CN110038805A - Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics - Google Patents
Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics Download PDFInfo
- Publication number
- CN110038805A CN110038805A CN201910304296.9A CN201910304296A CN110038805A CN 110038805 A CN110038805 A CN 110038805A CN 201910304296 A CN201910304296 A CN 201910304296A CN 110038805 A CN110038805 A CN 110038805A
- Authority
- CN
- China
- Prior art keywords
- detection switch
- tracked
- time
- tracking
- production logistics
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B07—SEPARATING SOLIDS FROM SOLIDS; SORTING
- B07C—POSTAL SORTING; SORTING INDIVIDUAL ARTICLES, OR BULK MATERIAL FIT TO BE SORTED PIECE-MEAL, e.g. BY PICKING
- B07C5/00—Sorting according to a characteristic or feature of the articles or material being sorted, e.g. by control effected by devices which detect or measure such characteristic or feature; Sorting by manually actuated devices, e.g. switches
- B07C5/02—Measures preceding sorting, e.g. arranging articles in a stream orientating
Landscapes
- Control Of Conveyors (AREA)
- General Factory Administration (AREA)
Abstract
The embodiment of the invention discloses a kind of tracking and controlling method of production logistics, device, equipment and computer readable storage mediums.Wherein, method include material to be tracked identification information it is identified, obtain material to be tracked from the first detection switch and be transmitted to the real time that the second detection switch is spent, as time of delivery value;If time of delivery value and the difference of preset time threshold show material tracking success, then continue that material to be tracked is conveyed and tracked in default error range;Wherein, time threshold is the standard time needed for transmitting material to be tracked in the pre-determined distance section of pipeline, and the distance between the first detection switch and the second detection switch are distance segment.The application realize material more efficiently, stablize, be accurately tracked by, advantageously ensure that material conveying and the later period sorting stable operation, also help reduce detection switch cost.
Description
Technical field
The present embodiments relate to logistics automatic sorting technical fields, more particularly to a kind of tracing control of production logistics
Method, apparatus, equipment and computer readable storage medium.
Background technique
Production logistics is the logistics activity referred in production technology, generally refers to raw material, fuel, outsourcing piece and puts into production
Afterwards, by blanking, material issuance, it is transported to each processing stand and storage point, and in the form of product, from a production unit (such as storehouse
Library) another production unit is flowed into, it processed, stored according to the technical process of regulation, then by certain transport device,
The circulation in some is put, and interior outflow is put from some, the circulation process of material physical form is embodied always.
It is real-time to material, be accurately tracked by most important object on existing logistic production line during material circulation
Material conveying tracking usually relies on detection switch counting superposition and realizes.
But due on pipeline detection switch it is more, the material of conveying easily there is a situation where tracking mistake, stability
Not high with accuracy, the sorting of conveying and later period to material has significant effect.
Summary of the invention
The embodiment of the present disclosure provides the tracking and controlling method of production logistics a kind of, device, equipment and computer-readable deposits
Storage media, realize material more efficiently, stablize, be accurately tracked by, advantageously ensure that material conveying and the later period sorting stabilization
Operation, also helping reduces detection switch cost.
In order to solve the above technical problems, the embodiment of the present invention the following technical schemes are provided:
On the one hand the embodiment of the present invention provides a kind of tracking and controlling method of production logistics, comprising:
When the identification information of material to be tracked is identified, the acquisition material to be tracked is transmitted from the first detection switch
To the time of delivery value of the second detection switch;;
The difference for calculating the first time and second time, as time of delivery value;
Judge whether the difference of the time of delivery value and preset time threshold is being preset in error range;
If so, the material to be tracked is continued to convey and be tracked;
Wherein, the time threshold is standard needed for transmitting the material to be tracked in the pre-determined distance section of pipeline
Time, the distance between first detection switch and second detection switch are the distance segment.
Optionally, whether the difference for judging the time of delivery value and preset time threshold is being preset in error range
Later, further includes:
If the time of delivery value and the difference of preset time threshold, will be described to be tracked not in default error range
Material flows back.
Optionally, whether the difference for judging the time of delivery value and preset time threshold is being preset in error range
Later, further includes:
If the time of delivery value and the difference of preset time threshold be not in default error range, from current pipeline
It is upper to reject the material to be tracked.
Optionally, when the acquisition material to be tracked is transmitted to the conveying of the second detection switch from the first detection switch
Between value include:
Obtain the material to be tracked enter first detection switch when first time and it is described second detection open
The second time when pass;
The difference for calculating the first time and second time, as time of delivery value.
Optionally, when the acquisition material to be tracked is transmitted to the conveying of the second detection switch from the first detection switch
Between value include:
When detect the material to be tracked enter first detection switch, start timing;
When detecting the material to be tracked into second detection switch, timing terminates;
The material to be tracked is obtained from first detection switch to the second detection switch timing duration value, as
Time of delivery value.
Optionally, first detection switch and second detection switch are adjacent.
On the other hand the embodiment of the present invention provides a kind of follow-up control apparatus of production logistics, comprising:
Time-obtaining module, it is identified for the identification information when material to be tracked, obtain the material to be tracked
The time of delivery value of the second detection switch is transmitted to from the first detection switch;
Material successfully tracks module, if for the time of delivery value and the difference of preset time threshold in default error model
In enclosing, then the material to be tracked is continued to convey and be tracked;The time threshold is the pre-determined distance section upload in pipeline
Standard time needed for the defeated material to be tracked, the distance between first detection switch and second detection switch are
The distance segment.
It optionally, further include reflux module, if for the time of delivery value and the difference of preset time threshold not pre-
If in error range, then the material to be tracked is flowed back.
The embodiment of the invention also provides a kind of tracing control equipment of production logistics, including processor, the processors
Realizing the tracking and controlling method of production logistics as described in preceding any one when for executing the computer program stored in memory
Step.
The embodiment of the present invention finally additionally provides a kind of computer readable storage medium, the computer readable storage medium
On be stored with the tracing control program of production logistics, realized such as when the tracing control program of the production logistics is executed by processor
The step of tracking and controlling method of any one of preceding production logistics.
The advantages of technical solution provided by the present application, is, utilizes time of the material in two detection switch transmission processes
Difference tracks material, reads in real time time of the material Jing Guo two detection switch, and with preset value, carry out pair
Than the value is that material passes through required time under normal circumstances, to can determine whether material tracks success, realizes material more
Efficiently, stablize, be accurately tracked by, greatly increase the stability of material conveying and later period sorting;In addition, defeated using material
The time difference sent tracks material, can save the quantity of detection switch, longer installation detection switch can be spaced on pipeline,
Sorting port will not cause sorting abnormal because of the erroneous judgement of detection switch, not only strengthen the stability of system, can also reduce detection
Cost is switched, and then reduces the cost of whole system.
In addition, the embodiment of the present invention provides corresponding realization device also directed to the tracking and controlling method of production logistics, sets
Standby and computer readable storage medium, further such that the method has more practicability, described device, equipment and computer can
Reading storage medium has the advantages that corresponding.
It should be understood that the above general description and the following detailed description are merely exemplary, this can not be limited
It is open.
Detailed description of the invention
It, below will be to embodiment or correlation for the clearer technical solution for illustrating the embodiment of the present invention or the relevant technologies
Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only this hair
Bright some embodiments for those of ordinary skill in the art without creative efforts, can be with root
Other attached drawings are obtained according to these attached drawings.
Fig. 1 is a kind of flow diagram of the tracking and controlling method of production logistics provided in an embodiment of the present invention;
Fig. 2 is the flow diagram of the tracking and controlling method of another production logistics provided in an embodiment of the present invention;
Fig. 3 is the flow diagram of the tracking and controlling method of another production logistics provided in an embodiment of the present invention;
Fig. 4 is a kind of specific embodiment structure of the follow-up control apparatus of production logistics provided in an embodiment of the present invention
Figure;
Fig. 5 is another specific embodiment structure of the follow-up control apparatus of production logistics provided in an embodiment of the present invention
Figure.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, with reference to the accompanying drawings and detailed description
The present invention is described in further detail.Obviously, described embodiments are only a part of the embodiments of the present invention, rather than
Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise
Under every other embodiment obtained, shall fall within the protection scope of the present invention.
The description and claims of this application and term " first ", " second ", " third " " in above-mentioned attached drawing
Four " etc. be for distinguishing different objects, rather than for describing specific sequence.Furthermore term " includes " and " having " and
Their any deformations, it is intended that cover and non-exclusive include.Such as contain a series of steps or units process, method,
System, product or equipment are not limited to listed step or unit, but may include the step of not listing or unit.
After describing the technical solution of the embodiment of the present invention, the various non-limiting realities of detailed description below the application
Apply mode.
Referring first to Fig. 1, Fig. 1 is that a kind of process of the tracking and controlling method of production logistics provided in an embodiment of the present invention is shown
It is intended to, the embodiment of the present invention may include the following contents:
S101: judging whether the identification information of material to be tracked can be identified, if so, executing S102;If it is not, then
Terminate tracking.
In the present embodiment, material to be tracked is tracked in the transmission process of certain section of transmission line.Generally with
Detection switch is installed at track beginning, then installs detection switch every suitable distance and each sorting port on the conveyor line.
It is understood that when carrying out material tracking, it is thus necessary to determine that the material tracked whether be user require to
Material is tracked, so needing to carry out identity information identification to material before being tracked.
In one embodiment, one can be preset to material to be tracked each of on transmission line can be shown that identity is believed
The label (such as two dimensional code, bar code, radio-frequency identification code etc.) of breath, is then swept using the equipment with label respective type
It retouches, if can scan to obtain the identification information of material to be tracked, proves that the material is material to be tracked;Either
The material identification information tracked can be needed to be compared with user, if the two is identical, prove that the material is material to be tracked.
In another embodiment, when material is not provided with label information, it can be carried out based on machine vision technique
Identify whether material is material to be tracked.For example, material identification model can be constructed in advance, which can be based on any one
Obtained by multiple sample images of machine learning algorithm (such as depth convolutional neural networks) training, material image to be tracked is inputted into the mould
Type can know whether the material that tracking is wanted for user.
Certainly, identification of any the relevant technologies to material to be tracked progress identification information, this Shen can be used
Any restriction is not done to this please.
S102: the time of delivery value that material to be tracked is transmitted to the second detection switch from the first detection switch is obtained.
It is understood that time of delivery value is that material to be tracked from the first detection switch is transmitted to the second detection switch
The time of actual consumption.
It should be noted that in order to improve the accuracy of material tracking, the first detection switch and the second detection switch can be with
Two adjacent detection switch;It certainly, can between the first detection switch and the second detection switch in order to improve material tracking efficiency
One or more detection switch can be set.
S103: judge whether the difference of time of delivery value and preset time threshold is being preset in error range;If so, holding
Row S104;If it is not, then terminating to track.
Time threshold is standard time needed for transmitting material to be tracked in the pre-determined distance section of pipeline, time threshold
It is mutually unique corresponding with pre-determined distance segment value, that is to say, that after time threshold is pre-set, the first detection switch and the second inspection
Survey switch before distance be exactly stablize it is constant.For example, time threshold (1s) is that material is examined from two that spacing is 1m
Required time when surveying switch normal transmission then the distance between the first detection switch and the second detection switch are 1m, and conveys
Time value is any one of (1-a, 1+a) value, and a is error amount, if the data obtained when 1s is two adjacent switch experiments, that
First detection switch is adjacent with the second detection switch;The data obtained when if 1s is two non-conterminous switch experiments, then first
Detection switch number between detection switch and the second detection switch is identical as the detection switch number in experimentation, such as in fact
During testing, material is transmitted to the standard time needed for detection switch K2 is transmitted to detection switch K3 again from detection switch K1 and is
1s, then being additionally provided with a detection switch between the first detection switch and the second detection switch on transmission line, and every two is examined
The spacing surveyed between switch is identical as every two detection switch spacing in experimentation.
Experiment can be first passed through and obtain the time that single material conveys between adjacent detection switch, when then material conveys
Record the time between each adjacent detection switch in real time, and compared with the time obtained before, by the range of time difference come
Determine material tracking situation.
Default error range can determine according to practical application scene, user's accuracy requirement and hardware device parameter configuration
Fixed, the application does not do any restriction to this.
S104: material to be tracked is continued to convey and is tracked.
In the present embodiment, if the identification information of material to be tracked can be both identified, and time of delivery value is in error
In range, then showing that the tracking process of material to be tracked is accurate, tracking can proceed with.
In technical solution provided in an embodiment of the present invention, time of the material in two detection switch transmission processes is utilized
Difference tracks material, reads in real time time of the material Jing Guo two detection switch, and with preset value, carry out pair
Than the value is that material passes through required time under normal circumstances, to can determine whether material tracks success, realizes material more
Efficiently, stablize, be accurately tracked by, greatly increase the stability of material conveying and later period sorting;In addition, defeated using material
The time difference sent tracks material, can save the quantity of detection switch, longer installation detection switch can be spaced on pipeline,
Sorting port will not cause sorting abnormal because of the erroneous judgement of detection switch, not only strengthen the stability of system, can also reduce detection
Cost is switched, and then reduces the cost of whole system.
Present invention also provides another embodiments, referring to Fig. 2, can include:
S201: material to be tracked is conveyed, and judges whether the identification information of material to be tracked can be identified, if
It is then to execute S202;If it is not, then executing S208;
S202: it when detecting that material to be tracked enters the first detection switch, opens time set and carries out timing.
S203: judging whether material to be tracked enters adjacent next detection switch, if so, S204 is executed, if it is not,
Then continue timing.
S204: timing terminates, and saves timing duration value.
Timing duration value herein is the time of delivery value in above-described embodiment.
S205: judge whether the difference of timing duration value and preset time threshold is being preset in error range;If so, holding
Row S206;If it is not, then terminating to track.
S206: time set is resetted.
S207: judge whether to need to continue to track, execute S203 if so, jumping back to;If it is not, then terminating to track.
S208: then material to be tracked is flowed back or is abandoned.
Abandoning can be that the material to be tracked is rejected from pipeline.
The step or method identical as above-mentioned implementation of the embodiment of the present invention, see the description of above-described embodiment, herein, just
It repeats no more.
For the embodiment of the present invention, the application combination computer program is schematically implemented to illustrate that it was realized with one
Journey, it may include:
Start timing according to CPU scan period itself;
Material [i] is conveyed on the conveyor line, reaches n# detection switch, [i] is cycle index, refers in pipeline
On the stock number that is conveyed;
Time [j] timing starts, and [j] is cycle index, refers to the timing time number of corresponding material;
Material [i] enters n+1# detection switch, i.e. material is delivered on the conveyor line at the detection switch of next installation;
When material enters n+1# detection switch, the value in time [j] is taken out, is stored in t [j], and by its time [j]
It resets, reclocking;
Material [i] enters n+2# detection switch, i.e., the detection that material is delivered to next installation of n+1 on the conveyor line is opened
At pass;
When material enters n+2# detection switch, the value in time [j] is taken out, is stored in t+1 [j], and by its time
[j] resets, reclocking;Repeat always in this way, takes out time of each material Jing Guo each adjacent detection switch;
Material [i] is conveyed on the conveyor line;
Material [i] is by identifying the attribute of material by the methods of vision, barcode scanning or detection at identification;
Material [i] is conveyed on the conveyor line, reaches n# detection switch;
Material [i] continues to convey on the conveyor line after n# detection switch;
Material [i] reaches n+1# detection switch;
The time t [j] taken out in timing procedure judges whether coincidence loss range compared with setting value t ';
Not in error range or material attribute is unidentified, material does not continue to track, and is flowed back or is rejected for judgement
Movement;
Judge in error range, and material attribute is identified, material continues to convey, and is tracked;
Material [i] reaches n+2# detection switch;
Take out the time t+1 [j] in timing procedure;
By time t+1 [j] compared with setting value t+1 ', judge whether coincidence loss range;
Not in error range or material attribute is unidentified, material does not continue to track, and is flowed back or is rejected for judgement
Movement;
Judge in error range, and material attribute is identified, material continues to convey, and is tracked, and subsequent tracking is successively
Analogize, until tracking is completed.
From the foregoing, it will be observed that the embodiment of the present invention realizes, material is more efficient, stablizes, is accurately tracked by, and advantageously ensures that object
The stable operation of material conveying and later period sorting, also helping reduces detection switch cost.
In addition, being please referred to shown in Fig. 3 present invention also provides another embodiment, it may include:
S301: judging whether the identification information of material to be tracked can be identified, if so, executing S302;If it is not, then
Terminate tracking.
S302: obtain first time of the material to be tracked when entering the first detection switch and when the second detection switch the
Two times.
S303: the difference at the first time with the second time is calculated, as time of delivery value.
Time of delivery value be material to be tracked from the first detection switch be transmitted to the second detection switch actual consumption when
Between.
S304: judge whether the difference of time of delivery value and preset time threshold is being preset in error range;If so, holding
Row S305;If it is not, then terminating to track.
S305: material to be tracked is continued to convey and is tracked.
The step or method identical as above-mentioned implementation of the embodiment of the present invention, see the description of above-described embodiment, herein, just
It repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention realizes, material is more efficient, stablizes, is accurately tracked by, and advantageously ensures that object
The stable operation of material conveying and later period sorting, also helping reduces detection switch cost.
The embodiment of the present invention provides corresponding realization device also directed to the tracking and controlling method of production logistics, further makes
It obtains the method and has more practicability.It is situated between below to the follow-up control apparatus of production logistics provided in an embodiment of the present invention
It continues, the tracking and controlling method of the follow-up control apparatus of production logistics described below and above-described production logistics can be mutually right
It should refer to.
Referring to fig. 4, Fig. 4 is the follow-up control apparatus of production logistics provided in an embodiment of the present invention in a kind of specific embodiment party
Structure chart under formula, the device can include:
Time-obtaining module 401, it is identified for the identification information when material to be tracked, obtain the object to be tracked
Material is transmitted to the time of delivery value of the second detection switch from the first detection switch.
Material successfully tracks module 402, if for time of delivery value and the difference of preset time threshold in default error model
In enclosing, then material to be tracked is continued to convey and be tracked;Time threshold is to be tracked to transmit in the pre-determined distance section of pipeline
Standard time needed for material, the distance between the first detection switch and the second detection switch are distance segment.
Optionally, in some embodiments of the present embodiment, referring to Fig. 5, described device may include reflux module
403, if material to be tracked is carried out not in default error range for time of delivery value and the difference of preset time threshold
Reflux.
In another embodiment, described device for example can also include rejecting module 404, if being used for time of delivery
Value and the difference of preset time threshold are not being preset in error range, then material to be tracked is rejected from current pipeline.
Optionally, the time-obtaining module 401 can also be to obtain material to be tracked when entering the first detection switch
The second time when first time and the second detection switch;The difference at the first time with the second time is calculated, as time of delivery
The module of value.
In another embodiment, the time-obtaining module 401 for example can also detect material to be tracked to work as
Into the first detection switch, start timing;When detecting material to be tracked into the second detection switch, timing terminates;Obtain to
Track module of the material from the first detection switch to the second detection switch timing duration value, as time of delivery value.
The function of each functional module of the follow-up control apparatus of production logistics described in the embodiment of the present invention can be according to above-mentioned side
Method specific implementation in method embodiment, specific implementation process are referred to the associated description of above method embodiment, herein
It repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention realizes, material is more efficient, stablizes, is accurately tracked by, and advantageously ensures that object
The stable operation of material conveying and later period sorting, also helping reduces detection switch cost.
The embodiment of the invention also provides a kind of tracing control equipment of production logistics, specifically can include:
Memory, for storing computer program;
Processor realizes the tracing control of production logistics described in any one embodiment as above for executing computer program
The step of method.
The function of each functional module of the tracing control equipment of production logistics described in the embodiment of the present invention can be according to above-mentioned side
Method specific implementation in method embodiment, specific implementation process are referred to the associated description of above method embodiment, herein
It repeats no more.
From the foregoing, it will be observed that the embodiment of the present invention realizes, material is more efficient, stablizes, is accurately tracked by, and advantageously ensures that object
The stable operation of material conveying and later period sorting, also helping reduces detection switch cost.
The embodiment of the invention also provides a kind of computer readable storage mediums, are stored with the tracing control journey of production logistics
Sequence, the as above tracking of production logistics described in any one embodiment when the tracing control program of the production logistics is executed by processor
The step of control method.
The function of each functional module of computer readable storage medium described in the embodiment of the present invention can be according to above method reality
The method specific implementation in example is applied, specific implementation process is referred to the associated description of above method embodiment, herein no longer
It repeats.
From the foregoing, it will be observed that the embodiment of the present invention realizes, material is more efficient, stablizes, is accurately tracked by, and advantageously ensures that object
The stable operation of material conveying and later period sorting, also helping reduces detection switch cost.
Each embodiment in this specification is described in a progressive manner, the highlights of each of the examples are with it is other
The difference of embodiment, same or similar part may refer to each other between each embodiment.For being filled disclosed in embodiment
For setting, since it is corresponded to the methods disclosed in the examples, so being described relatively simple, related place is referring to method part
Explanation.
Professional further appreciates that, unit described in conjunction with the examples disclosed in the embodiments of the present disclosure
And algorithm steps, can be realized with electronic hardware, computer software, or a combination of the two, in order to clearly demonstrate hardware and
The interchangeability of software generally describes each exemplary composition and step according to function in the above description.These
Function is implemented in hardware or software actually, the specific application and design constraint depending on technical solution.Profession
Technical staff can use different methods to achieve the described function each specific application, but this realization is not answered
Think beyond the scope of this invention.
The step of method described in conjunction with the examples disclosed in this document or algorithm, can directly be held with hardware, processor
The combination of capable software module or the two is implemented.Software module can be placed in random access memory (RAM), memory, read-only deposit
Reservoir (ROM), electrically programmable ROM, electrically erasable ROM, register, hard disk, moveable magnetic disc, CD-ROM or technology
In any other form of storage medium well known in field.
Above to a kind of tracking and controlling method of production logistics provided by the present invention, device, equipment and computer-readable
Storage medium is described in detail.Specific case used herein explains the principle of the present invention and embodiment
It states, the above description of the embodiment is only used to help understand the method for the present invention and its core ideas.It should be pointed out that for this skill
For the those of ordinary skill in art field, without departing from the principle of the present invention, several change can also be carried out to the present invention
Into and modification, these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims (10)
1. a kind of tracking and controlling method of production logistics characterized by comprising
When the identification information of material to be tracked is identified, the material to be tracked is obtained from the first detection switch and is transmitted to the
The time of delivery value of two detection switch;
Judge whether the difference of the time of delivery value and preset time threshold is being preset in error range;
If so, the material to be tracked is continued to convey and be tracked;
Wherein, when the time threshold is the standard needed for transmitting the material to be tracked in the pre-determined distance section of pipeline
Between, the distance between first detection switch and second detection switch are the distance segment.
2. the tracking and controlling method of production logistics according to claim 1, which is characterized in that when the judgement conveying
Between value and the difference of preset time threshold whether in default error range after, further includes:
If the time of delivery value and the difference of preset time threshold be not in default error range, by the material to be tracked
It flows back.
3. the tracking and controlling method of production logistics according to claim 1, which is characterized in that when the judgement conveying
Between value and the difference of preset time threshold whether in default error range after, further includes:
If the time of delivery value and the difference of preset time threshold in default error range, are not picked from current pipeline
Except the material to be tracked.
4. according to claim 1 to the tracking and controlling method of production logistics described in 3 any one, which is characterized in that described to obtain
The time of delivery value for taking the material to be tracked to be transmitted to the second detection switch from the first detection switch includes:
Obtain first time of the material to be tracked when entering first detection switch and when second detection switch
The second time;
The difference for calculating the first time and second time, as time of delivery value.
5. according to claim 1 to the tracking and controlling method of production logistics described in 3 any one, which is characterized in that described to obtain
The time of delivery value for taking the material to be tracked to be transmitted to the second detection switch from the first detection switch includes:
When detect the material to be tracked enter first detection switch, start timing;
When detecting the material to be tracked into second detection switch, timing terminates;
The material to be tracked is obtained from first detection switch to the second detection switch timing duration value, as conveying
Time value.
6. the tracking and controlling method of production logistics according to claim 4, which is characterized in that first detection switch and
Second detection switch is adjacent.
7. a kind of follow-up control apparatus of production logistics characterized by comprising
Time-obtaining module, it is identified for the identification information when material to be tracked, the material to be tracked is obtained from the
One detection switch is transmitted to the time of delivery value of the second detection switch;
Material successfully tracks module, if for the time of delivery value and the difference of preset time threshold in default error range
It is interior, then the material to be tracked is continued to convey and be tracked;The time threshold is to transmit in the pre-determined distance section of pipeline
Standard time needed for the material to be tracked, the distance between first detection switch and second detection switch are institute
State distance segment.
8. the follow-up control apparatus of production logistics according to claim 7, which is characterized in that further include reflux module, use
If in the time of delivery value and the difference of preset time threshold not in default error range, by the material to be tracked into
Row reflux.
9. a kind of tracing control equipment of production logistics, which is characterized in that including processor, the processor is for executing storage
The step of the tracking and controlling method of production logistics as described in any one of claim 1 to 6 is realized when the computer program stored in device
Suddenly.
10. a kind of computer readable storage medium, which is characterized in that be stored with production object on the computer readable storage medium
The tracing control program of stream realizes such as claim 1 to 6 times when the tracing control program of the production logistics is executed by processor
The step of tracking and controlling method of one production logistics.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910304296.9A CN110038805A (en) | 2019-04-16 | 2019-04-16 | Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910304296.9A CN110038805A (en) | 2019-04-16 | 2019-04-16 | Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110038805A true CN110038805A (en) | 2019-07-23 |
Family
ID=67277402
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910304296.9A Pending CN110038805A (en) | 2019-04-16 | 2019-04-16 | Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110038805A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111707182A (en) * | 2020-06-29 | 2020-09-25 | 上海中商网络股份有限公司 | Product spacing detection system, method and device |
CN111871833A (en) * | 2020-07-14 | 2020-11-03 | 深圳路辉物流设备有限公司 | Automatic sorting method and device for sorting assembly line packages and storage medium |
CN111871835A (en) * | 2020-07-15 | 2020-11-03 | 深圳路辉物流设备有限公司 | Method and device for correcting package moving distance error of sorting production line and storage medium |
CN112317333A (en) * | 2020-09-30 | 2021-02-05 | 浙江星程吉月智能科技有限公司 | Detection method for lattice falling of crossed belt lattice |
CN112418768A (en) * | 2020-11-27 | 2021-02-26 | 中冶赛迪重庆信息技术有限公司 | Material tracking method, system, equipment and medium for iron and steel enterprise raw material plant |
CN112758633A (en) * | 2020-12-02 | 2021-05-07 | 深圳市宏讯实业有限公司 | Feeding control method, feeding control device, feeding system and storage medium |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05186033A (en) * | 1992-01-08 | 1993-07-27 | Toshiba Corp | Tracking control device |
CA2099402A1 (en) * | 1994-02-28 | 1995-08-29 | Ernest Peter Martin | Electronically aided, high speed species sorting and analysis system |
CN102909146A (en) * | 2012-10-23 | 2013-02-06 | 西安轨道交通装备有限责任公司 | Paint spraying control method and device for pretreatment line |
CN104692078A (en) * | 2015-02-03 | 2015-06-10 | 赵磊 | Method for monitoring running state of belt-type conveyer |
CN104772289A (en) * | 2015-01-29 | 2015-07-15 | 上海透云物联网科技有限公司 | Target product detection system, detection method thereof, and target product processing system |
CN105170483A (en) * | 2015-07-31 | 2015-12-23 | 重庆世纪精信实业(集团)有限公司 | Unqualified machined industrial mechanical arm product statistical method and device based on construction synchronization |
CN105955227A (en) * | 2016-07-15 | 2016-09-21 | 苏州西斯派克检测科技有限公司 | Object-oriented controller tracking control method on production line |
CN206218344U (en) * | 2016-11-30 | 2017-06-06 | 上海新增鼎数据科技有限公司 | A kind of offline accurate measuring device of product |
CN107784444A (en) * | 2017-10-31 | 2018-03-09 | 福建摩尔软件有限公司 | A kind of production schedule performs tracking |
CN109240283A (en) * | 2018-08-10 | 2019-01-18 | 安徽库讯自动化设备有限公司 | A kind of operating status Intelligentized regulating and controlling system based on the punctual rate analysis of AGV trolley |
-
2019
- 2019-04-16 CN CN201910304296.9A patent/CN110038805A/en active Pending
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05186033A (en) * | 1992-01-08 | 1993-07-27 | Toshiba Corp | Tracking control device |
CA2099402A1 (en) * | 1994-02-28 | 1995-08-29 | Ernest Peter Martin | Electronically aided, high speed species sorting and analysis system |
CN102909146A (en) * | 2012-10-23 | 2013-02-06 | 西安轨道交通装备有限责任公司 | Paint spraying control method and device for pretreatment line |
CN104772289A (en) * | 2015-01-29 | 2015-07-15 | 上海透云物联网科技有限公司 | Target product detection system, detection method thereof, and target product processing system |
CN104692078A (en) * | 2015-02-03 | 2015-06-10 | 赵磊 | Method for monitoring running state of belt-type conveyer |
CN105170483A (en) * | 2015-07-31 | 2015-12-23 | 重庆世纪精信实业(集团)有限公司 | Unqualified machined industrial mechanical arm product statistical method and device based on construction synchronization |
CN105955227A (en) * | 2016-07-15 | 2016-09-21 | 苏州西斯派克检测科技有限公司 | Object-oriented controller tracking control method on production line |
CN206218344U (en) * | 2016-11-30 | 2017-06-06 | 上海新增鼎数据科技有限公司 | A kind of offline accurate measuring device of product |
CN107784444A (en) * | 2017-10-31 | 2018-03-09 | 福建摩尔软件有限公司 | A kind of production schedule performs tracking |
CN109240283A (en) * | 2018-08-10 | 2019-01-18 | 安徽库讯自动化设备有限公司 | A kind of operating status Intelligentized regulating and controlling system based on the punctual rate analysis of AGV trolley |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111707182A (en) * | 2020-06-29 | 2020-09-25 | 上海中商网络股份有限公司 | Product spacing detection system, method and device |
CN111707182B (en) * | 2020-06-29 | 2022-06-03 | 上海中商网络股份有限公司 | Product spacing detection system, method and device |
CN111871833A (en) * | 2020-07-14 | 2020-11-03 | 深圳路辉物流设备有限公司 | Automatic sorting method and device for sorting assembly line packages and storage medium |
CN111871835A (en) * | 2020-07-15 | 2020-11-03 | 深圳路辉物流设备有限公司 | Method and device for correcting package moving distance error of sorting production line and storage medium |
CN112317333A (en) * | 2020-09-30 | 2021-02-05 | 浙江星程吉月智能科技有限公司 | Detection method for lattice falling of crossed belt lattice |
CN112418768A (en) * | 2020-11-27 | 2021-02-26 | 中冶赛迪重庆信息技术有限公司 | Material tracking method, system, equipment and medium for iron and steel enterprise raw material plant |
CN112758633A (en) * | 2020-12-02 | 2021-05-07 | 深圳市宏讯实业有限公司 | Feeding control method, feeding control device, feeding system and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110038805A (en) | Tracking and controlling method, device, equipment and the readable storage medium storing program for executing of production logistics | |
CN109389275B (en) | Image annotation method and device | |
CN109840504B (en) | Article taking and placing behavior identification method and device, storage medium and equipment | |
CN103389937A (en) | Interface testing method and device | |
CN112052813B (en) | Method and device for identifying translocation between chromosomes, electronic equipment and readable storage medium | |
CN108830180A (en) | Electronic check-in method, device and electronic equipment | |
CN110309060B (en) | Detection method and device for updating identification algorithm, storage medium and computer equipment | |
US10083334B2 (en) | Barcode reconstruction utilizing a sequence alignment matrix | |
CN110288032A (en) | A kind of vehicle driving trace type detection method and device | |
CN109840503B (en) | Method and device for determining category information | |
CN110610169B (en) | Picture marking method and device, storage medium and electronic device | |
CN109919035A (en) | Improve method, apparatus, computer equipment and storage medium that attendance is identified by | |
CN103473492A (en) | Method and user terminal for recognizing permission | |
CN109993021A (en) | The positive face detecting method of face, device and electronic equipment | |
CN109902475A (en) | Identifying code image generating method, device and electronic equipment | |
CN109711503A (en) | A kind of robot localization method and device | |
CN107223257A (en) | Method of testing, test server and system | |
CN113780484A (en) | Industrial product defect detection method and device | |
CN102855635A (en) | Method and device for determining human body action cycles and recognizing human body actions | |
CN109241998A (en) | model training method, device, equipment and storage medium | |
CN101763506B (en) | Facial image tracking apparatus and method | |
CN103049747A (en) | Method for re-identifying human body images by utilization skin color | |
CN110443328A (en) | Fake method, device, equipment and medium are tested in identification based on LED antifalsification label | |
CN106887157A (en) | Parking stall enters car, goes out car data correlating method and device | |
CN116532414A (en) | Automatic cleaning method and device for dairy product production line, electronic equipment and medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190723 |