CN110031380A - A kind of method of scene nondestructive measurement celluar concrete infiltration rate - Google Patents

A kind of method of scene nondestructive measurement celluar concrete infiltration rate Download PDF

Info

Publication number
CN110031380A
CN110031380A CN201910422625.XA CN201910422625A CN110031380A CN 110031380 A CN110031380 A CN 110031380A CN 201910422625 A CN201910422625 A CN 201910422625A CN 110031380 A CN110031380 A CN 110031380A
Authority
CN
China
Prior art keywords
vertical tube
water
infiltration
interior
infiltration rate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910422625.XA
Other languages
Chinese (zh)
Inventor
朱亚洲
杨张兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Collier Environmental Protection Technology Co Ltd
Original Assignee
Collier Environmental Protection Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Collier Environmental Protection Technology Co Ltd filed Critical Collier Environmental Protection Technology Co Ltd
Priority to CN201910422625.XA priority Critical patent/CN110031380A/en
Publication of CN110031380A publication Critical patent/CN110031380A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N15/00Investigating characteristics of particles; Investigating permeability, pore-volume or surface-area of porous materials
    • G01N15/08Investigating permeability, pore-volume, or surface area of porous materials

Landscapes

  • Chemical & Material Sciences (AREA)
  • Dispersion Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Examining Or Testing Airtightness (AREA)

Abstract

The invention discloses a kind of methods of live nondestructive measurement celluar concrete infiltration rate, are related to celluar concrete technical field, include the following steps that (1) vertical tube is installed;(2) leak check;(3) water level, time measurement;(4) infiltration rate determines.The present invention can be achieved live quick nondestructive and measure celluar concrete infiltration rate, improve the efficiency and precision of in-site measurement, save measurement cost.

Description

A kind of method of scene nondestructive measurement celluar concrete infiltration rate
Technical field
The present invention relates to celluar concrete technical fields, and in particular to a kind of scene of celluar concrete infiltration rate is lossless Measurement method.
Background technique
Infiltration rate is one of important performance indexes of celluar concrete.In celluar concrete use process, impurity is stifled Consent gap can be substantially reduced its infiltration coefficient, influence service performance.It is live quickly to determine water permeability to the dimension of celluar concrete Shield maintenance is significant.The measurement of celluar concrete water permeability has two class method of coring and in-site measurement.Coring measurement at This height, low efficiency, and can have an adverse effect to concrete structure, the multiple measurement not being suitable for during maintenance.It is existing Some on-site measurement method low measurement accuracy, horizontal and vertical infiltration rate are difficult to measure respectively.
Summary of the invention
The present invention provides a kind of method of celluar concrete scene infiltration rate measurement, and measurement fast results are accurate and right Celluar concrete does not damage, and progress can be repeated several times.
To achieve the above object, the technical solution adopted by the present invention are as follows:
1. a kind of method of scene nondestructive measurement celluar concrete infiltration rate, which comprises the following steps:
(1) vertical tube is installed
Centered on measurement point, the hollow vertical tube of different-diameter is fixed respectively by concentric mode with glue.
(2) leak check
Before permeability test, it should be ensured that vertical tube and cellular concrete surface contact position good seal, no drainage.If having Leakage, then must spreading glue again, until good seal.
(3) water level, time measurement
Vernier caliper is placed in interior vertical tube.A certain amount of water is injected in interior vertical tube, records time t respectively as needed1, t2 When interior vertical tube in water surface elevation h1, h2.It in measurement process, is filled the water in outer vertical tube with constant flow rate, guarantees that water level is permanent in outer vertical tube Fixed, water body, which only occurs vertically to permeate, in guarantee celluar concrete does not occur horizontal infiltration.
(4) infiltration rate determines
Wherein, vertical tube is without top, bottomless, hollow plastic tube in the step (1).Outer stack diameter is recommended in 300- Between 600mm, it can be adjusted according to different aggregate sizes.Interior stack diameter is the half of outer stack diameter.
Wherein, in the step (2) leak check method are as follows:
(1) inwardly in vertical tube injection certain altitude water, after the completion of infiltration in the outer vertical tube of observation cellular concrete surface without Water stain, then interior vertical tube leakproofness is good;If it is water stain to observe that concrete surface occurs, there is leakage in interior vertical tube junction.
(2) after cellular concrete surface is dry in interior vertical tube, the water of certain altitude is injected in outer vertical tube, after the completion of infiltration Cellular concrete surface and the equal water stain-free of the outer cellular concrete surface of outer vertical tube in interior vertical tube are observed, then outer vertical tube leakproofness is good It is good.If it is water stain to observe that concrete surface occurs, there is leakage in outer vertical tube junction.
Wherein, in the step (3), water injection rate can be according to water amount required in celluar concrete use process in interior vertical tube It determines;It is described record data time interval can according to the observation water level decreasing speed determine.
Wherein, in the step (4), the determination of infiltration rate can results are averaged or many according to multiple permeability test Number.
The utility model has the advantages that
1. the being sealed property inspection of the invention before permeability test starts effectively reduces vertical tube and celluar concrete contact The measurement error that face leakage generates.
2. the present invention reduces influence of the horizontal infiltration to measurement result, improves using the hydraulic pressure of constant water level in outer vertical tube Measurement accuracy.
3. live quick, multiple, nondestructive measurement can be achieved in the present invention, cost is reduced, accidental error is reduced.
Specific embodiment
Present invention will be further explained below with reference to specific examples.These embodiments are merely to illustrate the present invention and do not have to In limiting the scope of the invention.
Embodiment
A kind of method of scene nondestructive measurement celluar concrete infiltration rate, which comprises the following steps:
(1) vertical tube is installed
Centered on measurement point, the hollow vertical tube of different-diameter is fixed respectively by concentric mode with glue.
(2) leak check
Before permeability test, it should be ensured that vertical tube and cellular concrete surface contact position good seal, no drainage.If having Leakage, then must spreading glue again, until good seal.
(3) water level, time measurement
Vernier caliper is placed in interior vertical tube.The water of about 5.4L is injected in interior vertical tube, as needed respectively record time 5s and Water surface elevation 273.2mm and 102.0mm when 125s in interior vertical tube.It in measurement process, is filled the water, is protected with constant flow rate in outer vertical tube Constant level in outer vertical tube is demonstrate,proved, water body, which only occurs vertically to permeate, in guarantee celluar concrete does not occur horizontal infiltration.
(4) infiltration rate determines
Wherein, vertical tube is without top, bottomless, hollow plastic tube in the step (1).Outer stack diameter is 300mm, interior perpendicular Pipe diameter is 150mm, the high 300mm of vertical tube.
Wherein, in the step (2) leak check method are as follows:
(1) water is inwardly filled in vertical tube, cellular concrete surface water stain-free in the outer vertical tube of observation, then interior perpendicular after the completion of infiltration Composite pipe tightness is good;If it is water stain to observe that concrete surface occurs, there is leakage in interior vertical tube junction.
(2) after cellular concrete surface is dry in interior vertical tube, water is filled in outer vertical tube, interior vertical tube is observed after the completion of infiltration Interior cellular concrete surface and the equal water stain-free of the outer cellular concrete surface of outer vertical tube, then outer vertical tube leakproofness is good.If observing Concrete surface appearance is water stain, then there is leakage in outer vertical tube junction.
Wherein, in the step (3), water injection rate can be according to water amount required in celluar concrete use process in interior vertical tube It determines;It is described record data time interval can according to the observation water level decreasing speed determine.
Wherein, in the step (4), measurement point has carried out the test of 4 sub-percolations, and infiltration rate is respectively 514cm/h, 531cm/h, 520cm/h, 497cm/h finally determine that the infiltration rate is 515cm/h.

Claims (5)

1. a kind of method of scene nondestructive measurement celluar concrete infiltration rate, which comprises the following steps:
(1) vertical tube is installed
Centered on measurement point, the hollow vertical tube of different-diameter is fixed respectively by concentric mode with glue.
(2) leak check
Before permeability test, it should be ensured that vertical tube and cellular concrete surface contact position good seal, no drainage.If there is infiltration Leakage, then must spreading glue again, until good seal.
(3) water level, time measurement
Vernier caliper is placed in interior vertical tube.A certain amount of water is injected in interior vertical tube, records time t respectively as needed1, t2When it is interior Water surface elevation h in vertical tube1, h2.It in measurement process, is filled the water in outer vertical tube with constant flow rate, guarantees constant level in outer vertical tube, Water body, which only occurs vertically to permeate, in guarantee celluar concrete does not occur horizontal infiltration.
(4) infiltration rate determines
2. a kind of live non-destructive measuring method of celluar concrete infiltration rate according to claim 1, which is characterized in that Vertical tube is without top, bottomless, hollow plastic tube in the step (1).Outer stack diameter is recommended between 300-600mm, can root It is adjusted according to different aggregate sizes.Interior stack diameter is the half of outer stack diameter.
3. a kind of live non-destructive measuring method of celluar concrete infiltration rate according to claim 1, which is characterized in that The method of leak check in the step (2) are as follows:
(1) water that certain altitude is inwardly injected in vertical tube, cellular concrete surface water stain-free in the outer vertical tube of observation after the completion of infiltration, Then interior vertical tube leakproofness is good;If it is water stain to observe that concrete surface occurs, there is leakage in interior vertical tube junction.
(2) after cellular concrete surface is dry in interior vertical tube, the water of certain altitude is injected in outer vertical tube, is observed after the completion of infiltration Cellular concrete surface and the equal water stain-free of the outer cellular concrete surface of outer vertical tube in interior vertical tube, then outer vertical tube leakproofness is good.If It is water stain to observe that concrete surface occurs, then there is leakage in outer vertical tube junction.
4. a kind of live non-destructive measuring method of celluar concrete infiltration rate according to claim 1, which is characterized in that In the step (3), water injection rate can be determined according to water amount required in celluar concrete use process in interior vertical tube;The record The time interval of data can according to the observation water level decreasing speed determine.
5. a kind of live non-destructive measuring method of celluar concrete infiltration rate according to claim 1, which is characterized in that In the step (4), infiltration rate determination can results are averaged or mode according to multiple permeability test.
CN201910422625.XA 2019-05-21 2019-05-21 A kind of method of scene nondestructive measurement celluar concrete infiltration rate Pending CN110031380A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910422625.XA CN110031380A (en) 2019-05-21 2019-05-21 A kind of method of scene nondestructive measurement celluar concrete infiltration rate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910422625.XA CN110031380A (en) 2019-05-21 2019-05-21 A kind of method of scene nondestructive measurement celluar concrete infiltration rate

Publications (1)

Publication Number Publication Date
CN110031380A true CN110031380A (en) 2019-07-19

Family

ID=67242791

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910422625.XA Pending CN110031380A (en) 2019-05-21 2019-05-21 A kind of method of scene nondestructive measurement celluar concrete infiltration rate

Country Status (1)

Country Link
CN (1) CN110031380A (en)

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576414A1 (en) * 1985-01-18 1986-07-25 Rech Geolog Miniere Apparatus for measuring the permeability of ground and more particularly formations with very low permeability, of the double ring type
CN201561922U (en) * 2009-12-07 2010-08-25 长沙理工大学 In situ precision control permeameter
CN102435540A (en) * 2011-10-31 2012-05-02 河海大学 Shallow sand permeability coefficient measuring system and method
CN202793989U (en) * 2012-09-23 2013-03-13 西安科技大学 Light constant head permeameter for porous concrete
CN202793990U (en) * 2012-09-23 2013-03-13 西安科技大学 Constant head multihole concrete penetrometer
CN106769761A (en) * 2016-12-14 2017-05-31 镇江市建科工程质量检测中心有限公司 A kind of method and device of in-site measurement pervious concrete infiltration coefficient
CN107340215A (en) * 2016-12-26 2017-11-10 江苏苏博特新材料股份有限公司 A kind of test device and method of testing for testing pervious concrete pavement coefficient of permeability
CN206671143U (en) * 2017-05-05 2017-11-24 中国地质调查局南京地质调查中心 A kind of full-automatic double-ring infiltration instrument
CN107764713A (en) * 2017-09-19 2018-03-06 刘学浩 The home position testing method of range-adjustable double-ring infiltration device and soil permeability coefficient
CN207379886U (en) * 2017-09-19 2018-05-18 刘学浩 Discrete range-adjustable double-ring infiltration device
CN207528604U (en) * 2017-12-11 2018-06-22 广西壮族自治区水利科学研究院 One kind is planted raw eco-concrete device for determining permeation coefficient
CN207557065U (en) * 2017-12-21 2018-06-29 山东大学 A kind of porous pavement infiltration coefficient in situ detection instrument
CN109342286A (en) * 2018-09-17 2019-02-15 北京市水科学技术研究院 A kind of permeable pavement ground water permeability on-the-spot test method and device
WO2019033467A1 (en) * 2017-08-16 2019-02-21 刘学浩 Range-adjustable dual-ring infiltration apparatus and in-situ testing method for soil permeability coefficient

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2576414A1 (en) * 1985-01-18 1986-07-25 Rech Geolog Miniere Apparatus for measuring the permeability of ground and more particularly formations with very low permeability, of the double ring type
CN201561922U (en) * 2009-12-07 2010-08-25 长沙理工大学 In situ precision control permeameter
CN102435540A (en) * 2011-10-31 2012-05-02 河海大学 Shallow sand permeability coefficient measuring system and method
CN202793989U (en) * 2012-09-23 2013-03-13 西安科技大学 Light constant head permeameter for porous concrete
CN202793990U (en) * 2012-09-23 2013-03-13 西安科技大学 Constant head multihole concrete penetrometer
CN106769761A (en) * 2016-12-14 2017-05-31 镇江市建科工程质量检测中心有限公司 A kind of method and device of in-site measurement pervious concrete infiltration coefficient
CN107340215A (en) * 2016-12-26 2017-11-10 江苏苏博特新材料股份有限公司 A kind of test device and method of testing for testing pervious concrete pavement coefficient of permeability
CN206671143U (en) * 2017-05-05 2017-11-24 中国地质调查局南京地质调查中心 A kind of full-automatic double-ring infiltration instrument
WO2019033467A1 (en) * 2017-08-16 2019-02-21 刘学浩 Range-adjustable dual-ring infiltration apparatus and in-situ testing method for soil permeability coefficient
CN107764713A (en) * 2017-09-19 2018-03-06 刘学浩 The home position testing method of range-adjustable double-ring infiltration device and soil permeability coefficient
CN207379886U (en) * 2017-09-19 2018-05-18 刘学浩 Discrete range-adjustable double-ring infiltration device
CN207528604U (en) * 2017-12-11 2018-06-22 广西壮族自治区水利科学研究院 One kind is planted raw eco-concrete device for determining permeation coefficient
CN207557065U (en) * 2017-12-21 2018-06-29 山东大学 A kind of porous pavement infiltration coefficient in situ detection instrument
CN109342286A (en) * 2018-09-17 2019-02-15 北京市水科学技术研究院 A kind of permeable pavement ground water permeability on-the-spot test method and device

Similar Documents

Publication Publication Date Title
CN105588796B (en) A kind of device of accurate quick measure soil permeability coefficient
CN201130143Y (en) Porous medium material permeability coefficient determinator
AU2020104274A4 (en) An instrument for measuring soil permeability coefficient under the action of freeze-thaw cycle
US9459192B2 (en) Water absorption test method and water absorption test device for concrete surface
WO2017028716A1 (en) Nondestructive detection method for concrete anti-permeability
CN103674799B (en) The device and method of a kind of mensurated gas composition axial diffusion coefficient in porous medium
CN203732408U (en) Testing device for permeation coefficient of pervious concrete
US20150377853A1 (en) Test device
CN103149140A (en) Porous media air permeability estimating device
CN203672756U (en) Indoor constant head test device for anisotropic soil bidirectional permeability coefficient
CN206114469U (en) That simulates different filler cracks moves water slip casting test device
CN103235107B (en) Pressure plate testing device capable of controlling suction force by negative pore water pressure
CN108982327A (en) A kind of damage concrete permeability detection device
CN105973782A (en) Determination instrument and determination method for osmotic coefficients of drilling and coring test part
CN103760085A (en) Test device for measuring multiscale rock permeability and test method
CN103033459B (en) Device for testing horizontal permeability of cement-soil deep mixing column indoors and test method
CN108375532A (en) Infiltration experiment device and test method
CN206440587U (en) A kind of test device of novel water permeable concrete permeable coefficient
CN111272634A (en) Permeable pavement permeability coefficient on-site measurement device and method
CN110031380A (en) A kind of method of scene nondestructive measurement celluar concrete infiltration rate
CN114428048A (en) Device and method for measuring permeability coefficient of lock catch and water stop strip structure
CN108226006A (en) The test method of cement-based material fluid permeability
CN109556931A (en) Soil cement cutting ring sample preparation facilities and permeability coefficient of cement soil measuring method, equipment
CN111337407A (en) Device and method for testing impermeability and durability of precast concrete joint
CN109520905A (en) A kind of permeable heterogeneity measurement device of pervious concrete and its test method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190719

WD01 Invention patent application deemed withdrawn after publication