate, water proof cloth bag inner concrete remains full state, coagulation Soil pushes cloth bag and top aqueous layer mobile, and Grouting Pipe follows cloth bag hoisting depth until cloth bag is emerged the water surface, using cloth bag every The mode of water carries out underwater concreting, and Forming Quality can reach land with the 95% of concrete intensity.
Casing is first mounted on the bottom by the present invention, cloth bag is crashed into the bottom with cement paste, the drawing when water proof cloth bag bottoms out The knot that can be undone by a pull of dynamic cloth bag lower part opens cloth bag, and Continuous Perfusion self-compacting concrete pushes cloth bag to spread out around, cloth bag and top Water layer by self-compacting concrete push hoisting depth, in entire casting process concrete always with water segregation.The present invention can be In the case where not prior draining so that underwater concreting quality reach with land peer-level, drain and pour and is same Step carries out, and improves overall structure compactness, substantially increases Forming Quality.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention Made any modification, equivalent replacement or improvement etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (5)

1. a kind of underwater mixed mud pouring construction method of cloth bag water proof, which is characterized in that the water proof cloth bag includes that upper and lower side is equal The water proof cloth bag body (3) of opening and the Grouting Pipe (1) being mounted in water proof cloth bag body (3), the Grouting Pipe (1) and water proof cloth The upper end opening of bag body (3) is connected to, and it is to have work on the knot that can be undone by a pull (4) that the lower ending opening of water proof cloth bag body (3), which is bundled into knot that can be undone by a pull (4), The other end of fastening wire (5), knot that can be undone by a pull line (5) is stretched out from the inside of water proof cloth bag body (3) across Grouting Pipe (1);
Casing (7) is first mounted on the bottom, top aqueous layer then will be divided into under inside casing (7) using water proof cloth bag body (3) Portion's concrete layer completes construction to the interior casting concrete of water proof cloth bag body (3) finally by Grouting Pipe (1).
2. the underwater mixed mud pouring construction method of a kind of cloth bag water proof according to claim 1, which is characterized in that including with Lower step:
1) casing is transferred: transferring casing (7) as required;
2) water proof cloth bag is installed: water proof cloth bag sinking under water to water proof cloth bag body (3) interior cement injection net slurry (6), works as cloth bag It pulls knot that can be undone by a pull line (5) to open the lower port of water proof cloth bag body (3) when bottoming out, slip casting is transferred simultaneously with steady rate concrete perfusion It manages (1), water proof cloth bag lower port is pushed to casing side wall by concrete, forms top aqueous layer and lower part concrete layer;
3) it pours: continuing with steady rate concrete perfusion, water proof cloth bag inner concrete remains full state, and concrete pushes away Dynamic cloth bag and top aqueous layer are mobile, and Grouting Pipe (1) is with cloth bag hoisting depth until cloth bag emerges horizontal plane (8).
3. the underwater mixed mud pouring construction method of a kind of cloth bag water proof according to claim 1 or 2, which is characterized in that adopt Concrete is divergence >=700mm self-compacting concrete (9).
4. the underwater mixed mud pouring construction method of a kind of cloth bag water proof according to claim 1, which is characterized in that it is described every The lower end of water cloth bag body (3) area that paves is 1.2-2 times of casing (7) floor space.
5. the underwater mixed mud pouring construction method of a kind of cloth bag water proof according to claim 1, which is characterized in that the note Threaded sleeve (2) are installed between slurry pipe (1) and the upper end opening of water proof cloth bag body (3).
CN201910371965.4A 2019-05-06 2019-05-06 A kind of underwater mixed mud pouring construction method of cloth bag water proof Pending CN110042841A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910371965.4A CN110042841A (en) 2019-05-06 2019-05-06 A kind of underwater mixed mud pouring construction method of cloth bag water proof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910371965.4A CN110042841A (en) 2019-05-06 2019-05-06 A kind of underwater mixed mud pouring construction method of cloth bag water proof

Publications (1)

Publication Number Publication Date
CN110042841A true CN110042841A (en) 2019-07-23

Family

ID=67280959

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910371965.4A Pending CN110042841A (en) 2019-05-06 2019-05-06 A kind of underwater mixed mud pouring construction method of cloth bag water proof

Country Status (1)

Country Link
CN (1) CN110042841A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200255722Y1 (en) * 2001-09-10 2001-12-20 김건수 Structure of pipe for filling up concrete under the water.
KR20020086054A (en) * 2001-05-11 2002-11-18 김건수 The method of construction for fundamental formative of bent in under the water.
CN102220759A (en) * 2010-02-07 2011-10-19 谢世尊 New drilling (punching) bored concrete pile construction method
CN103306276A (en) * 2012-03-07 2013-09-18 谢世尊 New dry construction method for drilled (punched) hole filling pile surrounded by mud
KR20140078815A (en) * 2012-12-18 2014-06-26 현대건설주식회사 concrete construction method and concrete structures manufactured thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020086054A (en) * 2001-05-11 2002-11-18 김건수 The method of construction for fundamental formative of bent in under the water.
KR200255722Y1 (en) * 2001-09-10 2001-12-20 김건수 Structure of pipe for filling up concrete under the water.
CN102220759A (en) * 2010-02-07 2011-10-19 谢世尊 New drilling (punching) bored concrete pile construction method
CN103306276A (en) * 2012-03-07 2013-09-18 谢世尊 New dry construction method for drilled (punched) hole filling pile surrounded by mud
KR20140078815A (en) * 2012-12-18 2014-06-26 현대건설주식회사 concrete construction method and concrete structures manufactured thereof

Similar Documents

Publication Publication Date Title
CN103967031B (en) A kind of caisson of consolidated subsoil and stake combination foundation and construction method thereof
CN107142929A (en) Sea is non-to squeeze into type large diameter single pile foundation structure and its construction method
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN106284081B (en) A kind of blast cofferdam is as cast-in-place box beam bracket foundation construction method
CN102561271B (en) Polymer grout injected earth-rock dam and construction method thereof
CN109056705A (en) A kind of the variable diameters steel reinforcement cage and method of administration of concise structure
CN108661081A (en) A kind of inverted tension type anchor cable system support suspension tunnel structure
CN112695809A (en) Structure and method for preventing downward-lying tunnel from floating upwards due to river channel excavation
CN105672250B (en) A kind of diaphram wall and underwater concrete tongue and groove bindiny mechanism and construction method
CN203049443U (en) High level trestle structure arranged on steep bare rock of deepwater torrent unsheathed layer
CN106638486B (en) High-tech zones cut-pff wall and gallery stage construction method
CN103572770B (en) A kind of stake case hydraulic structures and construction method thereof
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN212129036U (en) Cylindrical jacket pile foundation breakwater structure
CN110042841A (en) A kind of underwater mixed mud pouring construction method of cloth bag water proof
CN206956713U (en) Sea is non-to squeeze into type large diameter single pile foundation structure
CN106400807A (en) Maritime work barge grouting method and device thereof
CN209429040U (en) Flow turbulence area prestressed anchor Cable Structure
CN209308011U (en) A kind of variable diameters steel reinforcement cage of concise structure
CN208280189U (en) Pier nose formula anti-float anchor rod waterproofing node
CN207143965U (en) Steel plate concrete combined type anti-floating water sealing structure
CN216739713U (en) Karst area grout curtain structure
CN106013094A (en) Method applicable to pouring of concrete for artificial excavating pile body
CN106400745B (en) A kind of sea work barge operational method and equipment
CN206752413U (en) A kind of extra large work barge implement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190723

RJ01 Rejection of invention patent application after publication