CN110029586A - 一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 - Google Patents
一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 Download PDFInfo
- Publication number
- CN110029586A CN110029586A CN201910438513.3A CN201910438513A CN110029586A CN 110029586 A CN110029586 A CN 110029586A CN 201910438513 A CN201910438513 A CN 201910438513A CN 110029586 A CN110029586 A CN 110029586A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- anchor ear
- pipe post
- lower layer
- upper layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
Abstract
本发明公开了一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法,由下层钢管立柱、下层抱箍、上层抱箍、上层钢管立柱和千斤顶组成;其中,上层钢管立柱外径比下层钢管立柱外径大,上、下层抱箍根据设计标高安装于下层钢管立柱之上,千斤顶分别安装于下层抱箍设计位置。本发明解决了无可调系统钢管支撑结构高度控制困难、卸载工艺复杂的问题,同时通过调整该结构安装位置,可实现钢管立柱高度的在较大范围内变化,避免了材料二次使用时由于所需高度不同对钢管立柱进行切割和接长,所造成的材料和人力资源浪费的问题。
Description
技术领域
本发明涉及钢管立柱施工相关领域,具体来讲是一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法。
背景技术
目前城市高架桥梁修建时,由于桥墩高度较低,同时桥下需满足车辆通行净空要求,因此桥下支撑结构往往不具备设置标高调整系统的条件。
另外该类桥型上部结构通常采用落地式钢管支架进行施工,但是由于桥梁墩高变化大,桥下钢管立柱设计长度也需随桥墩高度的变化而变化,现通常采用接长或切割的方式调整钢管立柱的长度,此方式对钢材的损伤极大,钢管二次利用率大大降低。
发明内容
因此,为了解决上述不足,本发明在此提供一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法,解决了无可调系统钢管支撑结构高度控制困难、卸载工艺复杂的问题,同时通过调整该结构安装位置,可实现钢管立柱高度的在较大范围内变化,避免了材料二次使用时由于所需高度不同对钢管立柱进行切割和接长,所造成的材料和人力资源浪费的问题。
本发明是这样实现的,构造一种利用抱箍调整钢管立柱高度及卸载结构,其特征在于:由下层钢管立柱、下层抱箍、上层抱箍、上层钢管立柱和千斤顶组成;其中,上层钢管立柱外径比下层钢管立柱外径大,上、下层抱箍根据设计标高安装于下层钢管立柱之上,千斤顶分别安装于下层抱箍设计位置。
一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法,其特征在于:现场施工时,通过调整下层抱箍安装位置实现钢管立柱顶标高的粗调,通过4台千斤顶顶升上层抱箍实现钢管立柱顶标高的微调,通过4台千斤顶返程实现钢管支撑结构的卸载;
具体施工步骤如下:
(1)安装下层钢管立柱;
(2)根据设计位置安装下层抱箍,将下层抱箍与下层钢管立柱箍紧;
(3)在下层抱箍设计位置上安装千斤顶;
(4)在千斤顶上方安装上层抱箍,并将上层抱箍与下层钢管立柱临时紧固;
(5)安装上层钢管立柱;
(6)根据设计图纸安装上层钢管立柱上方其余支撑结构;
(7)适当放松上层抱箍,使上层抱箍与下层钢管立柱间能产生相对滑动;
(8)精确测量钢管支撑结构顶标高,利用千斤顶顶升上层抱箍,精确调整钢管支撑结构顶标高与设计标高一致;
(9)重新紧固上层抱箍,卸载4台千斤顶顶升作用,完成桥梁上部结构施工;
(10)桥梁上部结构施工完成后,再次利用千斤顶支撑上层抱箍,同时适当放松上层抱箍,使上层抱箍与下层钢管立柱间能产生相对滑动,缓慢回程千斤顶,实现钢管支撑结构的卸载。
(11)拆除钢管支撑结构,完成施工。
本发明具有如下优点:本发明在此提供一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法,解决了无可调系统钢管支撑结构高度控制困难、卸载工艺复杂的问题,同时通过调整该结构安装位置,可实现钢管立柱高度的在较大范围内变化,避免了材料二次使用时由于所需高度不同对钢管立柱进行切割和接长,所造成的材料和人力资源浪费的问题。具体优点如下;
(1)钢管立柱上支撑结构安装完成后,若发现支撑结构标高存在10cm以内的安装误差,可通过该结构进行标高的二次整,操作方便快速,调整精度高。
(2)桥梁上部结构施工完成后,可利用此装置进行卸载,操作简单可靠,安全性能高。
(3)通过调整下层抱箍安装位置实现了钢管立柱长度在较大范围内的变化,避免了钢管周转使用时由于长度不同而对钢管进行接长或割短,极大的提高了材料周转利用率,避免了材料浪费,现场操作方便快速,可大量节约现场人力资源。
附图说明
图1是本专利对应的平面示意图;
图2是图1对应的A-A示意图;
图3是图1对应的B-B示意图。
具体实施方式
下面将结合附图1-图3对本发明进行详细说明,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明通过改进在此提供一种利用抱箍调整钢管立柱高度及卸载结构,如图1-图3所示,可以按照如下方式予以实施;由下层钢管立柱1、下层抱箍2、上层抱箍3、上层钢管立柱4和千斤顶5组成;其中,上层钢管立柱4外径比下层钢管立柱1外径大1cm,上、下层抱箍根据设计标高安装于下层钢管立柱1之上,4台千斤顶5分别安装于下层抱箍2设计位置;现场施工时,通过调整下层抱箍安装位置实现钢管立柱顶标高的粗调,通过4台千斤顶顶升上层抱箍实现钢管立柱顶标高的微调,通过4台千斤顶返程实现钢管支撑结构的卸载;
具体施工步骤如下:
(1)安装下层钢管立柱1;
(2)根据设计位置安装下层抱箍2,将下层抱箍2与下层钢管立柱1箍紧;
(3)在下层抱箍2设计位置上安装千斤顶5;
(4)在千斤顶5上方安装上层抱箍3,并将上层抱箍3与下层钢管立柱1临时紧固;
(5)安装上层钢管立柱4;
(6)根据设计图纸安装上层钢管立柱4上方其余支撑结构;
(7)适当放松上层抱箍3,使上层抱箍3与下层钢管立柱1间能产生相对滑动;
(8)精确测量钢管支撑结构顶标高,利用千斤顶5顶升上层抱箍3,精确调整钢管支撑结构顶标高与设计标高一致;
(9)重新紧固上层抱箍3,卸载4台千斤顶5顶升作用,完成桥梁上部结构施工;
(10)桥梁上部结构施工完成后,再次利用千斤顶(5)支撑上层抱箍(3),同时适当放松上层抱箍3,使上层抱箍3与下层钢管立柱1间能产生相对滑动,缓慢回程千斤顶5,实现钢管支撑结构的卸载。
(11)拆除钢管支撑结构,完成施工。
综上可知,本专利的优点为:
(1)钢管立柱上支撑结构安装完成后,若发现支撑结构标高存在10cm以内的安装误差,可通过该结构进行标高的二次整,操作方便快速,调整精度高。
(2)桥梁上部结构施工完成后,可利用此装置进行卸载,操作简单可靠,安全性能高。
(3)通过调整下层抱箍安装位置实现了钢管立柱长度在较大范围内的变化,避免了钢管周转使用时由于长度不同而对钢管进行接长或割短,极大的提高了材料周转利用率,避免了材料浪费,现场操作方便快速,可大量节约现场人力资源。
对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本发明。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本发明的精神或范围的情况下,在其它实施例中实现。因此,本发明将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。
Claims (2)
1.一种利用抱箍调整钢管立柱高度及卸载结构,其特征在于:由下层钢管立柱(1)、下层抱箍(2)、上层抱箍(3)、上层钢管立柱(4)和千斤顶(5)组成;其中,上层钢管立柱(4)外径比下层钢管立柱(1)外径大,上、下层抱箍根据设计标高安装于下层钢管立柱(1)之上,千斤顶(5)分别安装于下层抱箍(2)设计位置。
2.一种利用抱箍调整钢管立柱高度及卸载结构施工操作方法,其特征在于:现场施工时,通过调整下层抱箍安装位置实现钢管立柱顶标高的粗调,通过4台千斤顶顶升上层抱箍实现钢管立柱顶标高的微调,通过4台千斤顶返程实现钢管支撑结构的卸载;
具体施工步骤如下:
(1)安装下层钢管立柱(1);
(2)根据设计位置安装下层抱箍(2),将下层抱箍(2)与下层钢管立柱(1)箍紧;
(3)在下层抱箍(2)设计位置上安装千斤顶(5);
(4)在千斤顶(5)上方安装上层抱箍(3),并将上层抱箍(3)与下层钢管立柱(1)临时紧固;
(5)安装上层钢管立柱(4);
(6)根据设计图纸安装上层钢管立柱(4)上方其余支撑结构;
(7)适当放松上层抱箍(3),使上层抱箍(3)与下层钢管立柱(1)间能产生相对滑动;
(8)精确测量钢管支撑结构顶标高,利用千斤顶(5)顶升上层抱箍(3),精确调整钢管支撑结构顶标高与设计标高一致;
(9)重新紧固上层抱箍(3),卸载4台千斤顶(5)顶升作用,完成桥梁上部结构施工;
(10)桥梁上部结构施工完成后,再次利用千斤顶(5)支撑上层抱箍(3),同时适当放松上层抱箍(3),使上层抱箍(3)与下层钢管立柱(1)间能产生相对滑动,缓慢回程千斤顶(5),实现钢管支撑结构的卸载;
(11)拆除钢管支撑结构,完成施工。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910438513.3A CN110029586A (zh) | 2019-05-24 | 2019-05-24 | 一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910438513.3A CN110029586A (zh) | 2019-05-24 | 2019-05-24 | 一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110029586A true CN110029586A (zh) | 2019-07-19 |
Family
ID=67243226
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910438513.3A Pending CN110029586A (zh) | 2019-05-24 | 2019-05-24 | 一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110029586A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924305A (zh) * | 2019-11-01 | 2020-03-27 | 中交第二航务工程局有限公司 | 一种预制盖梁安装定位系统的施工方法 |
CN112302253A (zh) * | 2020-10-29 | 2021-02-02 | 中国人民解放军63926部队 | 一种h型钢柱调节方法 |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1480197A (fr) * | 1966-03-12 | 1967-05-12 | Rohren Und Roheisengrosshandel | Echafaudage mobile, notamment chariot de coffrage |
CN202359506U (zh) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | 墩柱盖梁双抱箍支撑体系 |
CN103015330A (zh) * | 2013-01-18 | 2013-04-03 | 四川省交通运输厅公路规划勘察设计研究院 | 顶升桥梁钢抱箍支架系统 |
CN203160142U (zh) * | 2013-01-18 | 2013-08-28 | 四川省交通运输厅公路规划勘察设计研究院 | 顶升桥梁钢抱箍支架系统 |
CN203559909U (zh) * | 2013-12-03 | 2014-04-23 | 葛洲坝集团第五工程有限公司 | 一种可调高度的衬砌台车 |
CN104675416A (zh) * | 2013-12-03 | 2015-06-03 | 葛洲坝集团第五工程有限公司 | 一种台车高度调节装置 |
CN205604088U (zh) * | 2016-05-12 | 2016-09-28 | 中铁十局集团第二工程有限公司 | 一种盖梁可快速调节支架 |
CN109371841A (zh) * | 2018-11-22 | 2019-02-22 | 中建七局安装工程有限公司 | 一种高架桥梁施工用抱箍操作平台 |
CN208594486U (zh) * | 2018-07-10 | 2019-03-12 | 中铁大桥局集团有限公司 | 一种自动升降的抱箍系统 |
-
2019
- 2019-05-24 CN CN201910438513.3A patent/CN110029586A/zh active Pending
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1480197A (fr) * | 1966-03-12 | 1967-05-12 | Rohren Und Roheisengrosshandel | Echafaudage mobile, notamment chariot de coffrage |
CN202359506U (zh) * | 2011-12-15 | 2012-08-01 | 中交四航局第一工程有限公司 | 墩柱盖梁双抱箍支撑体系 |
CN103015330A (zh) * | 2013-01-18 | 2013-04-03 | 四川省交通运输厅公路规划勘察设计研究院 | 顶升桥梁钢抱箍支架系统 |
CN203160142U (zh) * | 2013-01-18 | 2013-08-28 | 四川省交通运输厅公路规划勘察设计研究院 | 顶升桥梁钢抱箍支架系统 |
CN203559909U (zh) * | 2013-12-03 | 2014-04-23 | 葛洲坝集团第五工程有限公司 | 一种可调高度的衬砌台车 |
CN104675416A (zh) * | 2013-12-03 | 2015-06-03 | 葛洲坝集团第五工程有限公司 | 一种台车高度调节装置 |
CN205604088U (zh) * | 2016-05-12 | 2016-09-28 | 中铁十局集团第二工程有限公司 | 一种盖梁可快速调节支架 |
CN208594486U (zh) * | 2018-07-10 | 2019-03-12 | 中铁大桥局集团有限公司 | 一种自动升降的抱箍系统 |
CN109371841A (zh) * | 2018-11-22 | 2019-02-22 | 中建七局安装工程有限公司 | 一种高架桥梁施工用抱箍操作平台 |
Non-Patent Citations (1)
Title |
---|
陈舟;余晓琳;颜全胜;张志林;段中星;: "北江大桥引桥整体顶升施工技术", 桥梁建设, no. 01 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924305A (zh) * | 2019-11-01 | 2020-03-27 | 中交第二航务工程局有限公司 | 一种预制盖梁安装定位系统的施工方法 |
CN112302253A (zh) * | 2020-10-29 | 2021-02-02 | 中国人民解放军63926部队 | 一种h型钢柱调节方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110029586A (zh) | 一种利用抱箍调整钢管立柱高度及卸载结构及施工操作方法 | |
CN106320332B (zh) | 基于顶推移动平台进行水上钻孔桩的施工方法及施工系统 | |
CN103352710B (zh) | 一种悬挂翻转式隧道仰拱模板台车及其施工方法 | |
US4492490A (en) | Road repair spreader | |
CN105672356A (zh) | 一种市政管线群跨越隧道的地下结构及其施工方法 | |
CN107988852A (zh) | 隧道地段crtsⅲ型板式无砟轨道新型结构的施工方法 | |
CN106245770B (zh) | 宽体变截面环形劲性梁施工方法 | |
CN108590705A (zh) | 一种盾构始井南北侧预留洞口模板支撑体系 | |
CN205062817U (zh) | 与基坑支护体系结合的栈桥 | |
CN208949882U (zh) | 一种桩径可调式桩基钢护筒定位装置 | |
CN109610289A (zh) | 一种双曲面钢箱梁胎架的制作方法 | |
CN108934283A (zh) | 一种用于蓝莓移栽繁殖的定位旋转工铲 | |
CN206070516U (zh) | 基于顶推移动平台进行水上钻孔桩的施工系统 | |
CN109179222A (zh) | 一种塔式起重机预埋节斜度及水平度控制施工方法 | |
CN108560369A (zh) | 一种用于高速环道曲面摊铺的放样施工方法 | |
CN107762537A (zh) | 隧道仰拱快速施工设备 | |
CN206752241U (zh) | 路缘石基座及扩建公路中间带纵断结构 | |
CN110004967A (zh) | 一种装配式综合管廊基础调平层及其施工方法 | |
CN207295390U (zh) | 一种道路结构层摊铺施工钢模板支撑体系 | |
EP1483193B1 (en) | Access platform | |
CN206986896U (zh) | 一种混凝土收仓抹面样架 | |
JP2008280711A (ja) | 均し装置 | |
CN108978697A (zh) | 地坪模板系统及施工方法 | |
CN214583231U (zh) | 一种利用椎体眼连接成的简易测量装置 | |
JPH0321798A (ja) | トンネル覆工工法及びその装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |