CN110042796A - A kind of New-Type Wharf construction method suitable for batholith - Google Patents

A kind of New-Type Wharf construction method suitable for batholith Download PDF

Info

Publication number
CN110042796A
CN110042796A CN201910376102.6A CN201910376102A CN110042796A CN 110042796 A CN110042796 A CN 110042796A CN 201910376102 A CN201910376102 A CN 201910376102A CN 110042796 A CN110042796 A CN 110042796A
Authority
CN
China
Prior art keywords
construction
harbour
batholith
construction time
foundation pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910376102.6A
Other languages
Chinese (zh)
Inventor
张博杰
杨克勤
何文钦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FHDI Engineering Co Ltd
Original Assignee
CCCC FHDI Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FHDI Engineering Co Ltd filed Critical CCCC FHDI Engineering Co Ltd
Priority to CN201910376102.6A priority Critical patent/CN110042796A/en
Publication of CN110042796A publication Critical patent/CN110042796A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/06Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
    • E02B3/068Landing stages for vessels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of New-Type Wharf construction method suitable for batholith, construction procedures are as follows: 1) according to certain land reef explosion of the gradient, forms the construction time foundation pit with dry work condition, and gutter is arranged;2) steel form is installed, plain concrete is poured, forms vertivcal quay wall;3) pouring reinforcement concrete lattice girder, and anchor pole is installed;4) affiliated facilities such as rubber fender, bollard and shield wheel bank are installed;5) land and water reef explosion combination is used, the rock mass of wharf apron is removed, forms basin.The present invention forms construction time foundation pit by land reef explosion first, then construction harbour wall in foundation pit in dry condition, lattice girder is carried out again to pour and the installation of anchor pole, it finally removes the rock mass on front side of harbour and forms basin, difficulty of construction and construction cost are significantly reduced, working procedure is simplified and shortens the construction period.

Description

A kind of New-Type Wharf construction method suitable for batholith
Technical field
The present invention relates to water transport engineering project technical fields, and in particular to a kind of Wharf Construction method suitable for batholith.
Background technique
For the Wharf Construction of traditional batholith geologic province, usually first reef explosion excavates to form basin and harbour foundation trench, then It is laid with rubble-mound foundation, then installation gravity caisson or box structure waterborne, forms vertivcal quay wall, top cast in place reinforced bar Concrete breastwork, dock structure rear backfill block stone.The method has the following disadvantages, first, reef explosion range needs to meet caisson Or the overall dimension of box structure, thus reef explosion amount is larger;Second, caisson or box structure need to meet stability requirement, institute Need the amount of reinforcing bar and concrete more, and rear backfill block stone dosage is larger;The prefabricated needs of third, caisson or square are special Prefabricated place, and installation waterborne needs large lifting equipment, the construction period is affected by natural conditions such as stormy waves.In synthesis It states, it is bad that the Wharf Construction method of traditional batholith geologic province is long there are the construction period, working procedure is cumbersome, project cost is higher etc. Gesture.
Summary of the invention
The technical problem to be solved by the present invention is in view of the drawbacks of the prior art, provide, a kind of arrangement and method for construction is more reasonable, applies Work difficulty is lower, cost is smaller, working procedure is simpler, suitable for the New-Type Wharf construction method of batholith.
In order to solve the above technical problems, the present invention adopts the following technical scheme: a kind of New-Type Wharf suitable for batholith is applied Work method, the Wharf Construction is on rock mass comprising has concrete wall and harbour face, harbour face is located at the top of concrete wall Face, it is characterised in that: construction method carries out according to the following steps,
1) land reef explosion is carried out higher than the position of construction time water level on the protolith upper thread of rock mass, being formed has dry work The construction time foundation pit of condition, and gutter is set in construction time bottom of foundation ditch;
2) steel form is installed, plain concrete is poured, forms the harbour concrete wall of vertical type;
3) pouring reinforcement concrete lattice girder, and anchor pole is installed, anchored lattice girder by anchor pole and forms entire coagulation The anchor structure of cob wall body;
4) affiliated facility is installed, including rubber fender, bollard and shield wheel bank, rubber fender are located at wharf apron line Front, bollard and shield wheel bank are located on harbour face;
5) land and water reef explosion combination is used, the remaining rock mass in front of harbour is removed, forms basin.
In step 1), construction time foundation pit is formed by with dry work condition, and the side Qi Hai rock mass top mark height is higher than The appropriate more unrestrained requirement highly to meet the construction time of construction time water level;The gutter being arranged in foundation pit is to meet construction time rain The drainage requirement of water, construction time water, infiltration etc..
In step 2), placement layer by layer harbour concrete wall, and routinely ratio from bottom to top when pouring plain concrete Add anti-crack fiber;Bolthole is reserved in casting process, for installing anchor pole.
In step 3), according to the sequence of concrete wall work progress, layer-by-layer pouring reinforcement concrete lattice girder;Installation Anchor pole applies prestressed stretch-draw anchorage, and is in the milk and forms prestressing force anchorage structures, can all remove after the installation is completed to anchor pole Lower one of steel form.
Further, each armored concrete lattice girder is vertical and horizontal intersection construction, and an anchor pole is arranged in each infall, is formed Strict anchor structure.
Further, each anchor pole is inserted in the subsequent rock mass of land side reef explosion side slope, to provide to concrete wall Anchor pulling force.
Basin is collectively formed in the remainder for removing part and construction time foundation pit in front of harbour after remaining rock mass, and constructs On the one hand the remainder of phase foundation pit other than plaing a part of to provide construction space, is on the other hand removed in reef explosion and is remained in front of harbour It can provide protective zone when remaining rock mass;The bottom surface elevation of basin and the bottom surface elevation of construction time foundation pit are identical, and gutter is lower than Basin bottom surface elevation.
The present invention forms construction time foundation pit by land reef explosion first, harbour wall of then constructing in foundation pit, then carries out The construction and installation of lattice girder and anchor pole after waiting harbours to form, finally blow the rock mass in front of harbour again and form basin, thus The defect of elder generation's reef explosion excavation, rear installation wall body structure, has significantly simplified working procedure, has reduced when avoiding traditional Wharf Construction Construction volume and construction cost, and can shorten the construction period, while the stability of structure can also be improved.
Detailed description of the invention
Fig. 1 is the diagrammatic cross-section of Wharf Construction process of the present invention;
Fig. 2 is harbour elevational schematic view of the present invention.
In figure, 1 is rock mass, and 2 be construction time foundation pit, and 31 be basin bottom, and 32 be harbour face, and 33 be wharf apron line, and 4 be row Ditch, 5 be concrete wall, and 6 be lattice girder, and 7 be anchor pole, and 81 be rubber fender, and 82 be bollard, and 83 be shield wheel bank.
Specific embodiment
In the present embodiment, referring to Figures 1 and 2, the New-Type Wharf construction method suitable for batholith, according to the following steps into Row,
1) land reef explosion is carried out higher than the position of construction time water level on the protolith upper thread of rock mass 1, is formed to have and is applied dryly The construction time foundation pit 2 of work condition, and gutter 4 is set in 2 bottom of construction time foundation pit;
2) steel form is installed, plain concrete is poured, forms the harbour concrete wall 5 of vertical type;
3) pouring reinforcement concrete lattice girder 6, and anchor pole 7 is installed, anchored lattice girder 6 by anchor pole 7 and is formed is entire The anchor structure of concrete wall 5;
4) affiliated facility, including rubber fender 81, bollard 82, shield wheel bank 83 etc. are installed, rubber fender 81 is located at harbour The front of frontal line 33, bollard 82 and shield wheel bank 83 are located on harbour face 32;
5) land and water reef explosion combination is used, the remaining rock mass 1 in front of harbour is removed, forms basin.
In step 1), construction time foundation pit 2 is formed by with dry work condition, and the side Qi Hai rock mass top mark height is higher than The appropriate more unrestrained requirement highly to meet the construction time of construction time water level;The gutter 4 being arranged in foundation pit is to meet construction time rain The drainage requirement of water, construction time water, infiltration etc..
In step 2), placement layer by layer harbour concrete wall 5, and routinely ratio from bottom to top when pouring plain concrete Add anti-crack fiber;Bolthole is reserved in casting process, for installing anchor pole 7.
In step 3), according to the sequence of 5 work progress of concrete wall, layer-by-layer pouring reinforcement concrete lattice girder 6;Peace Anchor pole 7 is filled, applies prestressed stretch-draw anchorage, and be in the milk and form prestressing force anchorage structures, all after the installation is completed can to anchor pole 7 Remove lower one of steel form.
Each armored concrete lattice girder 6 is vertical and horizontal intersection construction, and an anchor pole 7 is arranged in each infall, is formed strict Anchor structure.
Each anchor pole 7 is inserted in the subsequent rock mass 1 of land side reef explosion side slope, to provide the anchor drawing to concrete wall 5 Power.
Basin is collectively formed in the remainder for removing part and construction time foundation pit 2 in front of harbour after remaining rock mass 1, and applies The remainder one side of duration foundation pit 2 is other than plaing a part of to provide construction space, on the other hand before harbour is removed in reef explosion It can provide protective zone when side's residue rock mass;31 elevation of basin bottom is identical as the bottom surface elevation of construction time foundation pit 2, and gutter 4 Lower than basin bottom surface elevation.
The above has been described in detail, described above, is only a preferred embodiment of the present invention, when cannot It limit the scope of implementation of the present invention, i.e., it is all according to the made equivalent changes and modifications of the application range, it should still belong to covering scope of the present invention It is interior.

Claims (7)

1. a kind of New-Type Wharf construction method suitable for batholith, the Wharf Construction is on rock mass comprising has concrete wall With harbour face, harbour face is located at the top surface of concrete wall, it is characterised in that: and construction method carries out according to the following steps,
1) land reef explosion is carried out higher than the position of construction time water level on the protolith upper thread of rock mass, being formed has dry work condition Construction time foundation pit, and construction time bottom of foundation ditch be arranged gutter;
2) steel form is installed, plain concrete is poured, forms the harbour concrete wall of vertical type;
3) pouring reinforcement concrete lattice girder, and anchor pole is installed, anchored lattice girder by anchor pole and forms entire concrete walls The anchor structure of body;
4) affiliated facility is installed, including rubber fender, bollard and shield wheel bank, rubber fender are being located at wharf apron line just Face, bollard and shield wheel bank are located on harbour face;
5) land and water reef explosion combination is used, the remaining rock mass in front of harbour is removed, forms basin.
2. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: in step 1), Construction time foundation pit is formed by with dry work condition, and the side Qi Hai rock mass top mark height be higher than the appropriate height of construction time water level with Meet the more unrestrained requirement of construction time;The gutter being arranged in foundation pit to meet construction time rainwater, construction time water, infiltration row Water requirement.
3. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: in step 2), Placement layer by layer harbour concrete wall from bottom to top when pouring plain concrete, and routinely ratio adds anti-crack fiber;It poured Bolthole is reserved in journey.
4. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: in step 3), According to the sequence of concrete wall work progress, layer-by-layer pouring reinforcement concrete lattice girder;Anchor pole is installed, prestressed stretch-draw is applied Anchorage, and be in the milk and form prestressing force anchorage structures, it is all installed to anchor pole and removes lower one of steel form.
5. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: each armored concrete Lattice girder is vertical and horizontal intersection construction, and an anchor pole is arranged in each infall.
6. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: each anchor pole is inserted Enter in the subsequent rock mass of land side reef explosion side slope.
7. the New-Type Wharf construction method according to claim 1 suitable for batholith, it is characterised in that: remove in front of harbour Basin, the bottom surface elevation and construction time foundation pit of basin is collectively formed in the remainder of part and construction time foundation pit after remaining rock mass Bottom surface elevation it is identical, and gutter be lower than basin bottom surface elevation.
CN201910376102.6A 2019-05-07 2019-05-07 A kind of New-Type Wharf construction method suitable for batholith Pending CN110042796A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910376102.6A CN110042796A (en) 2019-05-07 2019-05-07 A kind of New-Type Wharf construction method suitable for batholith

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910376102.6A CN110042796A (en) 2019-05-07 2019-05-07 A kind of New-Type Wharf construction method suitable for batholith

Publications (1)

Publication Number Publication Date
CN110042796A true CN110042796A (en) 2019-07-23

Family

ID=67281072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910376102.6A Pending CN110042796A (en) 2019-05-07 2019-05-07 A kind of New-Type Wharf construction method suitable for batholith

Country Status (1)

Country Link
CN (1) CN110042796A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5622823B2 (en) * 2012-10-16 2014-11-12 みらい建設工業株式会社 Quay construction
CN205134340U (en) * 2015-11-24 2016-04-06 中国地质大学(武汉) A structural system that is used for ecological bank protection of high cliff matter side slope
JP2016135984A (en) * 2015-01-15 2016-07-28 寛治 ▲魚▼谷 Revetment structure
CN207608879U (en) * 2017-08-29 2018-07-13 中交天津港湾工程设计院有限公司 A kind of novel caisson Vierendeel girder plank frame
CN207862857U (en) * 2017-12-01 2018-09-14 广东航鑫咨询有限公司 A kind of bank protection structure of harbour

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5622823B2 (en) * 2012-10-16 2014-11-12 みらい建設工業株式会社 Quay construction
JP2016135984A (en) * 2015-01-15 2016-07-28 寛治 ▲魚▼谷 Revetment structure
CN205134340U (en) * 2015-11-24 2016-04-06 中国地质大学(武汉) A structural system that is used for ecological bank protection of high cliff matter side slope
CN207608879U (en) * 2017-08-29 2018-07-13 中交天津港湾工程设计院有限公司 A kind of novel caisson Vierendeel girder plank frame
CN207862857U (en) * 2017-12-01 2018-09-14 广东航鑫咨询有限公司 A kind of bank protection structure of harbour

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中华人民共和国交通运输部: "《码头结构施工规范JTS215-2018》", 12 March 2018 *
廖开文: "水下预裂爆破——岩基海岸建造码头岸壁的简便途径", 《海洋工程》 *

Similar Documents

Publication Publication Date Title
CN106758841B (en) A kind of whole construction process of the double rope face low-pylon cable-stayed bridges of double tower
CN211144503U (en) High steep topography bridge tunnel meets section open cut tunnel and connects long structure
CN103669374A (en) Combined supporting construction method of steel sheet pile used in silt soil slope
CN105862930A (en) Protection structure on existing tunnel below new underground engineering
CN105804089A (en) Locally-deepened supporting and protecting system used after original deep foundation pit is constructed and construction method of system
CN101597888B (en) Construction method of municipal drainage culvert sinking trough
CN110397050B (en) Beam-anchor type light drainage retaining wall and construction method thereof
CN108193642A (en) A kind of revetment reinforces facility and its construction method
CN109736884B (en) Treatment structure for water gushing in underground river close to tunnel and construction method of treatment structure
WO2023213117A1 (en) Widening structure and construction method for existing subgrade embankment wall section near river
CN110159294A (en) A kind of high steep landform tunnel immediately adjacent to bridge section spreading open cut tunnel construction method
CN109750571A (en) A kind of road landslide emergency and permanent supporting and retaining system integral structure and construction method
CN105064711B (en) Method for constructing underground garage between residential buildings
CN103452120A (en) Pile top crown beam structure of high-strength prestress pipe pile for supporting foundation pit and construction method thereof
CN109184699A (en) Existing river construction is worn under open trench tunnel
CN113503166B (en) Reinforced disposal structure of karst cave at middle and lower parts of tunnel and construction method thereof
CN105040707B (en) Combine the construction method of close pile deep foundation pit support building enclosure
CN110805049B (en) Construction method of mountain slope ultra-thickness spray anchor permanent supporting structure
CN106758852A (en) Across foundation pit enclosure to support beam trestle construction technology
CN106917358A (en) A kind of cable-stayed bridge main-beam combination constructing method thereof and its counter weight construction system
CN218346208U (en) Permanent side slope supporting structure based on reinforced concrete pile
CN109653223A (en) River anti-floating weighting board construction method
CN110042796A (en) A kind of New-Type Wharf construction method suitable for batholith
CN210737555U (en) Underground pipeline in-situ protection mechanism for foundation pit supporting system
KR100560390B1 (en) Breaking prevention structure of well box basis for bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190723