CN110030435A - A kind of comprehensive assembled suspension and support and its assembling method and its construction method - Google Patents

A kind of comprehensive assembled suspension and support and its assembling method and its construction method Download PDF

Info

Publication number
CN110030435A
CN110030435A CN201910406864.6A CN201910406864A CN110030435A CN 110030435 A CN110030435 A CN 110030435A CN 201910406864 A CN201910406864 A CN 201910406864A CN 110030435 A CN110030435 A CN 110030435A
Authority
CN
China
Prior art keywords
sunpender
collet
comprehensive
support
assembled suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910406864.6A
Other languages
Chinese (zh)
Inventor
邹翔
郭景
沈豪皇
李承飞
陶其乐
陈冠
朱海同
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Oriental Decoration Co Ltd
Original Assignee
China State Construction Oriental Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Oriental Decoration Co Ltd filed Critical China State Construction Oriental Decoration Co Ltd
Priority to CN201910406864.6A priority Critical patent/CN110030435A/en
Publication of CN110030435A publication Critical patent/CN110030435A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/223Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Supports For Pipes And Cables (AREA)

Abstract

The invention discloses a kind of comprehensive assembled suspension and supports, including collet, sunpender and several cross-arms, collet is fixed on top structure floor by anchor bolt, sunpender includes vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, first side sunpender, intermediate sunpender and second side sunpender are removably installed on collet, first side sunpender and intermediate sunpender, several cross-arms are detachably installed by connector between intermediate sunpender and second side sunpender, pipeline installation region is separated into several isolated areas by several cross-arms, different types of pipeline is installed for distributing.Comprehensive assembled suspension and support provided by the invention can arbitrarily be assembled according to different tube diameters, installed height mark, controllability is strong, simultaneously, comprehensive segmental timbering provided by the invention is assembled by connector, eliminate the multiple working procedures such as the profile derusting rust-proofing of conventional stent, punching, chamfering, welding, it is safe from harm to processing staff's body, is conducive to safety construction.

Description

A kind of comprehensive assembled suspension and support and its assembling method and its construction method
Technical field
The invention belongs to construction and decoration field more particularly to a kind of comprehensive assembled suspension and support and its assembling method and its apply Work method.
Background technique
Currently, in fine fitment installing engineering at home, engineering increasingly systematization, intelligence, the peace of electromechanics installation class The chief component of dress engineering is substantially made of environment division, pipe network part, end section, wherein intensive pipe network is equivalent to The maincenter of whole system, all systems depend on all kinds of pipe network connections and realize various functions.Need by setting suspension and support come The various main pipes and main line being laid in various system official websites.
Currently, the arrangement of the various main pipes of various system pipe networks, main line is all to be provided separately suspension and support installation for a long time, Pipeline collision and difficulty of construction are relatively prominent.And pipeline installation often will affect decoration construction, finally influence decorative effect.Because each Systematic pipeline is usually all respective professional unit mounting and installation, and pipeline suspension and support is also respectively to process, and suspension and support way can not yet It is unified.The construction method of pipeline is laid with using suspension and support substantially are as follows: preparation of construction → be familiar with this special pipelines drawing, verification now Field → confirmation pipeline specification model, installed height mark, laying path → calculating bracket specification → angle-steel blanking, punching, chamfering → welding → cleaning welding slag, derusting, first pass antirust paint → site infrare line positioning, punching → the second time antirust paint → installation branch Hanger → lay the line.
The defect of this construction method is that suspension and support manufacturing procedure is more, no matter all needs to be welded to add using angle steel or channel steel Work, and special-shaped suspension and support processing is even more cumbersome, it is larger to processing staff's body harm, and it is unfavorable for safety construction.
Summary of the invention
The object of the present invention is to provide a kind of comprehensive assembled suspension and support and its assembling method and its construction method, comprehensive dress Electric welding processing is not needed with formula suspension and support, is safe from harm to processing staff's body, is conducive to safety construction.
To solve the above problems, the technical solution of the present invention is as follows:
A kind of comprehensive assembled suspension and support, including collet, sunpender and several cross-arms:
Collet, including first side collet, intermediate collet and second side collet, the first side collet, it is described in Between collet and the second side collet be fixedly installed on top structure floor;
Sunpender, including vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, first side The top of side sunpender is removably mounted on the first side collet, and the top of the intermediate sunpender is removably mounted to described On intermediate collet, the top of the second side sunpender is removably mounted on the second side collet;
Several cross-arms, the first side sunpender and the intermediate sunpender, the intermediate sunpender are hung with the second side Several cross-arms are detachably installed by connector between bar, pipeline installation region is separated into several isolated areas, is used for Different types of pipeline is installed in distribution.
Preferably, the first side collet, the intermediate collet and the second side collet are all made of rectangle eight The top surface of hole list slot bottom support, the rectangle octal list slot bottom support is fixedly installed on the top structure floor by anchor bolt.
Preferably, the anchor bolt is M12 heavy duty metal anchor bolt.
Preferably, the first side sunpender and the second side sunpender using 41 it is single spell back punching channel steels, it is described in Between sunpender using 21 Two bors d's oeuveres back punching channel steel.
Preferably, the cross-arm punches channel steel or 41 Two bors d's oeuveres back punching channel steel using 41 single back of spelling.
Preferably, the bottom of the first side sunpender, the intermediate sunpender and the second side sunpender is all made of end Lid blocks.
Based on identical design, the present invention also provides a kind of assembling method of comprehensive assembled suspension and support, including it is as follows Step:
Collet is installed, the collet includes first side collet, intermediate collet and second side collet, the first side Collet, the intermediate collet and the second side collet are fixedly installed on top structure floor;
Sunpender is installed, the sunpender includes that vertical first side sunpender arranged in parallel, intermediate sunpender and second side are hung The top of the first side sunpender is removably mounted on the first side collet by bar, by the top of the intermediate sunpender End is removably mounted on the intermediate collet, and the top of the second side sunpender is removably mounted to the second side On collet;
Several cross-arms are installed, in the first side sunpender and the intermediate sunpender, the intermediate sunpender and described second Several cross-arms are detachably installed by connector between the sunpender of side, pipeline installation region is separated into several independent zones Different types of pipeline is installed for distributing in domain.
Preferably, the installation collet further comprises the first side collet, the intermediate collet and described second Side collet is all made of rectangle octal list slot bottom support, and the top surface of the rectangle octal list slot bottom support is fixedly mounted by anchor bolt In on the top structure floor.
Preferably, the rectangle octal list slot bottom support is fixedly installed in the top structure floor enterprising one by anchor bolt Step includes that the rectangle octal list slot bottom support is fixedly installed on the top structure floor by M12 heavy duty metal anchor bolt.
Preferably, the installation sunpender further comprises that the first side sunpender and the second side sunpender use 41 single back of spelling punch channel steel, and the intermediate sunpender is using 21 Two bors d's oeuveres back punching channel steel.
Preferably, several cross-arms of installation further comprise that the cross-arm carries on the back punching channel steel or 41 using 41 single spell Two bors d's oeuveres back punching channel steel.
Preferably, the installation sunpender includes the following steps:
S1: the top of the first side sunpender is removably mounted on the first side collet, by the centre The top of sunpender is removably mounted on the intermediate collet, the top of the second side sunpender is removably mounted to described On the collet of second side;
S2: end cap blocks, and the bottom of the first side sunpender, the intermediate sunpender and the second side sunpender is adopted It is blocked with the end cap.
Based on identical design, the present invention also provides a kind of pipeline layout assembled suspension and support construction methods, including such as Lower step:
Preparation of construction proposes the specification type of comprehensive assembled suspension and support material requested according to comprehensive pipeline Design Requirement Drawing Number and various accessories quantity it is tailor-made to carry out processing;
Drawing in-depth forms comprehensive pipeline floor plan in conjunction with construction site situation and each professional drawing, determines different The installed height mark and installation route of pipeline, deepen the comprehensive assembled branch out further according to the comprehensive pipeline floor plan and hang Frame detail drawing;
Measurement and positioning, the installation site of comprehensive assembled suspension and support described in measurement and positioning;
Section steel cutting processing, according to the configuration and dimensioned blanking of the comprehensive assembled suspension and support detail drawing;
Comprehensive assembled suspension and support is assembled, using the assembling method of above-mentioned synthesis assembled suspension and support;
Pipe installing, after the comprehensive assembled suspension and support is assembled, according to the installed height mark of the different pipelines from On install down.
Preferably, the installation site of comprehensive assembled suspension and support described in the measurement and positioning further comprises that utilization is infrared The installation site of comprehensive assembled suspension and support described in line laser instrument measurement and positioning.
The present invention due to using the technology described above, makes it have the following advantages that and actively imitate compared with prior art Fruit:
1) the present invention provides a kind of comprehensive assembled suspension and supports, including collet, sunpender and several cross-arms, collet to pass through Anchor bolt is fixed on top structure floor, and sunpender includes vertical first side sunpender arranged in parallel, intermediate sunpender and second side Side sunpender, first side sunpender, intermediate sunpender and second side sunpender are removably installed on collet, first side sunpender with Several cross-arms are detachably installed by connector between intermediate sunpender, intermediate sunpender and second side sunpender, several cross-arms will manage Line installation region is separated into several isolated areas, installs different types of pipeline for distributing.A kind of synthesis provided by the invention Assembled suspension and support can arbitrarily be assembled according to different tube diameters, installed height mark, and controllability is strong, simultaneously as provided by the invention Comprehensive segmental timbering is assembled by connector, and profile derusting rust-proofing, the punching, chamfering, weldering of conventional stent are eliminated Equal multiple working procedures are connect, is safe from harm to processing staff's body, is conducive to safety construction.
2) the present invention provides a kind of assembling methods of comprehensive assembled suspension and support, comprising steps of installation collet;Installation is hung Bar;Several cross-arms are installed.Collet is fixed on top structure floor by anchor bolt first;It then, then will be vertical arranged in parallel First side sunpender, intermediate sunpender and second side sunpender, first side sunpender, intermediate sunpender and second side sunpender pass through company Fitting is removably installed on collet;Finally, in first side sunpender and intermediate sunpender, intermediate sunpender and second side sunpender Between several cross-arms are detachably installed by connector, pipeline installation region is separated into several isolated areas by several cross-arms, is used Different types of pipeline is installed in distribution.A kind of assembling method of comprehensive assembled suspension and support provided by the invention, working procedure Succinctly, the multiple working procedures such as the profile derusting rust-proofing of conventional stent, punching, chamfering, welding are eliminated, are not had to processing staff's body Harm, is conducive to safety construction.The comprehensive assembled suspension and support as made from this method can be according to different tube diameters, peace simultaneously Dress absolute altitude arbitrarily assembles, and controllability is strong.
3) the present invention provides a kind of pipeline layout assembled suspension and support construction methods, comprising steps of preparation of construction;Drawing In-depth;Measurement and positioning;Section steel cutting processing;Comprehensive assembled suspension and support is assembled;Pipe installing.Firstly, according to integrated pipe line chart Paper design requirement prepares material, does preparation of construction;Then, it forms comprehensive pipeline in conjunction with construction site situation and each professional drawing and puts down Face layout drawing determines the installed height mark and installation route of different pipelines, deepens further according to comprehensive pipeline floor plan and integrate out Assembled suspension and support detail drawing;The installation site of the comprehensive assembled suspension and support of measurement and positioning again;Then, it is hung according to comprehensive assembled branch The configuration and dimensioned blanking of frame detail drawing carry out section steel cutting processing;Then, it is spelled according still further to comprehensive assembled suspension and support detail drawing Comprehensive assembled suspension and support is filled, finally, after comprehensive assembled suspension and support is assembled, according to the installed height mark of different pipelines from upper It is installed on comprehensive assembled suspension and support down.A kind of pipeline layout assembled suspension and support construction method provided by the invention, Before construction, after the pipeline construction drawing integration in-depth of each profession, a comprehensive assembled suspension and support is designed, each profession is managed Trace integration arrangement determines the installed height mark and installation route of different pipelines, realizes that pipeline arrangement is in good order, pipeline level is clear Clear beauty.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of comprehensive assembled suspension and support;
Fig. 2 is a kind of flow chart of the assembling method of comprehensive assembled suspension and support;
Fig. 3 is a kind of flow chart of pipeline layout assembled suspension and support construction method.
Description of symbols:
1: anchor bolt;2: collet;21: first side collet;22: intermediate collet;23: second side collet;3: sunpender;31: First side sunpender;32: intermediate sunpender;33: second side sunpender;4: cross-arm;5: connector;51: diplopore connector;52: four Hole connector.
Specific embodiment
Below in conjunction with the drawings and specific embodiments to a kind of comprehensive assembled suspension and support proposed by the present invention and its assembly side Method and its construction method are described in further detail.According to following explanation and claims, advantages and features of the invention will It becomes apparent from.
Embodiment one
Referring to shown in Fig. 1, Fig. 1 is a kind of structural schematic diagram of comprehensive assembled suspension and support;The present invention provides a kind of comprehensive Close assembled suspension and support, including collet 2, sunpender 3 and several cross-arms 4;Collet 2 includes first side collet 21, intermediate collet 22 and second side collet 23, first side collet 21, intermediate collet 22 and second side collet 23 are fixedly installed in top On structure floor;Sunpender 3 includes vertical first side sunpender 31 arranged in parallel, intermediate sunpender 32 and second side sunpender 33, The top of first side sunpender 31 is removably mounted on first side collet 21, and the top of intermediate sunpender 32 is removably mounted to On intermediate collet 22, the top of second side sunpender 33 is removably mounted on second side collet 23;Several cross-arms 4, first If detachably being installed between side sunpender 31 and intermediate sunpender 32, intermediate sunpender 32 and second side sunpender 33 by connector 4 Pipeline installation region is separated into several isolated areas by dry cross-arm 4, installs different types of pipeline for distributing.
Collet 2 includes first side collet 21, intermediate collet 22 and second side collet 23, first side collet 21, in Between collet 22 and second side collet 23 be fixedly installed on top structure floor.In the present embodiment, first side collet 21, intermediate collet 22 and second side collet 23 are all made of rectangle octal list slot bottom support, and there are four holes for top surface, pass through four Rectangle octal list slot bottom support is fixedly installed on top structure floor by anchor bolt 1, rectangle octal list slot bottom support below with Also there are four holes for the junction of sunpender 3, are bolted rectangle octal list slot bottom support and sunpender 3 by screw.In the present embodiment In, anchor bolt 1 selects M12 heavy duty metal anchor bolt.
Sunpender 3 includes vertical first side sunpender 31 arranged in parallel, intermediate sunpender 32 and second side sunpender 33, and first The top of side sunpender 31 is removably mounted on first side collet 21, and the top of intermediate sunpender 32 is removably mounted to centre On collet 22, the top of second side sunpender 33 is removably mounted on second side collet 23, in the present embodiment, the first side Side sunpender 31 and second side sunpender 33 are using 41 single spelling back punching channel steels;Since intermediate 32 two sides of sunpender are both needed to connection cross-arm 4, So intermediate sunpender 32 is using 21 Two bors d's oeuveres back punching channel steel.In the present embodiment, first side sunpender 31, intermediate sunpender 32 and the The bottom of dual side-edge sunpender 33 is all made of end cap closure, wherein the bottom of first side sunpender 31 and second side sunpender 33 is adopted It is blocked with 41 single sealing end caps of spelling, the bottom of intermediate sunpender 32 is blocked using 21 single sealing end caps of spelling.
Lead between several cross-arms 4, first side sunpender 31 and intermediate sunpender 32, intermediate sunpender 32 and second side sunpender 33 It crosses connector 5 and several cross-arms 4 is detachably installed, in the present embodiment, distributed according to different pipeline weight and Pipe installing, it is horizontal Load can using 41 it is single spell back punching channel steels or 41 Two bors d's oeuveres back punching channel steel, if pipeline weight not in, and only need to be in cross-arm 4 Top pipe laying, then cross-arm 4 can punch channel steel using 41 single back of spelling, if the top and lower part of cross-arm 4 are required to install Pipeline, then cross-arm 4 can be using 41 Two bors d's oeuveres back punching channel steel.In the present embodiment, according to the installation position of cross-arm 4 and carrying weight Amount selects diplopore connector 51 or four hole connectors 52 to carry out assembly, if the pipeline heavier-weight carried on cross-arm 4, uses Four hole connectors 52 carry out assembly, if the pipeline lighter in weight carried on cross-arm 4, diplopore connector 51 can be used and spelled Dress.Diplopore connector 51 or four hole connectors 52 are all made of the assembly that bolt and nut connection carries out comprehensive assembled suspension and support, Bolt and nut use 8.8 grades of electrogalvanizing bolts and electrogalvanizing spring nut, as shown in Figure 1, cross-arm 4 divides pipeline installation region It is divided into several isolated areas, cross-arm top or lower part and different types of pipeline is installed for distributing, in general, comprehensive dress Ventilation shaft, cable testing bridge and water supply and sewerage pipeline are successively installed from top to bottom with formula suspension and support, because ventilation shaft sectional area compared with Be typically chosen greatly and be mounted on top layer or middle layer, in this way it is possible to prevente effectively from later period cable laying and pipeline maintenance it is constant it Place.Next mouth of giving a dinner for a visitor from afar under needing because of partial ventilation pipeline, the lower section at mouth of giving a dinner for a visitor from afar under air hose, which should be avoided, there are other pipelines.Metal tube The installation fitting in road is both needed to pad in rubber, to achieve the effect that insulation, antidetonation, noise reduction.
The present invention provides a kind of comprehensive assembled suspension and support, including collet 2, sunpender 3 and several cross-arms 4, collet 2 is logical It crosses anchor bolt 1 to be fixed on top structure floor, sunpender 3 includes vertical first side sunpender 31 arranged in parallel, intermediate sunpender 32 With second side sunpender 33, first side sunpender 31, intermediate sunpender 32 and second side sunpender 33 are removably installed in collet 2 On, it is detachable by connector 5 between first side sunpender 31 and intermediate sunpender 32, intermediate sunpender 32 and second side sunpender 33 Several cross-arms 4 are installed, pipeline installation region is separated into several isolated areas by several cross-arms 4, for distributing installation variety classes Pipeline.A kind of comprehensive assembled suspension and support provided by the invention can arbitrarily be assembled according to different tube diameters, installed height mark, be adjusted Property is strong, simultaneously as comprehensive segmental timbering provided by the invention is assembled by connector, eliminates conventional stent The multiple working procedures such as profile derusting rust-proofing, punching, chamfering, welding are safe from harm to processing staff's body, are conducive to security civilization and apply Work.
Embodiment two
Referring to shown in Fig. 2, Fig. 2 is a kind of flow chart of the assembling method of comprehensive assembled suspension and support;A kind of comprehensive assembly The assembling method of formula suspension and support includes the following steps: that installation collet, collet include first side collet, intermediate collet and second Side collet, first side collet, intermediate collet and second side collet are fixedly installed on top structure floor;Installation is hung Bar, sunpender includes vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, by first side sunpender Top is removably mounted on the collet of first side, and the top of intermediate sunpender is removably mounted on intermediate collet, by second The top of side sunpender is removably mounted on the collet of second side;Several cross-arms are installed, sunpender and centre are hung in first side Several cross-arms are detachably installed by connector between bar, intermediate sunpender and second side sunpender, pipeline installation region is separated At several isolated areas, different types of pipeline is installed for distributing.
Collet is installed, collet includes first side collet, intermediate collet and second side collet, first side collet, in Between collet and second side collet be fixedly installed on top structure floor.In the present embodiment, first side collet, centre Collet and second side collet are all made of long square plate octal list slot bottom support, and are fixed by anchor bolt and are installed on top structure building On plate, there are four holes for the top surface of long square plate octal list slot bottom support, therefore first reserve hole site according to long square plate octal list slot bottom support and exist Structure floor or wall punching, punching depth should be subject to anchor bolt length, the implant part of screw anchor bolt are wholly embedded into knot In structure layer, then the firm structure floor of good patch is installed in long square plate octal list slot bottom prop hole position and anchor bolt again, finally by anchor bolt spiral shell Mother tightens, and long square plate octal list slot bottom support is fixedly installed on top structure floor.In the present embodiment, anchor bolt is selected M12 heavy duty metal anchor bolt.
Sunpender is installed, sunpender includes vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, is incited somebody to action The top of first side sunpender is removably mounted on the collet of first side, and the top of intermediate sunpender is removably mounted to centre On collet, the top of second side sunpender is removably mounted on the collet of second side;In the present embodiment, firstly, by A side sunpender, intermediate sunpender and second side sunpender are connected in long square plate octal list slot bottom support, long square plate octal list slot bottom Tool is there are four connecting hole on the both side plate of the lower section of support, by screw bolt by first side sunpender, intermediate sunpender and second side Side sunpender is connected in long square plate octal list slot bottom support.Then, then end cap closure is carried out, in the present embodiment, first side is hung Bar and second side sunpender are using single spelling back punching channel steel;Since intermediate sunpender two sides are both needed to connection cross-arm, so intermediate sunpender Punching channel steel is carried on the back using Two bors d's oeuveres, therefore the bottom of first side sunpender and second side sunpender is blocked using single sealing end cap of spelling, in Between the bottom of sunpender blocked using single sealing end cap of spelling.
Several cross-arms are installed, are passed through between first side sunpender and intermediate sunpender, intermediate sunpender and second side sunpender Connector detachably installs several cross-arms, and pipeline installation region is separated into several isolated areas, not of the same race for distributing installation The pipeline of class selects diplopore connector or four holes to connect according to the installation position of cross-arm and load capacity in the present embodiment Part carries out assembly, if the pipeline heavier-weight carried on cross-arm, carries out assembly using four hole connectors, if carried on cross-arm Pipeline lighter in weight then can be used diplopore connector and carry out assembly, and diplopore connector or four hole connectors are all made of bolt spiral shell Mother's connection carries out the assembly of comprehensive assembled suspension and support, and bolt and nut use 8.8 grades of electrogalvanizing bolts and electrogalvanizing spring spiral shell It is female.
The present invention provides a kind of assembling methods of comprehensive assembled suspension and support, comprising steps of installation collet;Installation is hung Bar;Several cross-arms are installed.Collet is fixed on top structure floor by anchor bolt first;It then, then will be vertical arranged in parallel First side sunpender, intermediate sunpender and second side sunpender, first side sunpender, intermediate sunpender and second side sunpender pass through company Fitting is removably installed on collet;Finally, in first side sunpender and intermediate sunpender, intermediate sunpender and second side sunpender Between several cross-arms are detachably installed by connector, pipeline installation region is separated into several isolated areas by several cross-arms, is used Different types of pipeline is installed in distribution.A kind of assembling method of comprehensive assembled suspension and support provided by the invention, working procedure Succinctly, the multiple working procedures such as the profile derusting rust-proofing of conventional stent, punching, chamfering, welding are eliminated, are not had to processing staff's body Harm, is conducive to safety construction.The comprehensive assembled suspension and support as made from this method can be according to different tube diameters, peace simultaneously Dress absolute altitude arbitrarily assembles, and controllability is strong.
Embodiment three
Referring to shown in Fig. 3, Fig. 3 is a kind of flow chart of pipeline layout assembled suspension and support construction method;The present invention provides A kind of pipeline layout assembled suspension and support construction method, includes the following steps, preparation of construction, according to comprehensive pipeline layout design It is required that proposing that the specifications and models of comprehensive assembled suspension and support material requested and the quantity of various accessories are had made to order to carry out processing;Drawing In-depth forms comprehensive pipeline floor plan in conjunction with construction site situation and each professional drawing, determines the installation mark of different pipelines High and installation route, deepens further according to comprehensive pipeline floor plan and integrates assembled suspension and support detail drawing out;Measurement and positioning, measurement Position the installation site of comprehensive assembled suspension and support;Section steel cutting processing, according to comprehensive assembled suspension and support detail drawing configuration and Dimensioned blanking;Comprehensive assembled suspension and support is assembled, using the assembly side of synthesis assembled suspension and support described in embodiment two Method;Pipe installing is installed after comprehensive assembled suspension and support is assembled according to the installed height mark of different pipelines from top to bottom.
Preparation of construction, Construction in Preparatory Stage comprehensive assembled suspension and support needed for being proposed according to comprehensive pipeline Design Requirement Drawing The specifications and models of material and the quantity of various accessories are tailor-made to carry out processing.Storehouse and main material heap is separately provided in construction site , preventing from marching into the arena material damage or is destroyed;Prepare electric hammer, drill bit, cutting machine, electric wrench needed for bracket processing is installed in advance Equal equipments;
Drawing in-depth, is conscientiously familiar with each professional construction blueprint, links up to obtain in conjunction with field condition and each Specialty Design teacher each Systematic pipeline installed height mark and duct route prioritization scheme integrate each professional drawing after the confirmation of pipe network route and form comprehensive pipeline Floor plan is deepened further according to comprehensive pipeline plan view and integrates assembled suspension and support detail drawing out;
Measurement and positioning using infrared laser instrument measurement and positioning bracket installation site, while avoiding colliding with other equipment;
Section steel cutting processing, according to the configuration and dimensioned blanking of comprehensive assembled suspension and support detail drawing;
Comprehensive assembled suspension and support is assembled, using the assembling method of synthesis assembled suspension and support described in embodiment two;
Pipe installing, comprehensive assembled suspension and support are pacified according to the installed height mark of different pipelines from top to bottom after the installation is completed Dress, successively substantially are as follows: ventilation shaft, cable testing bridge, water supply and sewerage pipeline.Because larger be typically chosen of ventilation shaft sectional area is mounted on Top layer or middle layer, in this way it is possible to prevente effectively from the constant place of later period cable laying and pipeline maintenance.Secondly because of partial ventilation Pipeline is given a dinner for a visitor from afar mouth under needing, and the lower section at mouth of giving a dinner for a visitor from afar under air hose, which should be avoided, other pipelines occurs.The installation fitting of metallic conduit is both needed to Pad in rubber, to achieve the effect that insulation, antidetonation, noise reduction.
The present invention provides a kind of pipeline layout assembled suspension and support construction methods, comprising steps of preparation of construction;Drawing is deep Change;Measurement and positioning;Section steel cutting processing;Comprehensive assembled suspension and support is assembled;Pipe installing.Firstly, according to comprehensive pipeline drawing Design requirement prepares material, does preparation of construction;Then, comprehensive pipeline plane is formed in conjunction with construction site situation and each professional drawing Layout drawing, determines the installed height mark and installation route of different pipelines, deepens comprehensive dress out further according to comprehensive pipeline floor plan With formula suspension and support detail drawing;The installation site of the comprehensive assembled suspension and support of measurement and positioning again;Then, according to comprehensive assembled suspension and support The configuration and dimensioned blanking of detail drawing carry out section steel cutting processing;Then, assembled according still further to comprehensive assembled suspension and support detail drawing Comprehensive assembled suspension and support, finally, after comprehensive assembled suspension and support is assembled, according to the installed height mark of different pipelines from upper past Under be installed on comprehensive assembled suspension and support.A kind of pipeline layout assembled suspension and support construction method provided by the invention, is being applied Before work, after the pipeline construction drawing integration in-depth of each profession, a comprehensive assembled suspension and support is designed, by each special pipeline Comprehensive arrangement determines the installed height mark and installation route of different pipelines, realizes in good order, the pipeline clear layer of pipeline arrangement It is beautiful.
Embodiments of the present invention are explained in detail above in conjunction with attached drawing, but the present invention is not limited to above-mentioned implementations Mode.Even if to the present invention, various changes can be made, if these variations belong to the model of the claims in the present invention and its equivalent technologies Within enclosing, then still fall within the protection scope of the present invention.

Claims (14)

1. a kind of comprehensive assembled suspension and support, which is characterized in that including collet, sunpender and several cross-arms:
Collet, including first side collet, intermediate collet and second side collet, the first side collet, the intermediate bottom Support and the second side collet are fixedly installed on top structure floor;
Sunpender is hung including vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, the first side The top of bar is removably mounted on the first side collet, and the top of the intermediate sunpender is removably mounted to the centre On collet, the top of the second side sunpender is removably mounted on the second side collet;
Several cross-arms, the first side sunpender and the intermediate sunpender, the intermediate sunpender and the second side sunpender it Between several cross-arms are detachably installed by connector, pipeline installation region is separated into several isolated areas, for distributing Different types of pipeline is installed.
2. comprehensive assembled suspension and support according to claim 1, which is characterized in that the first side collet, it is described in Between collet and the second side collet be all made of rectangle octal list slot bottom support, the top surface of the rectangle octal list slot bottom support It is fixedly installed on the top structure floor by anchor bolt.
3. comprehensive assembled suspension and support according to claim 2, which is characterized in that the anchor bolt is M12 heavy duty metal anchor Bolt.
4. comprehensive assembled suspension and support according to claim 1, which is characterized in that the first side sunpender and described Dual side-edge sunpender punches channel steel using 41 single back of spelling, and the intermediate sunpender is using 21 Two bors d's oeuveres back punching channel steel.
5. comprehensive assembled suspension and support according to claim 1, which is characterized in that the cross-arm is punched using 41 single back of spelling Channel steel or 41 Two bors d's oeuveres back punching channel steel.
6. comprehensive assembled suspension and support according to claim 1, which is characterized in that the first side sunpender, it is described in Between the bottom of sunpender and the second side sunpender be all made of end cap closure.
7. a kind of assembling method of comprehensive assembled suspension and support, which comprises the steps of:
Collet is installed, the collet includes first side collet, intermediate collet and second side collet, the first side bottom Support, the intermediate collet and the second side collet are fixedly installed on top structure floor;
Sunpender is installed, the sunpender includes vertical first side sunpender arranged in parallel, intermediate sunpender and second side sunpender, is incited somebody to action The top of the first side sunpender is removably mounted on the first side collet, and the top of the intermediate sunpender is removable It unloads and is installed on the intermediate collet, the top of the second side sunpender is removably mounted to the second side collet On;
Several cross-arms are installed, in the first side sunpender and the intermediate sunpender, the intermediate sunpender and the second side Several cross-arms are detachably installed by connector between sunpender, pipeline installation region is separated into several isolated areas, are used Different types of pipeline is installed in distribution.
8. the assembling method of comprehensive assembled suspension and support according to claim 7, which is characterized in that the installation collet into One step includes that the first side collet, the intermediate collet and the second side collet are all made of rectangle octal list slot The top surface of collet, the rectangle octal list slot bottom support is fixedly installed on the top structure floor by anchor bolt.
9. the assembling method of comprehensive assembled suspension and support according to claim 8, which is characterized in that the rectangle octal Single slot bottom support is fixedly installed on the top structure floor by anchor bolt, the rectangle octal list slot bottom support It is fixedly installed on the top structure floor by M12 heavy duty metal anchor bolt.
10. the assembling method of comprehensive assembled suspension and support according to claim 7, which is characterized in that the installation sunpender It further comprise that using 41 single spelling back punching channel steels, the centre is hung for the first side sunpender and the second side sunpender Bar is using 21 Two bors d's oeuveres back punching channel steel.
11. the assembling method of comprehensive assembled suspension and support according to claim 7, which is characterized in that the installation is several Cross-arm further comprises that the cross-arm punches channel steel or 41 Two bors d's oeuveres back punching channel steel using 41 single back of spelling.
12. the assembling method of comprehensive assembled suspension and support according to claim 7, which is characterized in that the installation sunpender Include the following steps:
S1: the top of the first side sunpender is removably mounted on the first side collet, by the intermediate sunpender Top be removably mounted on the intermediate collet, the top of the second side sunpender is removably mounted to described second On the collet of side;
S2: end cap blocks, and the bottom of the first side sunpender, the intermediate sunpender and the second side sunpender is used institute State end cap closure.
13. a kind of pipeline layout assembled suspension and support construction method, which comprises the steps of:
Preparation of construction, according to comprehensive pipeline Design Requirement Drawing propose comprehensive assembled suspension and support material requested specifications and models and The quantity of various accessories is tailor-made to carry out processing;
Drawing in-depth forms comprehensive pipeline floor plan in conjunction with construction site situation and each professional drawing, determines different pipelines Installed height mark and installation route, it is detailed to deepen the comprehensive assembled suspension and support out further according to the comprehensive pipeline floor plan Figure;
Measurement and positioning, the installation site of comprehensive assembled suspension and support described in measurement and positioning;
Section steel cutting processing, according to the configuration and dimensioned blanking of the comprehensive assembled suspension and support detail drawing;
Comprehensive assembled suspension and support is assembled, using the assembly of the described in any item comprehensive assembled suspension and supports of claim 7 to 12 Method;
Pipe installing, after the comprehensive assembled suspension and support is assembled, according to the installed height mark of the different pipelines from upper past Lower installation.
14. pipeline layout assembled suspension and support construction method according to claim 13, which is characterized in that the measurement is fixed The installation site of the position comprehensive assembled suspension and support further comprises being filled using comprehensive described in infrared laser instrument measurement and positioning Installation site with formula suspension and support.
CN201910406864.6A 2019-05-16 2019-05-16 A kind of comprehensive assembled suspension and support and its assembling method and its construction method Pending CN110030435A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910406864.6A CN110030435A (en) 2019-05-16 2019-05-16 A kind of comprehensive assembled suspension and support and its assembling method and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910406864.6A CN110030435A (en) 2019-05-16 2019-05-16 A kind of comprehensive assembled suspension and support and its assembling method and its construction method

Publications (1)

Publication Number Publication Date
CN110030435A true CN110030435A (en) 2019-07-19

Family

ID=67242319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910406864.6A Pending CN110030435A (en) 2019-05-16 2019-05-16 A kind of comprehensive assembled suspension and support and its assembling method and its construction method

Country Status (1)

Country Link
CN (1) CN110030435A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111692434A (en) * 2020-06-29 2020-09-22 北京城建七建设工程有限公司 Adjustable electromechanical pipeline comprehensive support and hanger system and construction method thereof
WO2023246167A1 (en) * 2022-06-21 2023-12-28 中国五冶集团有限公司 Bim-based adjustable comprehensive support and hanger system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203202425U (en) * 2013-05-07 2013-09-18 内蒙古兴泰建筑有限责任公司 Shared supports and hangers for pipeline comprehensive arrangement
CN106958694A (en) * 2017-04-06 2017-07-18 中铁建设集团有限公司 A kind of electromechanical installation comprehensive support
CN107620832A (en) * 2016-07-14 2018-01-23 河南大森机电股份有限公司 It is a kind of to integrate suspension and support without furred ceiling
CN206958390U (en) * 2017-07-14 2018-02-02 北京天润建设有限公司 A kind of suspension bracket
US20180044907A1 (en) * 2016-08-12 2018-02-15 Wuhan Zhihe Geotechnical Engineering Co., Ltd Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN109578698A (en) * 2019-01-25 2019-04-05 湖北工业大学 A kind of assembled suspension and support and its assembly method
CN210423986U (en) * 2019-05-16 2020-04-28 中建东方装饰有限公司 Synthesize assembled gallows

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203202425U (en) * 2013-05-07 2013-09-18 内蒙古兴泰建筑有限责任公司 Shared supports and hangers for pipeline comprehensive arrangement
CN107620832A (en) * 2016-07-14 2018-01-23 河南大森机电股份有限公司 It is a kind of to integrate suspension and support without furred ceiling
US20180044907A1 (en) * 2016-08-12 2018-02-15 Wuhan Zhihe Geotechnical Engineering Co., Ltd Inverse construction method for deep, large and long pit assembling structure of suspension-type envelope enclosure
CN106958694A (en) * 2017-04-06 2017-07-18 中铁建设集团有限公司 A kind of electromechanical installation comprehensive support
CN206958390U (en) * 2017-07-14 2018-02-02 北京天润建设有限公司 A kind of suspension bracket
CN109578698A (en) * 2019-01-25 2019-04-05 湖北工业大学 A kind of assembled suspension and support and its assembly method
CN210423986U (en) * 2019-05-16 2020-04-28 中建东方装饰有限公司 Synthesize assembled gallows

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111692434A (en) * 2020-06-29 2020-09-22 北京城建七建设工程有限公司 Adjustable electromechanical pipeline comprehensive support and hanger system and construction method thereof
WO2023246167A1 (en) * 2022-06-21 2023-12-28 中国五冶集团有限公司 Bim-based adjustable comprehensive support and hanger system

Similar Documents

Publication Publication Date Title
CN204901084U (en) Prefabricated integration assembled sectional shelf -unit based on BIM
CN104806822B (en) The modularity installation method of integral riser
CN110030435A (en) A kind of comprehensive assembled suspension and support and its assembling method and its construction method
CN107882591B (en) Assembled hanging piece, rapid mounting device and mounting method
WO2017133245A1 (en) Support for rail
CN207906614U (en) A kind of hanger for Pipe installing
CN110332372A (en) A kind of comprehensive suspension and support of the multi-functional finished product of suspended ceilings
CN108716571A (en) Adjustable machine electric line suspension and support and its application method
CN107893431A (en) A kind of assembled suspension and support fastener inserts and its pre-buried construction method of installation
CN103958821B (en) For installing the method and apparatus of Energy Chain
CN106114537A (en) Drivers' cab double floor beam
CN204677906U (en) Integral riser
CN211830140U (en) Cable trench cable laying device
CN206608210U (en) Geomantic omen line securement device in a kind of tunnel
CN210224845U (en) Water-reserved electric comprehensive wire slot structure
US20210210934A1 (en) System and method for an inland pipeline control station
CN210152263U (en) Assembly type water supply contact box and assembly structure thereof
CN207348891U (en) Pipe installs conversion cradle to arch against the wind
US1956879A (en) Method of installing underfloor duct systems
CN210267489U (en) Regional water supply integrated pipeline module
CN209227866U (en) Indoor pipeline arranging system and building
CN105020684A (en) Fixing support for outer wall lamp and installation method thereof
CN204946960U (en) A kind of accumulator plant
CN218265043U (en) PVC pipe embedded assembly
CN206250634U (en) A kind of distribution box bearing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination