CN110018392A - A kind of test macro of electrical power distribution automatization system main website - Google Patents
A kind of test macro of electrical power distribution automatization system main website Download PDFInfo
- Publication number
- CN110018392A CN110018392A CN201910295454.9A CN201910295454A CN110018392A CN 110018392 A CN110018392 A CN 110018392A CN 201910295454 A CN201910295454 A CN 201910295454A CN 110018392 A CN110018392 A CN 110018392A
- Authority
- CN
- China
- Prior art keywords
- cloud platform
- test
- work station
- power distribution
- main website
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/08—Locating faults in cables, transmission lines, or networks
- G01R31/081—Locating faults in cables, transmission lines, or networks according to type of conductors
- G01R31/086—Locating faults in cables, transmission lines, or networks according to type of conductors in power transmission or distribution networks, i.e. with interconnected conductors
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B23/00—Testing or monitoring of control systems or parts thereof
- G05B23/02—Electric testing or monitoring
- G05B23/0205—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults
- G05B23/0208—Electric testing or monitoring by means of a monitoring system capable of detecting and responding to faults characterized by the configuration of the monitoring system
- G05B23/0213—Modular or universal configuration of the monitoring system, e.g. monitoring system having modules that may be combined to build monitoring program; monitoring system that can be applied to legacy systems; adaptable monitoring system; using different communication protocols
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Automation & Control Theory (AREA)
- Debugging And Monitoring (AREA)
- Information Transfer Between Computers (AREA)
Abstract
The present invention relates to a kind of test macros of electrical power distribution automatization system main website, belong to power distribution network the field of test technology.The present invention builds multiple work stations using cloud platform technology, automatically configures to the operating system for each work station built, environmental variance and application program, and the time of multiple-workstation test environmental structure is greatly saved;The test case that each work station at cloud platform work station end is tested automatically by load, and the automatic test to interface operation and performance can be passed through.By above-mentioned means, the present invention solves the problems, such as that current power distribution automation main station system testing environmental structure complexity, automatic testing reliability and execution efficiency are lower.
Description
Technical field
The present invention relates to a kind of test macros of electrical power distribution automatization system main website, belong to power distribution network the field of test technology.
Background technique
State Grid Corporation of China in 2017 has organized to set up " electrical power distribution automatization system master function specification ".It is distinctly claimed in work
Make the number stood and be more than or equal to 60, passes through the function and performance for interacting examination main station system of work station and main station system.For example,
Application publication number is the patent application document of CN106444710A, and this document discloses a kind of survey of power distribution automation three distant function closed loop
Test system and method, including three distant testing workstations and three distant testers, work station obtain configuration parameter information from main website and will
It is sent to three distant testers, and the switch state at the scene of simulation and voltage and current information are sent to distribution certainly by three distant testers
Dynamicization terminal, distribution power automation terminal generates SOE information after working, and sends it to main website, and main website is sent it to again
Work station tests main website and distribution power automation terminal to realize.Although the program can be realized to power distribution automation
The test of system main website, but need to build actual work station, heavy workload, testing efficiency are low.
Summary of the invention
It is an object of the invention to provide a kind of test macros of electrical power distribution automatization system main website, to solve to need to build reality at present
The problem of heavy workload, low efficiency caused by border work station is tested.
The present invention provides a kind of test macro of electrical power distribution automatization system main website to solve above-mentioned technical problem, the test
System includes:
Cloud platform work station end: including cloud platform server cluster, for carrying out work station for cloud platform configuration management end
Simulation provides hardware support, and connect with master station communication to be measured;
Cloud platform configuration management end: building for carrying out virtual workstation at cloud platform work station end, and to building
Operating system, environmental variance and the application program that virtual workstation is related to automatically configure each work station;
Cloud platform work station test lead: for requiring to generate test case according to interface operation and/or performance automatic test,
And test case is loaded into the virtual workstation built at cloud platform work station end, the test result of receiving workstation.
The present invention builds multiple work stations using cloud platform technology, becomes to the operating system for each work station built, environment
Amount and application program are automatically configured, and the time of multiple-workstation test environmental structure is greatly saved;In cloud platform work station
Each work station at end realizes automatic test by the test case that load is tested automatically.By above-mentioned means, the present invention is solved
The problem that current power distribution automation main station system testing environmental structure is complicated, automatic testing reliability and execution efficiency are lower.
Further, The present invention gives specific virtual workstations to build means, and the cloud platform configuration management end is
According to distribution automation system test request, using Vmware vphere client management tool at cloud platform work station end
Build virtual workstation.
Further, the present invention gives the configuration process of virtual workstation, the cloud platform configuration management end fortune
Operating system, environmental variance and the application program that row VMware vsphere client management tool is related to virtual workstation
Each work station is automatically configured, and carries out the duplication of operating system and application program by WinRunner tool.
Further, in order to realize comprehensive test, the test case that the cloud platform work station test lead generates includes
Interface operation test case and performance test case.
Further, in order to guarantee the reliability of each end communication, the cloud platform work station test lead is matched with cloud platform
It sets management end and information exchange is carried out by TCP order and cloud platform work station end.
Further, be improve with the communication speed of main website to be measured, the cloud platform work station end using kilomega network with
Main website interconnection to be measured.
Detailed description of the invention
Fig. 1 is the architecture diagram of the test macro of electrical power distribution automatization system main website of the present invention;
Fig. 2 is the hardware architecture diagram of the test macro of electrical power distribution automatization system main website of the present invention;
Fig. 3 is that the present invention is built virtual workstation in cloud platform and shown using VMware vsphere client management tool
It is intended to;
Fig. 4 is configuration process schematic diagram of the present invention to virtual workstation;
Fig. 5 is reproduction process schematic diagram of the present invention to virtual workstation.
Specific embodiment
A specific embodiment of the invention is described further with reference to the accompanying drawing.
The test macro of electrical power distribution automatization system main website of the invention includes cloud platform configuration management end, cloud platform work station
End and cloud platform work station test lead, the software architecture used is as shown in Figure 1, cloud platform work station end is used to simulate beyond the clouds
At least 60 virtual workstations receive the test case that cloud platform work station test lead generates, and connect with master station communication to be measured
It connects;Cloud platform configuration management end: for carrying out building for virtual workstation at cloud platform work station end, and to the virtual work built
Make operating system, environmental variance and application program that station is related to automatically configure each work station;The test of cloud platform work station
End: for requiring to generate test case according to interface operation and/or performance automatic test, and test case is loaded into cloud platform
Each virtual workstation at work station end, and receive the test result of virtual workstation.
The test system hardware framework is as shown in Fig. 2, wherein cloud platform work station end uses cloud platform server cluster, packet
Several Cloud Servers are included, cloud platform configuration management end uses cloud platform management server, and cloud platform work station test lead uses
Cloud platform testing service device, main website to be measured are used SCADA server, are connected between each server using gigabit networking.
Specifically,
The operation of cloud platform configuration management end has Vmware (Virtual Machine ware) to manage ending tool, according to distribution
Automation system test request, cloud platform configuration management end are flat in cloud using VMware vsphere client management tool
Platform work station end creates virtual workstation according to step shown in Fig. 3.
It has created and has lost in thought operating system according to the installation of step shown in Fig. 4 after virtual workstation, installation test within the system
Required distribution network system workstation program, while according to newly-built operating system template, record screen work automatically using WinRunner
Have and carry out the duplication of operating system and application program in VMware vsphere client management end, according to " power distribution automation system
System master function specification " with requirement, 60 cloud platform distribution work stations are built automatically, and the virtual workstation can be by Fig. 5 institute at this time
Operating system template is shown as to be replicated and extended.For the present embodiment, screen tool and volume are recorded automatically using WinRunner
The script file translated carry out the automatically configuring of environmental variance (be ready in advance 60 work stations respectively required configuration file,
Environmental variance file and corresponding script file are separately operable corresponding script file with WinRunner).
Cloud platform configuration management end is using the WinRunner script startup cloud platform work station woven, based on test system
The display effect of system considers, each cloud platform management end starts 20 cloud platform work stations, but every cloud platform management end
Only show a cloud platform virtual machine, the work station of remaining connection carries out digital simulation as background traffic.
Cloud platform work station test lead is mainly used for the requirement according to interface operation and performance automatic test, automatically generates survey
Example on probation, load test use-case simultaneously execute differentiation test case result.Specific interface operation test case includes that work station is stepped on
Record operation, check curve, report browsing, check alarm, remote control operation etc., performance test case includes the sound of different page switchings
Between seasonable, response time of remote control operation etc..Interface operation and performance test are chosen typical use-case respectively and are illustrated.
Interface operation is to be remotely controlled execution example:
Position of the switch remote signalling artwork file configuration: choose the typical position of the switch point, close remote signalling icon and be defined as standard drawing
Shape carries out graphic definition with WinRunner tool.It is remotely controlled and operates and carry out operation recording using WinRunner, utilize
Remote signalling figure after the screen comparing function of WinRunner assigns defined test pattern with the remote control writ of execution compares
It is right.
Specific agreement:
Normality: the position of the switch is quartile, and remote control, which executes, assigns coincidence signal, and switch remote signalling position is closed by a point change, color becomes
Changing from green becomes red;The position of the switch is coincidence, and remote control, which executes, assigns quartile signal, and switch remote signalling position is by closing variation, color
Variation becomes green from red.
Fault case: the position of the switch is quartile, and remote control, which executes, assigns coincidence signal, and figure fails to generate corresponding change or variation
Time time-out;The position of the switch is coincidence, and remote control, which executes, assigns quartile signal, and figure fails to generate corresponding change or transformation period is super
When.
As a result differentiate part:
WinRunner is according to the standard form of setting and assigns after the transformation generated after telecommand compares, and generates
Test result.
Performance test is by taking page switching is tested as an example:
Typical case test interface A and page B is chosen, four typical identification regions are chosen on every page as standard regions
Domain;Page switching operation is carried out under background testing flow.The recording of aforesaid operations is carried out using WinRunner, is utilized
The screen comparing function of WinRunner compares 4 identified areas of the page after switching with standard area, completely the same to stop
Only the time records, and as the time of page switching, the 4s required with " electrical power distribution automatization system master function specification " is compared,
Finally provide test result.
Claims (6)
1. a kind of test macro of electrical power distribution automatization system main website, which is characterized in that the test macro includes:
Cloud platform work station end: including cloud platform server cluster, for carrying out work station simulation for cloud platform configuration management end
Hardware support is provided, and is connect with master station communication to be measured;
Cloud platform configuration management end: for carrying out building for virtual workstation at cloud platform work station end, and it is virtual to what is built
Operating system, environmental variance and the application program that work station is related to automatically configure each work station;
Cloud platform work station test lead: test case is generated for requiring according to interface operation and/or performance automatic test, and will
Test case is loaded into the virtual workstation built at cloud platform work station end, the test result of receiving workstation.
2. the test macro of electrical power distribution automatization system main website according to claim 1, which is characterized in that the cloud platform
Configuration management end is according to distribution automation system test request, using Vmware vphere client management tool in cloud
Build virtual workstation in working platform station end.
3. the test macro of electrical power distribution automatization system main website according to claim 2, which is characterized in that the cloud platform
Configuration management end runs operating system, the environment change that VMware vsphere client management tool is related to virtual workstation
Amount and application program automatically configure each work station, and carry out operating system and application program by WinRunner tool
Duplication.
4. the test macro of electrical power distribution automatization system main website according to claim 1, which is characterized in that the cloud platform
The test case that work station test lead generates includes interface operation test case and performance test case.
5. the test macro of electrical power distribution automatization system main website according to claim 1, which is characterized in that the cloud platform
Work station test lead and cloud platform configuration management end pass through TCP order and cloud platform work station end progress information exchange.
6. the test macro of electrical power distribution automatization system main website according to claim 1, which is characterized in that the cloud platform
Work station end is interconnected using kilomega network and main website to be measured.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910295454.9A CN110018392B (en) | 2019-04-12 | 2019-04-12 | Test system of distribution automation system main station |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910295454.9A CN110018392B (en) | 2019-04-12 | 2019-04-12 | Test system of distribution automation system main station |
Publications (2)
Publication Number | Publication Date |
---|---|
CN110018392A true CN110018392A (en) | 2019-07-16 |
CN110018392B CN110018392B (en) | 2021-11-19 |
Family
ID=67191297
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910295454.9A Active CN110018392B (en) | 2019-04-12 | 2019-04-12 | Test system of distribution automation system main station |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110018392B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110535945A (en) * | 2019-08-30 | 2019-12-03 | 苏州浪潮智能科技有限公司 | Test method, device, equipment and the storage medium of storage cluster alarm function |
CN111061244A (en) * | 2019-11-09 | 2020-04-24 | 许继集团有限公司 | Automatic testing method for power distribution master station monitoring system |
CN111308242A (en) * | 2020-03-06 | 2020-06-19 | 南方电网科学研究院有限责任公司 | Test platform and test method of distribution automation system |
CN112510839A (en) * | 2020-12-09 | 2021-03-16 | 国网四川省电力公司电力科学研究院 | Integrated test collection method and device for distribution automation main station |
CN112557789A (en) * | 2020-11-30 | 2021-03-26 | 广东电网有限责任公司 | Self-adaptive distributed intelligent test system for distribution automation terminal |
Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60105014A (en) * | 1983-11-11 | 1985-06-10 | Hitachi Ltd | Signal input device of monitor device |
EP1033022A2 (en) * | 1997-09-02 | 2000-09-06 | Ameritec Corporation | Apparatus and methods for automated testing of wireless communications systems |
US20080089226A1 (en) * | 2005-03-31 | 2008-04-17 | Youichi Konuma | Transmission device and redundant configuration between transmission device and layer 2 switch |
CN101458286A (en) * | 2008-12-30 | 2009-06-17 | 国家电网公司 | Phasor measuring set based on in situ spectroscopic analysis and applied wide domain measuring system |
CN101605084A (en) * | 2009-06-29 | 2009-12-16 | 北京航空航天大学 | Virtual network message processing method and system based on virtual machine |
CN201607643U (en) * | 2010-01-29 | 2010-10-13 | 国电联合动力技术(连云港)有限公司 | Testing device for variable pitch control system of wind generating set |
CN102324793A (en) * | 2011-10-11 | 2012-01-18 | 航天科工深圳(集团)有限公司 | Method and system for realizing a plurality of virtual power distribution terminals |
CN102361346A (en) * | 2011-06-23 | 2012-02-22 | 陕西电力科学研究院 | Master station full-digital scene testing method of power distribution automation system |
CN102916859A (en) * | 2012-09-28 | 2013-02-06 | 航天科工深圳(集团)有限公司 | Setting-up method and setting-up device for performance test platform of main station |
CN202854509U (en) * | 2012-08-24 | 2013-04-03 | 珠海许继电气有限公司 | Power distribution network feed line automation dynamic simulation system |
WO2014018819A1 (en) * | 2012-07-27 | 2014-01-30 | Altran Solutions Corp. | Automated test system |
CN103618383A (en) * | 2013-11-28 | 2014-03-05 | 国家电网公司 | Power distribution network monitoring and management system |
CN105680441A (en) * | 2016-01-25 | 2016-06-15 | 许继集团有限公司 | Simulated replacement technique-based simulated point-alignment device |
CN105807749A (en) * | 2014-12-29 | 2016-07-27 | 国家电网公司 | Test platform and test method for power dispatching automatic master station system |
CN106169815A (en) * | 2016-09-29 | 2016-11-30 | 广东电网有限责任公司肇庆供电局 | Stand end automated system operator workstation method for monitoring operation states and system |
CN106649085A (en) * | 2016-09-23 | 2017-05-10 | 郑州云海信息技术有限公司 | Cloud computing-based software test system |
CN206671433U (en) * | 2016-10-21 | 2017-11-24 | 国网山东省电力公司电力科学研究院 | A kind of distribution terminal automatization simulation test device |
CN207281579U (en) * | 2017-06-22 | 2018-04-27 | 国网湖北省电力公司武汉供电公司 | Distribution power automation terminal auto testing instrument |
CN108649563A (en) * | 2018-05-09 | 2018-10-12 | 许继集团有限公司 | A kind of power distribution network emulation platform |
JP2018186352A (en) * | 2017-04-24 | 2018-11-22 | 株式会社東芝 | Communication relay system and method |
-
2019
- 2019-04-12 CN CN201910295454.9A patent/CN110018392B/en active Active
Patent Citations (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60105014A (en) * | 1983-11-11 | 1985-06-10 | Hitachi Ltd | Signal input device of monitor device |
EP1033022A2 (en) * | 1997-09-02 | 2000-09-06 | Ameritec Corporation | Apparatus and methods for automated testing of wireless communications systems |
US20080089226A1 (en) * | 2005-03-31 | 2008-04-17 | Youichi Konuma | Transmission device and redundant configuration between transmission device and layer 2 switch |
CN101458286A (en) * | 2008-12-30 | 2009-06-17 | 国家电网公司 | Phasor measuring set based on in situ spectroscopic analysis and applied wide domain measuring system |
CN101605084A (en) * | 2009-06-29 | 2009-12-16 | 北京航空航天大学 | Virtual network message processing method and system based on virtual machine |
CN201607643U (en) * | 2010-01-29 | 2010-10-13 | 国电联合动力技术(连云港)有限公司 | Testing device for variable pitch control system of wind generating set |
CN102361346A (en) * | 2011-06-23 | 2012-02-22 | 陕西电力科学研究院 | Master station full-digital scene testing method of power distribution automation system |
CN102324793A (en) * | 2011-10-11 | 2012-01-18 | 航天科工深圳(集团)有限公司 | Method and system for realizing a plurality of virtual power distribution terminals |
WO2014018819A1 (en) * | 2012-07-27 | 2014-01-30 | Altran Solutions Corp. | Automated test system |
CN202854509U (en) * | 2012-08-24 | 2013-04-03 | 珠海许继电气有限公司 | Power distribution network feed line automation dynamic simulation system |
CN102916859A (en) * | 2012-09-28 | 2013-02-06 | 航天科工深圳(集团)有限公司 | Setting-up method and setting-up device for performance test platform of main station |
CN103618383A (en) * | 2013-11-28 | 2014-03-05 | 国家电网公司 | Power distribution network monitoring and management system |
CN105807749A (en) * | 2014-12-29 | 2016-07-27 | 国家电网公司 | Test platform and test method for power dispatching automatic master station system |
CN105680441A (en) * | 2016-01-25 | 2016-06-15 | 许继集团有限公司 | Simulated replacement technique-based simulated point-alignment device |
CN106649085A (en) * | 2016-09-23 | 2017-05-10 | 郑州云海信息技术有限公司 | Cloud computing-based software test system |
CN106169815A (en) * | 2016-09-29 | 2016-11-30 | 广东电网有限责任公司肇庆供电局 | Stand end automated system operator workstation method for monitoring operation states and system |
CN206671433U (en) * | 2016-10-21 | 2017-11-24 | 国网山东省电力公司电力科学研究院 | A kind of distribution terminal automatization simulation test device |
JP2018186352A (en) * | 2017-04-24 | 2018-11-22 | 株式会社東芝 | Communication relay system and method |
CN207281579U (en) * | 2017-06-22 | 2018-04-27 | 国网湖北省电力公司武汉供电公司 | Distribution power automation terminal auto testing instrument |
CN108649563A (en) * | 2018-05-09 | 2018-10-12 | 许继集团有限公司 | A kind of power distribution network emulation platform |
Non-Patent Citations (5)
Title |
---|
MING CHEN ET AL: "research on power dispatching aotomation system based on cloud computing", 《IEEE PES INNOVATIVE SMART GRID TECHNOLOGIES》 * |
吴宗楠: "基于虚拟平台的SCADA系统部署", 《中国优秀博硕士学位论文全文数据库(硕士)信息科技辑》 * |
吴栋萁: "虚实结合的馈线自动化系统测试平台设计", 《电力系统保护与控制》 * |
花子岚: "配电网自动化主站测试系统的设计与实现", 《重庆电力高等专科学校学报》 * |
闫江海: "智能变电站远动快速对点测试系统的构建", 《山西电力》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110535945A (en) * | 2019-08-30 | 2019-12-03 | 苏州浪潮智能科技有限公司 | Test method, device, equipment and the storage medium of storage cluster alarm function |
CN111061244A (en) * | 2019-11-09 | 2020-04-24 | 许继集团有限公司 | Automatic testing method for power distribution master station monitoring system |
CN111308242A (en) * | 2020-03-06 | 2020-06-19 | 南方电网科学研究院有限责任公司 | Test platform and test method of distribution automation system |
CN112557789A (en) * | 2020-11-30 | 2021-03-26 | 广东电网有限责任公司 | Self-adaptive distributed intelligent test system for distribution automation terminal |
CN112510839A (en) * | 2020-12-09 | 2021-03-16 | 国网四川省电力公司电力科学研究院 | Integrated test collection method and device for distribution automation main station |
Also Published As
Publication number | Publication date |
---|---|
CN110018392B (en) | 2021-11-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110018392A (en) | A kind of test macro of electrical power distribution automatization system main website | |
CN108400908B (en) | Automatic checking and accepting method for monitoring information of transformer substation | |
CN103248535B (en) | A kind of cloud system method of testing and device | |
CN100544292C (en) | A kind of method of BAS Broadband Access Server automatic test | |
EP2796996B1 (en) | Cloud infrastructure based management system and method for performing maintenance and deployment for application system | |
CN103777526A (en) | Simulation testing system of integrated electronic system of satellite | |
CN102036275B (en) | Simulator and message processing method | |
CN110008005B (en) | Cloud platform-based power grid communication resource virtual machine migration system and method | |
CN111600760B (en) | Quality detection system, method and equipment of power grid operation monitoring system | |
CN110784020A (en) | Automatic checking and accepting equipment, system and method for monitoring information | |
CN108802517B (en) | Testing method and system for in-place protection device | |
CN104796302A (en) | Method and system for testing network element simulators | |
CN105429773B (en) | A kind of distributed automatization test system and the management configuration method for testing terminal | |
CN104698374A (en) | Method for improving testing efficiency and accuracy of automatic relay protecting tester | |
CN104394029A (en) | An AFDX bus detecting method based on a hybrid channel | |
CN103326902A (en) | Configurable monitoring system and monitoring method for distributed type mainframe performance testing data | |
JP2011041455A (en) | Apparatus and method of testing report communication in power transformation automation system | |
CN107846304A (en) | A kind of automation engine of mixing cloud service architecture centralized management | |
CN113028603A (en) | Equipment monitoring system applied to central air-conditioning system | |
CN110764036B (en) | Intelligent distribution transformer terminal test method and system | |
CN115550164A (en) | Method and system for one-key installation and management of single-node big data assembly | |
CN101098259B (en) | Automatized test method and system for implementing large data impact | |
CN106934554A (en) | The implementation method and device of mirror-image system in a kind of intelligent scheduling automated system | |
CN104902494B (en) | A kind of more LTE terminal automatization test systems and its test method | |
CN112506770A (en) | Automatic system function verification method based on virtualization framework |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |