CN110031167A - Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state - Google Patents

Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state Download PDF

Info

Publication number
CN110031167A
CN110031167A CN201910272486.7A CN201910272486A CN110031167A CN 110031167 A CN110031167 A CN 110031167A CN 201910272486 A CN201910272486 A CN 201910272486A CN 110031167 A CN110031167 A CN 110031167A
Authority
CN
China
Prior art keywords
module
tube
adjustment module
standpipe
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910272486.7A
Other languages
Chinese (zh)
Inventor
许玉旺
付世晓
付雪鹏
何玥
张萌萌
胡瀚文
张智奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Jiaotong University
Original Assignee
Shanghai Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jiaotong University filed Critical Shanghai Jiaotong University
Priority to CN201910272486.7A priority Critical patent/CN110031167A/en
Publication of CN110031167A publication Critical patent/CN110031167A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M10/00Hydrodynamic testing; Arrangements in or on ship-testing tanks or water tunnels
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M7/00Vibration-testing of structures; Shock-testing of structures

Abstract

The present invention provides a kind of experimental provision for simulating two-tube interference dynamic response under vertical forced oscillation state, includes top movements module, pretension adjustment module, two-tube relative position adjustment module, riser end adjustment module, deep sea vertical pipe group module measure analysis module, bottom locating module.Top movements module is fixed on horizontal trailer, is connect in vertical direction with pretension adjustment module.Deep sea vertical pipe module both ends are sequentially connected riser end adjustment module, two-tube relative position adjustment module, and the two-tube relative position adjustment module in bottom end is connect with bottom locating module.Measurement analysis module is fixed on the support frame of top movements module, and bottom locating module is fixed on the lifting vacation bottom in pond.The configuration of the present invention is simple, operating condition changes quick and convenient in experimentation, and flexibility is high, and operation is simple, and measurement precisely, can simulate two-tube interference vortex-induced vibration under vertical forced oscillation state and respond, analyze its response characteristic.

Description

Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state
Technical field
The present invention relates to field of ocean engineering, and in particular, to two-tube under a kind of vertical forced oscillation state of simulation Interfere dynamic response experimental provision, more particularly, under a kind of vertical forced oscillation state of simulation, two standpipes form two-tube Interfere the experimental provision of dynamic response under the influence of interference effect.
Background technique
Offshore Platform such as oil exploration platform, work standpipe are long fine flexible structure.Standpipe can be due to top horizontal The movement of platform, and moving back and forth in water carries out forming a kind of oscillatory flow relative to standpipe, structural fatigue caused by vibrating or Possible resonance is serious to cause great prestige to the safety of marine structure other than it can accelerate the aging of device work The side of body.
For Offshore Platform, work standpipe often more than one, such as the four columns of semi-submerged platform, with And numerous tension legs of tension leg platform (TLP), therefore there are interfere with each other between work standpipe.Due to mutual dry between standpipe It relates to, the vortex-induced vibration mechanism and phenomenon of two root canals are more complicated for single pipe.From domestic and international researcher to such From the point of view of the research of phenomenon, with theory carries out Accurate Prediction be it is almost impossible, test be only most effective way.
But present experimental provision is generally existing following insufficient: (1) due to the complexity of experimental provision, two-tube interference phase It is seldom to close experiment;(2) operating condition is very single with respect to for actual conditions, cannot be preferably to the work standpipe in actual conditions Vortex-induced vibration is precisely predicted;(3) standpipe strain measurement error is larger causes subsequent arithmetic relatively large deviation occur.
Summary of the invention
For the defects in the prior art, the object of the present invention is to provide two-tube under a kind of vertical forced oscillation state of simulation Interfere dynamic response experimental provision.
Two-tube interference dynamic response experimental provision under a kind of vertical forced oscillation state of the simulation provided according to the present invention, packet Top movements module is included, pretension adjustment module, two-tube interference system measure analysis module, bottom locating module;
The top of top movements module, top movements module and the one of pretension adjustment module is arranged in measurement analysis module End connects in vertical direction, and position of the pretension adjustment module on top movements module level direction can be adjusted;
The other end of pretension adjustment module is connect with the upper end of two-tube interference system, the lower end of two-tube interference system It is connect with bottom locating module;
Measurement analysis module includes data collection processor, vertical movement controller, and the vertical movement controller makes Two-tube interference system does vertical force and shakes movement, and the data collection processor can acquire two-tube interference system movement number According to.
Preferably, two-tube interference system includes two-tube relative position adjustment module, riser end adjustment module, deep sea vertical pipe Group module;
Deep sea vertical pipe group module is made of two standpipes, and the both ends of every standpipe are separately connected a riser end and adjust mould Block, the lower section of two-tube relative position adjustment module is arranged in the riser end adjustment module connecting with standpipe upper end, under standpipe The top of two-tube relative position adjustment module is arranged in the riser end adjustment module of end connection.
Preferably, two-tube relative position adjustment module includes two-tube position adjustable plate, supervisor's connecting flange device, looped pipeline company Acting flange device, center flange device, nut;
Supervisor's connecting flange device, looped pipeline connecting flange device are connected with a corresponding standpipe respectively;
Two-tube position adjustable plate is connected by center flange device with pretension adjustment module, on two-tube position adjustable plate It is provided with looped pipeline shifting chute, looped pipeline connecting flange device is fixed in the looped pipeline shifting chute by nut, two-tube to adjust Spacing.
Preferably, riser end adjustment module includes three component instrument sensors, riser end fixture, universal joint and screw;
The fixing end of universal joint is connect with riser end fixture, one end of the movable end of universal joint and three component instrument sensors The other end of connection, three component instrument sensors is connected with supervisor's connecting flange device or looped pipeline connecting flange device, three component The data of instrument sensor are acquired by data collection processor;
Riser end fixture clamps standpipe, and screw can adjust standpipe by connecting with the threaded hole of riser end fixture Clamped degree.
Preferably, the surface of standpipe is evenly arranged with fibre optical sensor, and fibre optical sensor can measure the movement of standpipe, light The data of fiber sensor are acquired by data collection processor.
Preferably, top movements module include guide chain, it is support frame, top horizontal positioning track, top positioning sliding block, vertical Sliding rail, Power Component, upright slide block, radome fairing;
Measurement analysis module is connect with support frame, and the top of top horizontal positioning track is arranged in support frame;
Top horizontal positioning track is connect with guide chain;
Guide chain drives top positioning sliding block to adjust position, top positioning on top horizontal positioning track by Power Component Sliding block is connect with radome fairing;
Power Component is by vertical movement controller driving;
Vertical sliding track is arranged on radome fairing, and upright slide block can slide in vertical sliding track.
Preferably, pretension adjustment module includes end coupling, stretcher fixed plate and pressure spring tension assembly;
One end of end coupling is connect with upright slide block, and the other end of end coupling is connected with stretcher fixed plate It connects, pressure spring tension assembly can adjust the motion tension of two-tube interference system.
Preferably, bottom locating module includes bottom level positioning track, bottom positioning sliding block, bottom Power Component, vacation Bottom;
Bottom level positioning track is arranged on false bottom, and bottom level positioning track is parallel with top horizontal positioning track, Bottom Power Component drives bottom positioning sliding block to slide on bottom level positioning track;
Bottom positioning sliding block is connected with riser end adjustment module, and bottom Power Component is driven by vertical movement controller It is dynamic.
Preferably, measurement analysis module includes display, and the display being capable of real-time monitoring experimental result.
Compared with prior art, the present invention have it is following the utility model has the advantages that
1, the operating condition quantity that the present invention includes is more, great representativeness, and standpipe used is real work standpipe reduced scale, The vortex-induced vibration response condition of the work standpipe in real work can more be simulated;
2, the present invention more simplifies, convenient disassembly relative to other same devices, and operating condition conversion is easy, this is compared to other It is a huge progress for test device;
3, flexibility of the present invention is high, by the cooperation of pretension adjustment module and three component instrument sensors, it can be achieved that opposition Pipe pretension being precisely controlled and adjusting, can be adjusted according to actual condition.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention, Objects and advantages will become more apparent upon:
Fig. 1 is the structural schematic diagram of experimental provision provided by the invention;
Fig. 2 is the top structure figure of experimental provision provided by the invention;
Fig. 3 is the chart at the bottom of of experimental provision provided by the invention;
Fig. 4 is the structural schematic diagram of top movements module provided by the invention;
Fig. 5 is the structural schematic diagram of pretension adjustment module provided by the invention;
Fig. 6 is the structural schematic diagram of two-tube relative position adjustment module provided by the invention;
Fig. 7 is the side view of two-tube relative position adjustment module provided by the invention;
Fig. 8 is the structural schematic diagram of riser end adjustment module provided by the invention;
Fig. 9 is the scheme of installation of riser end provided by the invention;
Figure 10 is the structural schematic diagram of bottom locating module provided by the invention;
Figure 11 is the structural schematic diagram of deep sea vertical pipe provided by the invention;
It is shown in figure:
Specific embodiment
The present invention is described in detail combined with specific embodiments below.Following embodiment will be helpful to the technology of this field Personnel further understand the present invention, but the invention is not limited in any way.It should be pointed out that the ordinary skill of this field For personnel, without departing from the inventive concept of the premise, several changes and improvements can also be made.These belong to the present invention Protection scope.
The present invention provides a kind of simulate under vertical forced oscillation state for deficiency existing for above-mentioned existing experimental provision Two-tube interference dynamic response experimental provision.Two-tube interference dynamic response under vertical forced oscillation state can be simulated, and studies it Response characteristic.With closing to reality situation, operating condition cover it is wide, the advantages that device convenient disassembly, save the cost.
Two-tube interference dynamic response experimental provision under a kind of vertical forced oscillation state of the simulation provided according to the present invention, packet Top movements module 1 is included, pretension adjustment module 2, two-tube interference system measure analysis module 7, bottom locating module 6;
The top of top movements module 1, top movements module 1 and pretension adjustment module 2 is arranged in measurement analysis module 7 One end connect in vertical direction, and position of the pretension adjustment module 2 in 1 horizontal direction of top movements module can adjust Section;
The other end of pretension adjustment module 2 is connect with the upper end of two-tube interference system, the lower end of two-tube interference system Portion is connect with bottom locating module 6;
Measuring analysis module 7 includes data collection processor, vertical movement controller, and the vertical movement controller makes Two-tube interference system does vertical force and shakes movement, and the data collection processor can acquire two-tube interference system movement number According to.
Specifically, two-tube interference system includes that multitube relative position adjustment module 3, riser end adjustment module 4, deep-sea are vertical Pipe group module 5;
Deep sea vertical pipe group module 5 is made of two standpipes 35, and the both ends of every standpipe are separately connected a riser end tune Module 4 is saved, the lower section of two-tube relative position adjustment module 3 is arranged in the riser end adjustment module 4 connecting with 35 upper end of standpipe, The top of two-tube relative position adjustment module 3 is arranged in the riser end adjustment module 4 connecting with 35 lower end of standpipe.
Specifically, two-tube relative position adjustment module 3 include two-tube position adjustable plate 19, supervisor connecting flange device 21, Looped pipeline connecting flange device 22, center flange device 23, nut 24;
Supervisor's connecting flange device 21, looped pipeline connecting flange device 22 are connected with a corresponding standpipe 35 respectively;
Two-tube position adjustable plate 19 is connected by center flange device 23 with pretension adjustment module 2, two-tube position tune Looped pipeline shifting chute 20 is provided on section plate 19, looped pipeline connecting flange device 22 is fixed on the looped pipeline shifting chute by nut 24 In 20, to adjust two-tube spacing.
Specifically, riser end adjustment module 4 includes three component instrument sensors 26, riser end fixture 27, universal joint 28 With screw 25;
The fixing end of universal joint 28 is connect with riser end fixture 27, the movable end of universal joint 28 and three component instrument sensors 26 one end connection, the other end and supervisor's connecting flange device 21 or looped pipeline connecting flange device 22 of three component instrument sensors 26 It is connected, the data of three component instrument sensors 26 are acquired by data collection processor;The three component instrument sensors can measure Standpipe both ends are axial, flow to and flow to vertical stress value;
Riser end fixture 27 clamps standpipe 35, and screw 25, can by connecting with the threaded hole of riser end fixture 27 Adjust the clamped degree of standpipe 35.The three component instrument sensor measurement standpipe both ends are axial, flow to and flow to vertical Stress value.
Specifically, the surface of standpipe 35 is evenly arranged with fibre optical sensor 36, and fibre optical sensor 36 can measure standpipe 35 Movement, the data of fibre optical sensor 36 acquire by data collection processor.
Specifically, top movements module 1 includes guide chain 8, support frame 9, top horizontal positioning track 10, top positioning sliding block 11, vertical sliding track 12, Power Component 13, upright slide block 14, radome fairing 15;
Measurement analysis module 7 is connect with support frame 9, and the top of top horizontal positioning track 10 is arranged in support frame 9;
Top horizontal positioning track 10 is connect with guide chain 8;
Guide chain 8 drives top positioning sliding block 11 to adjust position on top horizontal positioning track 10 by Power Component 13, Top positioning sliding block 11 is connect with radome fairing 15;
Power Component 13 is by vertical movement controller driving;
Vertical sliding track 12 is arranged on radome fairing 15, and upright slide block 14 can slide in vertical sliding track 12, To adjust two-tube interference system in the relative position of vertical direction.
Specifically, pretension adjustment module 2 includes end coupling 16, stretcher fixed plate 17 and pressure spring tension assembly 18;
One end of end coupling 16 is connect with upright slide block 14, the other end and stretcher fixed plate of end coupling 16 17 are connected, and pressure spring tension assembly 18 can adjust the motion tension of two-tube interference system.Pretension adjustment module bottom It is connect with two-tube relative position adjustment module, fine adjustments is carried out to standpipe pretension by the regulating system of itself.
Specifically, bottom locating module 6 includes bottom level positioning track 31, bottom positioning sliding block 30, bottom power packages Part 29, false bottom 32;
Bottom level positioning track 31 is arranged on false bottom 32, bottom level positioning track 31 and top horizontal positioning track 10 is parallel, and bottom Power Component 29 drives bottom positioning sliding block 30 to slide on bottom level positioning track 31;False bottom 32 is steady It is fixed on the vacation bottom of pond, false bottom 32 has the characteristics that big quality and stable, to guarantee the overall stability of experimental provision;
Bottom positioning sliding block 30 is connected with riser end adjustment module 4, and bottom Power Component 29 is controlled by vertical movement Device driving.
Specifically, measurement analysis module 7 includes display, and the display being capable of real-time monitoring experimental result.
Preference of the invention is further elaborated below in conjunction with attached drawing.
As shown in figs. 1-11, the embodiment of the invention provides two-tube interference power under a kind of vertical forced oscillation state of simulation Experimental provision is responded, includes top movements module 1, pretension adjustment module 2, two-tube relative position adjustment module 3, riser end Adjustment module 4, deep sea vertical pipe group module 5 measure analysis module 7, bottom locating module 6.
The measurement analysis module 7 is fixed in top movements module 1 by support frame 9, the top horizontal positioning Track 10 is connect with guide chain 8, and guide chain 8 drives top positioning sliding block 11 to adjust on horizontal location track 10 by Power Component 13 Fixed, top positioning sliding block 11 and radome fairing 15 are affixed, and vertical sliding track 12 is fixed on radome fairing 15, and upright slide block 14 can To be slided in vertical sliding track 12.
The pretension adjustment module 2 includes end coupling 16, stretcher fixed plate 17 and pressure spring tension assembly 18.End Portion's connector 16 and upright slide block 14 are fixed, and module bottom is solid by top link 33 and two-tube relative position adjustment module 3 It is fixed.
The two-tube relative position adjustment module 3 includes two-tube position adjustable plate 19, supervisor connecting flange device 21, looped pipeline Connecting flange device 22, center flange device 23 and nut 24.The center flange device 23 at two-tube interference system both ends respectively with Top link 33 and bottom linker 34 are fixed, and fixed with two-tube position adjustable plate 19.It is responsible for connecting flange device 21 Fixed with nut 24 with two-tube 19 center of position adjustable plate, looped pipeline connecting flange device 22 is fixed on plate 19 by nut 24 In looped pipeline shifting chute 20.
The riser end adjustment module 4 includes three component instrument sensors 26, riser end fixture 27, universal joint 28 and spiral shell Silk 25.The three component instrument sensor 26 and the supervisor's connecting flange device 21 and looped pipeline of two-tube relative position adjustment module 3 connect Acting flange device 22 is fixed, and the riser end fixture 27 is used for the fixation of 5 neutral tube 35 of deep sea vertical pipe group module.
The deep sea vertical pipe group module 5 is made of more standpipes 35 and its surface fibre optical sensor 36, fibre optical sensor 36 It is evenly arranged on each deep sea vertical pipe 35.Standpipe upper and lower side and riser end fixture 27 are fixed by screw 25.
The measurement analysis module 7 includes: data collection processor, motion controller and display.Wherein: described Data collection processor is used to acquire the data of each three component instrument sensor 26 of two-tube interference system, fibre optical sensor, described Kinetic control system is used to control the movement of Power Component 13 and bottom Power Component 29, and the display is used for real-time monitoring Experimental result.
The bottom locating module 6 includes: bottom level positioning track 31, bottom positioning sliding block 30, bottom Power Component 29 and small false bottom 32.The bottom level positioning track 30 is parallel with top horizontal positioning track 10, and the bottom positioning is slided Block 30 and bottom linker 34 are fixed.
This specific implementation working principle: before experiment, fiber-optic grating sensor being evenly arranged in deep sea vertical pipe group module, The both ends of standpipe are sequentially connected riser end adjustment module, two-tube relative position adjustment module.At the top of two-tube interference system and in advance Tension adjustment module, top movements module are affixed, and bottom is connected with bottom locating module., when test, by the lifting at false bottom Specified form is presented so that riser model reaches specified position with the movement of trailer, mould is adjusted by two-tube relative position Block adjusts standpipe spacing, controls motor by the computer in measurement analysis module, so that standpipe does vertical forced oscillation campaign, stands The movement of pipe is recorded by high-speed camera, is strained by fiber sensor measuring, and data are transmitted to computer and are post-processed.
In experiment, due to the effect of the devices such as radome fairing, influence of the experimental provision in addition to standpipe to water flow is weakened, is protected The precision and accuracy of experiment are demonstrate,proved.
In the description of the present application, it is to be understood that term " on ", "front", "rear", "left", "right", " is erected at "lower" Directly ", the orientation or positional relationship of the instructions such as "horizontal", "top", "bottom", "inner", "outside" is orientation based on the figure or position Relationship is set, description the application is merely for convenience of and simplifies description, rather than the device or element of indication or suggestion meaning are necessary It with specific orientation, is constructed and operated in a specific orientation, therefore should not be understood as the limitation to the application.
Specific embodiments of the present invention are described above.It is to be appreciated that the invention is not limited to above-mentioned Particular implementation, those skilled in the art can make a variety of changes or modify within the scope of the claims, this not shadow Ring substantive content of the invention.In the absence of conflict, the feature in embodiments herein and embodiment can any phase Mutually combination.

Claims (9)

1. a kind of simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, which is characterized in that including top Motion module (1), pretension adjustment module (2), two-tube interference system measure analysis module (7), bottom locating module (6);
It measures analysis module (7) setting and adjusts mould in the top of top movements module (1), top movements module (1) and pretension One end of block (2) connects in vertical direction, and position of the pretension adjustment module (2) in top movements module (1) horizontal direction Setting can be adjusted;
The other end of pretension adjustment module (2) is connect with the upper end of two-tube interference system, the lower end of two-tube interference system It is connect with bottom locating module (6);
Measurement analysis module (7) includes data collection processor, vertical movement controller, and the vertical movement controller makes double Pipe interference system does vertical force and shakes movement, and the data collection processor can acquire two-tube interference system exercise data.
2. according to claim 1 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that two-tube interference system includes two-tube relative position adjustment module (3), riser end adjustment module (4), deep sea vertical pipe group Module (5);
Deep sea vertical pipe group module (5) You Lianggen standpipe (35) composition, the both ends of every standpipe are separately connected a riser end tune It saves module (4), the riser end adjustment module (4) connecting with standpipe (35) upper end is arranged in two-tube relative position adjustment module (3) lower section, the riser end adjustment module (4) connecting with standpipe (35) lower end are arranged in two-tube relative position adjustment module (3) top.
3. according to claim 2 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that two-tube relative position adjustment module (3) includes two-tube position adjustable plate (19), supervisor connecting flange device (21), pair Pipe connecting flange device (22), center flange device (23), nut (24);
Supervisor connecting flange device (21), looped pipeline connecting flange device (22) are connected with a corresponding standpipe (35) respectively;
Two-tube position adjustable plate (19) is connected by center flange device (23) with pretension adjustment module (2), two-tube position It is provided on adjustable plate (19) looped pipeline shifting chute (20), looped pipeline connecting flange device (22) is fixed on described by nut (24) In looped pipeline shifting chute (20), to adjust two-tube spacing.
4. according to claim 2 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that riser end adjustment module (4) includes three component instrument sensors (26), riser end fixture (27), universal joint (28) With screw (25);
The fixing end of universal joint (28) is connect with riser end fixture (27), and the movable end of universal joint (28) and three component instrument sense One end of device (26) connects, the other end and supervisor connecting flange device (21) or the looped pipeline connection method of three component instrument sensors (26) Blue device (22) is connected, and the data of three component instrument sensors (26) are acquired by data collection processor;
Riser end fixture (27) clamp standpipe (35), screw (25) by being connect with the threaded hole of riser end fixture (27), The clamped degree of standpipe (35) can be adjusted.
5. according to claim 2 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that the surface of standpipe (35) is evenly arranged with fibre optical sensor (36), and fibre optical sensor (36) can measure standpipe (35) Movement, the data of fibre optical sensor (36) acquire by data collection processor.
6. according to claim 1 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that top movements module (1) includes guide chain (8), support frame (9), top horizontal positioning track (10), top positioning sliding block (11), vertical sliding track (12), Power Component (13), upright slide block (14), radome fairing (15);
Measurement analysis module (7) is connect with support frame (9), and support frame (9) is arranged in the top of top horizontal positioning track (10);
Top horizontal positioning track (10) is connect with guide chain (8);
Guide chain (8) drives top positioning sliding block (11) to adjust position on top horizontal positioning track (10) by Power Component (13) It sets, top positioning sliding block (11) is connect with radome fairing (15);
Power Component (13) is by vertical movement controller driving;
Vertical sliding track (12) is arranged on radome fairing (15), and upright slide block (14) can be slided on vertical sliding track (12) It is dynamic.
7. according to claim 7 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that pretension adjustment module (2) includes end coupling (16), stretcher fixed plate (17) and pressure spring tension assembly (18);
One end of end coupling (16) is connect with upright slide block (14), and the other end of end coupling (16) is fixed with stretcher Plate (17) is connected, and pressure spring tension assembly (18) can adjust the motion tension of two-tube interference system.
8. according to claim 7 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that bottom locating module (6) includes bottom level positioning track (31), bottom positioning sliding block (30), bottom Power Component (29), false bottom (32);
Bottom level positioning track (31) is arranged on false bottom (32), bottom level positioning track (31) and top horizontal positioning rail In parallel, bottom Power Component (29) drives bottom positioning sliding block (30) to slide on bottom level positioning track (31) in road (10);
Bottom positioning sliding block (30) is connected with riser end adjustment module (4), and bottom Power Component (29) is controlled by vertical movement Device driving processed.
9. according to claim 1 simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state, spy Sign is that measurement analysis module (7) includes display, and the display being capable of real-time monitoring experimental result.
CN201910272486.7A 2019-04-04 2019-04-04 Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state Pending CN110031167A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910272486.7A CN110031167A (en) 2019-04-04 2019-04-04 Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910272486.7A CN110031167A (en) 2019-04-04 2019-04-04 Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state

Publications (1)

Publication Number Publication Date
CN110031167A true CN110031167A (en) 2019-07-19

Family

ID=67237388

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910272486.7A Pending CN110031167A (en) 2019-04-04 2019-04-04 Simulate two-tube interference dynamic response experimental provision under vertical forced oscillation state

Country Status (1)

Country Link
CN (1) CN110031167A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102194392A (en) * 2011-03-25 2011-09-21 华南理工大学 Quality detection method for LED (Light Emitting Diode) nixie tube
CN103105281A (en) * 2013-01-05 2013-05-15 中国海洋大学 Test device used for researching marine riser interference laws under top tension ratio effect
CN104002262A (en) * 2014-05-16 2014-08-27 浙江吉利控股集团有限公司 Support used for scanning of brake hard tube
CN104406753A (en) * 2014-11-25 2015-03-11 上海交通大学 Dynamic response testing device for deep-sea elongated vertical pipe under vertical forced oscillation
CN205732798U (en) * 2016-05-07 2016-11-30 上海大学 Cold headers charging length control device
CN107478408A (en) * 2017-08-16 2017-12-15 中国海洋石油总公司 One kind simulation uniform flow effect lower standing tube array dynamic response experimental provision

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102194392A (en) * 2011-03-25 2011-09-21 华南理工大学 Quality detection method for LED (Light Emitting Diode) nixie tube
CN103105281A (en) * 2013-01-05 2013-05-15 中国海洋大学 Test device used for researching marine riser interference laws under top tension ratio effect
CN104002262A (en) * 2014-05-16 2014-08-27 浙江吉利控股集团有限公司 Support used for scanning of brake hard tube
CN104406753A (en) * 2014-11-25 2015-03-11 上海交通大学 Dynamic response testing device for deep-sea elongated vertical pipe under vertical forced oscillation
CN205732798U (en) * 2016-05-07 2016-11-30 上海大学 Cold headers charging length control device
CN107478408A (en) * 2017-08-16 2017-12-15 中国海洋石油总公司 One kind simulation uniform flow effect lower standing tube array dynamic response experimental provision

Similar Documents

Publication Publication Date Title
CN107478408B (en) Riser array dynamic response experimental device under simulated uniform flow effect
CN100494943C (en) Vortex vibration testing device for flexible pipe mould horizontal in towing pool
CN202033164U (en) Testing device capable of simulating uniform-flow vortex-induced vibration of submarine pipeline
CN102305696B (en) Deep sea vertical pipe array model vortex-induced vibration test device with top capable of moving in step flow
CN102147321A (en) Uniform flow vortex-induced vibration simulation tester for seabed pipeline
CN101089577A (en) Vortex vibration testing device for flexible pipe mould vertical in towing pool
CN102109405B (en) Vortex-induced vibration test device for stand pipe under bidirectional shear flow and bidirectional ladder shear flow
CN102410918B (en) Vortex-induced vibration simulation test device for deep sea riser model with movable top end under uniform flow
CN102053000B (en) Rotary testing device for vortex-induced vibration for oblique riser under shear current
CN102072805B (en) Device for testing vortex-induced vibration and rotation of inclined riser under cascade shearing flow
CN110031166A (en) Uniform flow and platform move lower marine riser well head system bridge response to forced vibration device
CN102012306B (en) Vortex induced vibration rotation testing device for bidirectional shear flow lower inclined vertical pipe
CN102359855B (en) Forced vibration experiment facility for uniform down-flowing incoming flow of deep sea pipeline sectional model
CN102967429B (en) Device for simulating bidirectional self-oscillation under mutual interference of two stand column models under uniform flow
CN102053001A (en) Device for testing vortex-excited oscillation and rotation of vertical riser pipe under uniform flow and stepped uniform flow
CN102305697B (en) Vortex-induced vibration test device for movable deep sea vertical pipe array model at lower top end of uniform flow
CN101532836A (en) Environmental loading measuring device of ocean engineering model and use method thereof
CN110031169A (en) Simulate two-tube interference dynamic response experimental provision under oblique uniform flow effect
CN102323026B (en) Vortex-induced vibration simulation test device for pre-tensioned deep-sea riser model under step flow
CN102323030B (en) Deep-sea riser segmented model vertical flow forced vibration experimental device under action of uniform flow
CN113267305A (en) Riser vortex excitation dynamic response testing device and using method thereof
CN104406753A (en) Dynamic response testing device for deep-sea elongated vertical pipe under vertical forced oscillation
CN207019858U (en) A kind of ocean platform work standpipe vortex-induced vibration characteristic detection device
CN110031168A (en) Two-tube interference dynamic response experimental provision under dummy level forced oscillation state
CN110031165A (en) Simulate two-tube interference dynamic response experimental provision under uniform flow effect

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190719